MCE Deepwater Development 2017
NH GRAND HOTEL KRASNAPOLSKY • AMSTERDAM • 3-5 APRIL 2017
A Vision for the Year
Gregor Scott
Ocean Installer
MCE Deepwater Development 2017
AGENDA
/ INTRODUCTION
/ NIGERIA FIRST
/ THE NORTH SEA AND BEYOND
/ BACK TO AFRICA
/ QUESTIONS
MCE Deepwater Development 2017
3
Ocean Installer • At a glance
MCE Deepwater Development 2017
4
Normand Vision• Vessels – CSV Normand Vision
Long-term charter from Solstad
Ordered and developed in cooperation between OI, Solstad and Vard
Class leading asset design
Tailored for installation of flexible risers and flowlines
Length: 156,7m
Breadth: 27m
VLS: 150t
Crane capacity: 400t
Bunks: 140
Under deck carousel: 3000 ton
On deck carousel: 1800 ton
.
• 8 OFF VESSELS WITH SAME DESIGN
Skandi Acergy
Deep Artic (DSV)
Aker Wayfarer
Lewek Connector
Normand Oceanic
Skandi Vitoria
Skandi Niteroi
MCE Deepwater Development 2017
A VISION FOR THE YEAR
/ INTRODUCTION
/ NIGERIA FIRST
/ THE NORTH SEA AND BEYOND
/ BACK TO AFRICA
/ QUESTIONS
MCE Deepwater Development 2017
6
Nigeria First• OI’s First African Project - Aje
8 x anchors / mooring chains 1 x STP buoy system (APL Asia)1 x manifold & suction anchor foundation 1 x 4” 3km flexible gas lift flowline/riser 1 x 8” 3km flexible production flowline/riser 1 x 115mm OD 3km umbilical, UTA, mudmat & stand 4 x flexible jumpers 11 x Flying Leads
CA24.11.15
MOB04.01.16
DEMOB03.03.16
2 months (incl Christmas & New Year) 2 months
MCE Deepwater Development 2017
A VISION FOR THE YEAR
/ INTRODUCTION
/ NIGERIA FIRST
/ BACK TO THE NORTH SEA
/ RETURN TO AFRICA
/ QUESTIONS
MCE Deepwater Development 2017
8
The North Sea and Beyond• Statoil SLMP
8
MCE Deepwater Development 2017
9
The North Sea and Beyond
RE-INSTALLATION OF 2 MOORING LEGS
REPOSITIONING OF 2 MOORING LEGS
NORMAND VISION AND NORMAND INSTALLER WORKING SIMULTANEOUSLY
• Kraken Mooring Remedial work
MCE Deepwater Development 2017
A VISION FOR THE YEAR
/ INTRODUCTION
/ NIGERIA FIRST
/ THE NORTH SEA AND BEYOND
/ BACK TO AFRICA
/ QUESTIONS
10
MCE Deepwater Development 2017
11
MOHO NORD DEVELOPMENT
Client: TOTAL
Ownership: TOTAL (~53.5%) – Operator
Chevron (~31.5%)
Société Nationale des Pétroles du Congo (~15%)
Location: 75km SW of Pointe Noire – Congo
Water Depth: 750 – 1,200m
Subsea Infrastructure:
• 28 Subsea wellheads tied back to FPUs
• 17 additional wells from new TLP
Production capacity: 140,000 b/d
Moho Phase 1 Bis Scope:
• Extension of Moho Bilondo subsea development
• Tied back to Alima FPU
Ocean Installer won the MPI Contract
Total © Total ©
Total ©
Total ©
MCE Deepwater Development 2017
12
TOTAL
OVERVIEW
MOHO NORD CPI
2 x 45Te Transformers
Tendered Weight - 220Te
12,5m Long Topside end
6,3km MPP Power & Control Umbilical
Support & Leveling Structure
252 Te Multi Phase Pump Module
Dummy Multi Phase Pump Module
20 x Flying Leads
Tendered Weight – 307Te
175Te Pump Control Module
70Te SUT
Tendered Weight 60Te
MCE Deepwater Development 2017
13
Equipment OverviewInstallation & Tooling
Installation
• 2 x I/O Transformers
• PCM (Pump Control Module)
• MPP Umbilical
• MPP module
• 20 x Flying leads
Project equipment
• Project side VLS
• Project rigging & tools
• Horizontal connection system
• Survey
• Precommissioning
4,5m
8,9m
13,4m
6,4m
6,3km
12,5m6,25m
6,3m
5,4m6,7m
21m
MCE Deepwater Development 2017
14
Deck Overview
Deck Plan
Plan view of deck ready for transit from Rosyth
MCE Deepwater Development 2017
15
FPU Alima
• Location: Moho Nord Field – Congo
• Moored on fixed heading (12 Mooring lines)
• L: 188.5m
• B: 34m
• Slot 5: Umbilical Pull-in
• M41C: PCM Installation
• M51A: Transformer Installation (2x)
INSTALLATION SITES
MCE Deepwater Development 2017
16
PCM INSTALLATION.
MCE Deepwater Development 2017
17
PCM Installation Overview – PCM Lift
Crane Curve – Sealift Mode
• Radius – 19m
• Available Lifting Height – 38.5 m
• Capacity – 265 Te
• Utilisation (Dyn.) – Approx 75%
MCE Deepwater Development 2017
18
PCM Installation Overboarding Sequence
18
MCE Deepwater Development 2017
19
SimulationF1 Technology
MCE Deepwater Development 2017
20
SIMULATIONS
• Real time simulation
• Vessel crew
• Operational experience
• Crane and Moored FPU simulation
• Crane Controls as per vessel
• Tugger functionality as per vessel
Full System Check
MCE Deepwater Development 2017
21
INSTALLATION PCM operations
MCE Deepwater Development 2017
22
MCE Deepwater Development 2017
23
MPP INSTALLATION.
MCE Deepwater Development 2017
24
Product loadout
Umbilical Operations
MCE Deepwater Development 2017
25
Sim Vrs Installation
MPP UMBILICAL INSTALLATION
MCE Deepwater Development 2017
/ INTRODUCTION
/ NIGERIA FIRST
/ THE NORTH SEA AND BEYOND
/ BACK TO AFRICA
/ QUESTIONS
MCE Deepwater Development 2017
27QUESTIONS