INSPECTION REPORT
CLIENT
Example Company REPORT NUMBER
XXX00007813C FAX NUMBER
PAGE
1 OF 2 ATTENTION
Pre / Insp./ Rev
INSPECTION DATE
VENDOR
TITLE
Quality Manager MANUFACTURER
CC TO
INSPECTION LOCATION
TITLE
FAX NUMBER
THIS DOCUMENT SERVES AS EVIDENCE THAT PRO QC INTERNATIONAL LIMITED HAS PERFORMED THE INSPECTION SERVICES DETAILED HEREIN.
TYPE OF SERVICE
FINAL PRE-SHIPMENT INSPECTION
1ST RE-INSPECTION 2ND RE-INSPECTION
x
Surface Treatment and Assembly Process
REFERENCE
PAGE 2
PAGE
PAGE
PAGE PRODUCT
DESCRIPTION
ACOUSTIC PANELS
JOB
COLOR / FINISH
BRAND
-
P.O. NUMBER
123456
P.O QTY
136
INSP. LOT QTY
UNIT OF MEASURE
Set
SHORT SHIP QTY
0
INSPECTION RESULT
Passed
REF
PAGE
NOTE NUMBER
REASON FOR ON-HOLD INSPECTION RESULT
APPLICABLE REMARKS
1. Panel’s are stored on wooden pallets inside the storage area. See photos. 2. During inspections, we did not find any non-conformances. 3. All 136 panels are finished with the assembly process and protected using a plastic laminate sheet. 4. All 136 panels are ready for the loading process.
THE RESULTS DETAILED AND DETERMINATION JUDGED IN THIS DOCUMENT REFLECTS THE FINDINGS OF PRO QC INTERNATIONAL AT THE TIME AND PLACE OF INSPECTION ONLY. EVIDENCE OF ACTUAL SHIPMENT IS NEITHER OFFERED NOR IMPLIED. THIS REPORT DOES NOT RELEASE THE VENDOR OR MANUFACTURER FROM ANY OBLIGATIONS, CONTRACTUAL OR OTHERWISE, IN EFFECT WITH THE CLIENT TO REPAIR, REPLACE, OR COMPENSATE FOR ANY PRODUCT OR PART THEREOF IN WHICH DEFECTIVE CONDITIONS MIGHT HEREAFTER BE FOUND OR SUBSEQUENTLY DEVELOP. PRO QC INTERNATIONAL ASSUMES NO RESPONSIBILITY, AND SHALL IN NO WAY BE HELD LIABLE, FOR ANY DEFECTIVE CONDITIONS BEYOND THOSE CLEARLY DETECTABLE WITHIN THE LIMITS OF THE SPECIFIC INSPECTION SERVICES ORDERED BY THE CLIENT.
RESPECTFULLY SUBMITTED BY:
PRO QC INTERNATIONAL LIMITED
PRO QC INTERNATIONAL LIMITED, COPYRIGHT © DOCUMENT 07/97
!
See attached photos of process.
Panel Part Number
Panel quantity
Final Size
Type
Surface Treatment and Assembly process.
Thick
Height
Width
Width 2
Visual & Color check (RAL 7038 Agate Grey)
Thermal rock install
Perforated sheet install
Powder coating thickness 65~90 micron
1 28
50
3000
1000
-
Female + Male
Passed
Passed
Passed
Passed 2 2
50
3000
1000
-
Female + Male
Passed
Passed
Passed
Passed 3 2
50
3000
1000
-
Female + Male
Passed
Passed
Passed
Passed 4 4
50
3000
975
-
Male + Male
Passed
Passed
Passed
Passed 5 2
50
3047
589
441
Sloped Top
Passed
Passed
Passed
Passed 6 2
50
3047
590
441
Sloped Top
Passed
Passed
Passed
Passed 7 2
50
3047
480
291
Sloped Top
Passed
Passed
Passed
Passed 8 2
50
3047
480
290
Sloped Top
Passed
Passed
Passed
Passed 9 4
50
3000
635
-
Female + Male
Passed
Passed
Passed
Passed 0 4
50
3000
550
-
Female + Male
Passed
Passed
Passed
Passed 11 8
50
707
1000
-
Female + Male
Passed
Passed
Passed
Passed 12 2
50
585
1057
-
Male + Male
Passed
Passed
Passed
Passed 13 2
50
585
1057
-
Female + Male
Passed
Passed
Passed
Passed 14 4
50
1630
406
-
Female + Male
Passed
Passed
Passed
Passed 15 36
50
1630
1000
-
Female + Male
Passed
Passed
Passed
Passed 16 2
50
1630
1000
-
Female + Male
Passed
Passed
Passed
Passed 17 2
50
1630
1000
-
Female + Male
Passed
Passed
Passed
Passed 18 2
50
1630
1000
-
Female + Male
Passed
Passed
Passed
Passed 19 2
50
1630
1000
-
Female + Male
Passed
Passed
Passed
Passed 20 2
50
1440
635
-
Female + Male
Passed
Passed
Passed
Passed 21 2
50
1440
635
-
Female + Male
Passed
Passed
Passed
Passed 22 2
50
1630
1000
-
Female + Male
Passed
Passed
Passed
Passed 23 2
50
1630
1000
-
Female + Male
Passed
Passed
Passed
Passed 24 4
50
1630
560
-
Female + Male
Passed
Passed
Passed
Passed 25 4
50
1630
466
-
Female + Female
Passed
Passed
Passed
Passed 26 2
50
387
1355
-
Female + Male
Passed
Passed
Passed
Passed 27 2
50
387
1356
-
Male + Male
Passed
Passed
Passed
Passed 28 2
50
3000
1000
-
Female + Male
Passed
Passed
Passed
Passed 29 2
50
3000
1000
-
Female + Male
Passed
Passed
Passed
Passed
!
Application of heavy duty silicon between stiffeners and outer skin. Silicon condition after application.
Inserting acoustic infill, Thermalrock S60 (Density 60 kg/m3). Completion of insert in the acoustic infill.
Covering the infill with plastic sheeting. Plastic sheet will protect the infill from coming out.
Assembling the perforated sheet to the panel. Perorated sheet after assembly.
Drilling holes at the stiffeners to insert rebate. Accept left and right Rebate the hole to make sure perforated sheet attaches to stiffeners. stiffeners.
Using Henrob to attach between perforated sheet and stiffeners for Henrob are stronger then rebate. left and right panel.
Conducting visual inspection of the panel. Re-laminaing the panel after the inspection is done.
Panel is ready to insert acoustics infill. Finished panel.
Cover the infill using plastic sheet. Assemble the perforated sheet to the panel.