  • A T F Expert Group for Transport Government of Karnataka
  • Slide 2
  • Presentation on Performance Evaluation of RFD For Bangalore Metropolitan Transport Corporation 2013-14 (Provisional)
  • Slide 3
  • Infrastructure Bus Depots 39 Bus stations 52 Man power deployment: 36076 Bus staff ratio: 5.6 Daily (31.03.2014) We own 6775 buses We operate 6458 bus schedules We perform 13.14 lakh service kms We make 82898 bus trips We earn Rs 4.77 crore We carry 49.50 lakh passengers
  • Slide 4
  • Results Framework Document-2013-14 Section 1: Vision, Mission, Objectives, Functions Vision: Make BMTC sustainable, people centered and choice mode of travel for everyone Mission: To make services available, accessible and affordable To focus on providing safety for all stakeholders in travelling To integrate and coordinate with other transport networks and agencies To adopt labour and environment friendly practices To instill accountability and transparency at all levels of the organization
  • Slide 5
  • To improve the quality of the service To provide safe travel mode to the commuters and to improve the environment To improve the governance using IT initiatives and commuter centric activities To improve and upgrade the transport infrastructure Objectives: Mission (Contd.): To utilize technology to provide convenience to commuters, crew etc To innovate and reform to enhance performance To benchmark in order make service level improvements
  • Slide 6
  • Increasing no of schedules and Vehicles. Reducing % cancellation. Increasing Effective kms and vehicle utilization Increasing fuel efficiency. Reducing incidents of breakdowns and accidents. Increasing Traffic revenue. Increasing other revenue Reducing cost of operation. Improving Employees skill through imparting training Increasing civil infrastructure. Functions
  • Slide 7
  • The Corporation operated 6458 schedules against the target of 6600. The Corporation held the fleet strength of 6775 buses as against the target of 6927. The % cancellation of kms. during the period is 4.8 The Corporation operated 47.96 crore kms as against target of 52.53 crore kms. The vehicle utilization achieved was 217.5 kms against target of 225.0 The Corporation achieved 3.82 KMPL against the target of 3.85 The rate of breakdown during the period is 0.07 for every 10,000 kms. The rate of accidents was 0.07 for every 1,00,000 kms operated. The Corporation realized total revenue of Rs. 1982.18 croress against the target of Rs. 2179.31 crores 2013-14 (Provisional) RFD Report Achievements
  • Slide 8
  • The Corporation incurred of Rs. 2090.06 crores towards cost of operations as against the target of Rs.2123.83 crores. During the period, training has been imparted to 15791 employees. All the vehicles are checked for permissible smoke emission every month All the depots are installed with water recycling plants. Plantation is taken up in all depots, bus stations and Vaddarahalli Drivers Training Institute under afforestation programme. 2013-14 (Provisional) RFD Report Achievements - Contd
  • Slide 9
  • 2013-14 End of the year RFD Report for BMTC Annexure-1 Mandatory Success Indicators ObjectiveActionsSuccess IndicatorUnitWeightMedium term results as on 31-03-2014 EvaluationMarks Efficient functioning of the RFD System 1.1 Timely submission of draft RFD for approval 1.1.1 On-time submission Date2On timeExcellent2 1.2 Timely submission of end of the year RFD Results 1.2.1 On-time submission 31-07-2013 Date2On time2 Efficient use of IT in the Department 2.1 Timely updation of website contents 2.1.1 Percentage of Notifications, GOS, Circulars uploaded on the website within one week of issue Once in fortnight Percentage1100%Excellent1 Submission of Reports and citizens Charter 3.1 Timely submission of Annual Report 3.1.1 On-time submission Date1Dec-2013Fair0 3.2 Timely submission of MPIC 3.2.1 On-time submission Date1On timeExcellent1 3.3 Implementation of Citizens Charter 3.3.1 Uploading the Citizens/Clients Charter on website Date107-05-2013Excellent1 Ensuring compliance to the Financial accountabili ty framework 4.1 Timely submission of ATNS on audit paras of C & AG 4.1.1 Percentage of ATNS submitted within due date(4 months) Percentage1Submitted on time Excellent1 4.2 Timely submission of ATRS on PAC Reports 4.2.1 Percentage of ATRS submitted within due date(6 mon Percentage1On TimeExcellent1
  • Slide 10
  • Mandatory Success Indicators (Contd) Total 14 Administrative Reforms 5.1 Simplification of Procedures 5.1.1 Number of redundant procedures identified(based on credible action plan prepared by the department and endorsed by the ATF committee) Nil Number - 11 5.1.2 Number of redundant procedures simplified(based on credible action plan prepared by the department and endorsed by the ATF committee) Nil Number - 11 5.1.3 Number of redundant procedures notified(based on credible action plan prepared by the department and endorsed by the ATF committee) Nil Number - 11 Evaluation6.1 Developing and approving ToR, Tools 6.1.1 Developing TOR, Tools and successfully assigning evaluation to research engines Date11 6.1.2 Number of Evaluation studies completed and reports submitted as per date specified in TOR Date11 TOTAL WEIGHTAGE1514
  • Slide 11
  • SECTION-2 KEY OBJECTIVES, SUCCESS INDICATORS AND TARGETS 2013-14 S.NoParticularsActionSuccess IndicatorUnitWeightExcellent Very Good GoodFairPoor 1 No. of Schedules Improve the Coverage Area Increase No Schedules % to Target05 9590858075 2No. of Vehicles Improve Frequency in Providing Services Increase in No Vehicles % to Target05 9590858075 3% Cancellation Reducing cancellation% cancellation%05 2.53.03.54.0>4 4Effective Kms. Increasing Effective Kms. Increase in Effective Kms. % to Target10 9590858075 5 Avg. Vehicle Utilisation Increase in Kms/day/bus Increase in Vehicle Utilisation % to Target05 9594939291 6K M P L Increasing Fuel Efficency Increase in KMPL% to Target10 9594939291 7Rate of Breakdowns Improving Vehicle maintenance Decrease in Rate of Breakdowns Rate per 10,000 Kms. 05 0.04 0.050.06 0.070.08
  • Slide 12
  • SECTION-2 KEY OBJECTIVES, SUCCESS INDICATORS AND TARGETS-Contd S.NoParticularsActionSuccess IndicatorUnitWeightExcellentVery GoodGoodFairPoor 8Rate of AccidentsDecreasing Accidents Decrease in Rate of Accidents Rate per 1,00,000 Kms. 05 0.110.120.130.140.15 9Total Revenue Improve Revenue mobilization with Innovation Increased Total Revenue % to PYR 10 9876 Cost of Operation Measures to control costDecreased cost of operation % 10 2%above Cap (Tgt) 5%above Tgt 7%above Tgt 10%above Tgt 15% above Tgt 11 Training to Employees Training and Skill Deveopment of Staff Number of employee undergo Trainings No. 5 1200010000800070006000 12 Increasing the Transport Infrastructure Construction of new Depots/Bus Stations /Workshops Increase in number of units No. 5 9590858075 13 Environment Conservation Programme Rainwater harvesting,Plantation,Power Conservation Increase in numbers of units No. 5 9590858075
  • Slide 13
  • 2013-14 RFD Report for BMTC SECTION-3- TREND VALUES AND SUCCESS INDICATORS FOR 2013-14 SL. No ObjectivesWeightAction Success Indicator Unit FY 2013-14 % Achmt EvaluationMarks TargetActual 1 No of Schedules5 Improve the Coverage Area Increase No. of Schedules % to Target 6600645897.8Excellent5 2No. of Vehicles 5 Improve Frequency in Providing Services Increase in No. of Vehicles % to Target 6927677597.8Excellent5 3% Cancellation 5 Reducing cancellation % cancellation % 2.54.8 Poor1 4Effective Kms. 10 Increasing Effective Kms. Increase in Effective Kms. Crore kms 52.5347.9691.3Very Good8 5 Avg. Vehicle Utilisation 5 Increase in Kms/day/bus Increase in Vehicle Utilisation Kms 225.0217.596.7Excellent5 6K M P L 10 Increasing Fuel Efficency Increase in KMPL % to Target 3.853.8299.2Excellent10 7 Rate of Breakdowns 5 Improving Vehicle maintenance Decrease in Rate of Breakdowns Rate per 10,000 Kms. 0.040.07 Fair2
  • Slide 14
  • 2013-14 RFD Report for BMTC SECTION-3- TREND VALUES AND SUCCESS INDICATORS FOR 2013-14 SL. No ObjectivesWeightAction Success Indicator Unit FY 2013-14 % Achmt EvaluationMarks TargetActual 8Rate of Accidents 5 Decreasing Accidents Decrease in Rate of Accidents Rate per 1,00,000 Kms. 0.110.07 Excellent5 9Total Revenue 10 Improve Revenue mobilization with Innovation Increased Total Revenue In Rs. Crores 2179.311982.18 Excellent 10 Cost of Operation 10 Measures to control cost Decreased cost of operation In Rs. Crores 2123.832090.0698.4 Excellent 10 11 Training to Employees 5 Training and Skill Deveopment of Staff Number of employee undergo Trainings No. 1200015971133.1 Excellent 5 12 Increasing the Transport Infraustructure 5 Construction of new Depots/Bus Stations/Worksh op Increase in number of units No. 43+5239+5295.8 Excellent5 13 Environment Conservation Programme 5 a) Rainwater harvesting, Increase in number of units No. 28 Depots 100.0 Excellent5 b) Smoke Control Increase in number of tests No. 5300527799.3 85 Total76
  • Slide 15
  • Criteria/Success IndicatorDescription, Definition & Proposed Measurement Methodology (1) Improved and quality service The effective Kms. are the service and revenue earning Kms. actually used by the passengers. The increase in effective Kms. is the real service. This is increased by introduction of new schedules, rationalization of existing schedules and adoption passenger friendly measures. (2) %age of CancellationThe cancellation of effective Kms. is the real indicator of performance. This is measured on percentage basis over targeted/scheduled Kms. More the percentage of cancellation, the performance is bad. The efforts put in this regard will help to provide improvement in the services. (3) Operational cost controlThe major cost involved in operation of buses is from Fuel, Staff, Tyres & Spares. All put together constitute more than 80% of the cost of operation. Optimal achievement in fuel performance will reduce the cost of operation. The fuel performance is measured on achievement of kilometers per litre (KMPL).The other items in calculating the Cost Per Km. (CPKM) are on spares and effective crew utilization. (4) Economic use of productive inputs The buses constitute major productive in put. They should be used effectively, this use is measured in the form of vehicle utilization per day. One Km. improvement in vehicle utilization will save around 20 buses. The staff constitute other productive input. The controlling of non-scheduled over time will save money for BMTC. The Water & Electricity are other inputs. The saving of them is saving of money. (5) Transport Infrastructure Development The buses need regular preventive and operative maintenance to provide quality service. The Depots are the places where workshops are located. Increased number in Depots will help in proper maintenance and reduction in dead Kms. The Bus Stations are the traffic generating points. More number of bus stations is the more number of passenger comfort and quality of service. The Traffic Transit Management Centres are new concept under JnNURM they are actually passenger amenities centres. Section 4: Description and Definition of Success Indicators And Proposed Measurement Methodology
  • Slide 16
  • Section 4: Contd Description and Definition of Success Indicators And Proposed Measurement Methodology Criteria/Success IndicatorDescription, Definition & Proposed Measurement Methodology (6) Revenue Mobilization Activities The revenue is the life and blood of the BMTC, Proper sale of tickets, monthly and daily passes and proper collection revenue is the major function of BMTC. Plugging the leakage of revenue is another function. Encouraging the transparent methods to collect revenue by way of increasing Casual Contract services is an innovative method to increase revenue. There is one more source of revenue other than traffic revenue which is known as the non-traffic revenue. This is the revenue earned out of lending BMTC land and buildings on rental basis and premises for advertisement. This constitute major source of revenue for the Corporation. (7) IT initiativesTechnological advancement is the order of the day. Introduction of Intelligent Transport for Vehicle Tracking,Revenue collection, with real time information to the passengers at major Bus stations will make significant change in the performance of the BMTC. It will also increase the service delivery to the common public (8) Environment ConservationThe conservation of environment is necessity of the day. Improve the smoke emission standards, Tree plantation, Water recycling & Rain water harvesting, energy conservation, are a few among them.
  • Slide 17
  • Department Relevant Success indicator What do you need?Why do you need it? How much you need? What happens if you dont get it? (1) Finance Revenue Mobilisation Activities Timely release of Student Concession reimbursement To make good the cost of operation As per the target The margin volume decrease (2) TransportOverall Achievement Clearance of the proposals To improve the services As per proposal Decrease in quality of service and profitability (3) Revenue Transport Infrastructure Development Clearance of land disputes and furnishing of possessions and records Addition of New Depots &Bus stations As per proposal Addition of Depots, Bus stations & Workshops will be delayed. (4) Urban Development Technical Guidance and coordination with other stakeholders like Department of Finance,BBMP,BDA etc Clearance of proposals To improve the services As per proposal New Projects will not be implemented (5) BBMP Quality of service and cost control Maintenance of Roads and prevention of bottle necks on the road and Construction of Wayside Shelters To improve the services As per proposal Cancellation will be more. Cost will be more. Reduced fuel performance. Reduced customers satisfaction (6)BDA Transport Infrastructure Development Early transfer of land Addition of new Depots and Bus stations As per proposal New Depots and Bus stations will not be added Section 5: Specific Performance Requirements from other Departments
  • Slide 18
  • S.NoOutcome/ Impact Jointly Responsible for influencing this outcome/ impact with the following organization(s)/ departments Success Indicator2011- 122012-132013-142014-152015-16 1. Reduced Traffic Congestion Enhancing Mobility Urban Development (Go1/K ) a.Policy b.Coordination c.Funding BBMP a.Maintain & Support - Access Infrastructure to Buses b.Space for providing Information for commuters HOME a.Traffic monitoring b.Address unauthorized parking c.Provide priority to buses through lanes and signals Finance Support & Clear PPP projects KSPCB (Monitoring of Air Quality) Citizens and Civil Society Reduction in personalized passenger trips 8% 10%14%15% 1. Reduced Environmental Externality Reduced idling-smoke emissions, traffic calming etc Improved air quality Suitable Reduction in CO Emissions 1. Increased per capita (hence overall ) productivity Reduction in PT journey time N/A15%20%25%30%
  • Slide 19
  • Sources for Preparation of Result Frame work Document Annual Plan submitted to Government of India Annual Action Plan prepared by BMTC Monthly Management Review Committee Meeting proceedings of Transport Department Government of Karnataka Monthly Performance Appraisal Reports prepared by BMTC Monthly Review by Managing Director BMTC Compendium of Transport Terms published by Central Institute of Road Transport Pune Annual Administration Reports published by BMTC
  • Slide 20
  • SL. No Objecti ves Weig ht Action Success Indicator Unit TargetActualTargetActualProjected Action Plan value for to be finalised FY 2010- 11 FY 2011- 12 FY 2012-13FY 2013-14FY 2014-15 2014-15 1 No of Schedul es 5 Improve Service Capacit y Increase No. of Schedules % to Target 5965586963705949625066006967 2 No. of Vehicle s 5 Improve Service Standar d Increase in No. of Vehicles % to Target 6230611166016162658969547334 3 % Cancell ation 5 Reducin g cancellat ion % cancellation % -2.5-3.22.0 4 Effectiv e Kms. 10 Increasi ng Effective Kms. Increase in Effective Kms. Lakh kms 4666.444580.204907.694655.205076.965330.815597.35 5 Avg. Vehicle Utilisati on 10 Increase in Kms/da y/bus Increase in Vehicle Utilisation Kms 225222.1230.0224.6225.0228.0230.0 6 K M P L 10 Increasi ng Fuel Efficenc y Increase in KMPL % to Target 4.024.014.023.973.943.903.80 7 Rate of Breakd owns 5 Improvi ng Vehicle mainten ance Decrease in Rate of Breakdowns Rate per 10,000 Kms. - 0.04- 0.050.04
  • Slide 21
  • SL. No Object ives Weig ht Action Success Indicator Unit TargetActualTargetActualProjected Action Plan value for to be finalised FY 2010- 11 FY 2011- 12 FY 2012-13FY 2013-14FY 2014-15 2014-15 8 Rate of Accide nts 5 Decreasi ng Accident s Decrease in Rate of Accidents Rate per 1,00,00 0 Kms. -0.1100.100.090.800.07 9 Total Reven ue 10 New Avenues for Revenue mobileas ation Increased Total Revenue % to PYR 134238.69121123.53156499.26 150307.6 5 174814.02192295.42211524.96 10 Cost of Operat ion 10 Measure s to control cost Decreased cost of operation % Cost Racove ry to Total Revenu e 128622.76127899.53151732.23 148166.1 1 173335.22208002.26249602.72 11 Traini ng to Emplo yees 5 Training and Skill Deveop ment of Staff Number of employee undergo Trainings No. - 8752-13489180001850019000 12 Increas e in No. of Bus Depots 5 Improvi ng Civil Infrastr ucture Increase in Bus Depots No. -35-37414549
  • Slide 22
  • THANK YOU