A Status Report On Singur Total land acquired: 997.11 acre Mouzas involved: Beraberi Gopalnagar Singherbheri Bajemelia Khaserbheri Land details:

Name of Mouza Total area of the Mouza (in

acres)

Land acquired in the Mouzas (in acres)

Gopalnagar 1656.55 399.98 Beraberi 1043.82 327.21 Khaserbheri 229.62 180.68 Bajemelia 355.13 47.77 Singherbheri 310.75 41.47 Total 3595.87 997.11

Land Acquisition compensation to owners: Sali Land: Basic Price: Rs. 6.02 Lakh per acre Amount paid: Rs. 8.60 Lakh per acre1 Suna Land:

Basic Price: Rs. 8.92 Lakh per acre Amount paid: Rs.12.76 Lakh per acre2 Land Acquisition compensation to recorded bargadars: The total number of recorded bargadars (according to Collector): 237 25% of the total compensation (including crop compensation) paid to the recorded bargadars. Unrecorded Bargadars: According to local enquiry, the total number of unrecorded bargadars is about 170. Till date 60 such unrecorded bargadars have applied to Collector requesting that they be considered for some compensation to be paid to them.

1 On basic price, solatium @ 30%, Interest (@12% per annum) for 3 months 3% and consent award 10% i.e. 143% of the basic price and in addition to that crop compensation 2 On basic price, solatium @ 30%, Interest( @12% per annum) for 3 months 3% and consent award 10% i.e. 143% of the basic price and in addition to that crop compensation

Page 3: A Status Report on Singur Version 6122006

3

Land Acquisition compensation: Total compensation payable: Rs. 131.49 crore

LA Compensation Bargadars Mouza Total (Rs. in Lakh) Total (Rs. in Lakh)

Total (Rs. in Lakh)

Beraberi 4,148.84 24.61 4,173.45 Khaserbheri 3,765.90 11.81 3,777.71 Singherbheri 743.34 1.85 745.19

Bajemelia 429.88 2.13 432.02 Gopalnagar 3,997.02 23.58 4,020.60

Total 13,084.98 63.99 13,148.96

Disbursement till 2nd December 2006: Rs. 76.64 Crore Number of persons to whom disbursement has been made: 9020 Area of land in respect of which payment has been made: 635 acres Bargadars who has received payment: 88 Compensation amount disbursed to recorded bargadars: Rs. 17 lakh Total Disbursement yet to be made: Rs.54.85 Crore Persons yet to receive payment: 3000 (approx) Consent Status: Pre award: Raiyati consent: 548 acre Factory consent: 38 acre Vested Land: 34 acre Total: 620 acre Post award consent till 4th December 2006: 332 acre Total consent till 4th December 2006: 952 acres

Page 4: A Status Report on Singur Version 6122006

4

Rehabilitation and Training Program at Singur WBIDC camp office:

The camp office has been opened on 11th October 2006. The office is located within the

acquired land. Till 2nd December 1372 landlosers and 443 landless workers have been

enrolled in the office with details as under:

Category Total Men Women

Landlosers 1372 1050 322

Landless workers 443 405 38

Training programs initiated: Belur Math Ramkrishna Shilpa Mandir

179 landlosers are undergoing training at Belur Math Ramkrishna Shilpa Mandir in the following

trades:

Trade No of Trainees

Machinist 42

Welding 31

Two & Three Wheeler Repairing 2

Automobile Repairing 77

House Wiring & Electrical Gadget Repairing 27

Total 179

The total training program is of four months duration. In the second phase of the training

program, another 180 landlosers would be sent for training of which 146 would be graduate. 3

Other Training :

In addition to above program steps have been taken to start the following programs: 4

Trade No of Trainees Training Agency Starting date Tailoring 40(women in 2

batches) Singer India Ltd (duration : 6 months)

6th December 2006

Catering 25 (women) Institute of Hotel Management Catering, Technology & Applied Nutrition (duration: 4 weeks

19th December 2006

Mason 40 (landless labourers) CII (ER) (through its members) Machinist 10 CII (ER) (through its members) Security guard

60 (in 3 batches) G4/ Security Agency

3 The entire training cost is being borne by WBIDC 4 The entire training cost is being borne by WBIDC

Page 5: A Status Report on Singur Version 6122006

5

Community Development works undertaken and proposed: Drinking water: 63 tubewells have been repaired / installed in Gopalnagar (27 tubewells), Beraberi

(24) and K-G-D (12) Gram Panchayets. School Repair: Beraberi High School has been repaired and upgraded for vocational training by

Singer India in sewing. Road Improvement: Initial work for road improvement has been initiated. The works for widening and

strengthening the road used by the local villagers from National Highway to Kamarkundu station would be taken up next week.

Re-excavation of Julkia Canal: Survey work for re-excavation of Julkia canal has been completed. Rehabilitation

of this canal would improve the irrigation potential of adjoining lands as well as facilitate drainage of the entire area. Drainage channels are also being planned within the villages to reduce waterlogging during monsoon.

Irrigation facility : It has been proposed to install 4 to 5 deep tube wells in the area to improve the

cropping intensity of the adjoining area. Mandays generated: All the works are being executed with local labours mostly landless agriculture

workers and landlosers. Till date about 2000 mandays have been generated through the above community works taken up with the active help of local Panchayet Samity and all 3 Gram Panchayets.

In addition, the work of fencing the entire land is being executed with local landless agriculture workers and landlosers and about 5500 mandays have been generated till 5th December 2006.

Total Expenditure:

On account of various community development work, about Rs. 10 lakh has been expended till date on account of wage payment.

Page 6: A Status Report on Singur Version 6122006

6

Classification of land5:

Mouza wise classification of Land Acquired at Singu r in Hooghly District

Mouza Path/ Rasta

Sali6 Suna Others TOTAL

Beraberi 1.71 292.74 19.37 13.39 327.21 Khasherberi 0.00 161.05 8.13 11.50 180.68 Singherberi 0.00 29.36 2.58 9.53 41.47 Bajemelia 0.02 46.91 0.00 0.84 47.77 Gopalnagar 0.00 370.14 6.49 23.35 399.98

Total 1.73 900.20 36.57 58.61 997.11

Mouza Danga Khal/ Nala

Mandir/ Debottar Viti/ Bastu Shashan

Bash bagan N.Juli

Doba/ Pukur Bandh Bagan Others

Beraberi 0.93 0.49 0.20 0.87 0.00 1.13 0.00 4.97 1.73 3.07 0.00 13.39

Khasherberi 0.00 0.04 0.00 0.00 0.26 0.09 0.20 3.76 0.39 6.76 0.00 11.50

Singherberi 0.12 2.49 0.00 0.00 0.00 0.00 0.00 2.38 0.05 4.49 0.00 9.53

Bajemelia 0.00 0.08 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.67 0.06 0.84

Gopalnagar 0.70 0.00 0.00 0.00 0.00 0.00 0.15 5.40 4.49 12.45 0.16 23.35

Total 1.75 3.10 0.23 0.87 0.26 1.22 0.35 16.51 6.66 27.44 0.22 58.61

Mouza Path/ Rasta Sali Suna Others TOTAL

Beraberi 0.52% 89.47% 5.92% 4.09% 100.00% Khasherberi 0.00% 89.14% 4.50% 6.36% 100.00% Singherberi 0.00% 70.80% 6.22% 22.98% 100.00% Bajemelia 0.04% 98.20% 0.00% 1.76% 100.00% Gopalnagar 0.00% 92.54% 1.62% 5.84% 100.00%

Total 0.17% 90.28% 3.67% 5.88% 100.00%

5Initiative to exclude more fertile land: Initially land Area proposed for acquisition was 1053 Acres. Subsequently 175.57 Acres in two mouzas were taken out from initial proposal and another additional 119.68 Acres was added to initial area identified making the revised proposal for land acquisition for an area of 997.11 Acres. The details is given below: Mouza Wise Summary:

Name of Mouza

Initial Identified Area(Acres)

Land Excluded

Reason for exclusion Land Added

Reason for addition

Present Land

Gopal Nagar 526 126.02 Command area of Deep Tubewell

399.98

Bajemelia 86 38.23 Land in or around habitated area

47.77

Beraberi 208 119.21 Less fertile land

327.21

Khaserberi 192 11.32 180.68 Singerberi 41 0.47 41.47 Total 1053 175.57 119.68 997.11 6 Includes factory land of 38 acres

Page 7: A Status Report on Singur Version 6122006

7

Singur Block Profile: Total area: 156.30 sq. km 39075 acres Total number of Mouzas: 109 Total Population: 216827

Demographic Profile of Five Mouzas

NAME

TOTAL HOUSE HOLD

INDUSTRY WORKER

MAIN

TOTAL HOUSE HOLD

INDUSTRY WORKER

MALE

TOTAL HOUSE HOLD

INDUSTRY WORKER FEMALE

MAIN OTHER POPULATION

MAIN OTHER POPULATION

MALE

MAIN OTHER POPULATION

FEMALE

Beraberi 115 13 102 1231 1150 81 Sinher Bheri 143 39 104 192 177 15 Khaser Bheri 17 13 4 118 113 5

Baje Melia 40 23 17 773 690 83

Gopalnagar 376 193 183 2161 2013 148

Total 691 281 410 4475 4143 332

NAME MARGINAL WORKER

POPULATION

MARGINAL WORKER

MALE

MARGINAL WORKER FEMALE

Beraberi 230 53 177

Sinher Bheri 59 15 44

Khaser Bheri 6 0 6

Baje Melia 233 84 149

Gopalnagar 506 356 150

Total 1034 508 526

NAME TOTAL MAIN

WORKER

TOTAL MAIN

WORKER MALE

TOTAL MAIN

WORKER FEMALE

TOTAL CULTIVATOR

MAIN

TOTAL CULTIVATOR

MALE

TOTAL CULTIVATOR

FEMALE

TOTAL AGRI

WORKER MAIN

TOTAL AGRI

WORKER MALE

TOTAL AGRI

WORKER FEMALE

Beraberi 2177 1886 291 344 322 12 487 391 96 Sinher Bheri 630 440 190 188 153 35 107 71 36 Khaser Bheri 254 241 13 77 73 4 42 42 0

Baje Melia 1069 965 104 167 165 2 89 87 2

Gopalnagar 3580 3162 418 544 508 36 499 448 51

Total 7710 6694 1016 1320 1221 89 1224 1039 185

Page 8: A Status Report on Singur Version 6122006

8

NAME

MARGINAL CULTIVATOR POPULATION

MAIN

MARGINAL CULTIVATOR

MALE

MARGINAL CULTIVATOR

FEMALE

MARGINAL AGRI

WORKER POPULATION

MAIN

MARGINAL AGRI

WORKER POPULATION

MALE

MARGINAL AGRI

WORKER POPULATION

FEMALE

Beraberi 22 13 9 54 29 25 Sinher Bheri 24 2 22 12 6 6 Khaser Bheri 0 0 0 1 0 1

Baje Melia 78 29 49 9 7 2

Gopalnagar 32 24 8 279 239 40

Total 156 68 88 355 281 74

NAME

MARGINAL HOUSE HOLD

WORKER POPULATION

MAIN

MARGINAL HOUSE HOLD

WORKER POPULATION

MALE

MARGINAL HOUSE HOLD

WORKER POPULATION

FEMALE

MARGINAL OTHER

WORKER POPULATION

MAIN

MARGINAL OTHER

WORKER POPULATION

MALE

MARGINAL OTHER

WORKER POPULATION

FEMALE

Beraberi 137 3 134 17 8 9 Sinher Bheri 13 0 13 10 7 3 Khaser Bheri 4 0 4 1 0 1

Baje Melia 16 2 14 130 46 84

Gopalnagar 74 18 56 121 75 46

Total 244 23 221 279 136 143

NAME NON

WORKING POPULATION

NON WORKING

POPULATION MALE

NON WORKING

POPULATION FEMALE

Beraberi 4011 1273 1738 Sinher Bheri 824 289 535 Khaser Bheri 496 138 358

Baje Melia 2062 682 1380

Gopalnagar 7911 2550 5361

Total 15304 4932 9372

Page 9: A Status Report on Singur Version 6122006

9

Annexure: List of Trainees undergoing training at Ramakrishna Mission Shilpamandira, Belur Math

List of Trainees at Ramakrishna Mission Shilpamandi ra, Belur Math. Trade : House Wiring & Electrical Gadget Repairing

Sl. No. Name Fathers' Name Age Qlf. Mouza

1 Suranjan Ghosh Lab Kr. Ghosh 27 M.P. Bajemelia

2 Srimanta Mallik Srikanta Mallik 23 M.P. Bajemelia

3 Manimohan Bangal Biful Ch. Bangal 25 M.P. Gopalnagar

4 Samarendra Bag Bijay Krishna Bag 29 M.P. Berabari

5 Debkumar Pal Nimaichandra Pal 21 H.S. Berabari

6 Monaranjan Ghosh Nabakumar Ghosh 19 M.P. Berabari

7 Malayendu Dhole Lt. Dilip Dhole 34 M.P. Berabari

8 Anupam Ghosh Ginitan Ghosh 20 H.S. Berabari

9 Animesh Das Phanibhusan Das 26 M.P. Berabari

10 Nilkanta Das gokul Das 35 M.P. Berabari

11 Pulakesh De Madhusudan De 38 M.P. Singherveri

12 Avijit Das Billeshwar Das 22 H.S. Singherveri

13 Tanmoy Pal Guiram 37 M.P. Singherveri

14 Shyamapada Mandy Dilip Kr. Mandy 33 H.S. Gopalnagar

15 Pintu Pal Gobardhan Pal Singherveri

16 Surajit Das Tapan Das Singherveri

17 Animesh Maity Panchanan Maity Gopalnagar

18 Smirty Bikash Pal Ranjit Pal Singherveri

19 Niharranjan Ghosh Raghunath Ghosh 26 M.Com Gopalnagar

20 Mrinmoy Mal Sushil Mal 32 B.Com Berabari

21 Shovam Basu Hrishikesh Basu 19 HS Gopalnagar

22 Supriya Adhikary Haradhan Adhikary 33 H.S. Gopalnagar

23 Naba Kumar Malik Prasad Chandra Malik H.S. Bajemelia

24 Raj Kumar Malik Lt. Prasad Chandra Malik H.S. Bajemelia

25 Ujjwal Ghosh Radha Prasad Ghosh 18 M.P. Berabari

26 Kartick Ch. Dey Badan Ch. Dey Berabari

27 Radha Kanta Saha Sukumar Saha 23 M.P. Beraberi

Page 10: A Status Report on Singur Version 6122006

10

List of Trainees at Ramakrishna Mission Shilpamandi ra, Belur Math.

Trade : Automobile Repairing

Sl No. Name Father Name Age Edn. Mouza 1 Mrinalkanti Kole Gobinda Kole 35 H.S. Bajemalia

2 Mrityunjoy Malik Ajay Malik 26 M.P. Bajemalia

3 Taraknath Malik Kantacharan Mallik 24 H.S. Bajemalia

4 Pradip Patra Madhusudan Patra 17 M.P. Bajemalia

5 Amit Maity Paresh Maity 29 H.S. Gopalnagar

6 Gobinda Ghosh Joydeb Ghosh 20 H.S. Gopalnagar

7 Budhyadeb Shaw Anil Shaw 18 M.P. Gopalnagar

8 Malay Polen Mohanlal Polen 32 M.P. Khaserbheri

9 Aloke Kr. Polen Jawar Polen 35 M.P. Khaserbheri

10 Tanmoy Koley Sunil Koley 17 M.P. Khaserbheri

11 Soumya Saha Asis Kr. Saha 18 M.P. Beraberi

12 Rajib Ghosh Arjun Ghosh 24 M.P. Beraberi

13 Snehasis Ghosh Srikanta Ghosh 16 M.P. Beraberi

14 Achinta Das Nemai Das 31 M.P. Beraberi

15 Tapan Kr. Mal Biswanath Mal 38 H.S. Beraberi

16 Prosenjit Ghosh Kamalakanta Ghosh 20 H.S. Beraberi

17 Kajal Saha Bidyut Saha 34 B.Com Beraberi

18 Madhab Ghosh Monoranjan Ghosh 26 M.P. Beraberi

19 Chinmoy Kr. Ghosh Sukumar Ghosh 24 M.P. Beraberi

20 Samit Kr. Ghosh Mohanta Ghosh 24 M.P. Beraberi

21 Subhankar Dey Lt. Aloke Kr. Dey 21 B.Com Beraberi

22 Santu Bag Pawan Bag 17 M.P. Beraberi

23 Sovan Saha Chittaranjan Saha 24 M.P. Beraberi

24 Somnath Ghosh Samarendra Ghosh 21 H.S. Beraberi

25 Pallab Saha Lt. Baidya Nath Saha 26 M.P. Beraberi

26 Abhranil Ghosh Ajit Ghosh 25 H.S. Beraberi

27 Joydeep Hambir Netai Ch,. Hambir 18 M.P. Beraberi

28 Samir Das Joydeb Das 18 M.P. Beraberi

29 Somnath Das Dhananjoy Das 21 B.A. Beraberi

30 Rabi Gopal Das Mrityunjoy Das 32 B.A. Beraberi

31 Uday Das Anil Das 19 M.P. Singherbheri

32 Arun Santra Kartick Santra 19 M.P. Singherbheri

33 Jayanta Singha Maninandra Nath Singha 19 H.S. Khaserbheri

34 Pradeep Chakraborty Sakti pada Chakraborty 30 B.Com

35 Arup Chal Anadi Bhusan Chal 20 H.S. Gopalnagar

36 Amiya Saw Sanat Saw 23 B.Com Gopalnagar

37 Saptarshi Mitra Tarun Kr. Mitra 19 M.P. Gopalnagar

38 Koustav Ghosh Purnasankar Ghosh 22 B.Com Gopalnagar

39 Debkumar Saw Ramchandra Saw 20 B.Com Gopalnagar

40 Saraj Ghosh Tarak Nath Ghosh 20 B.Com Gopalnagar

41 Dipak Dutta Sailendra Nath Datta Beraberi

42 Uday Sankar Das Lt. BadalCh.Das Bajemalia

43 Akul Ch. Ruidas Lt.Adhir Ch.Ruidas Beraberi

44 Rabi Ranjan Ghosh N. K. Ghosh Beraberi

45 Soumen Koley Sudeb Koley Bajemalia

46 Biswajit Das Harendra Nath Das Bajemalia

47 Tapan Ghosh Shyamapada Ghosh Beraberi

48 Somnath Das Sanat Das 16 M.P. Khaserbheri

49 Santu Mullick S S Mullick 21 H.S. Gopalnagar

50 Sailendra Nath Das Mahadeb Das 32 M.P. Khaserbheri

51 Debrup Das Anandamoy Das Khaserbheri

52 Rathin Shaw Lt. Adwaita Shaw 36 H.S. Gopalnagar

53 Tapas Kr. Ghosh Kashi Nath Ghosh 26 B.Sc. Beraberi

Page 11: A Status Report on Singur Version 6122006

11

Trade : Automobile Repairing (contd..)

54 Rabindra Nath Mal Satya Charan Mal 36 M.P. Beraberi

55 Subrata Patra Prasad Patra 20 H.S. Gopalnagar

56 Ramananda Das Gokul Ch.Das Khaserbheri

57 Surajit Malik M.P. Khaserbheri

58 Pintu Maity Kanai Lal Maity M.P. Bajemalia

59 Mantu Jyoti Karuna Jyoti 23 B.A. Beraberi

60 Raj Kr. Jyoti Nirapada Jyoti Gopalnagar

61 Subhasish Ghosh Ratan Ghosh 26 H.S. Beraberi

62 Binoy Kr. Mati Mritunjoy Mati 25 M.P. Beraberi

63 Purna Ch. Das M.P. Beraberi

64 Subir Shaw Lt. Adhir Kr. Shaw 29 H.S. Gopalnagar

65 Arup Das Kartick Ch. Das Khaserberi

66 Nandalal Das Nemai Ch. Das 27 M.P. Beraberi

67 Amit Ghosh Chittarajan Ghosh M.P. Beraberi

68 Amit Kr. Bera Kartick Bera 21 H.S. Beraberi

69 Manoj Patra Gopinath Patra M.P.

70 Susanta Ghosh Niranjan Ghosh 32 M.P Berabari

71 Subhadip Ghosh Tapas Kr. Ghosh 16 M.P. Beraberi

72 Amit Kr. Pal Gobinda Pada Pal 20 M.P. Beraberi

73 Goutam Polen Manindra Nath Polen Khaserberi

74 Samit Ghosh Chittarajan Ghosh 25 H.S. Berabari

75 Surajit Das Biswanath Das Khaserberi

76 Snehasis Ghosh Srikanta Ghosh 16 M.P. Berabari

77 Subhasis Patra Lakhinarayan Patra 17 MP Doulatpur

Page 12: A Status Report on Singur Version 6122006

12

List of Trainees at Ramakrishna Mission Shilpamandi ra, Belur Math.

Trade : Two & Three Wheeler Repairing Sl

No. Name Father Name Age Edn. Mouza

1 Somnath Ghosh Nikhil Kr. Ghosh Berabari

2 Uttam Kr Das Nemai Ch Das

Trade : Welding & Fabrication Sl

No. Name Father Name Age Edn. Mouza

1 Bhaskar Das Kartik Chandra Das 18 H.S. Bajemelia

2 Sukhendu Das Sankar Das 18 M.P. Bajemelia

3 Biswajit Ghosh Sudhir Ch. Ghosh 23 H.S. Beraberi

4 Himanshu Ghosh Dilip ghosh 21 H.S. Beraberi

5 Harekrishna Batabyal Lt. Rashbehari Batabyal 35 M.P. Beraberi

6 Manonnit Das Ajit Kr. Das 22 M.P. Singherbheri

7 Biswanath Das Sambhunath Das 21 H.S. Singherbheri

8 Srimanta Shaw Shyamacharan Shaw 19 M.P. Gopalnagar

9 Amit Oraon Budhram Oraon 20 M.P. Gopalnagar

10 Babusona Neogi Nabakumar Neogi 21 M.P. Beraberi

11 Achinta Ghosh Biswanath Ghosh Beraberi

12 Sudipta Das Ganesh Ch. Das Gopalnagar

13 Bikash Sahana Lakshmi Kanta Sahana Gopalnagar

14 Sibsankar Bangal Ganesh Ch. Bangal Gopalnagar

15 Biswajit Kamley Haradhan Kamley Gopalnagar

16 Goutam Malik Basudeb Malik 20 H.S. Gopalnagar

17 Bobin Das Lt Anil Ch Das M.P. Khaserberi

18 Mrinal Kanti Khanra Dinabandhu Khanra 27 M.P. Beraberi

19 Pulakesh Das Nokuleshwar Das Khaserberi

20 Samar Kumar Koley Haradhan Koley Khaserberi

21 Sumit Mal Subodh Mal 20 H.S. Bajemalia

22 Subhendu Malik Lakshman Malik Gopalnagar

23 Raj Kumar Manna Haradhan Manna 35 M.P. Beraberi

24 Nirmal Chandra Koley Nirapada Koley Gopalnagar

25 Soumitra Santra Yudistir Santra 19 M.P. Gopalnagar

26 Himansu Das Ajit Kr. Das 21 H.S. Gopalnagar

27 Siddhartha Mal Panchu Gopal Mal Beraberi

28 Susanta Kr. Jyoti Haradhan Jyoti M.P. Gopalnagar

29 Saroj Kr. Ghosh Tarak Nath Ghosh Beraberi

30 Paran Ch. Ghorui Prafulla Ch. Ghorui 31 M.P. Gopalnagar

31 Sanatan Guchait Panchanan Guchait 36 Gopalnagar

Page 13: A Status Report on Singur Version 6122006

13

List of Trainees at Ramakrishna Mission Shilpamandi ra, Belur Math.

Trade : MACHINIST Sl

No. Name Father Name Age Edn. Mouza

1 Rajib Khara Birendra Nath Khara 25 B.Com Bajemalia

2 Pallab Patra Lakshmi Patra 21 M.P. Bajemalia

3 Dipankar Bera Mahadeb Bera 20 M.P. Gopalnagar

4 Amal Kr. Pollen Jawarharlal Pollen 34 M.P. Khasherveri

5 Nepal Ch. Bag Late Bibhuti Bhusan Bag 37 M.P. Khasherveri

6 Abhik Kr. Kole Ashoke Kole 24 M.P. Beraberi

7 Suman Bag Kartik Ch. Bag 16 M.P. Beraberi

8 Shankar Barui Lt. Amiya Barui 17 M.P. Beraberi

9 Dharani Dharan Dhara Panchanan Dhara 34 M.P. Beraberi

10 Basudeb Dhara Panchanan Dhara 18 M.P. Beraberi

11 Sanjib Ch. Barui Lt. Krishna Barui 34 M.P. Beraberi

12 Himangshu Shekhar Barui Lt. Krishna Barui 33 M.P. Beraberi

13 Koushik Bag Bijoy Krishna Bag 22 M.P. Beraberi

14 Kokhan Mallick Ratan Mallick 22 H.S. Beraberi

15 Amiya Kr. Santra Tapan Kr. Santra 18 H.S. Beraberi

16 Sanjay Adhikary Sukumar Adhikary 21 H.S. Gopalnagar

17 Sandip Kr Mallik Dulal Ch Mallik 19 H.S. Gopalnagar

18 Biswajit Das Late Subal Ch. Das 32 H.S. Beraberi

19 Bapan Dolui Basudev Dolui 23 H.S. Gopalnagar

20 Haridas Roy Balaram Roy 23 M.P. Gopalnagar

21 Shyam Sundar Bera Bharat Chandra Bera 22 M.P. Beraberi

22 Deb Das Banerjee Dilip Kr. Banerjee 22 M.P. Gopalnagar

23 Tanmoy Kr. Manna Rabindranath Manna 18 H.S. Gopalnagar

24 Bikash Pakira Charan Pakira 29 H.S. Beraberi

25 Bidyut Kr. Santra Ajit Santra 31 M.P. Beraberi

26 Anup Rui Das Adhir Chandra Ruidas 16 M.P. Beraberi

27 Chandrakanta Manna Anil Manna 16 M.P. Gopalnagar

28 Tamal Pakira Sankar Pakira 19 H.S. Beraberi

29 Shyama Pada Ruidas Dilip Ruidas 16 M.P. Gopalnagar

30 Kunal Kanti Koley Radhakanta Koley 40 B.Com Beraberi

31 Pradip Dey Tarak Dey 32 B.A. Beraberi

32 Ashoke Shaw Sanat Shaw 20 H.S. Khaserberi

33 Samir Chakraborty Biswanath Chakraborty M.P. Bajemalia

34 Raghunath Ghosh Gour Ghosh M.P. Beraberi

35 Chiranjib Mal Jayant Mal H.S. Beraberi

36 Suman Chakraborty Deb Kumar Chakraborty 23 M.P. Gopalnagar

37 Jugal Kishore Das Gobinda Das Gopalnagar

38 Asim Kr.Mal Baidyanath Mal 40 B.Com Beraberi

39 Joydeb Pakira Lt.Muchiram Pakira M.P. Gopalnagar

40 Sandeep Dey Mahadeb Dey 34 H.S. Beraberi

41 Bimal Kr. Rui Das Smt. Swarnabala Rui Das 31 M.P. Gopalnagar

42 Surajit Bag Baidyanath Bag 16 M.P. Gopalnagar

Page 14: A Status Report on Singur Version 6122006

14

ANNEXURE II: Discussion with Local People’s Representatives

Chronological History of Meetings:

Date Details Venue Outcome

27th May 2006 DM’s First all political Party meeting

DM’s office

17th June 2006 DM’s second all political Party meeting

DM’s office

4th July 2006 DM’s third all political Party meeting

DM’s office

27th August 2006

DM’s meeting with the leadership of “Krishi Jami Bachao Samity” under leadership of Sri Becharam Manna and six others

DM’s Bungalow

No decision transpired

5th September 2006 DM’s meeting with all three Gram Panchayet Pradhans and Members

DM’s office

Panchayet members of the other political parties did not attend.

13th /14th September 2006

MD WBIDC, Director Industry, DM and SP’s meeting with Sri Becharam Manna

Singur Police Station

No decision transpired

14th September 2006

MD WBIDC, Director Industry’s informal meeting with Sri Dudhkumar Dhara and Sri Mahadeb Das

A private house in Kolkata

No decision transpired

19th September 2006 MD WBIDC’s second meeting with Sri Dudhkumar Dhara and Sri Mahadeb Das

A private house in Kolkata

No decision transpired

21st September 2006 MD WBIDC, Director Industry’s meeting with MLA Singur

Singur Block office

MLA Singur was requested to identify the plots which in his opinion should have been classified for higher compensation to facilitate enquiry and decision , but no response received from him.

Page 15: A Status Report on Singur Version 6122006

15

Chronology of Land Acquisition: Issuance of Notice under Section 4(1) of Land Acquisition Act 1894:

19th July 2006 to 24th July 20067

Issuance of Notice under Section 6 of Land Acquisition Act 1894

29th August 2006 to 31st August 20068 Declaration of award:

21st September 2006 to 23rd September 2006

Commencement of payment of Land Acquisition:

25th September 2006 Constraints faced by WBIDC: From the very beginning of the process of Land acquisition WBIDC was engaged with the idea

that the compensation payable to the landowners and bargadars need to be commensurate with the

market value of land and its present usage pattern. This necessitated reconnaissance of the land.

But such scouting could not be done due to constant obstruction by the detractors. Even reports

were received that land owners are being prevented from attending the hearing by the agitators

and with lot of difficulty, a sense of security could be prevailed in the minds of the landowners to

enable them to participate in the process. However the entry to the land to explore the terrain and

to ascertain the ground condition by WBIDC team could not be ensured till early December.

7 There are altogether 13 LA Cases and the notices pertaining to each case was different. Therefore the dates between which all the notices were published are indicated not the individual dates pertaining to individual cases. 8 There are altogether 13 LA Cases and the notices pertaining to each case was different. Therefore the dates between which all the notices were published are indicated not the individual dates pertaining to individual cases

Page 16: A Status Report on Singur Version 6122006

16

Page 17: A Status Report on Singur Version 6122006

17

Page 18: A Status Report on Singur Version 6122006

18

Page 19: A Status Report on Singur Version 6122006

19