Transcript of A quick tour overview City of Arlington Pad Sites Tuesdays Tour Schedule KISD - Drilling Eden SW -...
WELCOMECITY OF DALLAS
WELCOMECITY OF DALLAS
A quick tour overview City of Arlington Pad Sites
Tuesday’s Tour Schedule
KISD - Drilling
Eden SW - Fracturing (Fracking)
Duke - Production
Compressor Station – Pipeline
Personal Protective Equipment (PPE)
Operators in
•64 Pad Sites
•367 Well heads
•Applications pending
•Chesapeake Energy
•XTO Energy
•Carrizo Oil and Gas
•Vantage Energy
•Legend Resources
•Titan Operating
•Quicksilver Resources
Pad Sites in
Tuesday’s Tour
Chesapeake – KISD
Drilling
Start: City Hall travel to KISD site
Here we will be able to observe a drill rig in the process of Horizontal Drilling
Tuesday’s TourTravel to Eden SW site
Tuesday’s Tour
XTO – Eden SW
Fracturing (Fracking)
A highly visible pad site, Eden SW is located to the east of two major thoroughfares; Cooper and Matlock.
It also resides in close proximity to several residential areas.
Tuesday’s Tour
XTO – Eden SW
Fracturing (Fracking)Travel to the Duke site
Tuesday’s Tour
Duke Pad Site – Chesapeake
Production
The Duke Site will allow us to observe a pad site in production; after the Drilling and Fracking have been completed this is all that remains.
Tuesday’s Tour
Duke Pad Site – Chesapeake
Production
Compressor Station -DFW Midstream
Pipeline
The Duke site is located next door to our final destination; DFW Midstream’s compressor facility
Personal Protective Equipment
Hard hats, eye and hearing protection will be provided to Task Force, City Council and Staff
Temperatures will be hotPlease wear comfortable clothingWater will be provided
Closed toe shoes are required
We look forward to seeing you