A Project Report On

87
TOTAL QUALITY MANAGEMENT

Transcript of A Project Report On

Page 1: A Project Report On

TOTAL QUALITY

MANAGEMENT

Page 2: A Project Report On

A PROJECT REPORT ON TOTAL QUALITY MANAGEMENT

IN CGI Information Systems & Management Consultants Pvt. Ltd.

SUBMITTED BY

RADHIKA TIMIR KURAMBHATTI

BACHELOR OF MANAGEMENT STUDIES

SEMISTER V

ACCEDEMIC YEAR 2008-2009

UNDER THE GUIDENCE OF

PROF. MR.KAILASH CHITNIS

SUBMITTED TO

UNIVERSITY OF MUMBAI

DATE OF SUBMISSION27-SEP-2008

K.G.JOSHI COLLEGE OF ARTS AND

N.G. BEDEKAR COLLEGE OF COMMERCE AND MANAGEMENT STUDIES

Chendani Bunder Road, Thane 400601Tel 022-2533 2412

Page 3: A Project Report On

K.G.JOSHI COLLEGE OF ARTS

AND

N.G. BEDEKAR COLLEGE OF COMMERCE

AND MANAGEMENT STUDIES

DECLARATION

I Radhika Timir Kurambhatti, student of Joshi-Bedekar College of T.Y.BMS

(SEM V) hereby inform that I have completed this project on Total Quality

Management in CGI in the academic year 2008-2009. The information

submitted is true and original to the best of my knowledge.

Signature

Radhika Timir Kurambhatti

Page 4: A Project Report On

ACKNOWLEDGEMENT

It gives me great pleasure to prepare project report on Total Quality

Management in CGI and present it to K.G.Joshi College of Arts and N.G.

Bedekar College of Commerce and management studies affiliated to Mumbai

University. I am very thankful to Prof. Mr. Kailash Chitnis for providing valuable

guidance and advice from time to time.

I would like to thank Mr. Vinay Thaly (Director Consulting Services) and

Shantanoo Joshi (Consultant).

This report is the combined support of all above mentioned and without whom

the project could not be completed.

Page 5: A Project Report On

EXECUTIVE SUMMARY

The project is on Total Quality Management in “CGI”.

First chapter addresses Topic, Aims, Objectives, Scope and regarding strategy

followed

Chapter Two explains about Definition & Evolution of Quality and about

Contribution of Quality Guru's

Concept of TQM, Tools & Techniques of TQM and Quality Circles are

addressed in Chapter Three.

Chapter Four provides information on CGI and their strategy

How to CGI has implemented TQM is explained in Chapter Five

Project Analysis and Recommendations are concluded in Chapter Six and

Seven respectively

Annexure, Bibliography & Webliography are addressed in last chapters

Page 6: A Project Report On

PROJECT CONTENTS

Chapter 1 - Project Introduction

Topic 1

Aims & Objectives 1

Scope of Project 2

Strategy followed to execute Project 2

Chapter 2 -Preface

Quality Definition 3

Quality Evolution 4

Contribution of Quality Gurus 05 - 11

Chapter 3 -Introduction to Total Quality Management (TQM)

Concept of TQM 12 - 13

Tools & Techniques of TQM 14 - 19

Quality Circles 20 - 28

Page 7: A Project Report On

Chapter 4 -CGI's TQM strategy

About CGI 29 - 31

TQM strategy 32 - 35

Chapter 5 -TQM implementation in CGI

Definition and Establishment of Quality System Management (QSM) 36 - 37Usage of Quality System Management (QSM) 37 - 38

Monitor and Improve Quality System Management (QSM) 38 - 39

Chapter 6 -Project Analysis

Advantage of TQM 40 - 42

Limitations of TQM 43 - 44

Chapter 7 -Recommendations 45 - 46

Chapter 8 -Annexure 47 - 48

Chapter 9 -Bibliography & Webliography 49

Page 8: A Project Report On

CHAPTER 1CHAPTER 1PROJECT INTRODUCTION

Page 9: A Project Report On

PROJECT INTRODUCTION

Topic

Understand the concept of Total Quality Management and to see how it is

implemented in IT Company

Aims & Objectives

To plan the project in detail

To know the background of TQM

To understand the concept of TQM

To get well versed with TQM

To see whatever we have learned till now, how that is really getting

implemented in IT industry

Compare the results with theory

Analyze the project

Recommends suggestions, if any

Provide learning of project

Page 1

Page 10: A Project Report On

Scope of Project

The scope is limited to implementation of TQM in CGI through ISO 9001 ,

CMMi (which mainly covers majority of Six Sigma concepts ) and through their

internal quality systems.

Strategy followed to execute Project

Prepare detailed activity list

Provide effort and cost

Prepare dependency plan based on assigned activities

Implement the activities

Revise the plan

Document the learning

Page 2

Page 11: A Project Report On

CHAPTER 2CHAPTER 2

PREFACE

Page 12: A Project Report On

Quality – Definition

Definition

QUALITY means “Fitness for Use” as per Dr. Juran. The components are said

to possess good quality, if they work well in the equipment for which they are

meant.

It is a relative term, generally used with reference to the end use of a product.

QUALITY is the distinguishing feature or “Grade” of the product in

appearance, performance, life, reliability, taste, odor and maintainability etc.

QUALITY is “Degree of Preference” to which a specified product is preferred

over competing products of equivalent grade. This is based on comparative

tests by the customers and is normally called customer preference.

QUALITY is a measure of the “Degree of Excellence” of the product.

QUALITY is “Conformity to Requirements” (Philip Crosby) and is concerned

with how well a product conforms to design and other specifications.

A short and widely accepted definition of today for QUALITY is Customer

Delight which aim to meet the following:

Stated needs (in simple words called Satisfiers)

Unstated needs (in simple words called Dis - Satisfiers)

Expectations (in simple words called Delighters)

According to Deming, QUALITY should be aimed at fulfilling the needs of the

customer, present and future.

Page 3

Page 13: A Project Report On

Quality Evolution

Phase Quality

Measurement

Quality

Control

Quality

Assurance

Total Quality

Management

Scope Products Raw

Material

& Products

Raw Material

& Products

&

Process

Raw Material

& Products &

All Process

Area of

Action

End of Line End of Line Online Before the beginning

System Appraisal Appraisal Appraisal

Prevention

Prevention

Appraisal

Function Inspection Inspection

Control

Inspection

Analysis

Plan, Control,

Improve and Audit

Status Operators Supervisor Manager General Manager or

Vice President

Reporting Production

Supervisor

Works

Manager

General

Manager

Managing Director or

President

Page 4

Page 14: A Project Report On

Contribution of Quality Gurus

A Guru, by definition, is a good person, a wise person and a teacher. A quality

Guru in addition to having these characteristics, will be, introducing , innovating

and implementing concept and approach to quality within business that will

make a major and lasting impact or give value for money or more Returns on

Investment(ROI). We cannot move ahead without addressing their contribution

to world of quality. There have been three groups of Gurus since the 1940’s:

Early 1950’s Americans who took the messages of quality to Japan

Late 1950’s Japanese who developed new concepts in response to the

Americans

1970’s-1980’s Western Gurus who followed the Japanese industrial success

It is beyond the scope of this project to go into nitty-gritty on each of the Gurus,

their philosophies, teachings and tools; however, a brief overview of their

contribution to the quality journey is given, supported by several references.

W Edwards Deming - The Americans who went to Japan, placed great

importance and responsibility on management, at the individual and company

level, believing management to be responsible for 94% of quality problems. His

fourteen point plan for TQM is a complete philosophy of management that can

be applied to small or large organizations in the public, private or service

sectors:

1. Create constancy of purpose towards improvement of product and service

2. Adopt the new philosophy. We can no longer live with commonly accepted

levels of delay, mistakes and defective workmanship

3. Cease dependence on mass inspection. Instead, require statistical evidence

that quality is built in

Page 5

Page 15: A Project Report On

4. Improve the quality of supplies. End the practice of awarding business on

the basis of price

5. Continuously improve production. Find problems. It is management’s job to

work continually on the system

6. Train and educate all employees. Institute modern methods of training on

the job

7. Supervision must help people. Institute modern methods of supervision of

production workers, The responsibility of foremen must be changed from

numbers to quality

8. Drive out fear, so that everyone may work effectively for the company

9. Eliminate boundaries. Break down barriers between departments

10.Eliminate numerical goals, posters and slogans for the workforce asking for

new levels of productivity without providing methods

11.Eliminate work standards that prescribe numerical quotas

12.Let people be proud of their work. Remove barriers that stand between the

hourly worker and their right to pride of workmanship

13.Encourage self-improvement. Institute a vigorous program of education and

retraining

14.Commit to ever improving quality. Create a structure in top management that

will push on the above points every day

The Original Quality Gurus

Page 6

Deming also encouraged a systematic

approach to problem solving and

promoted the widely known Plan, Do,

Check, Act (PDCA) cycle. The PDCA

cycle is also known as the Deming cycle,

although it was developed by a colleague

of Deming, Dr Shewhart.

Page 16: A Project Report On

It is a universal improvement methodology, the idea being to constantly

improve, and thereby reduce the difference between the requirements of the

Customer’s and the performance of the process. The cycle is about learning

and ongoing improvement, learning what works and what does not in a

systematic way; and the cycle repeats; after one cycle is complete, another is

started.

Dr Joseph M Juran - developed the Quality Trilogy – Quality Planning,

Quality Control and Quality Improvement. Good quality management requires

quality actions to be planned out, improved and controlled. The process

achieves control at one level of quality performance, then plans are made to

improve the performance on a project by project basis, using tools and

techniques such as Pareto analysis. This activity eventually achieves

breakthrough to an improved level, which is again controlled, to prevent any

deterioration. Dr. Juran believed quality is associated with customer satisfaction

and dissatisfaction with the product, and emphasized the necessity for ongoing

quality improvement through a succession of small improvement projects

carried out throughout the organization. His ten steps to quality improvement

are:

1. Build awareness of the need and opportunity for improvement

2. Set goals for improvement

3. Organize to reach the goals

4. Provide training

5. Carry out projects to solve problems

6. Report progress

7. Give recognition

8. Communicate results

9. Keep score of improvements achieved

10.Maintain momentum

Page 7

Page 17: A Project Report On

He concentrated not just on the end customer, but on other external and

internal customers. Each person along the chain, from product designer to final

users, is a supplier and a customer. In addition, the person will be a process,

carrying out some transformation or activity.

Dr Kaoru Ishikawa – The Japanese, made many contributions to quality,

the most noteworthy being his total quality viewpoint, company wide quality

control, his emphasis on the human side of quality, the Ishikawa diagram and

the assembly and use of the “seven basic tools of quality”:

Page 8

Pareto analysis which are the big problems?Cause and effect diagrams what causes the problems?Stratification how is the data made up?Check sheets how often it occurs or is done?Histograms what do overall variations look like?Scatter charts what are the relationships between factors?Process control charts which variations to control and how?

Page 18: A Project Report On

He distinguished between “errors”, which are inevitable, and “defects”, which

result when an error reaches a customer, and the aim of Poka-Yoke (Japanese

term, that means “mistake-proofing”) is to stop errors becoming defects. Defects

arise because errors are made and there is a cause and effect relationship

between the two. Zero quality control is the ideal production system and this

requires both Poka-Yoke and source inspections. In the latter, errors are looked

at before they become defects, and the system is either stopped for correction

or the error condition automatically adjusted to prevent it from becoming a

defect.

Philip B Crosby - The Western Guru, known for the concepts of “Quality is

Free” and “Zero Defects”, and his quality improvement process is based on his

four absolutes of quality:

1. Quality is conformance to requirements

2. The system of quality is prevention

3. The performance standard is zero defect

4. The measurement of quality is the price of non-conformance

His fourteen steps to quality improvement are:

Page 9

He believed these seven tools should

be known widely, if not by everyone, in

an organization and used to analyze

problems and develop improvements.

Used together they form a powerful kit.

Page 19: A Project Report On

1. Form a management level quality improvement team (QIT) with

responsibility for quality improvement process planning and administration

2. Determine where current and potential quality problems lie

3. Evaluate the cost of quality and explain its use as a management tool to

measure waste

4. Raise quality awareness and personal concern for quality amongst all

employees

5. Take corrective actions, using established formal systems to remove the

root causes of problems

6. Establish a zero defects committee and program

7. Train all employees in quality improvement

8. Hold a Zero Defects Day to broadcast the change and as a management

recommitment and employee commitment

9. Encourage individuals and groups to set improvement goals

10.Encourage employees to communicate to management any obstacles they

face in attaining their improvement goals

11.Give formal recognition to all participants

12.Establish quality councils for quality management information sharing

13.Do it all over again – form a new quality improvement team

Tom Peters - identified leadership as being central to the quality

improvement process, discarding the word “Management” for “Leadership”. The

new role is of a facilitator, and the basis is “Managing by walking about”

(MBWA), enabling the leader to keep in touch with customers, innovation and

people, the three main

areas in the pursuit of excellence. He believes that, as the effective leader

walks, at least 3 major activities are happening:

Listening ( suggests caring )

Teaching ( values are transmitted )

Facilitating ( able to give on-the-spot help)

Page 10

Page 20: A Project Report On

Having researched successful American organizations, he concluded that any

intelligent approach to organizing had to encompass, and treat as

interdependent, seven variables, in what became known as the McKinsey 7-S

Framework, designed to force explicit thought about both the hardware and

software of an organization:

Conclusion

Apart from above “gurus”, there are many other management “gurus” whose

philosophies and ideas are also important but at end of the day, it is

organizational call to select what is best and most suitable set of processes for

their organization based on their current and future needs

Page 11

Page 21: A Project Report On

CHAPTER 3CHAPTER 3

INTRODUCTION TO

“TOTAL QUALITY MANAGEMENT”

Page 22: A Project Report On

Concept of TQM

Total Quality Management is a management approach that originated in the

1950's and has steadily become more popular since the early 1980's. Total

Quality is a description of the culture, attitude and organization of a company

that strives to provide customers with products and services that satisfy their

needs. The culture requires quality in all aspects of the company's operations,

with processes being done right the first time and defects and waste eradicated

from operations.

Total Quality Management, TQM, is a method by which management and

employees can become involved in the continuous improvement of the

production of goods and services. It is a combination of quality and

management tools aimed at increasing business and reducing losses due to

wasteful practices.

TQM is a management philosophy that seeks to integrate all organizational

functions (marketing, finance, design, engineering, and production, customer

service, etc.) to focus on meeting customer needs and organizational

objectives.

TQM views an organization as a collection of processes. It maintains that

organizations must strive to continuously improve these processes by

incorporating the knowledge and experiences of workers.

The simple objective of TQM is "Do the right things, right the first time, every

time". TQM is infinitely variable and adaptable. Although originally applied to

manufacturing operations, and for a number of years only used in that area,

TQM is now becoming recognized as a generic management tool, just as

applicable in service and public sector organizations. There are a number of

Page 12

Page 23: A Project Report On

evolutionary standards with different sectors creating their own version from the

foundation of TQM activities which include:

Commitment by senior management and all employees

Meeting customer requirements

Reducing development cycle times

Just In Time/Demand Flow Manufacturing

Improvement teams

Reducing product and service costs

Systems to facilitate improvement

Line Management ownership

Employee involvement and empowerment

Recognition and celebration

Challenging quantified goals and benchmarking

Focus on processes / improvement plans

Specific incorporation in strategic planning

These activities can be practiced any where by all personnel in Manufacturing,

Marketing, Engineering, R&D, Sales, Purchasing, HR, IT etc.

Page 24: A Project Report On

Page 13

Tools and Techniques of TQM

The basic set of Total Quality Management tools are:

Pareto Principle

Scatter Plots

Control Charts

Flow Charts

Cause and Effect , Fishbone, Ishikawa Diagram

Histogram or Bar Graph

Check Lists

Check Sheets

Pareto Principle

The Pareto principle suggests that most effects come from relatively few

causes. In quantitative terms: 80% of the problems come from 20% of the

causes (machines, raw materials, operators etc.); 80% of the wealth is owned

by 20% of the people etc. Therefore effort aimed at the right 20% can solve

80% of the problems. Double (back to back) Pareto charts can be used to

compare 'before and after' situations. General use to decide where to apply

initial effort for maximum effect.

Page 14

Page 25: A Project Report On

Scatter Plots

A scatter plot is effectively a line graph with no line - i.e. the point intersections

between the two data sets are plotted but no attempt is made to physically draw

a line. The Y axis is conventionally used for the characteristic whose behavior

we would like to predict. Use to define the area of relationship between two

variables.

Warning: There may appear to be a relationship on the plot when in reality there

is none, or both variables actually relate independently to a third variable.

Page 15

Page 26: A Project Report On

Control Charts

Control charts are a method of Statistical Process Control, SPC. (Control

system for production processes). They enable the control of distribution of

variation rather than attempting to control each individual variation. Upper and

lower control and tolerance limits are calculated for a process and sampled

measures are regularly plotted about a central line between the two sets of

limits. The plotted line corresponds to the stability/trend of the process. Action

can be taken based on trend rather than on individual variation. This prevents

over-correction/compensation for random variation, which would lead to many

rejects.

Page 16

Page 27: A Project Report On

Flow Charts

Pictures, symbols or text coupled with lines, arrows on lines show direction of

flow. Enables modeling of processes; problems/opportunities and decision

points etc. Develops a common understanding of a process by those involved.

No particular standardization of symbology, so communication to a different

audience may require considerable time and explanation.

Cause and Effect , Fishbone, Ishikawa Diagram

Page 17

Page 28: A Project Report On

The cause-and-effect diagram is a method for analyzing process dispersion.

The diagram's purpose is to relate causes and effects. Three basic types:

Dispersion analysis, Process classification and cause enumeration. Effect =

problem to be resolved, opportunity to be grasped, result to be achieved.

Excellent for capturing team brainstorming output and for filling in from the 'wide

picture'. Helps organize and relate factors, providing a sequential view. Deals

with time direction but not quantity. Can become very complex. Can be difficult

to identify or demonstrate interrelationships.

Histogram or Bar Graph

A Histogram is a graphic summary of variation in a set of data. It enables us to

see patterns that are difficult to see in a simple table of numbers. Can be

analyzed to draw conclusions about the data set.

A histogram is a graph in which the continuous variable is clustered into

categories and the value of each cluster is plotted to give a series of bars as

above. The above example reveals the skewed distribution of a set of product

measurements that remain nevertheless within specified limits. Without using

some form of graphic this kind of problem can be difficult to analyses, recognize

or identify.

Page 18

Page 29: A Project Report On

Check Sheets

A Check Sheet is a data recording form that has been designed to readily

interpret results from the form itself. It needs to be designed for the specific data

it is to gather. Used for the collection of quantitative or qualitative repetitive

data. Adaptable to different data gathering situations. Minimal interpretation of

results required. Easy and quick to use. No control for various forms of bias -

exclusion, interaction, perception, operational, non-response, estimation.

Check Lists

A Checklist contains items that are important or relevant to a specific issue or

situation. Checklists are used under operational conditions to ensure that all

important steps or actions have been taken. Their primary purpose is for guiding

operations, not for collecting data. Simple and effective, generally used to check

that all aspects of a situation have been taken into account before action or

decision making.

Page 19

Page 30: A Project Report On

Quality Circles

Background

Two atom bombs dropped on Japan during 1945, converted the thriving,

industrial empire of Japan to dust and smoke, with millions killed or maimed.

Every one thought it would be centuries before Japan re-captures its pristine

glory, but Japan rose like a phoenix from ashes to become the leading nation of

the world within a short span of time. The power behind this miracle was fierce

will, determination and commitment of Japanese people and their quest for

quality. They adopted Quality Circles as ways of building attitudes to surmount

problems, improve quality and to be competitive.

Quality Circle:- A Human Interface

It epitomizes the policy of people building, respect for human beings and

conceives a participative management culture. This concept enables the grass-

root level employees to play a meaningful and significant role in their

organization. The responsibility for the attainment of Quality depends on all the

departments of an Organization. The main purpose behind Quality Circles is to

build the people and produce quality people towards making quality products or

providing quality services. It is to make a 'Man' productive and knowledge

worthy.

The Origin

The concept of Quality Circle is primarily based upon recognition of the value of

the worker as a human being, as someone who willingly activates on his job, his

wisdom, intelligence, experience, attitude and feelings. It is based upon the

human resource management considered as one of the key factors in the

improvement of product quality & productivity.

Page 20

Page 31: A Project Report On

Attributes of Quality Circles

Quality Circle is a form of participation management.

Quality Circle is a human resource development technique.

Quality Circle is a problem solving technique.

Composition of Quality Circles

It's a small group comprising of 6 to 12 employees doing similar work

They meet together voluntarily on a regular basis for identifying

improvements in their respective work areas

Their aim to achieve and so also to sustain excellence towards mutual

upliftment of employees as well as the organization.

Objectives of Quality Circles

Change in Attitude.

From "I don't care" to "I do care"

Continuous improvement in quality of work life through

humanization of work.

Self Development

Bring out 'Hidden Potential' of people

People get to learn additional skills.

Development of Team Spirit

Individual Vs Team – "I could not do but we did it"

Eliminate inter departmental conflicts.

Page 21

Page 32: A Project Report On

Improved Organizational Culture

Positive working environment.

Total involvement of people at all levels.

Higher motivational level.

PROCESS OF OPERATION

The operation of quality circles involves a set of sequential steps as under:

The use of various techniques must be supported with accurate information and

data. Data  and information collection or insufficient  data could  lead  to  a 

situation where decisions or  corrective  action  be implemented  effectively. 

Data and information should be collected for the following purposes

To understand the actual situation and to support or reinforce an option

To established the relationship between the problem  and  its causes..

Data can be collected using five methods, namely:

Interviews

Questionnaires

Observation

From reports and

From complaints by the public.

The data collected should be recorded information on the date of Collection,

method of collection and the individual who collated the data.  The data must be

recorded in a manner which facilitates its use that is, it must be arranged in

specific categories. For example, it should be categorized according to the four

management resources namely, man, method, material and machine.

Sampling:- A way to simplify  

Page 22

Page 33: A Project Report On

In data collection, samples are used. This involves the collection of data from a

small population of the total population involved.  The sampling techniques

generally used are:-

Random Sampling - This process involves the random selection of the

sample units. The selection can be made by the use of a random number

through table or lists of names to prevent any bias.

Systematic Sampling - This process involves the systematic selection of the

sample to be used. For example, choosing every tenth name from a list of

names..

Stratified Sampling - This process involves the selection of the sample

according to specific categories such as age, sex and income group, etc.

QC members may use various techniques in the problem-solving process. The

effective techniques generally are:-

Brainstorming;

Cause and Effect Analysis

Check sheets

Pareto Analysis

Brainstorming

Brainstorming can be defined as the methodology used to encourage every

individual in the Circle to express freely their opinions or give ideas in an open

discussion..

Brainstorming can be used to list down all the problem faced by an

organization, their causes and the potential effects if a certain suggestion is

implemented.

Page 23

Page 34: A Project Report On

To ensure the success of the brainstorming process, it is important for the Circle

to flow the following rules:

The subject for brainstorming should be clear and accurate. For example,

members may brainstorm to identify the causes and reasons why a certain

task cannot be completed on schedule

Each member will give only opinion/idea at each turn regardless of the

number of ideas he/she may have

A tension-free atmosphere must be maintained to encourage free

expression of ideas

Every idea expressed should be written on the black/white board, flip chart

or noted down by a secretary..

At the end of the brainstorming session, all the ideas expressed should be

evaluated one by one and short listed.

Voting is used to list the ideas according to priority.  The prioritization is

based on number of votes received for each idea..

Cause and Effect Analysis

The Cause and Effect Analysis is also known as the Fish-Bone Analysis.  This

technique is used to analyze problems with the identification of causes of a

problem through brainstorming.   This technique is easy to use   as   it

summarizes, arranges and explains all the causes of a problem which has been

identified in the form of a diagram.  It also allows for the identification of many

possible causes of a problem.  There are five steps in the construction of a

Cause and Effect Diagram..

Step 1: Identify a Problem - The first step is to identify the problem and to state

the problem accurately. 

Step 2: Determine the Main Causes - A problem is caused by various factors.  

These  factors  can  be categories  according  to  the resources of  production 

Page 24

Page 35: A Project Report On

such  as  Man, Machine, Material and Method etc.

Step 3: Determine the Sub-Causes under the Main Causes. Through a process

of brainstorming, the sub-causes of the problem are identified and entered

below the appropriate main causes.  Where possible, the sub-causes are

further broken down into more detailed sub-sub-causes

Check Sheets:

Check Sheets are an effective means of gathering data in a helpful and

meaningful way. 

Kaoru Ishikawa is often credited with "democratizing statistics."  This relates to

his desire to spread quality control ideas throughout the workplace.  His tools

make it easier to comprehend raw data, making quality improvements simpler. 

Check Sheets are a perfect example of this.  Although they can vary a good

deal depending on the type of data being collected, the purpose of the check

sheet is always the same.

"The Check Sheet is used to facilitate the collection and analysis of data. 

'Garbage in, Garbage out' is an old cliché, but it is true.  Therefore, the purpose

for which data is being collected must be clear.  Data reflects facts, but only if

they are properly collected.  The number of defects and where they are found

can be recorded and analyzed for causes" .

Pareto Analysis:

Pareto analysis provides the mechanism to control and direct effort by fact, not

by emotion. It helps to clearly establish top priorities and to identify both

profitable and unprofitable targets. Pareto analysis is useful to:

Page 25

Page 36: A Project Report On

Prioritize problems, goals, and objectives

Identify root causes

Select and define key quality improvement programs

Select key customer relations and service programs

Select key employee relations improvement programs

Select and define key performance improvement programs

Address the Vital Few and the Trivial Many causes of nonconformance

Maximize research and product development time

Verify operating procedures and manufacturing processes

Product or services sales and distribution

Allocate physical, financial and human resources

A Pareto chart is used for: Focusing on critical issues by ranking them in terms

of importance and frequency (example: Which course causes the most difficulty

for students? Which problem with Product X is most significant to the

customers?) Prioritizing problems or causes to efficiently initiate problem

solving (example: Which discipline problems should be tackled first? or, what is

the most frequent complaint by parents regarding the school? Solution of what

production problem will improve quality most?) Analyzing problems or causes

by different groupings of data (e.g., by program, by teacher, by school building;

by machine, by team) Analyzing the before and after impact of changes made in

a process (example: What is the most common complaint of parents before and

after the new principal was hired?; has the initiation of a quality improvement

program reduced the number of defectives?)

Quality management is not a one time effort but a continual long term endeavor

which has to be recognized, reinforced and rewarded by continuous monitoring

the ongoing data collection, evaluation, feedback and improvement

programmes. The top management should have to create an atmosphere

where the management and the workers cooperate with each other for smooth

functioning of the organization.

Page 26

Page 37: A Project Report On

Introducing Quality Circle in an Organization 

Quality circle is a new concept and its introduction may cause some resistance

on the part of the employees. Therefore, before introducing quality circle, all

precautions must be taken as in case of any organizational change. The steps

in the introduction of quality circle are briefly discussed below:

 

Selling the Idea of Quality Circle: The workers must be educated the need

and significance of quality circle from the point of view of the organization

and the workers. The workers should be allowed to clear their doubts about

quality circle. Attempt should be made to seek their voluntary cooperation in

implementing quality circles in the organization.

Constitution of Quality Circles: The employees should be encouraged to

form quality circles by drawing members doing the same kind of work. The

membership of a quality circle should not exceed ten to twelve members.

Analysis of Quality Problems: The members of a quality circle are

supposed to meet periodically, say once a month. They would collect data

and analyze the same. Past records, employee’s suggestions, customer’s

suggestions are very important in this regard. This will lead to identification

of the problems that hinder quality.

Problem Solving: The members of a quality circle will discuss the problems

thoroughly and make a list of possible solutions. The merits and demerits of

each solution will be evaluated. The final decision will be taken by the

consensus of all members.

Presentation of Suggestions to the Management: The suggestions for

improving the quality are put in writing and forwarded to the management.

Top management may form a committee to evaluate the suggestions of

different quality circles in the organization.

Page 27

Page 38: A Project Report On

Implementation: Proper publicity should be given to the suggestions of

Quality circles which are being put into practice. This will motivate the

employees, as they will feel importance of having contributed to well being of

the organization.

Page 28

Page 39: A Project Report On

CHAPTER 4CHAPTER 4

CGI’s “TQM” STRATEGY

Page 40: A Project Report On

o Founded in 1976

o Revenue run rate of CDN$3.8 billion

o Backlog of CDN$12.03 billion

o Approximately 27,000 professionals

o More than 100 offices serving clients in 16 countries

o One of the largest independent IT and business process services

companies

o NYSE: GIB — TSX: GIB.A

o 8.8 out of 10 satisfaction ranking in 2007 from CGI’s ISO

9001:2000certified client management process

o End-to-end services

o Consulting

o Systems integration

o Management of IT and business functions

o 100+ proprietary business solutions

o Focused industry expertise

o Financial services

o Government and healthcare

o Telecommunications and utilities

Page 41: A Project Report On

o Manufacturing , Retail and distribution

Page 29

o They are partnered with the following:

o 45 of 50 top banks in the Americas and Europe, and 11 of the 15

largest global property and casualty insurers

o Hundreds of government agencies and healthcare organizations

o 7 of the 10 largest global telecom carriers

o Leading global manufacturers in aerospace, metals and mining,

chemicals, and oil and gas

o Hundreds of retailers and multiple distribution segments and

channels, including postal services, transportation and logistics, and

wholesale distribution

Representative Clients

o Air Canada , Allstate Insurance ,American Express , AT&T ,Australian

and New Zealand Bank (ANZ) , AXA , Bank of America , Bell Canada ,

BellSouth , Blue Cross Blue Shield ,Bombardier , Commonwealth of

Virginia , Desjardins , Enbridge Petroleum , Government of Canada ,

Government of Quebec , HSBC Holdings plc , Hydro-Québec , If

Skadeförsäkring AB , JPMorgan Chase & Co, , Liberty Mutual , Lloyds

TSB Group Plc , Los Angeles County , Manu life Financial , Merrill

Lynch , Michelin North America , National Bank of Canada , New York

City , Prudential Financial , Rio Tinto Alcan , Sprint PCS , Telstra

Extract from www.cgi.com - Corporate statistics verified as on June 2008

Page 42: A Project Report On

Page 30

In brief, CGI is Montreal (Canada) based 30 years old IT company, having

27,000 members across the globe. The entire business is divided more than

100 offices globally, in multiple countries, in various regions and in various

Business units. CGI India is one of the business units amongst all having more

than 1200 members with 3 offices in India. Two offices are located in Bangalore

and one in Mumbai in Seepz, Andheri.

CGI is in TQM since last 10 years. CGI is ISO 9001 (from last 10 years), ISO

27001 (from last 2 years) and SEI CMM Level 5 (from last 5 years)

certified/assessed company.

CGI is having Corporate Quality department to take care of TQM at global level

and having Quality department at each business unit. In India this department is

called “Total Software Quality Management (TSQM)”, having 20 full time

members (12 for Bangalore and 8 for Mumbai).s

The responsibilities of TSQM are:

Training to all members on all internal as well as external quality models.

Assisting all members for defining, implementing and improving their

process

Conducting Internal audits

Facilitating External audits and assessment

Conduct analysis and reporting the recommendation to management for the

Internal as well as external client feedback/Complaints/Suggestion, Risks,

Learning’s and Audit report & Non conformities

Process suggestions, complaints and feedback

Prepare knowledge Management system and Process Assets repository

Understand and implement industries best practices

Page 43: A Project Report On

Page 31

TQM – CGI Strategy

Before going through the strategy let us understand three key terminology

differences.

Member - CGI is big family having more than 27,000 members across the globe

and every member is trying their best for the betterment of their family and for

their prosperity hence they are not called as employee but referred as Member.

Engagement – As CGI is having longer association or relationship with various

clients hence their association is referred as Engagement and not project.

Customers are referred as Clients.

Each employee when join CGI has to undergo “Induction” training. This is

mandatory, irrespective of their experience or designation. CGI called this

process as Integration process. Each employee before joining CGI has some

information about CGI to ensure their job stability or prosperity but is not aware

about the culture of CGI. The Integration processes addresses Dreams,

Mission, Vision, Values, Policies, Procedures and other cultural as well as

professional and technical requirements and ensure to convert new employee

into Member of CGI family. CGI will ensure that every member is fully

integrated with CGI before starting delivering to their esteem clients.

Every member of CGI is well versed with following set of core values

Intrapreneurship ( Leadership ) & Sharing

Partnership & Quality

Objectivity & Integrity

Respect

Financial Strength

Page 44: A Project Report On

Corporate social responsibility

Page 32

Using these values CGI has spread message of TQM across all levels. Sharing

the same values allows CGI to enjoy considerable autonomy and swiftness of

action without compromising their cohesiveness. It also allows them to mobilize

teams more rapidly and bring together the most experienced individuals from

across the company, who are able to quickly work as one to address a given

challenge. And, of course, these values also guide CGI’s decisions and actions.

Partnership and Quality

For CGI, partnership and quality are both a philosophy and a way of life. They

develop and follow the best management practices and they entrench these

approaches into client relationships and service delivery frameworks in order to

foster long term and strong partnerships with their clients. They listen to their

clients and they are committed to their total satisfaction in everything they do.

 Objectivity and Integrity

Page 45: A Project Report On

Exercise the highest degree of independent thinking in selecting the products,

services and solutions they recommend to clients. In doing so, they adhere to

Page 33

the highest values of quality, objectivity and integrity. Consequently, strict rules

of business and professional conduct are applied. They do not accept any

remuneration from their suppliers.

 Intrapreneurship and Sharing

CGI’s success is based on the competence, commitment and enthusiasm of

their members. Therefore, CGI promotes a climate of innovation and initiative

where they are empowered with a sense of ownership in supporting clients,

thus ensuring the firm’s profitable growth. Through teamwork, sharing their

know-how and expertise, they bring the best of CGI to their clients. As

members, they share in the value they create through equity ownership and

profit participation.

Respect

As a global company, CGI recognizes the richness that diversity brings to the

company and welcome this diversity while embracing the overall CGI culture. In

all they do what are respectful for their fellow members, clients, business

partners and for their competitors

Financial Strength

CGI strives to deliver strong, consistent financial performance which sustains

long term growth and rewards for their members and shareholders. Financial

strength enables them to continuously invest and improve services and

business solutions to the benefit of their clients. To this end, they manage their

business to generate industry superior returns.

Corporate Social Responsibility

Page 46: A Project Report On

Their business model is designed to ensure that they are close to their

Page 34

clients and communities. They embrace their social responsibilities and

contribute to the continuous development of the communities in which we all

live and work.

To summarize, demonstrating these values from leaders, continuous training

to all members at all levels, respecting member knowledge, providing excellent

environment where there is no fear to share knowledge are essential activities

CGI ensure to implement TQM

CGI ensures to provide Quality not only in their end product or service but also

make it an integral part of their business rule/processes which they use to

create their goods and services. An effective TQM program will produce greater

quantity, faster and at lower costs, by reducing their rework rates and cycle

times. In next chapter we will focus on detail implementation.

Page 47: A Project Report On

Page 35

CHAPTER 5CHAPTER 5

“TQM” IMPLEMENTATION IN CGI

Page 48: A Project Report On

TQM Implementation in CGI

Definition and Establishment of Quality System Management (QSM)

First step that was followed towards TQM was identification of all required

processes such as Technical, Functional, Support, Management etc. Technical

& functional processes covers all process related to spare parts development,

maintenance, migration etc. along with various domains such as Retail,

Manufacturing, Finance, Insurance, service centers, Medical etc. Support

processes takes care of all departmental process in detail such as Human

Resources, Finance, Information Security and Information Technology,

Administration, Training departments etc. . Management processes takes care

of all policies, frameworks and corporate level requirements for all business

units. As CGI is also following other quality models along with TQM such as SEI

CMM and various internal quality frameworks they have considered respective

requirements from these models too.

Once all processes were listed, they have come out with detail flowchart for all

processes to know their sequencing, interfaces, dependency on each other and

also to avoid duplication or redundancy if any. They have also followed Real

Value Activity (RVA), Business Value Activity (BVA) and No Value Activity

(NVA) principle of Six Sigma to decide the priority list. After finalizing their

processes they have documented them all in Quality System Management

(QSM) along with their Quality policy and Quality Manual after review and

approval from Top Management.

This QSM whenever gets revised will get released only after review and

approval from top management. Top Management along with TSQM takes full

Page 49: A Project Report On

responsibility to publish QSM time to time and ensure to address the same

when ever and where ever they found opportunity. All required budgets in

Page 36

terms of cost, infrastructure (hardware, software, building, workspace, utilities,

equipment etc) members’ efforts and cost are sponsored by them. They also

ensure to provide resources with right education, right experience and ensure to

provide right training to provide right skills. CGI has following various training

effectiveness mechanism to ensure that attended participants are properly

trained and faculty has the capability and skills to train the participants.

Usage of Quality System Management (QSM)

TSQM is providing detailed training to all members of CGI at all levels. The

process of training is not one time but it is journey. The annual calendar is

published well in advance so that all members can plan their team members

training requirements. Once members are trained on QSM then they start using

and implementing QSM accordingly.

Every department has defined their own process and their own process assets

such as forms, template, and guidelines, checklists etc., depending upon their

services, Service Level Agreement (SLA) are defined and monitored on monthly

basis.

Every engagement prepares their own plans based on requirement received

from client. Plans covers client requirements, Strategy to deliver the

requirements, Communication Management (Frequency and documentation

responsibility of Engagement, Management and review meetings, weekly status

reporting to management, clients etc, Escalation mechanism etc), Risk

management (identification of risk, risk probability, impact, priority, mitigation

and contingencies) , Configuration management (Data and document control) ,

Quality management (verification, validation mechanism, quality goals etc)

along with teams details, roles and responsibilities. While defining quality goals,

Page 50: A Project Report On

engagement are also considering business goals too. The common quality

goals for all engagements are Productivity, Defect Density, Review

Page 37

Effectiveness, Schedule Variance, Effort Variance and Cost of Quality etc. Apart

from Organizational level process assets such as guidelines, checklist, forms,

templates, standards, methodologies, engagement level assets are also getting

developed depending upon client’s requirements. Depending upon engagement

uniqueness, applicable best process assets, practices and best methods are

getting shared with the help of TSQM

Monitor and Improve Quality System Management (QSM)

Based on Business plans, CGI finalize their Business goals (Voice of Business)

and based on client’s requirement, Engagement Managers are planning their

engagement goals (Voice of Customer). Based on these two goals

organizational level processes are getting tailored and followed (Voice of

Process) for every engagement. Based on goals various measurements are

defined, managed and monitored. If the actual results are not matching than the

set goals then correction (fixing the problem) or corrective (preventing

recurrence) or preventive (preventing potential occurrence) action are taking

depending upon the situation till the goals are met. Based on learning’s goals

are revised and plans are revisited at engagement as well as at CGI level.

For every engagement or for every department one member from TSQM is

nominated to provide quality assistance on TQM, called as “Software Quality

Assurance Engineer (SQAE)” for engagement or “Quality Assurance Engineer

(QAE) ” for department. They visit every engagement/department on monthly

basis to ensure whether that team is following internal or external quality model

or not and reports their finding to management on monthly basis. Apart from

these checks, every engagement/department gets audited every six months

basis through Internal Audit and once in a year through External Audit. Apart

Page 51: A Project Report On

from conducting SQAE checks, coordinating internal and external audits,

SQAE/QAE also helps assigned team for their clarifications, query, if any Apart

Page 38

from TSQM checks and audits, on monthly basis management meeting taking

place (BMC meeting) wherein all engagement and departmental status are

getting discussed and appropriate corrective and preventive actions are taken

accordingly. During meeting Appreciation, suggestions, complaints and other

improvement or innovations activities if any are also getting discussed.

Depending upon Return on Investment (ROI) suggestions are getting prioritize

for implementation. In case improvement plan is at larger scale (needs more

days or needs a team of members) Quality Improvement Teams are formed and

required resources are provided till the solution is implemented. Without piloting

and ensuring required ROI suggestions are not implemented across the

organization.

On quarterly basis, Open House is conducted where in local management

updates member on quarterly performance and their future plans. Member’s

issues, if any are also addressed during this meeting. All good performers are

recognized by rewarding some monetary coupons and appreciation letter.

On yearly basis, Annual Tour is conducted where in Top management updates

member on yearly performance and their future plans. Member’s issues, if any

are also addressed during this meeting. All star performers are recognized by

rewarding some monetary coupons and appreciation letter.

Through various mechanism such as Engagement/department Team meetings,

Management review meeting, TSQM checks, internal as well as external audit

observation, clients and member feedback, suggestions from members, open

forum and annual tour. Management gets various feedbacks for QMS revision.

Page 52: A Project Report On

Using Statistical tool TSQM analyze them all and if found value addition to CGI

suggest management to take appropriate action.

This is how CGI is adopted TQM along with ISO 9001 and Cmmi which is

getting audited or assessed by third party on periodic basis since long.

Page 39

CHAPTER 6CHAPTER 6

PROJECT ANALYSIS

Page 53: A Project Report On

Advantages of TQM

Fully client driven

o Faster, Better and Cheaper is the mantra of TQM. Every activity is planned

and implemented to ensure customer delight. Customer covers internal as

well as external customer. All employees are fully focused on satisfying or

delighting their clients without compromising on quality.

o The supplier or vendor also part of this objective. Vendors are treated like

partner so that every one will take the same ownership and also earned the

equal reward.

o Various processes, practices, methodologies, guidelines, standards are

defined, documented, communicated and enforced across the organization

so that all stake holders are in sync with organizational goals

o Periodic communication is ensured at all levels to know the progress of

organization towards their set goals.

Continuous Improvement - Organization is working or improving on Kaizen

mode. Small but continuous improvements at all levels are going on

Employee Empowerment

o All employees are trained on periodic basis on technical, functional,

management and on soft skills through out their span. Training journey

starts with Integration and then goes on and on till they are familiar with

required skills and to get updated on revised new technical know how.

Page 54: A Project Report On

o Improvements are not only based on past experience or learning’s but

also based on suggestions across all levels. As employees are fully

trained and fully focused on their work they are the right channels to

know the improvement area’s which is encouraged through suggestions

scheme. Good Suggestions are rewarded instantly or on quarterly or

Page 40

yearly basis depending upon organizational practices. All recognized

orImplemented suggestions are communicated through newsletter along

with the employees’ name and with their reward so to empower everyone

to go and suggest all improvement area to improve organizational

productivity or to reduce waste/rework or to control cost etc.

o Employees get opportunities to work on improvement areas’ through

focused team, improvement teams or quality circles and get

management visibility for their interest in improving organization. It

fosters leadership and empowers employees to utilize all his potential at

greater extent.

o They will ensure to plan everything; everyone in organization is aware

where they are leading for. The drive and direction is focused and in

align with the business plan

o Management members are fully involved in implementing business plan

and will ensure to provide all required resources such has Resources,

Budget, Environment Utilities etc time to time till the goals are achieved

o Various control mechanisms are in place such functional, departmental

meetings, periodic checks, periodic reporting, review meeting, audits etc

to ensure all activities are in align with business plan

o Based on analysis, extending support by taking corrective and preventive

actions, recognizing and rewarding achievements, revising plan and

keeping everyone informed about the progress and about future plan on

timely basis.

Page 55: A Project Report On

Data driven Decision Making

o The data for all important activities are collected as measurement. These

measurement data is used to take decision or to forecast or predict the

business. Decisions are not person dependant but process dependant.

Page 41

Various tools such Brainstorming, Fish Bone, Pareto, Control Charts,

Histogram, Correlation, Regression are used to control variance and

variation.

Page 56: A Project Report On

Page 42

Limitation of TQM

o TQM is a philosophy

o It is not quality management but should be referred as process

management or process of improvement

o Does not Offers any set of guidelines for quality management. Like

religion, there are as many versions as there are advocates. A study by

Ernst & Young turned up around 945 different approaches for

implementing TQM.

o In reality it is not total since it only addresses one aspect of quality

management that is improvement

o TQM is remedial and not preventive. TQM is aimed at identifying the

causes of quality problems and eliminating them. The theory is that by

involving everyone in solving quality problems, eventually all problems

will be eliminated and the company's quality will continue to get better

and better. Unfortunately, TQM is based on studying past data which

amounts to examining the barn door after the horse has run away.

o ISO-9000 requires documentation and record keeping. ISO-9000, which

requires regular audits by an outside party. There is no such requirement

in TQM. TQM has a history of fading away over time. As a result,

improvements often get lost or forgotten as new people, new products

and new managers come and go. Also, the typical TQM implementation

relies heavily on the leadership of a "champion." When the champion

goes, so does the TQM program. TQM can disappear without a whimper.

According to various published reports, about three-quarters of

Page 57: A Project Report On

significantly sized American manufacturers have attempted some form of

TQM. Of those programs, about four-fifths have failed to produce any

significant results and most of them have simply disappeared.

o Goals are mainly set at higher level and very limited to bottom line

o Goals are not dead line.

Page 43

o Very often, Changes is triggered by internal customer requirements

o Improvement teams or Quality circles includes on techies, support or

departmental or management contribution is very less

o Developed by techies with limited knowledge of management

o Mostly the result is continual improvement and incident of breakthrough

improvement are very rare

o Does not target a specific scope and no dead line so improvement is not

consistent

o Focus is mostly in Quality instead of Quality + Cost + Cycle Time +

Business Issues

o As it is management driven, management support is must which is not

consistent.

Page 58: A Project Report On

Page 44

CHAPTER 7CHAPTER 7

RECOMMENDATIONS

Page 59: A Project Report On

Recommendations

After going through the concept, advantage, limitation of TQM and where TQM

is implemented along with ISO 9001 and CMMi suggesting for following

recommendations based on my observations and learning’s,.

Better to implement TQM with ISO 9001 or with CMMI or Six Sigma so that it

will not remain concept or Philosophy or theory but it should be integral part of

organization mechanism in place to address, resolve and prevent all quality

related issues.

The typical TQM program takes a year or so just to get started and as there is

no limit majority of them don’t achieve the required results even after spending

years hence need to be carried out on time bound basis.

Voice of Customer, Voice of Business and Voice of process all should be

considered for setting goals. Goal should be SMART. Specific, Measurable,

Achievable, Realistic and Target based.

Although TQM assures live and working continuous improvement and

compliance with the key elements of the standards it is not globally accepted, all

purpose quality model in the world hence If a business wants to remain

competitive, we have to implement along with ISO or CMMI or with Six Sigma.

Your activity should lead to profit improvement and not limited to process

improvement or for certification.

Page 60: A Project Report On

First improve and then document and then train.

Scope should be equally provided for Continual & Breakthrough improvements.

Page 45

Apart from Brainstorming, Fish Bone, Pareto, Control Charts, Histogram,

Correlation and Regression it should facilitate usage of improvement, such as

Failure Mode and Effect Analysis (FMEA), Quality

Function Deployment (QFD) and other tools of six sigma to help to move the

company towards being a world-class operation.

So to delight your internal as well as external clients go for

If you don’t go someone else will…..

Page 61: A Project Report On

Page 46

CHAPTER 8CHAPTER 8

ANNEXURE

Page 62: A Project Report On

Questionnaires

o What is the mission and vision of CGI?

o What are the objectives or goals of CGI?

o Would you please describe about Quality Journey of CGI?

o Globally as well as in India

o Who is the lead auditor for CGI for ISO 9001?

o Who is the lead auditor for CGI for ISO 27001?

o Who is the lead auditor for CGI for CMMi Level 5?

o What is the strength of CGI India?

o Do you have separate department for Quality?

o If yes, then how many employees are working in that?

o If no, then how you manage quality function in your company?

o Are they working full time or as and when basis?

o Would you please let me know how Quality department is working?

o Do you have separate department for Audit?

o If yes, then how many employee are working in that?

o If no, then how you manage audit function in your company?

o Are they working full time or as and when basis?

o Would you please let me know how Audit department is working?

o Who is the right person to talk about TQM here?

o Do you need any certificate from my college for this project?

Page 63: A Project Report On

o Could you please share soft copy of your TQM with me for my

project?

o If not could you provide me the hard copy for reference purpose?

o For referring at home or within office only?

o Can I take notes from hard copy and reproduce your activities in my

project after getting reviewed from your members?

o How TQM is getting implemented in CGI?

o What are the resources requirements of TQM in CGI?

Page 47

o Can I get chance to see the budget for TQM?

o How to do you ensure that all employees are understood TQM and

followed TQM?

o How do you ensure that message of TQM passes to all employees,

all the time?

o How do you compare TQM with you internal as well as external

quality models (ISO 9001 and CMMi)?

o Do you follow any reorganization or reward system to promote TQM?

o How do you improve your TQM?

o What are the various tools you are using for implementing TQM?

o How do you ensure to keep your customer and your employee

happy?

o Do your follow any measurement plan to monitor your business

goals or objectives?

o Do you follow specific process to handle customer complaints?

o Internal as well as external?

o Do you follow specific process to handle suggestion, improvement

and innovation?

o How do you promote quality in your company?

o Do you conduct quality quiz regularly?

Page 64: A Project Report On

o Do you conduct quality week?

o If yes? What is the frequency?

Page 48

CHAPTER 9CHAPTER 9

Page 65: A Project Report On

BIBLIOGRAPHY & WEBLIOGRAPHY

Bibliography

o Productivity & Quality Management – S.D. Aphale

o TQM & ISO 9000 for Architects and Designers – Charles Nelson

o Six Sigma Black Belt training Material – Asian Institute of Quality

Management

Webliography

o WWW.GOOGLE.COM

o WWW.CGI.COM

o WWW.ISIXSIGMA.COM

Page 66: A Project Report On