![Page 1: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/1.jpg)
A New Twist on an Old A New Twist on an Old Test for Activated Sludge Test for Activated Sludge Process ControlProcess Control
Estes Park PWO SeminarEstes Park PWO SeminarOctober 22, 2004October 22, 2004
Greg Farmer – Littleton / Englewood Greg Farmer – Littleton / Englewood WWTPWWTP
![Page 2: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/2.jpg)
L/E WWTP Process L/E WWTP Process SchematicSchematic
![Page 3: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/3.jpg)
Aerial ViewAerial View
![Page 4: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/4.jpg)
Phase 2 Construction Phase 2 Construction ProjectProject
![Page 5: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/5.jpg)
Phase 2 Construction Phase 2 Construction ProjectProject
![Page 6: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/6.jpg)
TF/SCTF/SC
40 – 70% of SBOD and 25 – 50% of 40 – 70% of SBOD and 25 – 50% of CBOD is removed in the trickle CBOD is removed in the trickle filterfilter
Aeration basins provide remaining Aeration basins provide remaining BOD removal and flocculationBOD removal and flocculation
SRT < 2 daysSRT < 2 days SVI around 100SVI around 100 Not intended for nutrient removalNot intended for nutrient removal
![Page 7: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/7.jpg)
Typical Activated Typical Activated Sludge Control Sludge Control MethodsMethods Control MLSS InventoryControl MLSS Inventory Dissolved oxygen concentrationDissolved oxygen concentration And RAS/clarifier blanketsAnd RAS/clarifier blankets
To produce a sludge that:To produce a sludge that: FlocculatesFlocculates SettlesSettles CompactsCompacts
![Page 8: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/8.jpg)
Traditional Traditional Performance Performance IndicatorsIndicators Secondary Secondary
clarifier effluent clarifier effluent TSS and BODTSS and BOD
Final effluent TSS Final effluent TSS and BODand BOD
SVI / SettleometerSVI / Settleometer SRTSRT F/MF/M
![Page 9: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/9.jpg)
But, what if……..But, what if……..
What if your secondary clarifiers do What if your secondary clarifiers do not function properly due to hydraulic not function properly due to hydraulic and/or flocculation deficienciesand/or flocculation deficiencies– Too shallowToo shallow– Short circuitingShort circuiting– RAS return problemsRAS return problems– Poor sampling locationPoor sampling location– Thermal CurrentsThermal Currents– Floc shearFloc shear
![Page 10: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/10.jpg)
Final Effluent TSS Final Effluent TSS Secondary Clarifier Secondary Clarifier TSSTSS
![Page 11: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/11.jpg)
TemperatureTemperature
Temperature plays a major role:Temperature plays a major role: Biological activity decreases by Biological activity decreases by
50% for every 10° C drop in 50% for every 10° C drop in temperaturetemperature
Clarifier thermal currents are Clarifier thermal currents are created with as little as a 0.5° C created with as little as a 0.5° C temperature differencetemperature difference
![Page 12: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/12.jpg)
Final Effluent TSS Final Effluent TSS Secondary Clarifier Secondary Clarifier TSSTSS
![Page 13: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/13.jpg)
Aeration Basin Aeration Basin Temperature SwingTemperature Swing
![Page 14: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/14.jpg)
Thermal CurrentsThermal Currents
![Page 15: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/15.jpg)
![Page 16: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/16.jpg)
What Tools Are What Tools Are Available?Available? Does a tool exist that can be used Does a tool exist that can be used
to predict or forecast the correct to predict or forecast the correct MLSS inventory to maintain a MLSS inventory to maintain a healthy biomass?healthy biomass?
This tool must not look at This tool must not look at deficiencies in the secondary deficiencies in the secondary clarifiersclarifiers
![Page 17: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/17.jpg)
Enter the Wally MeterEnter the Wally Meter
Developed by Dr. Eric Wahlberg as Developed by Dr. Eric Wahlberg as the Wahlometerthe Wahlometer
Consider it a “flocculated Consider it a “flocculated settleometer”settleometer”
Determines the “health” of an Determines the “health” of an activated sludgeactivated sludge
Negates the influence of secondary Negates the influence of secondary clarifier inefficiencies on process clarifier inefficiencies on process control decisions control decisions
![Page 18: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/18.jpg)
Wally Meter in ActionWally Meter in Action
Collect a MLSS grab sample 2 times/dayCollect a MLSS grab sample 2 times/day Pour into square Phipps and Bird Pour into square Phipps and Bird
flocculation jar or authentic flocculation jar or authentic “Wahlometer” “Wahlometer”
Mix at 50 rpm for 30 minutesMix at 50 rpm for 30 minutes Record the 5 minute SSVRecord the 5 minute SSV55 reading reading Settle for 30 minutes and record the 30 Settle for 30 minutes and record the 30
minutes SSVminutes SSV3030 reading to calculate SVI reading to calculate SVI Sample subnatant for TSS and/or NTUSample subnatant for TSS and/or NTU
Wally Meter
![Page 19: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/19.jpg)
Wally Meter TermsWally Meter Terms
ESS – Effluent Suspended SolidsESS – Effluent Suspended Solids FSS – Flocculated Suspended FSS – Flocculated Suspended
Solids, SS that remain in the Solids, SS that remain in the subnatant after 30 minutes of subnatant after 30 minutes of settling preceded by 30 minutes settling preceded by 30 minutes of flocculationof flocculation
![Page 20: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/20.jpg)
Clarifier ESS vs. Clarifier ESS vs. Wally Meter FSSWally Meter FSS
![Page 21: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/21.jpg)
How to Use the DataHow to Use the Data
The Wally Meter TSS value is the The Wally Meter TSS value is the lowest possible TSS value that lowest possible TSS value that can be attained in a perfect can be attained in a perfect environmentenvironment
Adjust MLSS to maintain low Adjust MLSS to maintain low Wally Meter TSSWally Meter TSS
Adjust seasonally for temperature Adjust seasonally for temperature changeschanges
![Page 22: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/22.jpg)
The EquationThe Equation
Inventory =Inventory =
(21,000lbs MLSS + ((Avg Wally Meter TSS – 6) * (21,000lbs MLSS + ((Avg Wally Meter TSS – 6) * 500))500))
+(21.5 C – Avg Basin temp.) * Lbs MLSS Inventory +(21.5 C – Avg Basin temp.) * Lbs MLSS Inventory * .1)* .1)
- (5-minute Wally Meter reading – 400) * 20- (5-minute Wally Meter reading – 400) * 20
![Page 23: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/23.jpg)
The EquationThe Equation
![Page 24: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/24.jpg)
Predictive ChartPredictive Chart Spreadsheet
![Page 25: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/25.jpg)
Last 45 DaysLast 45 Days
![Page 26: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/26.jpg)
Final EffluentFinal Effluent
![Page 27: A New Twist on an Old Test for Activated Sludge Process Control Estes Park PWO Seminar October 22, 2004 Greg Farmer – Littleton / Englewood WWTP.](https://reader035.fdocuments.us/reader035/viewer/2022062717/56649e315503460f94b229dd/html5/thumbnails/27.jpg)
ApplicabilityApplicability
Will the equation work for an Will the equation work for an activated sludge plant? A BNR activated sludge plant? A BNR plant?plant?
Collect data for a period of timeCollect data for a period of time Experiment with equation values Experiment with equation values
to attain a fitto attain a fit