A new generation of jack-up vessels MEET DAMEN @ OFFSHORE ...€¦ · A new generation of jack-up...

3
A new generation of jack-up vessels WTIVs With the dawn of the new 12-MW offshore wind turbines, installation capacities of the current, third generation wind turbine installation vessels (WTIVs) will be pushed to the limits and beyond. A new generation of jack-up vessels is necessary to serve the future offshore wind industry. The Dutch company Ulstein Design & Solutions BV has its own perspective when it comes to developing an efficient jack-up with a healthy economic lifetime in this rapidly evolving sector. F ollowing the early pioneering days of offshore wind, the second-generation installation jack-ups, specifically de- signed for wind turbine installation, started working in 2010, Ulstein noted. Originally intended to be the offshore wind installation vessel for decades to come, within a few years these vessels were caught up by the rapid growth in offshore wind turbines. Although some vessels were upgraded to cope with the higher lifting heights for the current 8-MW wind turbines, the quicker than expected increase in turbine size has meant that these second-generation wind installation vessels are no longer as efficient as they were. Around 2015, the third generation of wind installation jack-ups became operational due to the rapid growth in wind turbine size. Although these ves- sels are a nice fit for current generation wind turbines, they will be pushed to their limits by the new 12-MW turbines expected in 2022, Ulstein said. Like previous jack-up generations, it seems their viable economic lifespan again is reduced to just a single decade, rather than a more healthy 25 years, the com- pany added. Jan de Nul recently announced the construction of what can be reckoned as the first installation jack-up of the fourth generation, the Voltaire. With its size and lifting capacities, this huge vessel will be able to install the new 12-MW wind tur- bines and appears to be ready for the ex- pected further growth in turbine size in the decade to come. Ulstein Design & Solutions sees the big challenge as how to design the next generation jack-up correctly: making it only slightly larger than the current gen- eration could mean that it might be ob- solete within a few years; building it too large and the unit might never be com- petitive in the market. Ulstein J102 installing a future 15-MW turbine Source: Ulstein Design & Solutions > OFFSHORE & MARINE TECHNOLOGY OFFSHORE WIND 30 Ship&Offshore | 2019 | Nº 6

Transcript of A new generation of jack-up vessels MEET DAMEN @ OFFSHORE ...€¦ · A new generation of jack-up...

Page 1: A new generation of jack-up vessels MEET DAMEN @ OFFSHORE ...€¦ · A new generation of jack-up vessels WTIVs With the dawn of the new 12-MW offshore wind turbines, installation

A new generation of jack-up vesselsWTIVs With the dawn of the new 12-MW offshore wind turbines, installation capacities of the current, third generation wind turbine installation vessels (WTIVs) will be pushed to the limits and beyond. A new generation of jack-up vessels is necessary to serve the future offshore wind industry. The Dutch company Ulstein Design & Solutions BV has its own perspective when it comes to developing an efficient jack-up with a healthy economic lifetime in this rapidly evolving sector.

Following the early pioneering days of offshore wind, the second-generation installation jack-ups, specifically de-

signed for wind turbine installation, started working in 2010, Ulstein noted. Originally intended to be the offshore wind installation vessel for decades to come, within a few years these vessels were caught up by the rapid growth in offshore wind turbines. Although some vessels were upgraded to cope with the higher lifting heights for the current 8-MW wind turbines, the quicker than expected increase in turbine size has meant that these second-generation wind installation vessels are no longer as efficient as they were.

Around 2015, the third generation of wind installation jack-ups became operational due to the rapid growth in wind turbine size. Although these ves-sels are a nice fit for current generation wind turbines, they will be pushed to their limits by the new 12-MW turbines expected in 2022, Ulstein said. Like previous jack-up generations, it seems their viable economic lifespan again is reduced to just a single decade, rather than a more healthy 25 years, the com-pany added.

Jan de Nul recently announced the construction of what can be reckoned as

the first installation jack-up of the fourth generation, the Voltaire. With its size and lifting capacities, this huge vessel will be able to install the new 12-MW wind tur-bines and appears to be ready for the ex-pected further growth in turbine size in the decade to come.

Ulstein Design & Solutions sees the big challenge as how to design the next generation jack-up correctly: making it only slightly larger than the current gen-eration could mean that it might be ob-solete within a few years; building it too large and the unit might never be com-petitive in the market.

Ulstein J102 installing a future 15-MW turbine Source: Ulstein Design & Solutions

>

OFFSHORE & MARINE TECHNOLOGY OFFSHORE WIND

30 Ship & Offshore | 2019 | Nº 6

The FCS 7011 brings a new long-distance class, capable of servicing large platforms a long distance from port. Its size, capacity and technical solutions enable it to exchange large volumes of personnel quickly, efficiently and in a very broad weather window.

DAMEN.COM

Your access to offshore solutions.

Next level approach offshore crew transport.

FAST CREW SUPPLIER 7011

8-9 OCTOBER, 2019 | AMSTERDAM, THE NETHERLANDS | BOOTH #1.300

MEET DAMEN @ OFFSHORE ENERGY

ADV-4-003 FCS 7011 210x297 .indd 1 19.08.2019 15:16:56SPI_006_19_030-038_OM-.indd 30 13.09.2019 11:41:13

Page 2: A new generation of jack-up vessels MEET DAMEN @ OFFSHORE ...€¦ · A new generation of jack-up vessels WTIVs With the dawn of the new 12-MW offshore wind turbines, installation

The FCS 7011 brings a new long-distance class, capable of servicing large platforms a long distance from port. Its size, capacity and technical solutions enable it to exchange large volumes of personnel quickly, efficiently and in a very broad weather window.

DAMEN.COM

Your access to offshore solutions.

Next level approach offshore crew transport.

FAST CREW SUPPLIER 7011

8-9 OCTOBER, 2019 | AMSTERDAM, THE NETHERLANDS | BOOTH #1.300

MEET DAMEN @ OFFSHORE ENERGY

ADV-4-003 FCS 7011 210x297 .indd 1 19.08.2019 15:16:56SPI_006_19_030-038_OM-.indd 31 13.09.2019 11:41:13

Page 3: A new generation of jack-up vessels MEET DAMEN @ OFFSHORE ...€¦ · A new generation of jack-up vessels WTIVs With the dawn of the new 12-MW offshore wind turbines, installation

Business caseAs leading ship designers, Ulstein studies the market developments in offshore wind carefully to gain insight into the expected size of future wind turbines, which deter-mines the design case for new installation vessels. The company created a business case tool to develop and evaluate multiple solutions. This tool shows which designs would be viable in the current and future market by calculating relevant performance parameters, including average installation time, cost per turbine and return on invest-ment.

For turbine installations, the designers ran a wide range of business case analyses for different types and sizes of installation vessels and jack-ups. These analyses provid-ed great insight in which technical options and jack-up sizes work well from a business perspective. Working with business models and studying the results enabled them to understand clearly the challenges of their clients, Ulstein said. One of the interesting lessons is that ‘economies of scale’ does have

its limits for wind installation vessels; the economic sweet spot is not necessarily the largest unit, it added.

With the business case results the de-signers optimised and further developed their range of Ulstein wind installation jack-ups. Featuring lower steel weight, higher crane capacity and better operabil-ity, Ulstein’s X-Jack design clearly shows

its benefits for a 15-MW business case; cutting up to 25% in total installation cost in comparison with currently available jack-ups. Moreover, the company said it has been able to optimise the main dimen-sions of the Ulstein J102 to be the most competitive design in the market; both for the near future as well as for the next gen-eration wind turbines envisioned by 2030.

Generations of wind turbine installation vessels Source: Ulstein Design & Solutions

Norwegian expertise for floating wind farm in South KoreaDONGHAE 1 | Norwegian state energy company Equinor, the Korea National Oil Corporation (KNOC) and power company Korea East-West Power have established a consortium to under-take a feasibility study and develop a 200-MW floating offshore wind farm,

Donghae  1, off Ulsan in South Korea. The facility will be located close to the KNOC-operated Donghae natural gas field and the partners will assess the feasibility of using the Donghae 1 plat-form as a substation for the wind farm. Subject to the outcome of the feasibility

study, construction of the facility could begin in 2022, with power production starting about two years later. If the plans go ahead as the partners envis-age, the Donghae floating wind farm will be more than twice the size of the larg-est floating facility today – the 88-MW Hywind Tampen facility on Norway’s continental shelf.“We are very pleased to be a member of the partnership involved in realising the first floating offshore wind farm in Asia,” said Stephen Bull, senior vice president for the wind and low carbon cluster of New Energy Solutions in Equinor. “A floating offshore wind farm of this size will help further increase the competi-tiveness of floating offshore wind power in the future.”The project comes as part of South Ko-rea’s strategy to transform its energy mix, cutting the share of nuclear power and coal while targeting a 20% contribution from renewables by 2030. Of the 49 GW of renewables production planned by then, solar is likely to account for 31 GW and wind 16 GW.

Now that floating wind technology is mature and costs have started to come down, Equinor expects to see exponential growth in floating offshore wind worldwide Source: Equinor

32 Ship & Offshore | 2019 | Nº 6

OFFSHORE & MARINE TECHNOLOGY OFFSHORE WIND

VIDEO SECURITYP R O D U C T Swww.videotec.com

Made in I ta ly

IP66/IP67IP68/IP69

TYPE 4XTYPE 6P

NTX New IP68 stainless steel

thermal camera with radiometric functions

Videotec presents NTX, the new IP68 stainless steel thermal camera with radiometric functions, developed to provide a preventative surveillance system in the most critical environmental conditions.

NTX is ideal for the most demanding applications in the marine and industrial sectors, in critical infrastructures, power plants and transport sector, including railways and motorway tunnels.

SPI_006_19_030-038_OM-.indd 32 13.09.2019 11:41:15