A Human Centered Design: The MV KEN EICHNER-2

45
A Human Centered Design The MV KEN EICHNER-2 Presented to: CFOA 2011 Presented by: Callum Campbell, P.Eng., Senior Naval Architect

description

Presentation to Canadian Ferry Operators Conference, 13 September 2011 Presented by Callum Campbell, P.Eng., Senior Naval Architect

Transcript of A Human Centered Design: The MV KEN EICHNER-2

Page 1: A Human Centered Design: The MV KEN EICHNER-2

A Human Centered DesignThe MV KEN EICHNER-2

Presented to: CFOA 2011Presented by: Callum Campbell, P.Eng., Senior Naval Architect

Page 2: A Human Centered Design: The MV KEN EICHNER-2

Contents

Motivation for New Vessel

Existing Service and Vessels

Human Centred Design

Page 3: A Human Centered Design: The MV KEN EICHNER-2
Page 4: A Human Centered Design: The MV KEN EICHNER-2
Page 5: A Human Centered Design: The MV KEN EICHNER-2
Page 6: A Human Centered Design: The MV KEN EICHNER-2
Page 7: A Human Centered Design: The MV KEN EICHNER-2
Page 8: A Human Centered Design: The MV KEN EICHNER-2

Service Quarter mile wide crossing

Every 30 minutes during most of the year, except during the May to September when it runs every 15 minutes

$5 per ride per walk-on

Page 9: A Human Centered Design: The MV KEN EICHNER-2

Reference Vessel: Bob Ellis MV Bob Ellis

Built as “Mt Marcy”

In operation on the route since 1988

Built by Blount Marine

Page 10: A Human Centered Design: The MV KEN EICHNER-2

Reference Vessel: Oral Freeman MV Oral Freeman

Designed by Kvaerner

Built by Alaska Ship & Drydock

Built in 2001

22 car

149 passenger

Double-ended Ro-Ro

Conventional Propulsion

Page 11: A Human Centered Design: The MV KEN EICHNER-2

Motivation for the New Ferry “Bridge to nowhere” cancelled by Governor Palin

Bob Ellis not compliant

Page 12: A Human Centered Design: The MV KEN EICHNER-2

Owner’s Team Owner: State of Alaska

Operator: Ketchikan Gateway Airport

Owner’s Engineer: The Glosten Associates

Page 13: A Human Centered Design: The MV KEN EICHNER-2

Requirements

Page 14: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2011

Page 15: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ same

Page 16: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals same

Page 17: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp same

Page 18: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp sameCars 22 23

Page 19: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp sameCars 22 23Deadweight 83 LT 40% more

Page 20: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp sameCars 22 23Deadweight 83 LT 40% moreSpeed 10 knots 12 knots

Page 21: A Human Centered Design: The MV KEN EICHNER-2

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp sameCars 22 23Deadweight 83 LT 40% moreSpeed 10 knots 12 knotsCertification ABS/ USCG same but new regs

Page 22: A Human Centered Design: The MV KEN EICHNER-2

Oral Freeman New Ferry

Price $5 M same

Year 2001 + 10 years

Cars 22 5%

Dimension 116’ x 48’x12’ same

Compatibility 2 term same

Engine 2 x 850 hp same

Speed 10 knots 20%

Crew 2 same

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp sameCars 22 23Deadweight 83 LT 40% moreSpeed 10 knots 12 knotsCertification ABS/ USCG same but new regsPrice $5 M same

Page 23: A Human Centered Design: The MV KEN EICHNER-2

Oral Freeman New Ferry

Price $5 M same

Year 2001 + 10 years

Cars 22 5%

Dimension 116’ x 48’x12’ same

Compatibility 2 term same

Engine 2 x 850 hp same

Speed 10 knots 20%

Crew 2 same

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp sameCars 22 23Deadweight 83 LT 40% moreSpeed 10 knots 12 knotsCertification ABS/ USCG same but new regsPrice $5 M sameCrew 2 same

Page 24: A Human Centered Design: The MV KEN EICHNER-2

Oral Freeman New Ferry

Price $5 M same

Year 2001 + 10 years

Cars 22 5%

Dimension 116’ x 48’x12’ same

Compatibility 2 term same

Engine 2 x 850 hp same

Speed 10 knots 20%

Crew 2 same

RequirementsOral Freeman New Ferry

Year 2001 2009Dimension 116’ x 48’x12’ sameCompatibility 2 terminals sameEngine 2 x 850 hp sameCars 22 23Deadweight 83 LT 40% moreSpeed 10 knots 10 knotsCertification ABS/ USCG same but new regsPrice $5 M $7 MCrew 2 same

Page 25: A Human Centered Design: The MV KEN EICHNER-2
Page 26: A Human Centered Design: The MV KEN EICHNER-2

Contract Type Design-Build

Owner Prepared Specification

Partly prescriptive on equipment/ arrangement

Partly performance based

Concept Guidance Drawing

No credence given

Page 27: A Human Centered Design: The MV KEN EICHNER-2

Design-Build Team Shipyard: Alaska Ship and Drydock

Naval Architect & Marine Engineer: Capilano Maritime

Page 28: A Human Centered Design: The MV KEN EICHNER-2

New Ferry Design• Design ABS/U.S. Coast Guard• Length 116 ft. – 6 in.• Breadth 48 ft.• Depth 12 ft.• Draft 9 ft.• Design Speed 10 knots• Service Speed 8 knots• Passengers 149• Crew 2• Cars 23• Main Engines 2 x 850 HP Cummins• Generators2 x 55kW Northern Lights

Page 29: A Human Centered Design: The MV KEN EICHNER-2

Lines of Concept Ferry

Page 30: A Human Centered Design: The MV KEN EICHNER-2

Lines of Proposed Ferry

Page 31: A Human Centered Design: The MV KEN EICHNER-2

Main Deck

Page 32: A Human Centered Design: The MV KEN EICHNER-2

Lower Deck

Page 33: A Human Centered Design: The MV KEN EICHNER-2

• MV Ken Eichner-2• Built by ASD• Launched April

2011

Newbuild as Launched

Page 34: A Human Centered Design: The MV KEN EICHNER-2

USCG Subchapter-T

Page 35: A Human Centered Design: The MV KEN EICHNER-2

Tonnage Frames

Page 36: A Human Centered Design: The MV KEN EICHNER-2

Access

Page 37: A Human Centered Design: The MV KEN EICHNER-2

Sightlines as Planned

Page 38: A Human Centered Design: The MV KEN EICHNER-2

Sightlines as Delivered

Page 39: A Human Centered Design: The MV KEN EICHNER-2

Sightlines as Planned

Page 40: A Human Centered Design: The MV KEN EICHNER-2

Sightlines as Delivered

Page 41: A Human Centered Design: The MV KEN EICHNER-2

Ergonomics

Page 42: A Human Centered Design: The MV KEN EICHNER-2

ASTM F1166

Page 43: A Human Centered Design: The MV KEN EICHNER-2

RelationshipsOwner/

Operator

Owner’s Engineer

Shipyard

Naval Architect

Classification Society

Suppliers

Page 44: A Human Centered Design: The MV KEN EICHNER-2

Conclusion Simple, Robust, Human Centred Ferry: 1

Eaten by Lions: 0

Page 45: A Human Centered Design: The MV KEN EICHNER-2

Contact Callum Campbell

Capilano Maritime Design

twitter: @CapMarDesign