PROPOSED FIVE YEAR STRATEGIC FACILITY PLANPROGRAMS FOR 2010 TO 2015
ENGR. ROBERTO G. ROSALES, msmeFACILITIES MANAGER, Member – ASHRAEMember – PSVAREMember - BOMAP
SEPTEMBER 21,2009
![Page 2: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/2.jpg)
5-Year STRATEGIC FACILITY PLANNING
OBJECTIVE TO IMPROVE PHYSICAL AND ENVIRONMENTAL
CONDITIONS OF FACILITIES by 2011 TO IMPROVE EFFICIENCY OF SYSTEM AND LOWER
O&M COST BY 3% UPON PROJECT COMPLETION by 2012
TO BRING MAJOR EQUIPMENT TO THE LEVEL OF ITS STANDARD OPERATING CONDITIONS by 2015
![Page 3: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/3.jpg)
5-Year STRATEGIC FACILITY PLANNING
FACILITIES WATER SYSTEM AIRCONDITIONING AND VENTILATION
SYSTEM LIGHTING SYSTEM LANDSCAPE AREA EMERGENCY POWER SYSTEM
![Page 4: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/4.jpg)
5-Year STRATEGIC FACILITY PLANNING
WATER FACILITY ENHANCEMENT OF WATER
QUALITY THROUGH FIRST STAGE DIRECT FEED AND UV FILTRATION
PROVISION OF ALTERNATE MAIN PIPE RISER FOR CRITICAL FLOOR SUPPLY
REPLACEMENT OF PUMP CONTROLLERS USING VARIABLE FREQUENCY FOR ENERGY SAVINGS OF 50% ON PUMPING COST
![Page 5: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/5.jpg)
5-Year STRATEGIC FACILITY PLANNING
AIRCONDITIONING AND VENTILATION SYSTEM DESIGN OF NEW TYPICAL FLOOR
LOBBY AIRCONDITIONING VS. RESTORATION WORKS ONLY
USE OF ENERGY RECOVERY VENTILATION SYSTEM
UTILIZE EXISTING VFD CONTROLLERS to improve system efficiency to maximize existing investment
Basement Elevator Lobby Airconditioning
![Page 6: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/6.jpg)
5-Year STRATEGIC FACILITY PLANNING
AIRCONDITIONING AND VENTILATION SYSTEM COOLING TOWERS( HEART OF THE SYSTEM)
WATER MANAGEMENT DESIGN OF WATER RECIRCULATION PIPES PROVISION OF WATER METER WATER TREATMENT PROGRAM ENHANCEMENT
COOLING TOWER FILLERS PROVISION OF STANDBY FILLER PER TOWER
MODULE RESTORATION OF BMS CONTROLLERS AND
VALVES REPLACEMENT OF MAIN PIPE LINES affected by
Corrosions RESTORATION OF VIBRATION ISOLATORS RESTORATION OF ACOUSTIC PANELS
![Page 7: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/7.jpg)
5-Year STRATEGIC FACILITY PLANNING
AIRCONDITIONING AND VENTILATION SYSTEM PROVISION OF EFFICIENCY
CONTROLS FOR TOILET EXHAUST SYSTEM
BASEMENT VENTILATION SYSTEM USE OF JET FANS – AS AN
ALTERNATIVE SYSTEM
![Page 8: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/8.jpg)
5-Year STRATEGIC FACILITY PLANNING
LIGHTING SYSTEM USE OF INTERACTIVE LIGHTING
FOR LOBBY CORRIDOR FOR ADDED SAFETY
USE OF ELECTRONIC BALLAST FOR BASEMENT LIGHTING FOR 20% ADDED ENERGY SAVING
IMPROVEMENT OF LIGHTING SYSTEM FOR TRAFFIC CONTROL
![Page 9: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/9.jpg)
5-Year STRATEGIC FACILITY PLANNING
LANDSCAPE WATERPROOFING
Integrated waterproofing of Landscape Area
Irrigation system improvement
Trees and tree pits improvement
![Page 10: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/10.jpg)
5-Year STRATEGIC FACILITY PLANNING
EMERGENCY POWER SYSTEM Emergency Power System
Rehabilitation of Synchronizing Switchgear for all towers, priority is Rizal Tower
Recommended works of Caterpillar& Shockblock for Gensets
Assessment of BusDuct System
Assessment of Running Motors
![Page 11: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/11.jpg)
5-Year STRATEGIC FACILITY PLANNING
SYSTEM EST. COST in Millions
TARGET DATE REMARKS
1 WATER SYSTEM 3.6 2 QTR 2012 TO 2QTR 2013
Chemperts/AMD/AFS
2. AIRCONDITIONING 4.4 4 QTR 2012 &1QTR2015
Dacworks/MEI
3. LIGHTING SYSTEM 3.5 4 QTR 2010 TO 2QTR 2011
Weiland/MEI
4. LANDSCAPE AREA 3.5 4 QTR 2010 TO 2 QTR 2013
BNMP/RLC
5. EMERGENCY POWER SYSTEM
1.5 3QTR 2012 / 3QTR 2014 Caterpillar/Shockblock
TARGET SCHEDULE IN PHASES
![Page 12: A Five Year Plan V.2](https://reader036.fdocuments.us/reader036/viewer/2022062514/5591d7ca1a28ab1c468b4652/html5/thumbnails/12.jpg)
5-Year STRATEGIC FACILITY PLANNING
THANK YOU!