Executive Summary
A European Union Project of Common Interest
Pan European Electricity Grid
Integrated
A Bridge for Friendship
and Prosperity
A Pioneering
Endeavor
Distance : 311 nmi
Max Depth: 410 m
Power: 730 MW
Norway-Netherlands (NorNed)
Distance : 226 nmi
Max Depth: 1600 m
Power: 1000 MW
Italy-Sardinia (SAPEI)
8
England-Scotland
Distance : 227 nmi
Voltage: 600 kv
Power: 2200 MW
Decision:2013 / Completion 2015
167 nmi 475
nmi
178 nmi
820 nmi
2200m.
The Project
The Challenge
Depth <2200 m
The Answer
Cable Weight @ 60 kg/m
50 years life span
The Route Planning
The Seabed
The Seabed
The Original Planning
16
The latest Planning - May 2013
16
The latest Planning - May 2013
16
Existing Cables
.
Latitude Longitude
34°52.954' N 28°08.837' E
35°31.550' N 25°02.713' E
35°31.534' N 25°02.838' E
35°30.198' N 25°13.635' E
35°29.231' N 25°21.452' E
35°28.929' N 25°23.892' E
35°28.896' N 25°24.161' E
34°52.954' N 28°08.837' E
35°18.880' N 26°46.468' E
34°52.954' N 28°08.837' E
34°47.500' N 28°24.396' E
34°44.842' N 28°31.972' E
34°32.227' N 29°07.877' E
34°23.701' N 29°32.093' E
34°10.211' N 29°56.946' E
34°09.352' N 30°15.084' E
34°10.985' N 31°30.295' E
34°09.735' N 32°19.881' E
34°15.025' N 32°38.706' E
34°25.975' N 32°46.345' E
57 Cables
37 Operational 14 Non Operational
6 Scheduled
Existing Cables
.
ΟΝΟΜΑ
APHRODI2
ARIANE-1
MARHERAK
ntls2aslaidR2
ITUR E1
Minos
MINOS_CHANIA-BU
ALEXANDR
ALEXANDR
TGN_BU6_DIMITRIOS
TGN_BU7_LOMBARDA
Atene-creta1
ATENE-CRETA
Admiralty
The most advanced vessel
•High Technology •AMC Connector •9000 tons of cable
The most advanced vessel
•Concurrent dual cable laying •Depth: 3000 meters
The most advanced vessel
•Vertical, heavy load cable laying •High speed cruising
The Cable Protection
•Remote Operated Vehicle (ROV) - 4000 m depth capability
Inspection ROV from
our technical team
The Journey
January 2012
Project Announcement - Nicosia
March 4, 2012
Israel’s Official Commitment - Tel Aviv
March 23, 2012
Cyprus Electricity Authority commits to the project - Nicosia
April 23, 2012
Steering Committee's 1st meeting - Nicosia
May 18, 2012
Briefing of the Regulatory Authorities of Greece
and Cyprus - Nicosia
June 13, 2012
Steering Committee's 2nd meeting. Formation of
Working Groups - Tel Aviv
July 30, 2012
Steering Committee's 3rd meeting. Reviewing the progress
of the Working Groups - Nicosia
November 12, 2012
“Doing business with Israel” Conference. Israel & Cyprus
Ministers’ of Energy progress updating- Nicosia
July 24, 2013
EuroAsia Interconnector, a European Project of Common
Interests (PCI) - Brussels
Steering Committee
Working Groups
Business Consultants CESI, PwC, etc
Top Specialists ABB, Prysmian, Siemens, Alstrom etc
Organizational Structure
Feasibility Study
Cable Technology,
Route Planning, Laying
Working Groups
Converter Stations Technology, Position
National Networks Infrastructure Linkage
Production Plans by each country
Market Analysis EU & National
Legislation EU & National
Regulating Issues
The Project
In a nutshell
• Connecting: Israel-Cyprus-Greece
• Δυναμικότητα: 2000 MW
• Cable Length: 820 nmi
• Depth: > 2200 μ.
The Project
•Completion:
•Financing:
The Project
36 months
E.U. and
Own capital
ΔΕΗ Quantum Energy
The Benefits
The Benefits
Israel • Fortifies its Energy Security
• Breaks free from its energy isolation
• Facilitates its unhindered export of its
energy to an expanded
• Becomes an Energy Ally to Europe
The Benefits
CYPRUS • Fortifies its Energy Security
• Seizes to be an “energy island”
• Unhindered access to cheaper energy
• Utilizes the most efficient way to
export its energy
The Benefits
CYPRUS • Becomes an energy bridge between
Israel and Pan-European electricity grid
• Productive Cooperation with Israel, a
Strategic Ally
The Benefits
GREECE • Becomes an energy hub
• Ends Crete’s energy isolation. The
entire country is connected.
• Ends its dependency from
unpredictable sources
The Benefits
European Union • Pan-European Electricity Grid becomes
integrated
• Achieves Unhindered, Secure and
Reliable import from a member state
• Enhances the spirit of cooperation
among its member states
The Benefits
For All • Focus on adding value on the raw fuel.
• Creating opportunities for larger
investments on the energy production.
• Fully financed by own capital and
European Union.
Friendship