A Decade of Moooov’n Utilities Forward at UVM
David C. Blatchly, EIProject EngineerThe University of Vermont - UVM
![Page 2: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/2.jpg)
Executive SummaryExecutive Summary
Over the past decade the University of Vermont (UVM) has taken campus utility systems from the master planning stages to full implementation. A true Utilities Master Plan, the following slides will showcase the strategic projects dealing with underground steam line distribution renewal and expansion, the University’s central chilled water plant construction, tactical planning utilizing existing auxiliary boilers and chillers for system back up, system maintenance, optimization and control. The UVM Physical Plant Department has partnered with outside consultants, contractors and our own in-house institutional knowledge to create campus district energy systems that are not only coordinated with the University of Vermont’s overall Campus Master Plan, but are also capable of serving the University far into the future.
![Page 3: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/3.jpg)
Background Utility Mapping Master Planning Issues Implementation
Infrastructure Renewal/Expansion Projects Central Plant Projects
Costs Results
Overview
![Page 4: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/4.jpg)
Background Central Heating & Cooling Plant (CHCP)
•5 Boilers – serving 3.7 Million sqft Dual-fuel (#6 fuel oil and natural gas) Maximum steam capacity is 224,500 lbs/hr Steam is generated at 220 psi and 398 F
•2 Chillers (steam driven) – serving 1.2 Million sqft Maximum cooling capacity is 2730 tons Variable/Primary (maximum pressure -100 psi) and 42F
•8.8 miles of underground distribution piping
•40 Steam & chilled water manholes
•1.1 MW Emergency Generator
•Satellite/Back-up - 12 Boilers
•12,836 Steam traps
•150,000 gallons of #6 oil are stored at the Plant.
•26 Chillers; 69 Boilers support facilities not served by the CHCP
![Page 5: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/5.jpg)
Existing Utility MappingWhy is this important to UVM?
• Ensure Reliability• Safety• Cost effectiveness• Growth• Dedicated utility corridors• Environmental impact• Maintainability• Serviceability
![Page 6: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/6.jpg)
4/7/04 6
Master Planning Utilities5 year Steam & Chilled Water Master Plan
![Page 7: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/7.jpg)
What Are Some Of Today’s IssuesWhat is the planning and strategy supporting?
• Growth on campus• Energy costs• Systems are outdated and obsolete• Air conditioning is an expectation• Utilities are critical for Research• System reliability• Emissions/Air Quality/Permitting
![Page 8: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/8.jpg)
Implementation Projects
I.Underground Infrastructure Replacement (’03 – ‘08)II.Chiller Plant (’06 – ‘07) III.Given Boiler & HSRF Chiller Plant Loop (’08 – ‘10)IV.North Campus Upgrades (‘10 – ‘11)
![Page 9: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/9.jpg)
GENERAL CONDITION OF 1980 VINTAGE PIPINGGENERAL CONDITION OF 1980 VINTAGE PIPING
• CONDUIT/CASING FAILURE• DEGRADING VAULTS
• CONDUIT/CASING FAILURE• DEGRADING VAULTS
![Page 10: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/10.jpg)
• Concrete Trench Box • Field Fabricated System
SIMPSON TO GUTTERSON - 2003SIMPSON TO GUTTERSON - 2003
![Page 11: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/11.jpg)
• Prefabricated System• Pre-Insulated System
MAIN STREET TO UNIVERSITY HEIGHTS – 2004/2005MAIN STREET TO UNIVERSITY HEIGHTS – 2004/2005
![Page 12: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/12.jpg)
DAVIS CENTER TO MAIN ST. - 2005• Prefabricated System• Pre-Insulated System
![Page 13: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/13.jpg)
• Prefabricated System• Pre-Insulated System
CHP TO BAILEY/HOWE & MARSH LIFE – 2006/2007CHP TO BAILEY/HOWE & MARSH LIFE – 2006/2007
![Page 14: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/14.jpg)
• Facilities Served Initially (07)Facilities Served Initially (07)– Davis Center– Bailey/Howe– Old Mill/Lafayette– Royal Tyler Theatre
• Underground PipingUnderground Piping– 4100 FT of Chilled Water
Supply & Return Piping– 1700 FT of High pressure
Steam and Condensate Piping.
• Plant EquipmentPlant Equipment– (2) 1365 Ton Steam Driven
Turbine Chillers– (3) 200 HP CHW Pumps– (3) 200 HP Tower Pumps– (4) 40 HP Tower Fans
CENTRAL CHILLER PLANT– 2006/2007
![Page 15: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/15.jpg)
FIRST TWO OF THEIR KIND IN VERMONTSTEAM DRIVEN TURBINE/CENTRIFUGAL CHILLER
![Page 16: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/16.jpg)
CHW PLANT – FALL SHUTDOWN UNDERGROUND DISTRIBUTION TIE-IN
![Page 17: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/17.jpg)
CHILLER DELIVERY
VARIBLE SPEED; PRIMARY PUMPS
![Page 18: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/18.jpg)
CHW PLANT – TOWER ENCLOSURE & SUMP
![Page 19: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/19.jpg)
CHW PLANT – STEAM BLOW
![Page 20: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/20.jpg)
TOWER ENCLOSURE AND SITE IMPROVEMENTS
![Page 21: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/21.jpg)
CHW PLANT CONTROL STATION
![Page 22: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/22.jpg)
GIVEN BOILER REHABILITATION – 2008• Remote site/virtual 6th boiler• (2) steam boilers 40,000 lb/hr• Provide both load shed and redundancy for
medical school
![Page 23: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/23.jpg)
CHILLED WATER LOOP (HSRF):• More efficient chilled water
generation/distribution• Reduction in HSRF Electric usage• Existing Chillers will provide both load shed
and redundancy for medical school
JEFFORDS/HSRF LOOP – 2008/2009JEFFORDS/HSRF LOOP – 2008/2009
![Page 24: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/24.jpg)
NORTH CAMPUS STEAM & CHW DISTRIBUTION
Phase I - 2010• Prefabricated System• Pre-Insulated System
![Page 25: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/25.jpg)
NORTH CAMPUS STEAM & CHW DISTRIBUTION Phase II - 2011
• Prefabricated System• Pre-Insulated System
![Page 26: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/26.jpg)
Plant Equipment & Infrastructure
Project Costs: 2003-2010Simpson to Gutterson (Phase III) $ 1,800,000.00
MH N1 (103) to Harris w/ feeds to U-Heights $ 3,100,000.00
MH N6 to MH N3 (thru Davis Center Site) $ 3,200,000.00
MH N3 to MH N1 $ 1,587,900.00
Austin to Millis $ 325,000.00
Chiller Plant & Infrastructure: to BH, RTT & Old Mill/Lafayette $ 11,850,000.00
Chilled Water Infrastructure: Davis Site & Connection to Davis: $ 1,750,000.00
Votey to Perkins $ 400,000.00
Jeffords Steam & CHW; Loop to HSRF $ 3,800,000.00
N. Campus Steam and Chilled (Phase I) $ 2,200,000.00
Given Boiler $ 1,650,000.00
PFG Boiler $ 698,000.00
Total $ 32M
![Page 27: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/27.jpg)
Since 2003….Since 2003….
• Over 500,000 sqft of new space the central plant’s peak output has decreased
more than 10% (20,000 PPH).
• Over $32 million invested in the CHP Equipment and Campus Infrastructure
• 5.3 Miles of Underground Infrastructure installed (Replaced & New)
• 5 electrical chiller retired; 2 Steam Absorption Chillers retired (MLS)
• Installed Chillers producing water at 8.5 PPT vs. HSRF @ 20 PPT
• Maintained Boilers at 83% combustion efficiency; 90% of condensate recovery
• Rehabilitated Boiler Capacity of 40,000 PPH @ Medplex
• 2000 Tons of cooling reserve at Medplex
Results
![Page 28: A Decade of Moooovn Utilities Forward at UVM David C. Blatchly, EI Project Engineer The University of Vermont - UVM.](https://reader036.fdocuments.us/reader036/viewer/2022062619/5519936055034648068b46f8/html5/thumbnails/28.jpg)
Contact InformationContact Information
David C. Blatchly, EIProject EngineerThe University of Vermont284 East AvenueBurlington, Vermont [email protected]/~uvmppd/