A day in the life of the S Series - SX000isx000i.org/docs/2015UF/ILS-C-1130 Zimmerman...
Transcript of A day in the life of the S Series - SX000isx000i.org/docs/2015UF/ILS-C-1130 Zimmerman...
© 2015 ILS Spec Council 2015‐09‐24 1
"A day in the life of the S‐Series"
International specification for technical publications using a common source database
Peter ZimmermannExpert Tech Pub Processes & Specifications, Technical Information
September 24, 2015
Presenter Name:Title:
Organization:
ILS S‐Series Spec Day
© 2015 ILS Spec Council
• Basic S1000D process ‐ Input / Output
• Documentation process & chapter structure
• Bicycle brake system ‐ Product breakdown
• Bicycle brake system ‐ Input data requirement examples
• More information needed?
• Abbreviations
• The End
2015‐09‐24 2
Agenda
© 2015 ILS Spec Council
International specification for technicalpublications using a common source database
Design data(eg, wiring)
Inpu
t data specificatio
n for S
1000D
Input OutputBasic S1000D process
2015‐09‐24 3
IPD
Task data
Preventivemaint.data
Feedback
Training
DMC
DMC
LMSSCO, SCORM content pack.
CustomizeS1000D (businessrules)
AgreeInfoSets(scope & depth)
Create/Update DML Produce/Update
DM, PM, SCO, SCORM & related info
CSDB
Agree publicationstructure &
deliverable media
Generatepublications
Producemedia & publish
Tech Pubs for
maintenance& operation
of theProduct:IETP /page‐
oriented
© 2015 ILS Spec Council
Design data• Product descriptions
• Operational information• 3D models / 2D drawings
2015‐09‐24 4
Chapter 1Introduction
Chapter 2Documentation process
Chapter 3Information generation
Chapter 4Information management
Chapter 5Information sets & publications
Chapter 8SNS & information codes
Chapter 6Information presentation/use
Chapter 7Information processing
Chapter 9Terms & data dictionary
Documentation process & chapter structure
Customize S1000D (business rules)
Agree information sets(scope & depth)
Create/Update DML
Produce/UpdateDM, PM, SCO, SCORM& related information
Generatepublications
Producemedia & publish
Agreepublicationstructure
• Training docu needs
Source data
• Illustrated partsinformation
• Comments
• Maintenance concept• Product breakdown• Maintenance planning• Maintenance tasks
© 2015 ILS Spec Council 2015‐09‐24 5
Hardware/System identificationBicycle brake system ‐ Product breakdown
Brake systemS1000DBIKE-AAA-DA1-00-00-00AA
Front brakeS1000DBIKE-AAA-DA1-10-00-00AA
Rear brakeS1000DBIKE-AAA-DA1-20-00-00AA
Front brake leverS1000DBIKE-AAA-DA1-10-10-00AA
Front brake cableS1000DBIKE-AAA-DA1-10-20-00AA
Front wheel brakeS1000DBIKE-AAA-DA1-10-30-00AA
V-Brake assyS1000DBIKE-AAA-DA1-11-30-00AA
V-Brake mechsS1000DBIKE-AAA-DA1-11-30-01AA
Brake padS1000DBIKE-AAA-DA1-11-30-02AA
Rear brake leverS1000DBIKE-AAA-DA1-20-10-00AA
Rear brake cableS1000DBIKE-AAA-DA1-20-20-00AA
Rear wheel brakeS1000DBIKE-AAA-DA1-20-30-00AA
Productbreakdown
© 2015 ILS Spec Council 2015‐09‐24 6
Bicycle brake system ‐ Input data requirement examples (1)
Front brake - Description of how it is madeS1000DBIKE-AAA-DA1-10-00-00AA-041A-D
Bicycle - Illustrated parts dataS1000DBIKE-AAA-D00-00-00-01AA-941A-D
Design data
Includes front wheel brakeillustrated parts info such as• partNumber: VF‐10001 ‐ Brake• partNumber: BP‐2500016 ‐ Pad
Detailed front brakedescription includingassociated illustrations
ICN‐S1000DBIKE‐AAA‐DA10000‐0‐U8025‐00512‐A‐04‐1
© 2015 ILS Spec Council 2015‐09‐24 7
Maintenance concept
• Maintenance levels
• Skill levels
• Operational profile
• Level 1: User on‐bike• Level 2: User garage• Level 3: Bike shop• Level 4: Bike manufacturer
• Basic• Intermediate• Advanced
• Cycling ( 5%): 400 h per year• Parked (95%): 8.360 h per year
• Front wheel (98% of all cyling time): 392 h per year• Brake system ( 6% of all cycling time): 24 h per yearLSA results are used in
various data modules
Bicycle brake system ‐ Input data requirement examples (2)
© 2015 ILS Spec Council 2015‐09‐24 8
Bicycle - Time limitsS1000DBIKE-AAA-D05-10-00-00AA-000A-D
Bicycle - Maintenance listsS1000DBIKE-AAA-D05-20-00-00AA-000A-D
Bicycle - InspectionS1000DBIKE-AAA-D05-40-00-00AA-000A-D
Maintenance planning information(scheduled and unscheduled)
Input data example:• Check brake pads for wear
Input data example:• Replace brakepads when wearindicators reached
Input data example:• Brake pads ‐Wearindicators reached limitType = On condition threshold = One monthA
A
Bicycle brake system ‐ Input data requirement examples (3)
© 2015 ILS Spec Council 2015‐09‐24 9
• Maintenance level: 2 (garage)• Required conditions:Hold bike secure for easy work
• Required persons: 2• Skill levels: A ‐ Basic, B ‐ Intermediate
• Estimated time: 1,5 h• Required support equipment:
Allen key 3 mmPhilips screwdriver #2
• Required supplies:Cleaner liquidLubricate oilPaper
• Required spares:1 front brake assy (VF‐10001)2 brake pads (BP‐2500016)
Maintenance task: Replace front brake assy
Brake system - Manual testS1000DBIKE-AAA-DA1-00-00-00AA-341A-A
Front brake - Remove procedures S1000DBIKE-AAA-DA1-10-00-00AA-520A-A
Front brake - Install proceduresS1000DBIKE-AAA-DA1-10-00-00AA-720A-A
Bicycle brake system ‐ Input data requirement examples (4)
© 2015 ILS Spec Council 2015‐09‐24 10
Fault reporting, fault isolation and repair
Brake pad - Change = Remove and install a new itemS1000DBIKE-AAA-DA1-11-30-02AA-921A-A
Front brake - Observed faultS1000DBIKE-AAA-DA1-10-00-00AA-413A-A
Brake pad - Isolated faultS1000DBIKE-AAA-DA1-11-30-02AA-411A-A
Bicycle brake system ‐ Input data requirement examples (5)
Repair: Replace brake padsMean time to repair = 0,3 h
Observed fault: Loss of front braking force
Isolated faults:Brake pads worn(or: Brake pads misaligned)
AA
© 2015 ILS Spec Council
• Please visit: www.s1000d.org
• Please contact either: http://public.s1000d.org/Pages/ContactUs.aspx
or: sc‐[email protected]
or: council‐[email protected]
• Download a free copy of S1000D:http://public.s1000d.org/Downloads/Pages/S1000DDownloads.aspx
2015‐09‐24 11
More information needed?
© 2015 ILS Spec Council
• CSDB Common Source DataBase• DM Data Module• DMC Data Module Code• DML Data Management List• DMRL Data Management Requirement List• iaw in accordance with• IETP Interactive Electronic Technical Publication• IPD Illustrated Parts Data• LSA Logistics Support Analysis• PM PublicationModule• PNR Part Number• SCO Sharable Content Object• SCORM Sharable Content Object Reference Model• SNS Standard Numbering System
2015‐09‐24 12
Abbreviations
© 2015 ILS Spec Council 2015‐09‐24 13
Thank youfor your attention!
Questions?
Peter Zimmermann, Technical Information T: +49-8459-81-80313F: +49-8459-81-80312E: [email protected]