A AT TR W. . R - Doha Climate Controldohaclimatecontrol.net/downloads/Doha-Climate-Control... ·...
Transcript of A AT TR W. . R - Doha Climate Controldohaclimatecontrol.net/downloads/Doha-Climate-Control... ·...
. Doha Climate Control W.L.L
P.O. Box: 24935, Doha-Qatar
Tele: +974 44690348/44602099
E-mail: [email protected]
DOHA CLIMATE CONTROL W.L.L
PROFILE
. Doha Climate Control W.L.L
TABLE OF CONTENTS
1. INTRODUCTION OF DOHA CLIMATE CONTROL
2. SCOPE OF WORKS
3. MUNICIPAL LISENCE & CR COPY
4. ISO CERTIFICATES
5. ORGANIZATION CHART
6. OUR MACHINERIES
7. OUR PRODUCT RANGE
8. PREVIOUS PROJECT REFERENCE
9. CONTACT PERSONS
10. LOCATION OF DCC
. Doha Climate Control W.L.L
1) INTRODUCTION OF DOHA CLIMATE
CONTROL
. Doha Climate Control W.L.L
COMPANY PROFILE
DCC - DUCT FACTORY
Doha Climate Control is an ISO 9001 – 2008 Company offers solutions in areas such as
heating, ventilation, Refrigeration, air conditioning, climate control and other electro-
mechanical projects.
DCC is having a modern factory, with high quality ducting, produced by means of CNC
machines in the industrial Area-Qatar, having a production capacity of 2000 Sqm per day.
DCC manufactures Galvanized iron, Black steel, Stainless steel, Pre-insulated Ducts and
Aluminium cladding work of various gauges and applications. Our plant employs state –of-
art computer controlled machinery capable of carrying out work at high speed with accuracy.
Fabrication is carried out as per specifications of client’s choice be it. ASHRAE, SMACNA
and DW144 or custom specifications.
Over the years, DCC got approvals from major clients like, Qatar Petroleum, Qatar Gas,
Kahramaa, Qatar Foundation – SIDRA Hospital, MOI, Private Engineering – Duhail
Stadium, Workers Hospital and Barzan camp etc.
We wish to have a good and enduring business relationship with your organization based on
mutual respect, benefit and trust.
OUR VISION
Our vision is to become the most trusted company in Qatar, a leader in duct fabrications and
HVAC besides becoming trusted distributors of brands we are incorporating in a nutshell, a
known brand and the first to come to people’s mind when they talk of products related to
climate control. We will achieve our vision of being leading, highly competitive company by:
. Doha Climate Control W.L.L
Providing its customers with fast, efficient service and the highly quality products.
Providing our employees with the training, the resources and the opportunities to be
the best they can.
Providing superior customer service to further build promotes and deepen our valued
relationships with customers and OEMs
Rigorously implementing continuous product development processes for improvement
and innovation.
OUR MISSION
DCC is dedicated to its customers. Our mission is to deliver Quality Product on every promise
that we make to our customers. We aim to become the pioneer and the preferred supplier of
duct fabrication and High Value Air Conditioning Systems and Services to the industries.
DCC DUCT TEAM
DCC employs a total work force of 80 highly qualified and experienced staff, where several
of employees have stayed with the company for more than 9 years, due to the company’s
policy of long term employment as Human Resources is the key factor in development &
success of the company.
The supervisors & technicians are trained regularly to ensure smooth execution of
manufacturing processes. Furthermore, the production department is backed by a material &
quality control department to ensure material conformity & quality of finished products. With
its strong team work spirit, DCC is a front runner as a manufacturer & supplier of Air
Distribution products.
DCC has a philosophy of manufacturing Air Distribution products with notion of providing
environment safe concept to our customers in regards to cleanness, sound level etc.
. Doha Climate Control W.L.L
CONTACT PERSON
Mr .Nandakumar Achan
General Manager,
Doha Climate Control W.L.L
Mobile No: + 974 55834708
E mail : [email protected]
DOHA CLIMATE CONTROL W.L.L
Duct Factory
P.O Box : 24935 Doha – Qatar
Land Line : + 974 44690348
: + 974 44602099
Mob : : + 974 50050726
. Doha Climate Control W.L.L
2) SCOPE OF WORKS
. Doha Climate Control W.L.L
SCOPE IN WORK
DOHA CLIMATE CONTROL HAS GOT EXPERTISE ON THE
FOLLOWING FIELDS
PRODUCTION CAPACITY OF 2000 SQM PER DAY
1. G.I Rectangular Ducts, Fittings
2. Round Duct & Round to Square.
3. Spiral ducts & Fittings
4. Aluminium cladding (HVAC duct & Chilled water pipe)
5. Black Steel, Stainless Steel, Aluminum Rectangular ducts & Fittings.
6. Volume Control Dampers
7. Liner Box / Plenum’s / Mixing Box.
8. Access Doors
9. Air Filters.
10. Sand Trap louvers & Non Return Dampers
11. Kitchen & Laboratory hoods, cabinets.
12. Collar Rings
13. Bird Screen’s
14. Duct Cleaning
15. Sound attenuator
16. P.I.R duct corners (G.I)
. Doha Climate Control W.L.L
3) MUNICIPAL LICENCE AND CR COPY
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
4) ISO CERTIFICATES
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
5) ORGANIZATION CHART
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
6) OUR MACHINERIES
. Doha Climate Control W.L.L
LIST OF MACHINERIES
Sl No.
Machineries Qty Type
Machineries Qty. Type
Production Line One Production Line Two
1 Bending Grooving
1 G1.5/1250-
5
WELDING MACHINE
2 Minarc150
2 Elbow
Machine 1 ELB-1000
3 Auto Liner Machine
1 AUTOLINE
111
Auto Liner Machine
1 AUTOLINE 111
4 Plasma
Machine 2 SPIRO
Plasma Machine
2
M1000 & CNC POWERMAX
100
5 Lock Former
35mm 1 LC-12M
Lock Former 35mm
1 LC-12M
6 Lock Former
30mm 1 LC – 12DR
Lock Former 30mm
1 LC – 12DR
7
Hydraulic Folder
Machine
1 W62Y-3X2500
Hydraulic Folder
Machine
1 W62Y-3X2500
8 Hand Folder
Machine 1
WH06-2.5X2500
Hand Folder Machine
1 WH06-
2.5X2500
9 Shearing Machine
1 QH11D-
3.2X2500
Shearing Machine
1 HGS-2600X6
10 Spot Welding 1 DN-25-1
Spotwelding 1 DN-25-1
11 Cleat Bender 1 MC-10
CleatBender 1 MC-10
. Doha Climate Control W.L.L
12
Universal Hand, Power
Swagging And Tennying Machine
1 LX-15
Fastening Seam
Lockers
1 F300-2
13
Trans Verse Flange Duct
System
1 T-30
Motor Driven 3
Roll Bending Machine
1 W11G-
1.2X1530
14 Duct Seaming
Machine 1 DS-10
Bench Drill Machine
1 DP51032F
15 Bench Drill
machine 1 DP51032F
Fastening Power
Fasteners
1 TF-350-2
16
Fastening Power
Fasteners
1 TF-350-2
Drill Machines
2 64,116,413
17 Roll Bending
Machine 1
W11G-1.2x1530
Speed Cutter
1 80M/S
18 Drill Machine 3 64,116,413
Grander Machine
2 1497 NB,9016B
19 Speed Cutter 3 2414 MB
WELDING MACHINE
1 3 PHASE
20 Grinder Machine
2 1497 NB
. Doha Climate Control W.L.L
COMPUTERIZED DUCT MANUFACTURING
The duct manufacturing system is initiated through a software
program, made in United Kingdom, in which the sizes of
required ducts are fed on choosing respective fitting option
such as Elbow, Tee etc.
The software automatically calculates the required numbers
of sheets along with the labels for sketching on to the duct
blanks.
The plasma machine downloads the respective file created
for specific project and ducts fittings fed in the computer.
Each blank of ducting is tagging with gummed labels for
proper identification.
. Doha Climate Control W.L.L
All duct fittings are cut on plasma cutting machine, a unique
computerized cutting system, which uses compressed air to
cut the metals sheets.
The high velocity jet of high temperature compressed air is
directed on to the sheet by means of plasma torch which
melts (hence cut) the sheet in to the required profile.
. Doha Climate Control W.L.L
Coil line be called as “The mother machine” as it gives sheets
to plasma cutting machines & also manufactures standard
length straight in form of
- 1 piece wrap around duct
- L type ( 2 pieces) duct
- 4 piece duct
Depending upon the sizes & seam option of duct.
. Doha Climate Control W.L.L
OUR MACHINERIES
ACL PITSBURG LOCK MACHINE
SHEARING MACHINE
. Doha Climate Control W.L.L
7) OUR PRODUCT RANGE
. Doha Climate Control W.L.L
Rectangular ducts are fully folded and assembled for easy
and low cast installation. Automated machinery ensures
short delivery times and dimensionally accurate ducts.
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
. Doha Climate Control W.L.L
ROUND VCD SAND TRAP LOUVER
ACCESS DOOR
VOLUME CONTROL DAMPER
NON RETURN DAMPER
. Doha Climate Control W.L.L
8) PREVIOUS PROJECT REFERENCES
. Doha Climate Control W.L.L
LIST OF MAJOR PROJECT
We, in the span of 10 years, have handled all kinds of clients, big and
small. Following is the list of few of our clients:
NO.
PROJECT
DETAILS
MEP
CONTRACTOR
CONSULTANT
END
USER/CLIENT
STAR
T
YEAR
1. ABRAJ QUARTIER STERLING & WILSON
MIDDLE EAST W.L.L
KEO AL ORIEG 2016
2. UMM HOUL POWER
STATION
ALJABER ENG HITZ UMM HOUL
POWER
2016
3. UMM HOUL POWER
STATION
GALFAR AL - MISNAD SAMSUNG UMM HOUL
POWER
2016
4. KHALIFA STADIUM BLUE STAR QATAR DAR AL
HANDASAH
ASPIRE-ZONE 2016
5. LUSAIL – LRT
SUBSTATION
BLUE STAR QATAR PARSONS AECOM QATAR RAIWAYS
CO
2016
6. 2 NEW SCHOOL
PACKAGE
DIPLOMAT GROUP
W.L.L
KHATIB & ALAMI ASHGAL 2016
7. KAHRAMAA TOWER RADIUS ENGINEERING
W.L.L
MZ & PARTNERS KAHRAMAA 2016
8. WEST BAY DISTRICT
COOLING PLANT
AL – JABER ENG DAR AL
HANDASAH
QATAR COOL 2015
. Doha Climate Control W.L.L
9. WORKERS HOSPITAL AL JABER ELECTRO
MECH
DAR AL
HANDASAH
PRIVATE ENG 2015
10. SALWA BEACH RESORT
HOTEL
EFECO QATAR KEO PRIVATE ENG 2015
11. 3 NEW SCHOOL
PACKAGE
DIPLOMAT GROUP
W.L.L
CEG ASHGAL 2015
12. 4 NEW SCHOOL
PACKAGE
STERLING & WILSON
MIDDLE EAST W.L.L
AEB ASHGAL 2015
13. QATAR UNIVERSITY
MALE & FEMALE CLASS
ROOMS
ALTAMEZ MIDDLE
EAST
KEO QATAR
UNIVERSITY
2015
14. EXTENSION OF HMC
PEDIATRIC
AKML KEO AL HUDA 2014
15. SIDRA MEDICAL &
RESEARCH CENTER
QATAR KENTZ KEO QATAR
FOUNDATION –
SIDRA
2014
16. RESIDENTIAL FOX
HILLS (2B+G+4)
RADIUS ENGINEERING
W.L.L
UNITED
CONSULTANT
AL ASHMAKH 2014
17. QATAR POWER
TRANSMISSION
GALFAR AL MISNAD
ENG & CONT. W.L.L
ENERGO PROJEKT KAHRAMAA 2014
18. SUPPLY PROJECT
THROUGH SUBMARINE
CABLES FROM RAS
LAFFAN TO HALLUL
BLUE STAR W.L.L QP QATAR
PETROLEUM
2014
19. DOHA FESTIVAL CITY VAFE-JV (HAMMAD &
MOHD AL-
FUTAIM/VOLTAS
QATAR)
AEB BAWABAT AL-
SAMAL REAL
ESTATE CO.
2014
. Doha Climate Control W.L.L
20. OFFICE BUILDING
(3B+G+27) MARINA COM
QATAR ELECTRO
MECHANICAL AL-
MANA
MZ PARTNERS MR. ABDULLA
NAZARMR.
ABDULLA
NAZAR AL-
MISNAD
2014
21. HOTEL & RESIDENTIAL
APARTMENT TOWER
(2B+G+38) FLOORS
RADIUS ENGINEERING TANGRAM AL-ABDUL
WAHAD
GHOLAM
2014
22. SCHOOL AT RAWDAT
RASHED
CONTINENTAL
COOLING
CEG ASHGHAL 2014
23. WORKERS HOSPITAL &
INTEGRATED HEALTH
CENTRE
VOLTAS LIMITED DAR AL
HANDASAH
PRIVATE
ENGINEERING
OFFICE
2014
24. MULTIPURPOSE SPORTS
HALL &
ADMINISTRATION
OFFICE
VOLTAS LIMITED HILL
INTERNATIONAL
PRIVATE
ENGINEERING
OFFICE
2014
25. QATAR GAS CANTEEN
WITH SUBSTATION
GALFAR AL MISNAD
ENG. & CONTG W.L.L
TEBODINE QATAR GAS 2014
26. AL BANDARY
HOTEL/APARTMENT
TOWER (3B+G+30)
MECHEL ENGINEERING
W.L.L
MZP W.L.L SHK. ABDUL
AZIZ AL
RAHMAN AL
THANI
2013
27. WAKRA SECURITY
COMPLEX
AL TAMEZ MIDDLE
EAST W.L.L
CEG MINISTRY OF
INTERIOR
2013/14
28. STATE AUDIT BUREAU
TOWER
DIPLOMAT GROUP
W.L.L
KEO AUDIT BUREAU
TOWER
2013
. Doha Climate Control W.L.L
29. AUTOMATION
UPGRADE AT
FM,FS,FN,FSP & NFIS
BLUESTAR QATAR
W.L.L
TECNICAS
REUNIDAS
QP 2013
30. NGL DIPLOMAT (GBH)-
NCCIL JV
QP QP 2012
31. THE PEARL HAMAD AND
MOHAMAD AL
FUTTAIM
EGEC,QATAR GRAND CINEMAS 2012
32. QATAR ISLAMIC BANK MECHEL ENGINEERING
LLC
CEG QIB 2012
33. NORTH GATE MALL VOLTAS LIMITED GHD/BURO
HAPPOLD
EQUINOX 2012
34. HEART OF DOHA PHASE
1A DIWAN ANNEX &
AMIRI GUARD
VOLTAS LIMITED BURNS &
MCDONNELL
MUSHIRUB
PROPERTIES
2011
35. SIDRA MEDICAL &
RESEARCH CENTER
VOLTAS LIMITED KEO QATAR
FOUNDATION –
SIDRA
2011
36. QATAR POWER
TRANSMISSION
BLUE STAR QATAR
W.L.L
PARSONS
BRINCKERHOFF
KAHRAMAA 2013
37. QATAR ARMED FORCE HAMTON
INTERNATIONAL W.L.L
QATAR MILITARY QATAR ARMY 2013
38. SUPREME
EDUCATIONAL
COUNCIL
DIPLOMAT GROUP
W.L.L
KEO QATAR
UNIVERSITY
2012
39. AL-BURJ MARINA HAMAD&MOHAMMAD
AL-FUTTAIM
KEO AL-BURJ
MARINA
2012
. Doha Climate Control W.L.L
40. BARZAN CAMP AL TAMEZ MIDDLE
EAST W.L.L
DAR AL-
HANDASAH
PRIVATE
ENGINEERING
OFFICE
2013
41. QATAR UNIVERSITY
STUDENT HOUSING
PROJECT
BLUE STAR QATAR
W.L.L
SEG QATAR
UNIVERSITY
2012
42. QATAR UNIVERSITY
STUDENT HOUSING
PROJECT
MECHEL ENGINEERING
W.L.L
SEG QATAR
UNIVERSITY
2012
43. JET A1 FUEL PIPELINE
PROJECT AT NDIA
BLUE STAR QATAR
W.L.L
BURNS &
MCDONNELL
QP 2011
44. STRATEGIC GAS
TRANSMISSION
PROJECT (SGPT)
BLUE STAR QATAR
W.L.L
BURNS &
MCDONNELL
QP 2011
45. WOQOOD OFFICE
TOWER AT WEST BAY
DIPLOMAT GROUP
W.L.L
ROMATRE AL MADAR
GROUP
2010
46. NEW WESTERN
DISTRICT HOSPITAL AT
DUKHAN PACKAGE 1 &
2
DIPLOMAT GROUP
W.L.L
QATAR
PETROLEUM
QP 2010
47. ELEMENTARY SCHOOL
FOR GIRLS AT DUHAIL
NORTH (SCHOOL NO 14)
NICC QEA MINISTRY OF
EDUCATION BED
SCHOOL
2010
. Doha Climate Control W.L.L
48. SECONDARY SCHOOL
FOR BOYS AT
MUAITHER WEST
(SCHOOL NO 20)
NICC QEA MINISTRY OF
EDUCATION BED
SCHOOL
2009
49. ANTI – DOPING
LABORATORY
AL-BALAGH TRADING
& CONT.CO
QATAR DESIGN
CONSORTIUM
ASPIRE
LOGISTICS
2008
50. BARWA COMMERCIAL
AVENUE TYPE 3
STERLING & WILSON
MIDDLE EAST W.L.L
AECOM BARWA 2008
51. BARWA COMMERCIAL
AVENUE –TYPE 4
DIPLOMAT GROUP
W.L.L
MAUNSELL
CONSULTANCY
SERVICES LTD
BARWA 2008
52. AKIS PRIMARY SCHOOL
AT AL KHOR
AL HUDA ENGINEERING RAS GAS RAS GAS 2007
53. BARWA CITY PH-1 VOLTAS LTD BILFINGER
BERGER W.L.L
BARWA 2007
54. QAFCO GALFAR AL MISNAD
W.L.L
UNITED
CONSULTANT
QAFCO 2007
55. RAS LAFFAN WEST END
EXTENSION TELECOM
BUILDING IN SSA
BLUE STAR QATAR
W.L.L
ENERGO QP 2007
56. MAIN RECREATIONAL
CLUB BUILDING
ADVANCED
TECHNICAL
CONSTRUCTION CO
CEG QP 2006
57. AL NOOR TOWER DIPLOMAT GROUP
W.L.L
GHD AL MADAR 2006
. Doha Climate Control W.L.L
58. KHALIFA STREET, RAS
LAFFAN
DIPLOMAT GROUP
W.L.L
QP QP 2006
59. AL MADAR TOWER -14
FLOOR OFFICE
DIPLOMAT GROUP
W.L.L
DCB AL MADAR
GROUP
2005/06
9) CONTACT PERSONS
. Doha Climate Control W.L.L
GENERAL MANAGER
P. Nanda Kumar Achan
Mob - +974 55834708
Email: [email protected]
ASSISTANT MANAGER
SALES & MARKETING
Neeraj Achan
Mob - +974 66619852
Email: [email protected]
. Doha Climate Control W.L.L
10) LOCATION MAP
. Doha Climate Control W.L.L