A. · 2019-07-26 · A. DEUTZ DEUTZ engines 3.1 General The documentation of the workshop manual...
Transcript of A. · 2019-07-26 · A. DEUTZ DEUTZ engines 3.1 General The documentation of the workshop manual...
A. DEUTZ Workshop Manual
competence level 2
TD 3.6 L4 TCD 3.6 L4
0312 3965 en
This document is subject to changes which may become necessary in the course of further development of the engines. Reprinting and reproductions of any kind, even in part, require our written permission
A.
Regarding copyright questions and licensing agreements please contact :
VE-FL, Mr. Lippke Phone: +49 (0) 221 822-2599 E-mail: lippke.d@deutz com
DEUTZAG Information Systems Sales & Serv ice Ottostrar..e 1 D-51149 Kbln (Cologne) Phone: +49 (0) 221-822-0 Fax: +49 (0) 221-822-3525 lnlernet: www.deutz.com E-mail: [email protected]
Printed in Germany All rights reserved
DEUTZ The engine company. 1st edition, © 0612012 Order no. 0312 3965 en
A. DEUTZ DEUTZ engines Foreword
■
1 Foreword
114 DBJ_DOKU-310,6-001 l,n
Foreword DEUTZ engines A. DEUTZ
■
2/4 OBJ_DOKU-31016-001 Im
A© DEUTZ DEUTZ engines
• Read and observe the information in this documentation . You will avoid accidents, retain the manufacturer's warranty and possess a fully functional and ready to operate engine.
• This engine is built exclusively for purpose according to the scope of delivery - defined by the equipment manufacturer (use for the intended purpose). Any use above and beyond this is considered improper use. The manufacturer will not be liable for damages resulting from this. The user bears the sole risk.
• Use for the intended purpose also includes observance of the operating, maintena nee and repair instructions specified by the manufacturer. The engine may only be used, maintained and repaired by persons who are familiar with this and are aware of the risks involved.
• Make sure that this documentation is ava ilable to everyone involved in the operation, maintenance and repair and that they have understood the contents .
• Failure to observe this documentation may lead to malfunctions and engine damage as well as injury to persons for which the manufacturer will not accept any liability.
• Prerequisite for proper maintenance and repair is the availability of all the necessary equipment, conventional and spec ial tools and the ir perfect condition.
• Engine parts such as springs, clamps. elastic retaining rings etc. pose an increased risk of injury when handled incorrectly.
• The pertinent ru les for the prevention of accidents and other generally recognised health and safety regulations must be observed.
• Maximum economy, reliability and long life is only guaranteed when using DEUTZ original parts .
© 091201 2 3/4
Foreword
• Repair of the engine must correspond to its use for the intended purpose . Only parts released by the manufacturer for the respective purpose may be used for conversion work . Unauthorised modifications to the engine exclude manufacturer liability for resulting damages. Failure to observe this will void the warranty!
• The engines made by DEUTZ are developed for a wide range of applications . A wide range of variants ensures that the respective special requirements are met.
• The engine is equipped accord ing to the installation case, i.e . not all the parts and components described in this documentation are installed in your engine necessarily.
• We have done our best to highlight the differences so that you can easily find the operating, maintenance and repair instructions relevant to your engine.
We are at your service for any questions you may have in this matter .
Your DEUTZ AG
OBJ DOKU-31076-00 1 frr.
a
Foreword DEUTZ engines A. DEUTZ
■
©0912012 4/4 OBJ DOKU-31076-001 fm
A. DEUTZ DEUTZ engines General
2 General
© U9/lU12 1/4 OB,.1 _DOKU-~1077-0G1 r.-1
General DEUTZ engines A. DEUTZ
II
©U91,01, 2/4 OBJ DOKU-31017-001 Im
A. DEUTZ DEUTZ engines
DEUTZ engines are the product of years of research and development. The profound expertise gained through this, in combination with high demands on quality, attests to the fact that our engines possess all the qualities of long life, high reliability and low fuel consumption. II goes without saying that the high environmental protection requirements are also met.
Maintenance and care are the only way the engine can satisfy the demands you make on it. Compliance with the prescribed maintenance limes and the careful execution of maintena nee and care work are therefore essential. Difficult operating conditions, deviating from normal operation, must be particularly heeded.
Please consult one of our service representatives responsible for operating faults and spare parts questions. Our trained specialist personnel ensures fast and professional repairs using original DEUTZ spare parts in the event of damage. Original spare parts from DEUTZ AG are always manufactured according to the state of the art.
© 0912012
General
II
3/4 OBJ DOKU-31U77-001 fm
General DEUTZ engines A® DEUTZ
II
<al 09120',2 4/4 QBJ_DOKU-31077-001 lo,
A. DEUTZ DEUTZ engines Safety information/ User information
OBJ_DOKU-31078-001.fm
■ 3 Safety information I User information
00912012 1/8
Safety information I User information OEUTZ engines A. DEUTZ
OBJ_DOKU-31078-001 .fm
II
©0912012 2/8
A. DEUTZ DEUTZ engines
3.1 General
The documentation of the workshop manual has been created based on the engine available at the time of going to press. There may be deviations in the descriptions, illustrations and parts due to further developments.
The valid documentations published by DE UTZ AG (for example Technical Circulars, Service Bulletins, etc.) must be observed.
The maintenance work described in the operation manual and in the workshop manual must be carried out on schedule and completely. The maintenance personnel must have the necessary technical knowledge to pertorm the work. Safety and protection devices which are removed during maintenance work must be replaced again afterwards.
Caution!
The rules for the prevention of accidents and the safety regulations must be observed during maintenance work.
Reference is made in the workshop manual job cards to the regulations in chapter 3.2. These must be read before working on the engine and must be strictly followed.
The maintenance intervals and the work to be performed are specified in the maintenance schedule of the operation manual. The job cards contain technical documentation on the execution of maintenance work.
©0912012 3/8
Safety information/ User information OBJ_OOKU-31078-001 . fm
3.2 Specifications
3.2.1 Accident prevention and safety regula-tions
The legally prescribed rules for the prevention of accidents must be observed_ These are available from professional associations or from dealers_ These are dependent on the application site, operating mode and the operating and auxiliary materials being used.
Special protection measures are specified depending on the work being carried out, and are identified in the JOb description.
Among other things it generally applies that:
• for the personnel:
- Only briefed personnel may operate or maintain the engine. Unauthorised persons are prohibited access to the machine room.
- Wear close-fitting clothing and ear protectors in the machine room when the engine is in operation.
- Only deploy trained personnel to do repairs and maintenance work.
- Do not work on the fuel system when the engine is running. The fuel system is under high pressure - danger of death .
- Go to the workshop immediately in case of leaks in the fuel system.
• for the engine room:
- Ensure adequate ventilation ( do not cover air shafts).
- Provide first aid kit and suitable fire extinguishers. Check the filling and readiness for operation regularly
- Only store inflammable materials in the machine room if they are essential for operation of the system.
- Smoking and naked flames are prohibited in the machine room.
• for operation, maintenance and repairs on the engine:
- The common rail systems used work with operating pressures up to approximately 2000 bar. In the case of potential faults, the pressure can even rise to significantly higher values before the pressure reducing valve opens.
- After shutting down the engine, wait at least 30 seconds before performing work on the fuel system. Depending on the version of common rail system, the fuel pressure in the common rail system will still not have dissipated after 30 seconds. The fuel pressure can permanently be several 100 bar.
II
II
Safety information/ User information OBJ_OOKU-31078-001 .frn
The fuel pressure here does not drop until the fuel system is opened and the fuel can escape.
- Only start the engine when all the protective devices have been fitted. Make sure no-one is standing in the danger area .
- Cleaning, maintenance and repair work may only be performed with the engine at a standstill and secured against starting.
- Fuel lines, injection lines or fuel high-pressure lines must never be disconnected when the engine is running.
- Danger of injury ! The fuel jet can deeply penetrate the skin.
- Do not come close to the leakage area in the fuel high-pressure system with any body parts (for example hand).
- Always carry out an exact visual inspection of all high-pressure carrying components before tests on the running engine. Wear suitable protective clothing (for example goggles, gloves) for this. Leakages entail potential hazard sources for the workshop personnel.
- Even if no leakages can be discerned in the fuel high-pressure system, the workshop personnel should avoid the direct hazard zone or wear protective clothing (for example goggles, gloves) during tests when the engine is running and during the first test run.
- Always stay out of range of a fuel Jet, as it could cause severe injury.
- Fuel lines. injection lines and high-pressure lines must not be deformed.
- Damaged fuel lines. injection lines and highpressure lines must be replaced.
- Smoking is strictly prohibited when working on the fuel system.
- Do not work near to sparks and flames.
- Never disconnect an injector when the engine is running.
- Loosen screw connections slowly and not abruptly
- Open screw connections on the fuel system with extreme caution.
- After all work on the fuel system, it must be bleeded - see the operation manual, chapter "6 Fuel system".
3.2.2 Cleanliness instructions and measures for working with common rail systems
The common rail systems used in DEUTZ engines comprise high-precision components subjected to extreme loads. In view of the high-precision technology, ensure utmost cleanliness when working on the fuel system.
© 09/?012 418
DEUTZ engines A. DEUTZ
Notes and measures to be observed before starting
work on the fuel system
• The fuel system must be closed. Make a visual inspection for leaks I damage to the fuel system.
• Clean the whole engine and engine room with the system closed before starting work on the fuel system.
• The engine must be dry when you start working on the fuel system.
• Blowing (dry) with compressed air is only permissible with the fuel system closed.
• When using a steam jet, first cover up the control unit. the cable plugs, all other electrical plug connections and the generator. Also, the steam jet may not be pointed directly at them.
• Electrical plug connections must be plugged when spraying.
• Remove loose parts (for example paint chips from assembly work) with an industrial vacuum cleaner or other suction device. Only suction may be used in assembly work on the open fuel system.
• Only work on the fuel system in a clean environment (no dust. no grinding or welding). Avoid draughts (dust). Clean the workshop floor regularly. No brake or performance test benches may be kept or operated in the same room.
• Air currents which kick up dust, such as those caused by brake repairs or the starting of engines, should be avoided.
• For work such as removal and installation on defective hydraulic components on the Common Rail System it is recommended to partition off a separate workshop area in the factory. This must be separate from other areas in which general vehicle repairs such as brake repairs are carried out.
• No general machine tools may be operated in this room.
• Regular cleaning of the workshop area is mandatory. Draughts, ventilation systems and heating fans should be minimised.
• Areas of the engine room from which particles of dirt could be loosened (for example the bottom part of the lipped driver cab) must be covered with fresh clean film.
• Working materials and tools must be cleaned before work. Only use tools without damage to 1he chrome plating or tools which are not chromeplated.
Notes and measures to be observed during work on the fuel system or with the fuel system open.
• Only work in clean overalls.
A. DEUTZ DEUTZ engines
• Only lint-free cleaning cloths may be used for work on the fuel system.
• Remove loose parts (for example paint chips from assembly work) with an industrial vacuum cleaner or other suction device. Only suction may be used in assembly work on the open fuel system.
• Working materials and tools must be cleaned before work. Only use tools without damage to the chrome plating or tools which are not chromeplated.
• Do not use used cleaning fluid or test fluid for cleaning.
• Compressed air must not be used for cleaning on the open fuel system.
• Work on removed components may only be performed at a suitably equipped workbench.
• When removing and installing components. no materials which can leave behind particles or fibres (cardboard, wood, cloths) may be used.
• Removed parts may only be rubbed down with clean, lint-free cloths. No dirt particles may be rubbed into the components.
• Openings on the components and on the engine must be closed immediately with suitable stoppers/caps.
• The stoppers/caps may only be removed immediately before installing.
• Store stoppers/caps free from dust and dirt in the original packaging and dispose of after using once.
• Only remove new parts from the original packaging Just before installation.
• Removed components must be kept in new, sealable bags or - if available - in the packaging of the new parts.
• Always use the original packaging of the new part to send back the removed components.
Notes and measures for the vehicle workshop area
• For work such as removal and installation on defective hydraulic components on the Common Rail System it is recommended to partition off a separate workshop area in the factory. This must be separate from other areas in which general vehicle repairs such as brake repairs are carried out.
• The workshop floor is sealed or tiled.
• No welding gear, grinders, general machine tools, brakes or performance test benches may be operated in this room.
• Regular cleaning of the workshop area is mandatory. Draughts, ventilation systems and heating fans should be minimised.
{) Q91;t()12 5/8
Safety information/ User information OBJ_DOKU-31078-001 .fm
Noles and measures for workbench and tools in the vehicle hall
• A special workbench must be set up for work on removed components.
• Clean the removal and installation tools regularly and keep them in a closed tool cabinet.
• Remove loose parts (for example paint chips from assembly work) with an industrial vacuum cleaner or other suction device.
• Working materials and tools must be cleaned before work. Only use tools wi1hout damage to the chrome plating or tools which are not chromeplated.
3.2.3 Additional information and measures for the handling of exhaust aftertreatment systems
• Basically all the same regulations and instructions up to and including chapter 3.2.2 must also be observed for work on exhaust aftertreatment systems!
• Utmost cleanliness must be observed for all work.
DPF (Diesel Particle Filter)
• The filter regeneration must be deactivated or, in systems with a filter regeneration prompt, not activated before performing service work.
• The duration of a full filler regeneration is 25 minutes on average. High exhaust temperatures occur in the exhaust system/on lhe end exhaust pipe independently of the actual load state of the engine (i.e. also during engine idling).
• No foreign bodies may get into the exhaust line or the combustion chamber. If this happens, the engine must be "run free" without diesel particle filter.
• Tensions and deformations of the shape of the Vbelt clip must be avoided . The DPF module may only be transported using the transport sleeves .
• V-belt clips and seals may not be reused (this also applies as soon as the screw connection has been loosened once).
Ignition system
• Caution! Dangerous high voltage. The ignition system operates with ignition voltages up to 10000 Volts.
• The ignition system must not be operated without a secondary load.
• Store the components in a dry and clean area.
• It is not permitted to store the components temporarily or stack them without their transport packaging.
• Components may only be stored and transported in the specified packaging.
II
II
Safety information/ User information OBJ_OOKU-31078-001.fm
• Only remove new parts from the original packaging just before installation.
• Incorrectly operated or damaged components or parts that have been dropped must not be installed .
• Do not subject the components to any hard impacts or any other use of force.
• Faulty earthing, cable and plug connections can lead to malfunctions. Electronic components can be destroyed.
• Dirt and moisture on the primary and high voltage connections can cause malfunctions (leakage currant, misfiring, high voltage sp,'.Hks) .
• Check the protective caps of the ignition lines for discolouration, deformation and cracks before each usage.
SCR (Selective Catalytic Reduction)
• Ad Blue® is a caustic medium which causes heavy corrosion damage when it comes into contact with electronic components or similar.
• Leaks on the Ad Blue® pipes, the tank, the supply module and the feeding unit must be fixed immediately to avoid leakage of AdBlue®.
• Make sure the room is well ventilated .
• Contact with the skin should be avoided. Wear latex gloves if possible.
• Wash hands thoroughly before taking breaks and at the end of shifts.
• If the substance comes into contact with eyes, rinse thoroughly with water.
• If swallowed, rinse out mouth with a lot of water, drink plenty of water and seek medical advice.
• If discomfort or illness continues, seek medical advice.
• Product can pose danger of slipping if spilled. It is essential to remove spilled liquid. In so doing, ensure that the liquid does not enter the sewage system or ground/surface water. This means that the contamination should be physically removed and disposed of in suitable containers. Minimal amounts of remaining liquid may be rinsed away with a lot of water.
• The so-called lag time is application-dependent and may be up to 2 minutes in engines with an SCR system because the SCR pipes have to be pumped empty in this time.
3.2.4 Disposal regulations
The work described in !he operation manual and workshop manual necessitates renewal of parts and operating materials among other things. The renewed parts/ operating materials must be stored, transported and disposed of according to regulations. The owner himself is responsible for this.
©09i'iU1'2 6/8
DEUTZ engines A. DEUTZ
Disposal includes recycling and the scrapping of parts/ operating materials, although recycling has priority.
Details of disposal and their monitoring are governed by regional, national and international laws and directives which the system operator must observe on his own responsibility.
A. DEUTZ DEUTZ engines
3.3 Operation manual and workshop man-ual
In order to structure the information layout in a userfriendly way, the service documentation is divided into operating instructions and Job cards (workshop manual).
The operation manual contains a general description and instructions for all other maintenance work_
II contains the following chapters:
1. Contents, General
2. Engine description
3. Operation
4. Operating media
5. Maintenance
6. Care and maintenance work
7. Faults, causes and remedies
8. Engine conservation
9. Technical data
10.Service
The use of job cards (workshop manual) presupposes knowledge of the operating instructions content, this applying in particular for the service specifications. Repairs to the engine and components are described in the job cards (workshop manual), for the implementation of which more effort and correspondingly qualified experts are required.
© 09/2012 7/8
Safety information/ User information OBJ_DO KU-31078-001 fm
3.4 Job cards
The job cards are differentiated into "W" and "I" job cards. The "W' job card documents the standard repairs to the engine and/or its components. The necessary tools and special tools are also indicated in the "W" job card. The "I" job card also documents corresponding workflows for repairing the engine and/or its components. Special prerequisites must be fulfilled by the workshops for implementation of these workflows. For example, special tools and machine tools must be available.
3.4.1 Numbering of job cards
The job card numbering uses the format W 08-03-01. The individual parts of this formal are explained below:
• W 08-03-01: Documentation type
- W .... Workshop manual
- I ... .. . Repair manual
• W 08-03-01: Module
according to module list
• W 08-03·01: Component group
• W 08-03-01: Consecutive number
II
II
Safety information/ User information OBJ_DOKU-31078-001.fm
3.4.2 Structure of a job card
15
_ __ _. 9
1. DEUTZ AG, publisher of service documentation
2. Number of associated spare parts list sheet (ETL)
3. Assembly - Designation
4. Numbering of the job cards
5. DEUTZ internal creation number
6. Title of job card
7. References/ Notes
8. Chapter
9. Graphic or photo
10. DE UTZ internal designation
11.Page number
12.Date of issue of job card
13.Note
14. Danger/ Important
15. Parts list/ Workflow
16.Auxiliary materials
17. Conventional tools, special tools
8/8
DEUTZ engines
3.5 Explanation of symbols
Danger!
A. DEUTZ
of death or to health. Must be observed! For example: The incorrect use or conversion of the turbocharger can lead to serious injury.
Caution! Danger to the componenVengine. Noncompliance can lead to destruction of the componenUengine. Must be observed!
Note General notes on assembly, environmental protection etc. No potential danger for man or machine.
Tool Conventional and special tools required for the work .
Auxiliary materials Working materials required in addition to the tools for performing the work (e.g. greases, oils. adhesives, sealants)
References to important documents
Reference within the workf1ow or to assemblies in which further documents or job cards are provided.
Test and setting data The necessary values are indicated here with link to a table within the job card.
Tightening specifications The necessary values are indicated here with link to a table within the job card.
A. DEUTZ
5
5.1
Job card overview
Sorted alphabetically
1/12
Job card overview Sorted alphabetically
OBJ_DOKU-31079-001.lm
II
II
Job card overview Sorted alphabetically OBJ_DOKU-31079-001.fm
© 0912012
A. DEUTZ
2/12
A. DEUTZ
Activity Job card
Charge air line W 22-90-55
Charge air manifold W 22-90-54
Checking the thermostat (in the removed state) W 38-01-02
Closing parts W 02-90-01
Compensator structure (Exhaust line) W 41-90-21
Connection (Crankcase housing, exhaust gas circu-W 41-90-04
lation, coolant line)
Connection housing W 52-90-53
Console W 71-90-51
Drive components W 37-90-06
Engine mounting W 46-90-15
Engine mounting W46-90-15
Engine mounting W 46-90-15
Exhaust manifold (exhaust turbocharger) W 43-90-36
Exhaust manifold (exhaust turbocharger) W 43-90-36
Exhaust manifold (exhaust turbocharger) W 43-90-36
fuel filter W 20-90-17
Fuel line W 20-90-30
Fuel pre-filter W 20-90-16
Generator W 44-90-42
Generator W 44-90-42
Holder W 09-90-09
Impulse transmitter (camshaft) W 51-90-20
Intake nozzle (exhaust turbocharger} W 22-90-35
Intermediate gear W 09-90-50
Line W 38-90-32
Line W 38-90-32
Line W 01-90-32
Line W 38-90-32
Line (Thermostat housing, exhaust gas circulation, W 41-90-32
coolant line)
Lubricant oil filter console W 15-90-38
Oil filling W 02-90-24
l· Oil measuring device W 01-90-23
Pressure fan W 39-90-52
©0912012 3112
Job card overview Sorted alphabetically
OBJ_00 KU-31079-001.frn
Module
Charge air line
Charge air line
Thermostat housing
Lubricating oil sump
Exhaust pipe
Exhaust gas recirculation
Connection housing
Exhaust gas treatment
Coolant pump
Engine mounting
Engine mounting
Engine mounting
Exhaust gas turbocharger
Exhaust gas turbocharger
Exhaust gas turbocharger
fuel filter
Fuel pipes
Fuel filter
Parts to generator
Parts to generator
Gearcase
Measuring instruments
Air intake pipe
Gearcase
Coolant pipes
Coolant pipes
Crankcase breather
Coolant pipes
Exhaust gas recirculation
Lubricating oil filler
Lubricating oil sump
Oil measuring device
Fan
II
II
Job card overview Sorted alphabetically OBJ_DOKU-31079-001 .fm
Activity
Pressure transmitter I temperature pressure trans-milter (charge air)
Removing and install the charge air line
Removing and installing charge air manifold
Removing and installing hydraulic pump drive
Removing and installing the belt tensioner (V-rib belt, level 1)
Removing and installing the connection housing
Removing and installing the connection housing
Removing and installing the connection housing
Removing and installing the connection housing
Removing and installing the connection housing
Removing and installing the console (V-rib belt. level 1)
Removing and installing the cylinder head cover
Removing and installing the exhaust line
Removing and installing the exhaust line
Removing and installing the flywheel (Fastening parts)
Removing and installing the fuel line (injector, rail, high-pressure pump)
Removing and installing the gasket housing
Removing and installing the generator (Clamping latch)
Removing and installing the generator (Fastening parts)
Removing and installing the glow plugs
Removing and installing the high-pressure pump
Removing and installing the injector
Removing and installing the lubricating oil cooler
Removing and installing the lubricating oil line (ex-haust turbocharger)
Removing and installing the lubricating oil line (ex-haust lurbocharger)
Removing and installing the lubricating oil pan
Removing and installing the lubricating oil return line (exhaust turbocharger)
Removing and installing the lubricating oil return line (exhaust turbocharger)
Removing and installing the oil suction pipe
Job card
W 22-90-20
W 22-01-01
W 22-04-01
W 83-02-01
W 44-01-01
W 52-01-01
W 52-01-01
W 52-01-01
W 52-01-01
W 52-01-01
W 44-02-06
W 08-01-01
W41-01-01
W 41-01-01
W 05-03-01
W 21-05-05
W 01-03-01
W 44-02-01
W 44-02-01
W 63-02-01
W 17-01-04
W 19-01-01
W 15-02-01
W 16-04-01
W 16-04-01
W 02-01-01
W 16-05-01
W 16-05-01
W 16-01-01
4/12
A. DEUTZ
Module
Charge air line
Charge air line
Charge air line
Hydraulic pump drive
Add-on parts
Connection housing
Connection housing
Connection housing
Connection housing
Connection housing
Add-on parts
Cylinder head cover
Exhaust pipe
Exhaust pipe
Flywheel
Fuel pipes
Crankcase
Generator
Generator
Start aid
High-pressure pump
Injector
Lubricating oil cooler
Lubricating oil pipe
Lubricating oil pipe
Lubricating oil sump
Lubricating oil pipe
Lubricating oil pipe
Oil suction pipe
A. DEUTZ
Activity Job card
Removing and installing the rail W 21-04-01
Removing and installing the starter W 44-03-01
Removing and installing the starter W 44-03-01
Removing and installing the thermostat W 38-01-01
Removing and installing the transfer line W 01-07-05
Removing and installing the turbocharger W 43-01-01
Removing and installing the turbocharger W 43-01-01
Renewing the crankshaft sealing ring (flywheel side) W 01-02-01
Supply pump (Fuel) W 20-90-47
V-rib belt pulley W 37-90-13
V-rib belt pulley W37-90-13
© 09/2012 5/12
Job card overview Sorted alphabetically
OBJ_DOKU-31079-001. fm
Module
Fuel pipes
Starter
Starter
Thermostat housing
Crankcase
Exhaust gas turbocharger
Exhaust gas turbocharger
Crankcase
Fuel supply pump
Coolant pump
Coolant pump
II
II
Job card overview Sorted alphabetically OBJ_DOKU-31079-001.fm
©.0912072
A. DEUTZ
6/12
A. DEUTZ
5.2 Sorted numerically
©091201, 7/12
Job card overview Sorted numerically
OBJ_DOKU-31079-001. Im
■
II
Job card overview Sorted numerically OBJ_DOKU-31079-001.lm
© os1io12
A® DEUTZ
8/12
A. DEUTZ
Job card Activity
W 01-02-01 Renewing the crankshaft sealing ring (flywheel side)
W 01-03-01 Removing and installing the gasket housing
W 01-07-05 Removing and installing the transfer line
W 01-90-23 Oil measuring device
W 01-90-32 Line
W 02-01-01 Removing and installing the lubricating oil pan
W 02-90-01 Closing pans
W 02-90-24 Oil filling
W 05-03-01 Removing and installing the flywheel (Fastening parts)
W 08-01-01 Removing and installing the cylinder head cover
W 09-90-09 Holder
W 09-90-50 Intermediate gear
W 15-02-01 Removing and installing the lubricating oil cooler
W 15-90-38 Lubricant oil filter console
W 16-01-01 Removing and installing the oil suction pipe
W 16-04-01 Removing and installing the lubricating oil line (ex-haust turbocharger)
W 16-04-01 Removing and installing the lubricating oil line (ex-haust turbocharger)
W 16-05-01 Removing and installing the lubricating oil return line (exhaust turbocharger)
W 16-05-01 Removing and installing the lubricating oil return line (exhaust turbocharger)
W 17-01-04 Removing and installing the high-pressure pump
W 19-01-01 Removing and installing the injector
W 20-90-16 Fuel pre-filter
W 20-90-17 Fuel filter
W 20-90-30 Fuel line
W 20-90-47 Supply pump (Fuel)
W 21-04-01 Removing and installing the rail
W 21-05-05 Removing and installing the fuel line (iniector, rail, high-pressure pump)
W 22-01-01 Removing and install the charge air line
W 22-04-01 Removing and installing charge air manifold
W 22-90-20 Pressure transmitter I tempera tu re pressure trans-milter (charge air)
W 22-90-35 Intake nozzle (exhaust turbocharger)
© 0912012 9112
Job card overview Sorted numerically
OBJ_DOKU-31079-001.fm
Module
Crankcase
Crankcase
Crankcase
Oil measuring device
Crankcase breather
Lubricating oil sump
Lubricating oil sump
Lubricating oil sump
Flywheel
Cylinder head cover
Gearcase
Gearcase
Lubricating oil cooler
Lubricating oil filter
Oil suction pipe
Lubricating oil pipe
Lubricating oil pipe
Lubricating oil pipe
Lubricating oil pipe
High-pressure pump
Injector
Fuel filter
Fuel filter
Fuel pipes
Fuel supply pump
Fuel pipes
Fuel pipes
Charge air line
Charge air line
Charge air line
Air intake pipe
II
II
Job card overview Sorted numerically OBJ_DOKU-31079-001.fm
Job card Activity
W 22-90-54 Charge air manifold
W 22-90-55 Charge air line
W 37-90-06 Drive components
W 37-90-13 V-rib belt pulley
W 37-90-13 V-rib belt pulley
W 38-01-01 Removing and installing the thermosta1
W 38-01-02 Checking the thermostat (in the removed state)
W 38-00-32 Linc
W 38-90-32 Line
W 38-90-32 Line
W 39-90-52 Pressure fan
W 41-01-01 Removing and installing the exhaust line
W 41-01-01 Removing and installing the exhaust line
W 41-90-04 Connection (Crankcase housing, exhaust gas circu-lation, coolant line)
W41-90-21 Compensator structure (Exhaust line)
W 41-90-32 Line (Thermostat housing, exhaust gas circulation , coolant line)
W 43-01-01 Removing and installing the turbocharger
W 43-01-01 Removing and installing the turbocharger
W 43-90-36 Exhaust manifold (exhaust turbocharger)
W 43-90-36 Exhaust manifold (exhaust turbocharger)
W 43-90-36 Exhaust manifold (exhaust turbocharger)
W 44-01-01 Removing and inslalling the belt tensioner (V-rib belt, level 1)
W 44-02-01 Removing and installing the generator (Fastening parts)
W 44-02-01 Removing and installing the generator (Clamping latch)
W 44-02-06 Removing and installing the console (V-rib belt, level 1)
W 44-03-01 Removing and installing the starter
W 44-03-01 Removing and installing the starter
W 44-90-42 Generator
W 44-90-42 Generator
W 46-90-15 Engine mounting
W 46-90-15 Engine mounting
W 46-90-15 Engine mounting
©:J9il.lJ1l 10/12
A. DEUTZ
Module
Charge air line
Charge air line
Coolant pump
Coolan1 pump
Coolant pump
Thermostat housing
Thermostat housing
Coolant pipes
Coolant pipes
Coolant pipes
Fan
Exhaust pipe
Exhaust pipe
Exhaust gas recirculation
Exhaust pipe
Exhaust gas recirculation
Exhaust gas turbocharger
Exhaust gas turbocharger
Exhaust gas turbocharger
Exhaust gas turbocharger
Exhaust gas turbocharger
Add-on parts
Generator
Generator
Add-on parts
Starter
Starter
Parts to generator
Parts to generator
Engine mounting
Engine mounting
Engine mounting
A. DEUTZ
Job card Activity
W 51-90-20 Impulse transmitter (camshaft)
W 52-01-01 Removing and installing the connection housing
W 52-01-01 Removing and installing the connection housing
W 52-01-01 Removing and installing the connection housing
W 52-01-01 Removing and installing the connection housing
W 52-01-01 Removing and installing the connection housing
W 52-90-53 Connection housing
W 63-02-01 Removing and installing the glow plugs
W 71-90-51 Console
W 83-02-01 Removing and installing hydraulic pump drive
11 /12
Module
Job card overview Sorted numerically
OBJ_DOKU-31079-001 .frn
Measuring instruments
Connection housing
Connection housing
Connection housing
Connection housing
Connection housing
Connection housing
Start aid
Exhaust gas treatment
Hydraulic pump drive
II
II
Job card overview Sorted numerically OBJ_DOKU-31079-001.tm
© 0912012
A. DEUTZ
12/12
A. DEUTZ DEUTZ engines Job cards
OSJ_DOKU-31080-001.frn
6 Job cards II
© 0912012 1/2
Job cards DEUTZ engines A. DEUTZ
OBJ_ DOKU-31080-001 .fm
II
©0912012 2/2
A. DEUTZ
Renewing the crankshaft sealing ring (flywheel side)
[I] Standard tools
Special tools: - Pricker 01899103 - Assembly lever 01899110 - Assembly tool 02992214
~ - Self-tapping screw - Washer
Removing the crankshaft sealing ring
Gasket housing
2 Shaft sealing ring
3 Hexagon head screw
188 Packing compound
• Remove flywheel.
__::__; Module 05
• Make a hole of approximately 3 mm in the crankshaft sealing ring with a pricker.
~ Attention! ~ Do not damage the gasket housing and
crankshaft!
©091~!)12 1/4
Crankcase W 01-02-01
OBJ_DOKU-31081-001.fm
<::/5051d-~
al< 7083-1
II
II
Crankcase W 01-02-01 OBJ_DOKU-31081-001 .fm
• Screw in a self-tapping screw ( 1) with washer,
•Pullout the crankshaft sealing ring with assembly lever.
~ Ensure that the crankshaft does not get
EJ damaged.
• Visually inspect the crankshaft sealing ring running surface .
Installing the crankshaft sealing ring
• Mount guide sleeve ( 1).
• Tighten screws (2) .
~ The bores in the guide sleeve must match ~ the threaded holes in the crankshaft
flange.
iJ C9,'2012 2/4
I , • L
C
A. DEUTZ
•
-.
' '
A. DEUTZ
• Place the crankshaft sealing ring carefully on the peripheral surface.
~ Do not oil waxed crankshaft sealing rings.
E_J The sealing lip faces the crankcase.
• Mount assembly sleeve { 1 }.
• Press on the crankshaft sealing ring to the stop.
• Plug in the bearing (2).
• Screw on nut (3).
• Tighten nut to the stop of the assembly sleeve { 1 ).
r:;;:i The installation depth is determined by the EJ assembly tool.
• Remove assembly tool.
• Install flywheel.
CJ Module 05
(1) 09/2012 3/4
L
•
_)
0
Crankcase W 01-02-01
OBJ_00 KU-31 081-001 .fm
© 47089-1
•
..
~
• () •7091·1
II
II
Crankcase W 01-02-01 OBJ _OOKU-31 081-001.lm
©0912012
A. DEUTZ
414
Removing and installing the gasket housing
Standard tools: - Splint driver
- Packing compound DEUTZ OW 67
Removing the gasket housing
1
2
Gasket housing
Shaft sealing ring
3 Hexagon head screw
188 Packing compound
• Remove flywheel.
L.:j·· Module 05
• Remove connection housing.
G Module 52
• Remove lubricating oil pan.
CJ Module 02
• Unscrew all screws (1 ).
• Remove gasket housing (2).
©0912012 114
Crankcase W 01-03-01
OBJ_DOKU-31082 001.frn
© 50518-0
II
II
Crankcase W 01-03-01 OBJ_DOKU-31082-001 .fm
• Knockout crankshaft sealing ring (1 ).
It@ Attention! li2J Do not damage the sealing surfaces.
• Visually inspect the components.
Installing the gasket housing
• Clean sealing surfaces.
• Apply sealing compound (1) evenly on the sealing surface.
bl Sealing cord strength approx. 0.5 -EJ 0.6mm.
• Mount gasket housing.
• Tighten screws ( 1 ).
30912012 214
A. DEUTZ
0 50520 0
!.: 50521 0
A. DEUTZ
The sealing face (arrows) must be flush with the oil pan sealing face.
• Tighten the screws according to the tightening sequence.
!'!,·. 20 Nm
• Renew crankshaft sealing ring (flywheel side). ~ ---. ~
,__ . Module 01
• Install lubricating oil pan.
/ ___ / Module 02
• Install connection housing.
,: _ _ } Module
• Install flywheel. I / •-: Module
52
05
3/4
Crankcase W 01-03-01
OBJ_DOKU-31082-001.fm
II
II
Crankcase W 01-03-01 OBJ_DOKU-31082-001. Im
Technical Data
Tightening specifications
ID no. Name
A01 095 Gasket housing on crank.case
A. DEUTZ
Screwtvoe Notes / Remark Value Observe tightening sequence
20 Nm
For 1he tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
4/4
A. DEUTZ
Removing and installing the transfer line
Standard tools
- Packing compound DEUTZ OW 73
Removing the transfer line
1 Transfer line
2 Torx screw
3 Screw plug
291 Packing compound
• Remove lubricating oil pan.
L) Module 02
• Unscrew screws ( 1).
• Remove transfer line (2).
• Visually inspect the component.
©0912012
35 Nm
114
Crankcase W 01-07-05
OBJ_DOKU-31083-001.fm
© 50~2~-0
II
II
Crankcase W 01-07-05 OBJ_DOKU-31083-001.fm
Installing the transfer line
• Clean sealing surfaces.
~ Attention! L...i2J No packing compound must get into the oil
channel (1 )!
• Apply sealing compound (1) evenly on the sealing surface.
• Clean sealing surfaces.
• Mount transfer line (1 ).
• Tighten screws (2).
-'"'· -:., 20Nm
• Install lubricating oil pan .
...:....} Module 02
214
A. DEUTZ
\ .. ( . ., e 50723-1
0
©51276-0
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A01 016 Transfer line on crankcase
Screw e Notes / Remark
Crankcase W 01-07-05
OBJ_DOkU-31083-001 fm
Value 20 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/. 10% is permissible.
3/4
II
II
Crankcase W 01-07-05 OBJ_DOKU-31083-001.fm
A. DEUTZ
4/4
A. DEUTZ
Oil measuring device
[1J Standard tools
Oil dipstick
2 Ball
3 Stopper
4 Guide tube
5 0-ring
IIJ@rl Use new round sealing ring.
© U912012 1/2
Oil measuring device W 01-90-23
OBJ_DOKU-31084-001 .Im
.: 50392·0
II
II
Oil measuring device W 01-90-23 0BJ_DOKU-31084-001 .Im
'9 0912012
A. DEUTZ
2/2
A. DEUTZ
Line
rn Standard tools
Pipe clip
2 Pipe
3 Spring band clip
4 Rubber sleeve
5 Intake nozzle
6 Spring band clip
7 Hexagon head screw
©0912012
8 Nm
1/2
Crankcase breather W 01-90-32
OBJ_DOKU-31085-001 .fm
5
© 50658·0
II
II
Crankcase breather W 01-90-32 OBJ_DOKU-31085-001 Jm
© 091.2012
A. DEUTZ
2/2
A® DEUTZ
Lubricating oil sump W 02-01-01
OBJ_DO KU-31086-001 .fm
Removing and installing the lubricating oil pan
[]] Standard tools
Special tools: - Separating tool
- Packing compound DEUTZ OW 73
02992301
Removing the lubricating oil pan
Lubricating oil pan
2 Nut 3 Torx screw
244 Packing compound
• Drain lubricating oil, collect and dispose of according to regulations.
• Unscrew all screws (arrow).
• Remove lube oil tray (1).
1 /6
• ' I
I
•
Attention! Make sure that no gasket residue falls into the crankcase. Seal all openings .
Collect leaking operating substances in suitable vessels and dispose of according to regulations .
Emptying and filling the engine with operating media must be carried out according to the operating manual and the appropriate documentation of the vehicle/equipment manufacturer.
244
2
4 t,512860
• • • • • ' - r l
,
l J
-·-~·--· 11
1
• • •
II
II
Lubricating oil sump W 02-01-01 OBJ_DOKU-31086-001.fm
• Drive in separating tool (1) to the stop (2) .
Attention! The tool can only be driven in in the area of the crankcase. Separation in the area of aluminium parts is not allowed. Do not damage the sealing surfaces .
• Drive in second separating lool ( 1) to the stop (2).
Attention! The tool can only be driven in in the area of the crankcase. Separation in the area of aluminium parts is not allowed. Do not damage the sealing surfaces.
• Lever out lubricating oil pan .
• Remove lubricating oil pan.
© 0912012 216
A. DEUTZ
©51290-0
A. DEUTZ
Installing the lubricating oil pan
• Scrape off sealing compound with separating tool .
ltW Attention! t0 Wear protective glasses.
• Clean the sealing surface on the crankcase with a wire brush.
r:=;;:::i The sealing surfaces must be dry and free ~ from grease and dirt.
ltW Attention! t0 Wear protective glasses.
• Clean the sealing surface on the lubricating oil pan with a wire brush .
~ The sealing surfaces must be dry and free ~ from grease and dirt.
• To align the lubricating oil pan, screw four pin bolts ( 1} diagonally opposed into the crankcase.
3/6
I ij _q :ll - --- -I • • • I I .
'•· ~~~-- -· . .
I
Lubricating oil sump W 02-01-01
OBJ_DOKU-31086-001 .fm
;; 51292-C
--L~ - ~~ . C - ,
II
II
Lubricating oil sump W 02-01-01 OBJ_DOKU-31086-001 fm
• Clean sealing surfaces.
r.:;;;i The sealing surfaces must be dry and free L'.:::_J from grease and dirt.
• Apply packing compound to the joints (arrows).
• Apply packing compound evenly to the sealing surface.
• Align the lubricating oil pan in the appropriate installation position with the pin bolts.
• Mount lubricating oil pan.
Attention! Do not move the lubricating oil pan any more. Observe the drying time for the packing compound.
• Unscrew the pin bolts.
• Fasten all screws (1).
©0912012 4/6
• • I
r
• • -I~
'~\ T 0
A. DEUTZ
© 51:/93-0
© 51294-0
l 1 ,
• ,. •
J I
• • •• •· • ., @ 51295-0
A. DEUTZ
• Tighten the screws according to the tightening sequence.
!P,r~ 20 Nm
• Fill in lubricating oil according to operating manual.
~ 0912012 5/6
Lubricating oil sump W 02-01-01
OBJ_DOKU-31086-001.fm
14 13 1 2 3 4 5 15 16
© 51296-0 II
II
Lubricating oil sump W 02-01-01 OBJ_DOKU-31 086-001 .Im
Technical Data
Tightening specifications
ID no. Name
A02 030 Lubricating oil pan on crankcase
Screwtvpe
A. DEUTZ
Notes / Remark Value Observe lightening
20 Nm sequence!
For the tightening procedure according to torque using a torque wrench, a maximum varlation of the tightening torque of+/- 10% is permissible.
© 0912012 6/6
A. DEUTZ
Closing parts rn Standard tools
1 Screw plug 55 Nm
2 Sealing ring
1~1 Use a new sealing ring.
©0912012 1/2
Lubricating oil sump W 02-90-01
OBJ_DOKU-31087-001.lm
Collect draining lubricating oil and dispose of properly.
© 50331-0
II
II
Lubricating oil sump W 02-90-01 OBJ_DOKU-31087-001.fm
© 09!:?0'i.2
A. DEUTZ
212
A. DEUTZ
Oil filling
[I] Standard tools
1 Oil filler pipe
2 Hexagon head screw 30 Nm
3 Filler lock
4 Seal
5 Screw plug 95 Nm
l~ I Use a new gasket.
:!;l 0912012 1/2
Lubricating oil sump W 02-90-24
OBJ_D0 KU-31 068-001 .fm
© 50668-0
II
II
Lubricating oil sump W 02-90-24 OBJ DOKU-31088-001 .fm
A. DEUTZ
2/2
A. DEUTZ
Removing and installing the flywheel (Fastening parts)
[I] Standard tools
Special tools: - Guide pin (self-const
ructed) - Auxiliary screws - Rotation angle disc
Removing the flywheel
Flywheel
2 Ring gear
3 Screw
4 Bearing bush
M10x120 01899093
• Hold the crankshaft at the central screw.
• Screw in auxiliary screws ( 1 ).
• Unscrew screws (2).
• Remove flywheel using auxiliary screws .
• Visually inspect the components.
©0912012 1/4
Flywheel W 05-03-01
OBJ_DOKU-31089-001 .fm
© 51460-0
~ 5M62-U
II
II
Flywheel W 05-03-01 OBJ_DOKU-31089-001 .fm
Installing the flywheel
• Insert self-made guide pin (arrow) .
bl The bores in the flywheel must match the EJ threaded bores in the crankshaft flange.
• Mount flywheel using auxiliary screws.
~ Attention! Lf£J Renew screws every time they are loo
sened.
• Tighten screws alternately.
- Stage 1:
,~e·,c.:, 30 Nm
• Tighten screws with rotation angle disc.
- Stage 2:
- Stage 3
i"'r'•:, 30"
• Remove guide pin.
• Unscrew auxiliary screws.
© 0912012
A. DEUTZ
2/4
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A05 001 Flywheel on crankshaft
A05 001 Flywheel on crankshaft A05 001 Flywheel on crankshaft
Screw type Notes / Remark Stage 1: Use new screws Stage 2:
Stage 3:
Flywheel W 05-03-01
OBJ_DOKU-31089-001 Jm
Value
30 Nm
60° 30°
For the tightening procedure according to torque using a torque wrench. a maximum variation of the lightening torque of +/- 10% is permissible.
© 091201:? 3/4
II
II
Flywheel W 05-03-01 OBJ_DOKU-31089-001 fm
11: 09120',2
A. DEUTZ
4/4
A. DEUTZ
Removing and installing the cylinder head cover
[I] Standard tools
Removing cylinder head
Cylinder head cowling
2 Seal
3 Screw
4 Filler lock
5 Plug piece
• Removing the crankcase breather.
L,:} Module 01
• Unscrew screws ( 1 ).
• Remove cylinder head cowling (2).
1/4
Cylinder head cover W 08-01-01
OBJ_DOKU-31090-001 fm
II
II
Cylinder head cover W 08-01-01 OBJ_OO KU-37090-001 .fm
• Remove gasket ( 1 ).
Installing cylinder head cover.
• Mount new gasket (1) .
• Mount cylinder head cover (1) .
A. DEUTZ
~ 50509 0
G 50509-0
2/4
• Tighten the screws according to the tightening sequence.
§,"•~ 8.5 Nm
• Install crankcase breather.
W Module 01
©0912012 3/4
4
Cylinder head cover W 08-01-01
OBJ_DOKU-31 090-001. fm
5
© 50511-0 II
a
Cylinder head cover W 08-01-01 OBJ_DOKU-31090-001 .fm
Technical Data
Tightening specifications
ID no. Name Screw e Notes/ Remark A08 004 Cylinder head cover on cylinder head
A. DEUTZ
Value 8.5Nm
For the lightening procedure according to torque using a torque wrench. a maximum variation of the tightening torque of+/- 10% is permissible.
4/4
~>® DEUTZ
Holder
[1] Standard tools
1 Holder
2 Impulse transmitter
3 Hexagon head screw 8.5 Nm 4 Hexagon head screw 5 Nm
Position 2:
1~ I Use new round sealing ring.
~ 0912012 1/2
Gearcase W 09-90-09
OBJ_0OKU-31091-001 fm
- Safety information / User information
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling.
~51285-0
II
II
Gearcase W 09-90-09 OBJ DOKU-31091-001 ,lm
A. DEUTZ
212
A. DEUTZ
Intermediate gear
[I] Standard tools
1 Intermediate gear
2 Shaft
3 Hexagon head screw
©091201:/
30 Nm
112
Gearcase W 09-90-50
OBJ _DOKU-31 092-001.fm
II
II
Gearcase W 09-90-50 06J_D0K U-31092-001 fm
© 09120" 2
A. DEUTZ
2/2
A. DEUTZ
Lubricating oil cooler W 15-02-01
OBJ_DO KU-31093-001.fm
Removing and installing the lubricating oil cooler
[]] Standard tools
Removing the lubricating oil cooler
1 Lubricating oil cooler
2 Seal
3 Hexagon head screw
• Unscrew all screws ( 1 ).
• Remove lubricating oil cooler (2).
• Remove gasket (3).
r:;;i Collect draining lubricating oil and dispose EJ of property.
• Visually inspect the components.
~ 09/2012
. (
(
1/4
Collect leaking operating substances in suitable vessels and dispose of according to regulations. The appropriate operating manual should be observed for emptying and filling the engine.
~ 5C279 0
II
II
Lubricating oil cooler W 15-02-01 OBJ_DOKU-31093-001.fm
Installing the lubricating oil cooler
• Visually inspect the components.
• Clean sealing surfaces.
• Turn in screws (arrows).
M8x20-10.9
• Fasten new seal (1) on lubricant oil cooler housing with screws.
• Mount lubricating oil cooler ( 1 ).
• Tighten screws (2)
• Tighten all screws (2) alternalely .
.-"'" • ·. 30 Nm
2/4
A. DEUTZ
I:: 50280·0
~)5C2S1-0
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A 15 051 Oil cooler housing on crankcase
Screw e Notes / Remark
Lubricating oil cooler W 15-02-01
OBJ_DOKU-31093-001 fm
Value 30 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
3/4
II
II
Lubricating oil cooler W 15-02-01 OBJ_DOK U-31 093-001.fm
:al 09120"2
A. DEUTZ
4/4
A. DEUTZ
Lubricant oil filter console
[I) Standard tools
1 Interchangeable filter 12 Nm
2 Threaded bush
3 Cover
4 0-ring
5 Hexagon head screw 30 Nm
,~, Use new round sealing ring.
1/2
5
Lubricating oil filter W 15-90-38
OBJ_DOKU-31094-001 .fm
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instruc• lions for emptying and filling the engine.
·1 "'l
( ;, -~
l q JQ• '~~
•
lP' • 2
:;;, 50390-0
II
II
Lubricating oil filter W 15-90-38 OBJ_DOKU-31094-001 .frn
A. DEUTZ
2/2
A. DEUTZ
Removing and installing the oil suction pipe
Standard tools
- Packing compound DEUTZ DW 73
Removing the oil suction pipe
1 Oil suction pipe
2 Torx screw
291 Packing compound
• Remove lubricating oil pan.
!..._:j Module 02
• Unscrew screws ( 1 ).
• Remove oil suction pipe (2).
• Visually inspect the component.
©0912072 1/4
Oil suction pipe W 16-01-01
O8J_DOKU-31095-001.fm
G) 5()409-0
II
II
Oil suction pipe W 16-01-01 OBJ_DOKU-31095-001.frn
Installing the oil suction pipe
• Clean sealing surface.
• Apply 5ealing compound (1) evenly on the sealing surface.
• Clean sealing surface.
• Install oil suction pipe ( 1 ).
• Tighten screws (2).
!'!• ,.·.:·, 22 Nm
• Install lubricating oil pan.
~ 1 Module 02
©09R01Z 214
A. DEUTZ
I © 50727-0
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A16 015 Oil suction pipe on crankcase
Screw e Notes / Remark M8x25-10,9
Oil suction pipe W 16-01-01
OBJ_DOKU-31095-001 .fm
Value 22 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
© OQ/2012 314
II
II
Oi I suction pipe W 16-01-01 OBJ_DOKU-31095-001 ,fm
A. DEUTZ
414
A. DEUTZ
Removing and installing the lubricating oil line ( exhaust turbocharger)
[1] Standard tools
Removing the lubricating oil line
1 Lubricating oil line
2 Hollow screw
3 Sealing ring
• Unscrew hollow screw ( 1 }.
• Remove sealing rings (2).
©09/2012 1/4
Lubricating oil pipe W 16-04-01
OBJ_DOKU-31096-001 .fm
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instruc· lions for emptying and filling the engine.
© 5{)444-0
II
II
Lubricating oil pipe W 16-04-01 OBJ_DOKU-31096-001.lm
• Unscrew hollow screw ( 1 ).
• Remove sealing rings (2).
• Remove lubricating oil pipe (3).
Installing the lubricating oil line
• Clean sealing surfaces.
• Mount lubrication oil line ( 1 ).
• Mount sealing rings (2).
• Screw on hollow screw (3).
• Clean sealing surfaces.
• Mount lubrication oil line (1 ).
• Mount sealing rings (2) .
• Tighten hollow screw (3).
18 Nm
Attention! Install tension-free.
©:)9/2012
A~ DEUTZ
214
• Tighten hollow screw ( 1 ).
!'!'·,::: 18 Nm
ltW Attention! ~ Install tension-free.
(;)0912012 314
Lubricating oil pipe W 16-04-01
OBJ_DOKU-31096-001.fm
II
II
Lubricating oil pipe W 16-04-01 OBJ_DOKU-31096-001 fm
Technical Data
Tightening specifications
ID nQ. Name
A43 047 Lubricating oil pipe on exhaust tur-bocharQer
A43 048 Lubricating oil line on crankcase
A. DEUTZ
Screw tvoe Notes / Remark Value
Hollow screw Use new sealing rings 18 Nm
Hollow. screw Use new sealing rings 18 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
4/4
A. DEUTZ
Removing and installing the lubricating oil line (exhaust turbocharger)
[I] Standard tools
Removing the lubricating oil line
1 Lubricating oil line
2 Hollow screw
3 Sealing ring
• Unscrew hollow screw (1) .
• Remove sealing rings (2).
G) 0912012 114
Lubricating oil pipe W 16-04-01
OBJ_DOKU-31097-001 .frn
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instructions for emptying and filling the engine.
©50t56·U
© 50675-0
II
II
Lubricating oil pipe W 16-04-01 OBJ_DOKU-31097-001,lrn
• Unscrew hollow screw (1).
• Remove sealing rings (2) .
• Remove lubricating oil pipe (3).
Installing the lubricating oil line
• Clean sealing surfaces.
• Mount lubrication oil line ( 1 ).
• Mount sealing rings (2).
• Screw on hollow screw (3).
• Clean sealing surfaces .
• Mount lubrication oil line (1 ).
• Mount sealing rings (2) .
• Tigh1en hollow screw (3).
18 Nm
Attention! Install tension-free.
A. DEUTZ
:;l 50676-C
2/4
A. DEUTZ
• Tighten hollow screw (1 ).
~ Attention! L..i2J Install tension-free.
© 09,2012 314
Lubricating oil pipe W 16-04-01
OBJ DOKU-31097-001.fm
II
II
Lubricating oil pipe W 16-04-01 OBJ_DOKU-31097-001.lm
Technical Data
Tightening specifications
ID no. Name
A43 047 Lubricating oil pipe on exhaust tur-bocharger
A43 048 Lubricating oil line on crankcase
A. DEUTZ
Screw type Notes / Remark Value
Hollow screw Use new sealing rings 18 Nm
Hollow screw Use new sealing rinos 18 Nm
For the tightening procedure according to torque using a torque wrench. a maximum variation of the tightening torque of +/- 10% is permissible.
()0912012 4/4
Lubricating oil pipe W 16-05-01
OBJ_DOKU-31098-001.fm
Removing and installing the lubricating oil return line ( exhaust turbocharger)
Standard tools
Special tools: - Disassembly tool
- Fitting compound DE UTZ AP1908
Removing the oil return line
1 Fastening flange
2 0-ring
3 Oil return line
4 0-ring
5 Hexagon head screw
6 Hexagon head screw
7 Seal
• Unscrew screws ( 1).
• Remove gasket (2).
02992127
116
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instructions for emptying and filling the engine.
© 50435-0
II
II
Lubricating oil pipe W 16-05-01 OBJ_OOKU-31098-001 .lm
• Unscrew screw (1).
• Pull out oil return line (2) in direction of arrow.
• Remove flange ( 1) in direction of arrow.
• Remove round sealing ring (2) with disassembly tool.
• Visually inspect the component.
• Remove the O-ring (1) with the disassembly tool .
• Visually inspect the component.
216
A. DEUTZ
0
0 © 50683-C
A. DEUTZ
Mounting the oil return line
• Clean sealing surfaces.
• Lightly coat new round sealing ring with DE UTZ AP1908 mounting compound.
• Insert new O-ring { 1 ).
• Clean sealing surfaces.
• Lightly coat new round sealing ring with DEUTZ AP1908 mounting compound.
• Insert new O-ring (1) .
• Insert flange (2) in direction of arrow.
• Clean sealing surfaces.
• Mount oil return pipe { 1 ).
• Insert oil return line ( 1) in direction of arrow.
• Fas ten screw (2).
0
316
Lubricating oil pipe W 16-05-01
OBJ _DOKU-31098-001.fm
© 5068•-0 II
II
Lubricating oil pipe W 16-05-01 0BJ_DOKU-31098-001 Im
• Clean sealing surfaces.
• Mount gasket ( 1 ).
• Mount oil return pipe (2).
• Tighten screws (3) .
Bt· '::-, 8.5 Nm
• Tighten screw (1 ).
,",r· •· . 8.5 Nm
ffil Attention' l.J2j Install tension-free.
A. DEUTZ
4/6
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A43 044 Oil return line on exhaust turbochar-
Icier A43 046 Oil return line on crankcase
Screw type Notes/ Remark
Lubricating oil pipe W 16-05-01
OBJ_DOKU-31098-001 .fm
Value
8.5 Nm
8.5 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
5/6
II
II
Lubricating oil pipe W 16-05-01 OBJ_DOKU-31098-001 Im
© 09<2012
A® DEUTZ
6/6
A. DEUTZ
Lubricating oil pipe W 16-05-01
OBJ_DOKU-31 099-001.fm
Removing and installing the lubricating oil return line (exhaust turbocharger)
[I] Standard tools
Special tools: - Disassembly tool
- Fitting compound DE UTZ AP1908
Removing the oil return line
Fastening flange
2 O-ring
3 Oil return line
4 O-ring
5 Hexagon head screw
6 Hexagon head screw
7 Seal
• Unscrew screws (1 ).
• Remove gasket (2).
02992127
1/6
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instructions for emptying and filling the engine.
0 ..,..... 4
rs; 50657 •0
II
II
Lubricating oil pipe W 16-05-01 OBJ_DOKU-31099-001 .fm
• Unscrew screw ( 1).
•Pullout oil return line (2) in direction of arrow.
• Remove flange ( 1) in direction of arrow.
• Remove round sealing ring (2) with disassembly tool.
• Visually inspect the component.
• Remove the O-ring (1) with the disassembly tool.
• Visually inspect the component.
©U9.12Q12 2/6
A. DEUTZ
© 506B1-0
0 © snnBJ-o
A. DEUTZ
Mounting the oil return line
• Clean sealing surfaces.
• Lightly coat new round sealing ring with DEUTZ AP1908 mounting compound .
• Insert new O-ring ( 1 ).
• Clean sealing surfaces.
• Lightly coat new round sealing ring with DEUTZ AP 1908 mounting compound.
• Insert new O-ring (1 ).
• Insert flange (2) in direction of arrow.
• Clean sealing surfaces.
• Mount oil return pipe ( 1 ).
• Insert oil return line (1) in direction of arrow.
• Fas ten screw (2).
3/6
l I
01
Lubricating oil pipe W 16-05-01
OBJ_DOKU-31099-001.fm
© 50684-0
I., 0 .:; 5068.5-0
~ 50686·0
II
II
Lubricating oil pipe W 16-05-01 OBJ_DOKU-31099-001.lm
• Clean sealing surfaces.
• Mount gasket ( 1 ).
• Mount oil return pipe (2).
• Tighten screws (3).
:''· ,_., 8.5 Nm
• Tighten screw (1 ).
f,-, :; 8.5 Nm
liN Attention! li2J Install tension-free.
© 0912012
A. DEUTZ
© 50688-D
4/6
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A43 044 Oil return line on exhaust turbochar-ger
A43 046 Oil return line on crankcase
Screw type Notes/ Remark
Lubricating oil pipe W 16-05-01
OBJ_DO KU-31 099-001.fm
Value
8.5 Nm
8.5 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
© 0912012 5/6
II
II
Lubricating oil pipe W 16-05-01 OBJ DOKU-31099-001 fm
,:;J 0912012
A. DEUTZ
6/6
A. DEUTZ
High-pressure pump W 17-01-04
OBJ_DOKU-31100-001.fm
Removing and installing the high-pressure pump
w Standard tools: - Separating tool
Special tools: - Special wrench 02992112 - Disassembly tool 02992127 - Plugs/caps 01899144
~ - Mirror - Marker pen, waterproof,
permanent
Removing the high-pressure pump
1 High-pressure pump
2 Spacer
3 Hexagonal nut
4 Washer
5 O-ring
6 Hexagonal nut
7 O-ring
©09/:2012 116
- Safety information/ User information
Danger! Do not carry out work on the fuel system when the engine is running . The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 1 OD bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and din particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling . Collect leaking operating substances in suitable vessels and dispose of according to regulations.
J '. u
'., ·• .. -'~':f°'~ ' ...
3
II
II
High-pressure pump W 17-01-04 OBJ_DOKU-31100-001 .lm
• Unlock cable plug and remove.
• Remove high-pressure line .
• Remove fuel pipes.
[ __ J Module 21
• Unscrew locking screw (1 ).
• Remove sealing ring .
L:} Module 09
• Turn crankshaft in engine direction of rotation until marking is visible.
(1) Marking high-pressure pump gear wheel
• Apply help marking ( 1 ).
High-pressure pump gear wheel and intermediate gear
ir6:7 Attention! LJ2j Do not turn the crankshaft any more'
2/6
A. DEUTZ
• Unscrew nuts ( 1 ).
~ Attention! ~ Do not twist the high-pressure pump.
• Remove high-pressure pump (2).
~ Attention! lJ2j Do not turn the crankshaft any more!
Attention! Do not damage the high-pressure pump gear wheel.
Use a suitable tool.
• Hold high-pressure pump gear wheel (1 ).
• Unscrew nut (2) .
• Remove washer (3).
• Pull off high-pressure pump gear wheel ( 1) with separating tool.
• Remove spacer (4) .
• Visually inspect the components.
• Remove the O-rings ( 1) with the disassembly tool.
Attention! All the help markings must be transferred when renewing/changing a part. Do not turn the crankshaft any morel
3/6
High-pressure pump W 17-01-04
OBJ_DOKU-31100-001 Im
II
II
High-pressure pump W 17-01-04 0BJ_DOKU-31100-001.fm
Installing the high-pressure pump
• Clean sealing surfaces.
• Mount new O-rings ( 1 ).
• Push on spacer (2).
Attention! Ensure that the installation location is free from faults. Recess (3) is on the fuel supply side.
• Mount high-pressure pump gear wheel ( 1 ).
liW Attention! LJ2:..j Pay attention to installation position.
(2) Surrounding groove
(3) Marking
Attention! Ensure that the installation location is free from faults. Do not damage the high-pressure pump gear wheel. The clamping pin ( 1) must engage in the groove (2).
• Fit washer (3).
• Screw on nut (4). 1~1 Use a suitable tool.
• Hold high-pressure pump gear wheel (5).
• Tighten nuts (4)
"',-. 80Nm
© 0912012
A. DEUTZ
© 51436-0
© 51438-0
416
A® DEUTZ
e pump H h-pressur 1g w 17-01-04
OBJ_ --------------~===:~:D:O~K~U:·31100-001.fm
( 1)
t. n! . Atten 10 . . t permissible. ·1 ble ! tl_ Dry running is no ure must be ava1 a
C-f S fficient fuel press mp. u - essure pu
at the high-pr - at least 4.3 bar Fuel pressu re at the supply
. h ressure pump. • Install hig -p t be visible.
Markings mus atch. · must m
Help marking heel
ump gear w . hi h-pressure P gear wheel (1) Marking _9 . h-pressure pump Help marking_ h1g ear
(2) and intermediate g
• Sere
Attention! - h-pressure pump. t twist the h1g Do no
won nuts (1 ).
• Tighten nuts ( 1 ).
~-,. , :, 21 Nm
• Install locking screw.
09 ____ " Module
• Install fuel pipes. 1· e . ressure in . • Fit new h1gh-p 21
.· Module .. - . , lu
. d lock cable P g. • Plug in an
0
516
II
II
High~pressure pump W 17-01-04 OBJ_DOKU-31100-001.fm
Technical Data
Tightening specifications
ID no. Name
A17 004 High-pressure pump gear wheel and high-pressure pump drive shaft
A17 031 High-pressure pump on crankcase
A. DEUTZ
Screw type Not~s / Remark Value Hold high-pressure pump
80 Nm oear wheeL
21 Nm
For the lightening procedure according lo torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
1l 0912012 6/6
Removing and installing the injector
rn Standard tools
Special tools: - Diagnostic tool
SerDia 2010 - Assembly pliers - T orx tool set - Plugs/caps - Lever tool - Disassembly tool - Extraction tool - Slide hammer
Remove injector
1 Injector
2 Sealing disc
3 Clamping claw
4 Screw
© 09/2012
01899050 01899092 01899144 02992117 02992127 02992138 02992294
1/6
Injector W 19-01-01
OBJ_DOKU-31101-001 .fm
- Safety information / User information
Danger! Do not carry out work on the fuel system when the engine is running. The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 100 bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling . Collect leaking operating substances in suitable vessels and dispose of according to regulations.
II
II
Injector W 19-01-01 OBJ_DOKU-31101-001.frn
1600 bar Injection system
Attention! Note assignment of the injector to the cylinder. The injector is assigned by the relevant IMA code (1) to the corresponding cylinder. The assignment is saved in the control unit. Each time an injector is replaced/renewed, the correct assignment to the relevant cylinder must be made by transferring the new I MA code in the control unit. Observe installed injection system1 The I MA codes of the different injection systems are basically different. The injector calibration depends on the installed injection system. The exact procedure can be taken from the listed documentation and must be observed.
'--.i DiagnoStic SerOia 2010 tool
SerDia manual
The following work procedure describes the removal and installation of an injector.
Proceed in the same way lo remove further injectors.
• Unlock cable plug and remove.
• Disconnect the fuel line from the injector .
._.} Module 21
Attention! Position (1 ): The injector must be renewed if the pipe connection is disconnected.
• Hold pipe connection ( 1).
• Remove injection line.
/__::__.1 Module 21
• Unscrew screw (2).
© 0912012
A. DEUTZ
<'l 51243-0
2/6
A. DEUTZ
• Insert lever tool ( 1) in the clamping claw.
• Loosen the injector by moving the lever tool ( 1) in the direction of the arrow.
• Remove injector and clamping claw.
Attention! Do not brush off the nozzle tip of the iniector_
Do nol damage nozzle head on the inJector during disassembly of the sealing disc (1).
• Grip fixed sealing disc (1) using the assembly pliers (2) and pull off with slight turning movements.
Removing fixed sealing disc at cylinder head
• Insert extraction device (1) .
bl The supports (arrow} must rest in the bore EJ of the sealing disc.
3/6
Injector W 19-01-01
OBJ_DOKU-31101-001 .fm
;) 50<62-0 II
II
Injector W 19-01-01 OBJ_DOKU-31101-001 fm
• Screw in spindle (1) until the sealing disc is fastened on the pull-out device. [~ I Hold puller on hexagon.
• Install adapter (2) on disassembly device.
• Install slide hammer ( 1) on disassembly device.
• Pull out fixed sealing disc.
Installing the injector
• Mount new sealing disc ( 1) on injector.
© 0912012
Attention! Before installing the injector, combustion residue must be cleaned carefully from the bore on the cylinder head. Suck off dirt particles.
4/6
A. DEUTZ
0
A. DEUTZ
Attention! Note assignment of the injector to the cylinder. Ensure that the installation location is free from faults.
• Insert injector carefully in the cylinder head.
• Mount clamping shoe.
• Insert screw (1) .
[:;;l Do not tighten the screw until after EJ assembling the injection line.
• Mount new injection pipe.
'--.I Module 21
Do not tighten union nuts.
Attention! Position ( 1 ): The injector must be renewed if the pipe connection is disconnected.
• Tighten screw (2) .
,'!,·-,~--,. 30 Nm
• Tighten union nuts of the inJection line.
L:,.J Module 21
• Connect fuel line.
Attention! Removed, missing and bent clips must be renewed. The clip must spring back to the hold position automatically. Otherwise renew the clip.
L., .• J Module 21
• Plug in and lock cable plug.
©0912012 5/6
Injector W 19-01-01
OBJ_DOKU-31101-001.fm
II
II
Injector W 19-01-01 OBJ_DOKU-31101-001,fm
Technical Data
Tightening specifications
ID no. Name
A 19 001 Injector on cylinder head, clamping claw
Screw tvoe
A. DEUTZ
Notes / Remark Value Observe order of installation. 30 Nm Install injector without tension.
For the lightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
6/6
A. DEUTZ
Fuel pre-filter
[I] Standard tools
1 Fuel pre-filter
2 Console
3 Sensor 1.6 Nm
4 Sealing ring
Use a new sealing ring.
Vent fuel system according to operating instructions.
Fuel pre-filter
[~,} Operation manual
3 09/2012 1/2
Fuel filter W 20-90-16
OBJ_DOKU-31102-001.fm
- Safety information / User information
- Operation manual
Danger!
Do not carry out work on the fuel system when the engine is running. The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 100 bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and din particles before disassembly. Clean the area around the components concerned carefully. Blow wet pans dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling. Collect leaking operating substances in suitable vessels and dispose of according to regulations.
© 50549-0
II
II
Fuel filter W 20-90-16 OBJ_OO KU-31102-001 .fm
©09f/()1';
A. DEUTZ
212
A. DEUTZ
Fuel filter rn Standard tools
2
3
4
5
Fuel spare filter
Filter head
Pressure sensor
Hexagon head screw
0-ring
25 Nm
42 Nm
[ ll@f I Use new round sea ling ring.
© 0912012 1/2
Fuel filter W 20-90-17
OBJ_DOKU-31103-001 .fm
- Safety information / User information
- Operation manual
Danger! Do not carry out work on the fuel system when the engine is running. The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 100 bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling. Collect leaking operating substances in suitable vessels and dispose of according to regulations.
© ,~551-0
II
II
Fuel filter W 20-90-17 OBJ DOKU-31103-001.fm
©09120·.2
A. DEUTZ
212
A. DEUTZ
Fuel line
2
3
4
5
Standard tools
Special tools: - Hose clip pliers - Spring band pliers - Plugs/caps
Hose pipe
Hollow screw
Sealing ring
Clip
Holding tape
20 Nm
1~ I Use new sealing rings.
©0912012
01899037 01899112 01899144
112
Fuel pipes W 20-90-30
OBJ_DOKU-31104-001.fm
- Safety information I User information
- Operation manual
Danger! Do not carry out work on the fuel system when the engine is running. The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 100 bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling. Collect leaking operating substances in suitable vessels and dispose of according to regulations.
© 50548-0
II
II
Fuel pipes W 20-90-30 0BJ_DOKU-31104-001 .fm
Attention! Ensure that the installation location is free from faults. Lay the hose pipe free from chafing and tension.
- Dimension X
© 0912012 212
A. DEUTZ
A. DEUTZ
Supply pump (Fuel)
[I] Standard tools
Special tools: - Plugs/caps
Supply pump
- Fastening
Screws
4 X M5-8.8
01899144
112
Fuel supply pump W 20-90-47
OBJ_DOKU-31105-001.fm
- Safety information I User information
Danger!
Do not carry out work on the fuel system when the engine is running. The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 100 bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling. Collect leaking operating substances in suitable vessels and dispose of according to regulations.
• i l • 1 I I l .,,,
. I I -=-" ti
© 5D547-D
II
II
Fuel supply pump W 20-90-47 OBJ_DOKU-31105-001 .fm
2/2
A. DEUTZ
Removing and installing the rail
[I] Standard tools: - Wrench insert size 14
Special tools: - Long socket wrench insert 01899132 - Plugs/caps 01899144 - Special wrench 02992112 - Disassembly tool 02992127
- Assembly grease 01016496
Removing the rail
1 Rail
2 High-pressure line
3 Injection line
4 Injection line
5 Torx screw
6 Spacer
© 0912012 1/10
Fuel pipes W 21-04-01
OBJ_DO KU-31106-001 .fm
- Safety information / User information
Danger! Do not carry out work on the fuel system when the engine is running. The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 100 bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully_ Blow wet parts dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling. Collect leaking operating substances in suitable vessels and dispose of according to regulations.
4
© 50552-0
II
II
Fuel pipes W 21-04-01 OBJ_DOKU-31106-001.fm
Removing high-pressure line
• Remove fuel return line.
• Unscrew union nut ( 1) with special wrench.
• Remove cable harness holder and swing aside.
• Unscrew union nuts (2) with special wrench.
• Remove high-pressure line (3).
~ Collect draining fuel and dispose of L'.::J according to regulations.
Removing injection pipes
• Unscrew lock nuts ( 1) with special wrench.
~ Attention! lJ2J Position (3):
The injector must be renewed if the pipe connection is disconnected.
• Hold pipe connection of injector.
• Unscrew lock nuts (2).
• Remove injection lines.
rd Collect draining fuel and dispose of L'.::J according to regulations.
• Unlock cable plug .
• Pull out cable plug.
• Unscrew screws (1).
• Remove the rail (2).
• Remove spacer (3).
• Visually inspect the components.
© 0912012
A. DEUTZ
if: 51411-0
2/10
A. DEUTZ
Removing the pressure sensor
• Unscrew the rail pressure sensor (1) with the socket wrench.
r:::;;:i Collect draining fuel and dispose of EJ according to regulations.
Attention! Do not touch the pin contacts of the rail pressure sensor with your hands to avoid electrostatic discharging. Ensure absolute cleanliness of the connector.
• Visually check the thread and the sealing edge (arrows)of the rail pressure sensor.
Installing the pressure sensor
Attention! No foreign bodies may get into the rail. Ensure utmost cleanliness. Especially on the thread and the sealing surface of the rail. See the spare parts documentation_ Rail pressure sensor and pressure limiting valve must be replaced as a pair.
• Clean thread and sealing area of the rail.
• Coat the thread and sealing edge of the rail pressure sensor lightly with assembly grease.
©0912012 3/10
Fuel pipes W 21-04-01
OBJ_DOKU-31106-001.fm
©51412·0
© •30H-0
© <3017-0
II
II
Fuel pipes W 21-04-01 OBJ_DOKU-31106-001 .fm
liW Attention! LJ2J Only tighten the rail pressure sensor with
the hexagon.
• Screw in rail pressure sensor ( 1 ).
• Tighten rail pressure sensor (1) with the socket wrench insert.
§':>,~-: 70 Nm
Removing the pressure limiting valve
• Unscrew pressure limiting valve (1).
~ Collect draining fuel and dispose of EJ according to regulations.
• Visually check the thread and the sealing edge of the pressure limiting valve.
© 0912012 4110
A. DEUTZ
© 51412-0
© 51413-0
:!'.l 43253•1
A. DEUTZ
• Remove the O-ring with the disassembly tool .
Installing the pressure limiting valve
Attention! No foreign bodies may get into the rail. Ensure utmost cleanliness. Especially on the thread and the sealing surface of the rail. See the spare parts documentation. Rail pressure sensor and pressure limiting valve must be replaced as a pair.
• Mount new O-ring (1 ).
• Lightly coal the thread and sealing edge of the pressure limiting valve with assembly grease.
© 0912012 5/10
Fuel pipes W 21-04-01
OBJ_DOKU-31106-001.fm
©43335-0 II
II
Fuel pipes W 21-04-01 OBJ_DOKU-31106-001.fm
• Clean thread and sealing area of the rail.
• Screw in pressure limiting valve (1 ).
• Tighten pressure limiting valve.
f!;> '~::i 1 00 Nm
Mounting rail
• Mount rail ( 1) with spacer (2).
• Loosely preassemble rail (1) with screws (3). 1~1 Do not lighten screws.
Installing injection pipes
Attention! The injection lines must always be renewed after disassembly.
Note assignment and installation position of the injection lines.
• Mount new injection lines (1 ).
© 09(.10',2
A. DEUTZ
© 51413-0
© 57.dld·O
~ 01415-0
6110
A. DEUTZ
Attention! Pay attention to alignment of the injection pipes. Lines must not be in the bores (1) of the union nuts. Install injection lines without tension and without touching. They must be a safe distance away from adjacent parts.
• Align injection lines.
• Tighten union nuts hand-tight.
Installing high-pressure line
Attention! The high-pressure line must always be renewed after dismantling.
Ensure that the installation location is free from faults.
• Mount new high-pressure line (1 }.
Attention! Pay attention to alignment of the high-pressure line. Line may not touch in the bore ( 1) of the union nut. Install high-pressure line without tension and contact. They must be a safe distance away from adjacent parts.
• Align high-pressure line.
• Tighten union nuts hand-tight.
©0912012 7/10
Fuel pipes W 21-04-01
OBJ_DOKU-31106-001.fm
© 51416-0 II
II
Fuel pipes W 21-04-01 OBJ_DOKU-31106-001.fm
• Tighten screws ( 1 ).
f>,, 30 Nm
• Tighten the union nuts in order.
?s, .. , 30 ~]:~ Nm
• Check injection lines for perfect installation position .
• Check the high-pressure line for perfect installation position.
• Mount fuel return line.
• Mount cable harness holder.
• Plug in and lock cable plug.
IIJ@f I Ensure that the connection is perfect.
8110
A. DEUTZ
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name Injection line on rail and injector.
A21 003 high-pressure line on high-pressure pump and on rail
A21 038 Rail on cylinder head
A21 039 Pressure limiting valve on rail
A21 040 Pressure sensor on rail
Screw type
Union nut
M18x1.5
Notes / Remark Observe installation regulation. Use new line.
Observe assembly specification.
Lightly coat the thread and sealing edge with assembly qrease.
Lightly coat the thread and sealing edge with assembly grease.
Fuel pipes W 21-04-01
OBJ_DOKU-31105-001.frn
Value
30 : )·~ Nm
30 Nm
100 Nm
70 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
© 09/2012 9110
II
II
Fuel pipes W 21-04-01 OBJ_DOKU-31106-001.fm
ti 0912012
A. DEUTZ
10/10
A. DEUTZ
Removing and installing the fuel line (injector, rail, high-pressure pump)
Standard tools
Special tools: - Spring band pliers - Plugs/caps - Disassembly tool
Removing the fuel line
1 Return line
2 Hose holder
3 Fuel line
4 Hose pipe
5 Pipe clip
6 Hexagon head screw
7 Spring band clip
© 0912012
01899112 01899144 02992127
1/6
Fuel pipes W 21-05-05
OBJ_DOKU-31107-001.fm
- Safety information/ User information
Danger! Do not carry out work on the fuel system when the engine is running. The fuel system is under high pressure -Danger of death.
The fuel pressure can continuously remain up to several 100 bar even after stopping the engine. Here the fuel pressure is only reduced if the fuel system is opened and the fuel can escape outside.
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Observe the safety regulations and national specifications for handling fuels. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling. Collect leaking operating substances in suitable vessels and dispose of according to regulations.
© 50550-U
II
II
Fuel pipes W 21-05-05 OBJ_DOK U-31107-001. frn
Attention! Removed, missing and bent clips must be renewed. The clip must spring back to the hold position automatically. Otherwise renew the clip.
• Press in the clip (1) to the stop.
• Pullout return line (2).
• Remove the O-ring (1) with the disassembly tool .
• Remove return line (1) from hose holder (2).
• Unlock coupling plug (3) and pull off.
• Unscrew screws (4).
©0912012
A. DEUTZ
© 51304-0
© ,, 305-0
© 51306-0
216
A. DEUTZ
. band pliers. I. ( 1} with spring . band c ip • Loosen spring
• Pull off hose pipe (2).
return line. • Remove mponents.
. ct the co • Visually inspe
. the fuel line Mounting
· I r n is free Attention. . tallation loca ,o that the ins Ecsoce d
from faults. th the spring ban g band clip (1) w1 . the spnn • Position
pliers.
- Dimension X
• 2 mm •i~ .4-2
,, . t the hose pipe (2). • Moun
• Position res u . hose holder . t rn line. (2
) rt return line ( 1) in
• lnse . (3
)_ • Pos1t10 .. n pipe clips
• Tighten screws (4) . and latch into place. nt coupling plug (5) • Mou
:!SJ 09/2012 3/6
Fuel pipes w 21-05-05
----------()BJ_D()Kl~~31107-001.fm OBJ_DOKU-
X
©01309-0
II
II
Fuel pipes W 21-05-05 OBJ_DOKU-31107-001.lrn
Attention! Removed, missing and bent clips must be renewed. The clip must spring back to the hold position automatically. Otherwise renew the clip,
• Mount new round sealing ring (2).
• Position return line ( 1) vertically to the injector.
• Insert return line ( 1) in injector by hand.
Attention! Ensure that the installation location is free from faults. Return line must snap in audibly.
• Tighten screws ( 1 ).
©0912012
A. DEUTZ
© 51310-0
© 51311·0
4/6
Au DEUTZ
Technical Data
Tightening specifications
ID no. Name A 12 095 Pipe clips. fastening
Screw e Notes I Remark
Fuel pipes W 21-05-05
OBJ_0OKU-31 107-001 Jm
Value 30 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
5/6
II
II
Fuel pipes W 21-05-05 OBJ_DOKU-3 7 107-001 .fm
© 09.1201:;:
A. DEUTZ
6/6
A. DEUTZ
Removing and install the charge air line
[I] Standard tools
Remove charge air line
1 Charge air line
2 Seal
3 Hexagon head screw
• Remove fuel return line.
• Unlock cable plug and disconnect.
• Unscrew screws (1).
• Remove charge air line (2).
• Remove gasket (3).
• Visually inspect the components.
©0912012 1/4
Charge air line W 22-01-01
OBJ_OOKU-31108-001.fm
© 50•13-0
II
II
Charge air line W 22-01-01 OBJ_DOKU-31108-001.frn
Install charge air line
• Clean sealing surfaces.
• Mount new gasket ( 1 ).
• Turn screws into the seal a few turns.
bl The seal is locked by the screw thread .
EJ Ensure that the installation location of the gasket is free from faults.
• Mount charge air line (1).
• Tighten screws (2). 1~ I Do not move gasket.
• Tighten the screws according to the tightening sequence.
t'• ,, __ , 30 Nm
~ Attention! lJ2J Ensure that the cables are laid perfectly.
• Plug in and lock cable plug.
• Mount fuel return line.
©09/2012 2/4
A. DEUTZ
© 504 15-0
B 4 2 6
5 1 3 7
~- ~0.!117-0
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A2.2 030 Charge air line on c linder head
Screw e Notes / Remark
Charge air line W 22-01-01
OBJ_DOKU-31108-001.fm
Value 30 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
3/4
II
II
Charge air line W 22-01-01 OBJ_DOKU-31108-00 t.fm
©09-12012
A. DEUTZ
4/4
• I
A. DEUTZ
Removing and installing charge air manifold
101 Standard tools: l__!L_J - Spring band pliers
Removing charge air manifold
1 Rubber sleeve
2 Hose nozzles
3 Spring band clip
4 Spring band clip
5 Spring band clip
6 Seal
7 Charge air manifold
8 Hexagon head screw
01899112
• Loosen spring band clips ( 1) with spring band pliers.
• Unscrew screws (2) .
• Remove charge air manifold (3) .
• Remove gasket ( 4).
• Visually inspect the component.
©09/2012 1/4
Charge air line W 22-04-01
OBJ_DOKU-31109-001 .lm
·:e> 5U403-0
II
II
Charge air line W 22-04-01 OBJ_DOKU-31109-001.fm
Installing charge air manifold
• Clean sealing surfaces.
• Mount gasket ( 1 ).
• Mount charge air manifold (2).
• Fasten screws (3).
• Tighten screws alternately.
fJ,- ,_ ·:; 30 Nm
• Position spring band clips (4) with spring band pliers.
©0912012 214
A. DEUTZ
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name Screw e Notes/ Remark A22 046 Char e air manifold on char e air line
Charge air line W 22-04-01
OBJ_DOKU-31109-001.fm
Value 30 Nm
For the tightening procedure according to torque uslng a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
3/4
II
II
Charge air line W 22-04-01 OBJ_OOKU-31109-001.fm
©-19120' 2
A. DEUTZ
414
A. DEUTZ
Charge air line W 22-90-20
OBJ_DOKU-31110-001. Im
Pressure transmitter / temperature pressure transmitter (charge air)
1
2
3
4
5
6
7
8
Standard tools
- Fitting compound DEUTZ AP1908
Temperature sensor
Hexagon head screw
Hexagon head screw
Hexagon head screw
Pressure sensor
Console
Sealing ring
Hollow screw
9 Hose ring piece
242 Mounting compound
• Clean sealing surfaces. 1~1 Use new sealing rings.
<,) 0912012
11 Nm
30 Nm
5 Nm
18 Nm
1/2
- Safety information / User information
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling.
II
II
Charge air line W 22-90-20 0BJ_DOKU-31110-001.fm
© 0912012
Positions
5
Use mounting compound.
Use new round sealing ring.
A. DEUTZ
2/2
Intake nozzle (exhaust turbocharger)
~ Standard tools: l_JL_J - Spring band pliers 01899112
1 2
3
4
5 6
7
Intake nozzle
Spring band clip
Spring band clip
Hexagon head screw 13 Nm Pipe clip
Pipe
Rubber sleeve
Push the pipe and rubber muff up as far they will go.
Position the spring band clip facing upwards in an easy to reach position.
©0912012 112
Air intake pipe W 22-90-35
OBJ_DOKU-31111-001.fm
II
II
Air intake pipe W 22-90-35 OBJ DOKU-31111-001 frn
A. DEUTZ
212
A. DEUTZ
Charge air manifold
[I] Standard tools
1 Charge air manifold
2 Throttle valve
3 Seal
4 Hexagon head screw
5 Hexagon head screw
6 Seal
1~ I Use a new gasket.
©0912012
30 Nm
13 Nm
1/2
Charge air line W 22-90-54
OBJ_DOKU-31112-001.fm
II
II
Charge air line W 22-90-54 OBJ_DOKU~31112-001.fm
Technical Data
Tightening specifications
..
ID no. Name Screw e Notes / Remark A2.2 046 Char e air manifold on char e air line
212
A. DEUTZ
Value 30 Nm
A. DEUTZ
Charge air line
rn Standard tools
Special tools: - Spring band pliers
Rubber sleeve
2 Hose pipe
3 Spring band clip
4 Spring band clip
5 Spring band clip
6 Seal
7 Charge air line
8 Hexagon head screw g Pipe clip
10 Hexagon head screw
11 Hose pipe
12 Hollow screw
13 Sealing ring
~ Use a new gasket.
© 0912012
01899112
13 Nm
30 Nm
30 Nm
112
Charge air line W 22-90-55
OBJ_DOKU-31113-001.fm
II
II
Charge air line W 22-90-55 OBJ 0OKU-31113-001 .fm
©;J9/'.i;'l)12
A. DEUTZ
212
A. DEUTZ
V-rib belt pulley
[I] Standard tools
1
2
V-rib belt pulley
Hexagon head screw
©09/2012
30 Nm
1/2
coolant pump W 37-90-13
OBJ_DOKU-31114-001.fm
II
II
Coolant pump W 37-90-13 OBJ_DOKU-31114-001.fm
A. DEUTZ
2/2
A® DEUTZ
Drive components
[I] Standard tools
1 V-rib belt pulley
2 Hexagon head screw 20 Nm
© 0912012 1/2
Coolant pump W 37-90-06
OBJ_DOKU-31115-001 .fm
II
II
Coolant pump W 37-90-06 OBJ DOKU-31115-001 .fm
f:l 0912012
A. DEUTZ
212
A. DEUTZ
V-rib belt pulley rn Standard tools
1
2
3
V-rib belt pulley
Adapter
Hexagon head screw
© 091~01:/
30 Nm
1/2
Coolant pump W 37-90-13
OBJ_DOKU-31116-001.fm
II
II
Coolant pump W 37-90-13 OBJ DOKU-31116-001 .fm
~0912012
A. DEUTZ
2/2
A. DEUTZ
Removing and installing the thermostat
[I] Standard tools
Removing the thermostat
Thermostat housing
2 Thermostat
4 Sealing ring
5 Screw plug 65 Nm
6 Seal
7 Hexagon head screw
8 Temperature sensor
• Drain, collect and dispose of coolant according to regulations
• If present: Remove coolant hose from outlet nozzle.
• Unscrew screws (1 ).
• Remove thermostat housing (2)
• Visually inspect the component.
© 09120>2 1/4
Thermostat housing W 38-01-01
OBJ_DOKU-31117-001 .fm
- Operation manual
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instructions for emptying and filling the engine.
2
7
5
© S\JBJ-0
11)51384-0
II
II
Thermostat housing W 38-01-01 OBJ_DOKU-31117-001.fm
• Remove gasket (1 ).
• Remove thermostat (2).
• Visually inspect the components.
Installing the thermostat
• Clean sealing surfaces.
• Insert thermostat (1 ).
• Insert screws ( 1 ).
• Fix new gasket (2) to the thermostat housing with screws.
Ae DEUTZ
\•'
© .51385-0
© o13A9-Q
'.Q5138b-Q
2/4
A. DEUTZ
• Mount thermostat housing (1).
• Tighten screws (2).
• Fasten screws (3).
• Tighten all screws ( 1 ).
:;, '<:, 30 Nm
• If present: Push coolant hose onto outlet nozzle and fasten .
• Fill cooling system according to the operating manual.
/_-.:_j Operation manual
©0912012 314
T \
l
\_ 0 '
Thermostat housing W 38-01-01
OBJ_DOKU-31117-001.fm
© 51381-0
<;) 5138B-O
II
II
Thermostat housing W 38-01-01 OBJ_DOKU-31117-001.fm
Technical Data
Tightening specifications
ID no. Name Screw e Notes / Remark A38 001 Thermostat housin on cylinder head
A. DEUTZ
Value 30 Nm
For the tightening procedure accordin9 to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
C09'2012 4 /4
A. DEUTZ
Thermostat housing W 38-01-02
OBJ_DOKU-3111B-001. fm
Checking the thermostat (in the removed state)
10) Standard tools: l___LJ - Thermometer
Checking thermostat
Thermostat housing
2 Thermostat
4 Sealing ring
5 Screw plug
6 Seal
7 Hexagon head screw
8 Temperature sensor
65 Nm
• Measure beginning of stroke, dimension (a).
• Note measured value, dimension {a).
1/4
IA) Danger! ~ Risk of injury!
Hot water and hot thermostat.
6
2
/, 4 I
5
- --a --~
7
© 513B3-0
© 51:190-0
II
II
Thermostat housing W 38-01-02 OBJ_DOKU-31118-001.fm
• Heat up the thermostat in the water bath.
• Determine beginning of opening .
In order to determine the exact beginning of opening, the temperature should be measured as close as possible to the thermostat.
Do not touch the thermostat.
The waler should be continuously stirred for an even temperature distribution. The temperature rise should not take place faster than 1 °C/min. Otherwise the beginning of opening will be delayed accordingly.
- Nominal value:
,:':< 86 "C
• Measure water temperature.
- Nominal value:
:)".- 99 °C
• Measure end of stroke, dimension (b).
• Note measured value, dimension (b).
• Determine stroke.
Calculation example Desired:
Given: Measured:
Calculation:
Result:
Stroke
Beginning of stroke, dimension (a)
End of stroke, dimension (b) Dimension (b) - dimension (a)
= stroke
• Compare resull with setpoint value.
- Nominal value:
',,,, 9 mm
,f, \1~1201/
A. DEUTZ
©51J92·0
214
A. DEUTZ
Technical Data
Testing and setting data
ID no. Name P38 11 Thermostat, beginning of opening P38 13 Thermostat, stroke P38 14 Thermostat, stroke, test temperature
Additional Information
at 99 •c . minimum
3/4
Thermostat housing W 38-01-02
OBJ_DOKU-311 18-001 Jm
Value 86 ·c 9mm 99 ·c
II
II
Thermostat housing W 38-01-02 OBJ DOKU-31118-001.fm
~ 09!2012
A® DEUTZ
414
A@ DEUTZ
Line
[I] Standard tools: - Spring band pliers
Special tools: - Plugs/caps
Pipe
2 Spring band clip
3 Elbow
4 Hose pipe
5 Hexagon head screw
6 Support plate
7 Pipe clip
8 Hexagon head screw
© 09120>2
01899112
01899144
f"
13 Nm
8 Nm \\
1/2
Coolant pipes W 38-90-32
OBJ_DOKU-31119-001.fm
3
2
8
II
II
Coolant pipes W 38-90-32 OBJ_ DOK U-31119-001 .Im
© 0912012
A. DEUTZ
2/2
A. DEUTZ
Line
rn Standard tools
1 Coolant line
10 Hexagon head screw
'<' 0912012
14 Nm
1/2
Coolant pipes W 38-90-32
OBJ_DOKU-31120-001 .Im
© 50554-0
II
II
Coolant pipes W 38-90-32 OBJ_DOKU-31120-001 .fm
A. DEUTZ
212
A. DEUTZ
Line
[I] Standard tools
1 Coolant line
10 Hexagon head screw
11 Hexagon head screw
12 Washer
~0912012
14 Nm
14 Nm
1/2
Coolant pipes W 38-90-32
OBJ_DOKU-31121-001.fm
II
II
Coolant pipes W 38-90-32 OBJ_DOKU-31121-001.fm
©09.'(Q12
A. DEUTZ
212
A. DEUTZ
Pressure fan
00 Standard tools
Pressure fan
2 Hexagon head screw 30 Nm
©0912012 1 /2
Fan W 39-90-52
OBJ_DOKU-31122-001 .Im
© 51338-0
II
Fan W 39-90-52 A.
DEUTZ OBJ DOKU-31122-001 fm
II
212
A. DEUTZ
Removing and installing the exhaust line
00 Standard tools
Removing exhaust line
Exhaust line
2 Seal
3 Hexagon head screw
• Remove turbocharger.
~·__:_ _ _; Module 43
• Remove cooler .
._j Module 41
• Unscrew all screws (1).
• Remove exhaust line (2) ,
• Remove gasket (3).
©09/2Q1;. 1/4
Exhaust pipe W 41-01-01
OBJ_DOKU-31123-001 .fm
II
II
Exhaust pipe W 41-01-01 OBJ_DOKU-31123-001 .fm
Installing exhaust line
• Visually inspect the components.
• Clean sealing suriaces.
• Turn in screws (arrows).
• Fasten new seal ( 1) with screws on exhaust line.
• Clean sealing surfaces.
• Mount exhaust line ( 1 ). 1~ I Note installation position .
• Fasten ell screws (2) .
• Tighten the screws according to the tightening se-quence.
1~;- '. ·; 30 Nm
• Install the turbocharger . .. -- ...
Module 43 : ,' ·------...v
• Install cooler_ ~ ---~
L--JJ Module 41
'1>0912012 2/4
A. DEUTZ
© so,20-0
8 3 5
~ -'o
,--\ Cl)
6 4 2 7
© 50734-0
Au DEUTZ
Technical Data
Tightening specifications
ID no. Name
A41 001 Exhaust line on cylinder head
Screw type Notes I Remark Observe tightening sequence
Exhaust pipe W 41 -01-01
OBJ_0OKU-31 123-001.lm
Value
30 Nm
For the tightening procedure according lo torque using a torque wrench, a maximum variation of the tightening torque of+/• 10% is permissible.
3/4
II
II
Exhaust pipe W 41-01-01 OBJ DOKU-311 23-001 .frn
A. DEUTZ
4/4
A. DEUTZ
Removing and installing the exhaust line
[I] Standard tools
Removing exhaust line
Exhaust line
2 Seal
3 Hexagon head screw
• Remove turbocharger.
~-: . ./ Module 43
• Remove cooler.
:._:,-; Module 41
• Unscrew a II screws ( 1).
• Remove exhaust line (2).
• Remove gasket (3).
;f.: 09i2012 1/4
Exhaust pipe W 41-01-01
OBJ_DOKU-31124-001 .fm
II
II
Exhaust pipe W 41-01-01 OBJ_DOKU-31124-007.frn
Installing exhaust line
• Visually inspect the components.
• Clean sealing surfaces.
• Turn in screws (arrows).
• Fasten new seal (1) with screws on exhaust line.
• Clean sealing surfaces.
• Mount exhaust line (1 ). l~ I Note installation position.
• Fasten all screws (2).
• Tighten the screws according to the tightening sequence.
:·:, ,. 30 Nm
• Install the turbocharger.
L.) Module 43
• Install cooler.
.:::.:) Module
©09:2012
41
2/4
A. DEUTZ
©50731·0
8 1 3 5
! C Ii _) 1 ;,J~ ,._J
6 4 2 7
.:; SO?J:,.o
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A41 001 Exhaust line on cylinder head
Screw type Notes / Remark Observe Lightening sequence
Exhaust pipe W 41-01-01
OBJ_DOKU-31124-001.lm
Value
30Nm
For the tightening procedure according 10 torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
3/4
II
II
Exhaust pipe W 41-01-01 OBJ_DOKU-31124-001 .fm
A. DEUTZ
4/4
A. DEUTZ
Connection
Exhaust gas recirculation W 41-90-04
OBJ_DOKU-31125-001.fm
(Crankcase housing, exhaust gas circulation, coolant line)
Standard tools
- Fitting compound DEUTZ AP1908
1 Hose nozzles
2 O-ring
3 Hexagon head screw 20 Nm
[ll@rl Use new round sealing ring .
• Lightly coat new round sealing ring with DEUTZ AP1908 mounting compound.
© 0912012 1/2
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instructions for emptying and filling the engine.
© 50387-0
II
II
Exhaust gas recirculation W 41-90-04 OBJ_DOKU-31125-001 .fm
© 0912012
A. DEUTZ
2/2
Compensator structure (Exhaust line)
[I] Standard tools
1 Compensator
2 Seal
3 Hexagon head screw
Use a new gasket.
Attention! Check seal.
20 Nm
Ensure that the installation location is free from faults.
:I) 0912012
Install without tension (without torsional stresses) and do not pre-compress.
J
1/2
Exhaust pipe W 41-90-21
OBJ_DOKU-31126-001.fm
© 50386-G
II
II
Exhaust pipe W 41-90-21 OBJ_DOKU-31126-001.lm
•~ :JW/0',J
A. DEUTZ
212
A. DEUTZ
Line
Exhaust gas recirculation W 41-90-32
OBJ_DOKU-31127-001.frn
(Thermostat housing, exhaust gas circulation, coolant line)
1
2
3
4
5 6
7
8
9
Standard tools: - T orx tool set - Spring band pliers
Special tools: - Plugs/caps
Hose pipe
Spring band clip
Coolant line
Torx screw
Hexagon head screw
Pipe clip
Seal
Rubber sleeve
Sealing ring
10 Nm
8Nm
10 Screw plug 80 Nm
~ Use a new gasket.
L'.:::._J Use a new sealing ring .
01899092 01899112
01899144
1/2
Collect leaking operating substances in suitable vessels and dispose of according to regulations.
Observe the appropriate operating instructions for emptying and filling the engine.
© $0:lAS-O
II
II
Exhaust gas recirculation W 41-90-32 OBJ_DOKU-31127-001.fm
(S)091l012
A. DEUTZ
2/2
A. DEUTZ
Removing and installing the turbocharger
[1] Standard tools
Removing turbocharger
1 Exhaust turbocharger
2 Seal
3 Hexagon head screw
• Remove intake nozzle.
C_:/ Module 22
• Remove the lubricating oil line.
• Remove lubricating oil return line.
L:J Module 16
• Remove exhaust manifold.
W Module 43
• Unscrew screw ( 1)
1/4
Exhaust gas turbocharger W 43-01-01
OBJ_DOKU-31128-001.fm
II
II
Exhaust gas turbocharger W 43-01-01 OBJ_DOKU-31128-001 .fm
• Unscrew screws ( 1 ).
• Remove turbocharger (2).
• Remove gasket (3) .
• Visually inspect the component.
Installing the turbocharger
• Clean sealing surfaces.
• Mount gasket (1 ).
'" Mount turbocharger (2) .
• Fasten screws (3).
• Fasten screw (1) .
• Tighten screw (1).
'> ':·- 30 Nm
• Tighten screws (2) .
~;•,. ; 30 Nm
• Fit intake nozzle.
_:_,) Module 22
• I nstal I I ubricating oil line.
• I nstal I I ubricating oil return line.
:_._:_.. Module 16
• Install exhaust manifold .
Module 43
A. DEUTZ
2/4
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A43 020 Turbocharger on exhaust line
Exhaust gas turbocharger W 43-01-01
OBJ_DOKU-31128-001.fm
Screw e Notes / Remark Value 30Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
3/4
II
II
Exhaust gas turbocharger W 43-01-01 OBJ_DOKU-31128-001.fm
© 0912012
A. DEUTZ
4/4
A. DEUTZ
Removing and installing the turbocharger
[I] Standard tools
Removing turbocharger
1 Exhaust turbocharger
2 Seal
3 Hexagon head screw
• Remove intake nozzle.
L.,_i Module 22
• Remove the lubricating oil line.
• Remove lubricating oil return line.
[_-> Module 16
• Unscrew screws ( 1 ).
• Remove turbocharger (2) .
• Remove gasket (3).
• Visually inspect the component.
1 /4
._l I -..
Exhaust gas turbocharger W 43-01-01
OBJ_DOKU-31129-001 .fm
© 5050~-u
II
II
Exhaust gas turbocharger W 43-01-01 OBJ_DOKU-31129-001 .fm
I nsta Iii ng the tu rboch arg er
• Clean sealing surtaces.
• Mount gasket ( 1 ).
• Mount turbocharger (2) .
• Tighten screws (3) .
t'f<·,~::, 30 Nm
• Fit intake nozzle.
L:.J Module 22
• Install lubricating oil line.
• Install lubricating oil return line.
!_~_) Module 16
A. DEUTZ
2/4
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A43 020 Turbochar er on exhaust line
Exhaust gas turbocharger W 43-01-01
OBJ_DOKU-3 1129-00·1 Jm
Screw e Notes / Remark Value 30 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
C)09t2012 3/4
II
II
Exhaust gas turbocharger W 43-01-01 OBJ_DOKU-31129-001.fm
'<l 0912012
A. DEUTZ
4/4
A. DEUTZ
Exhaust manifold ( exhaust turbocharger) rn Standard tools
Exhaust manifold
2 Clip
3 N~ 10Nm
[~ I Note installation position.
©0912012 1/2
Exhaust gas turbocharger W 43-90-36
OBJ_DOKU-31130-001 .fm
-- 3
ca, 50389-0
II
II
Exhaust gas turbocharger W 43-90-36 OBJ_DOKU-31130-001.fm
©0912012
A. DEUTZ
2/2
A. DEUTZ
Exhaust manifold (exhaust turbocharger)
[I] Standard tools
1 Exhaust line
2 Clip
3 Clip
4 Seal
9 Nm
9 Nm
~ Note installation position.
EJ Use a new gasket.
© 0912012 1/2
Exhaust gas turbocharger W 43-90-36
OBJ_DOKU-31131-001.fm
3 4 2
II
II
Exhaust gas turbocharger W 43-90-36 OBJ_DOKU-31131-001.fm
©091W12
A. DEUTZ
2/2
A. DEUTZ
Exhaust manifold (exhaust turbocharger) w Standard tools
1 Exhaust manifold
2 Clip
3 Nut 10 Nm
1~ I Note installation position.
©0912012 1/2
Exhaust gas turbocharger W 43-90-36
OBJ_DOKU-31132-001.fm
J 2
© 51481-0
II
II
Exhaust gas turbocharger W 43-90-36 OBJ_DOKU-31132-001.fm
@0912012
A. DEUTZ
2/2
A. DEUTZ
Removing and installing the belt tensioner (V-rib belt, level 1)
[I] Standard tools II ! ,1 - Operation manual
Removing the belt tensioner
Belt tensioner
2 Deflection pulley
3 V-rib belt
4 Cylinder head screw
• Remove V-rib belt.
.~ . .! Operation manual
• Unscrew screw (1).
• Remove belt tightener (2).
• Visually inspect the component.
1/4
Add-on parts W 44-01-01
OBJ_DOKU-31133-001.fm
Ii;) 50562-1
II
II
Add-on parts W 44-01-01
OKU-31133-001 .1m OBJ_O
Installing the belt tensioner
• Moun t belt tensioner (1 ).
• Fasten screw (2).
• Tighten screw (2).
g.~'<:, 48 Nm e running direction. • Fit the -ri V "b belt according to th
W Operation manual
©091'./01Z 2/4
A. DEUTZ
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A44 041 Belt tightener on gear case
Screw e Notes / Remark
Add-on parts W 44-01-01
OBJ_DOKU-31133-001 .lm
Value 48 Nm
For the lightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/. 10% is permissible.
314
II
II
Add-on parts W 44-01-01 OBJ_DOKU-31133-001 .fm
A@ DEUTZ
4/4
A. DEUTZ
Removing and installing the generator (Clamping latch}
[I] Standard tools
Removing the generator
Clamping strap
2 Threaded piece
3 Hexagon head screw
4 Washer
5 Hexagon head screw
6 Hexagon head screw
7 Spacing sleeve
8 Hexagon head screw
9 Hexagonal nut
• Disconnect the battery's negative terminal.
• Remove plus cable.
• Pullout cable plug (1).
©0912012 1/4
•
Generator W 44-02-01
OBJ_DOKU-31134-001 .fm
- Safety information / User information
- Operation manual
II
II
Generator W 44-02-01 OBJ_DOKU-31134-001 .fm
• Loosen screw (1 ).
• Hold nut (2).
• Unscrew screw (3).
• Loosen screws (4).
• Swing generator (5) in direction of arrow.
• Remove V-belt.
• Unscrew screw {1 ).
• Remove generator (2).
• Visually inspect the components.
Installing the generator
• Mount generator ( 1 ).
• Fasten screw (2).
• Insert screw (3).
• Screw on nut (4 ).
© 0912012
A. DEUTZ
2/4
A® DEUTZ
• Mount V-belt.
• Tighten V-belt (1) by turning the clamping screw (2).
• Check V-belt tension.
L:j Operation manual
• Hold screw (2)
• Tighten nut ( 1 ) .
,-":c· •.- ; 30 Nm
• Tighten screw (3) .
.:'':,. ,_--. 42 Nm
• Tighten screw (4) .
t'>,_. , 30 Nm
• Plug in the cable plug ( 1 ).
• Fit plus cable ,
• Connect !he battery's negative termina I.
3/4
Generator W 44-02-01
OBJ_DOKU-31134-001.fm
II
II
Generator W 44-02-01 OBJ_DOKU-31134-001 .fm
Technical Data
Tightening specifications
ID no. Name A44 012 Generator on console A44 015 Generator at clamping latch A44 017 Clamping latch on gear case
A. DEUTZ
Screw tvoe Notes / Remark Value 42 Nm 30 Nm 30 Nm
For the lightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
414
A. DEUTZ
Removing and installing the generator (Fastening parts)
[I] Standard tools
Removing the generator
1 Hexagon head screw
2 Hexagon head screw
• Remove V-rib belt
L_:,,.J Operation manual
• Disconnect the battery's negative terminal.
• Remove plus cable.
• Unlock cable plug ( 1) and disconnect.
© 09/201;! 1/4
Generator W 44-02-01
OBJ_DOKU-31135-001 .fm
© 50660-U
II
II
Generator W 44-02-01 OBJ_DOKU-31135-001 fm
• Unscrew screws ( 1 ).
• Remove generator (2).
• Visually inspect the components·.
Installing the generator
• Mount generator (1) .
• Tighten screws (2).
t, ,.- . 42 Nm
• Mount cable plug ( 1) and lock.
• Fit plus cable.
• Connect the battery's negative terminal .
• Position V-rib belt.
:__:,j Operation manual
G 0912012
A. DEUTZ
2/4
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A44 012 Generator on console
Screw e Notes / Remark
Generator W 44-02-01
OBJ_DOKU·31135-001.fm
Value 42 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
3/4
II
II
Generator W 44-02-01 OBJ_DOKU-31135-001. fm
G 0912012
A. DEUTZ
4/4
A® DEUTZ
Removing and installing the console (V-rib belt, level 1)
Standard tools
- Packing compound DEUTZ OW 73
Removing the console
Console
2 Clamping pin
3 Hexagon head screw
4 Clamping sleeve
5 Hexagon head screw
244 Packing compound
• Remove V-rib belt.
/~_/ Operation manual
• Remove generator (level 1 ).
/~_j Module 44
• Unscrew screws (1).
• Remove console (2).
• Visually inspect the components.
-t) 0912012
[ml -Operation manual
114
Add-on parts W 44-02-06
OBJ_DOK U-31136-001.fm
II
II
Add-on parts W 44-02-06 OBJ_DOKU-31136-001 .fm
Mounting the console
• Clean sealing surfaces.
~ Make sure the clamping pin (arrow) is in EJ place .
• Clean sealing surfaces.
• Apply sealing compound ( 1) evenly on the sealing surface. 1~ l Sealing cord strength approx. 3 mm
• Mount console ( 1) over the clamping pins.
• Fasten screw (2).
M8x85-10.9
• Fasten screws (3).
M8x60-10.9
@09/2012 2/4
A. DEUTZ
'b": 50657•iJ
A® DEUTZ
• Tighten all screws according to the tightening sequence.
f.t0 •~:) 30 Nm
• Mount generator (level 1 ).
W Module 44
• Fit the V-rib belt according to the running direction .
. 1-:...) Operation manual
© 09/2012 3/4
5
4
6
Add-on parts W 44-02-06
OBJ_DOKU-31136-001 .Im
2
~ 50859•0 II
II
Add-on parts W 44-02-06 OBJ_DOKU-31136-001.fm
Technical Data
Tightening specifications
ID no. Name A44 013 Console on crankcase/ ear case
A. DEUTZ
Screw e Notes I Remark Value 30 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
4/4
Removing and installing the starter
[]] Standard tools
Removing the starter
1 Starter
2 Hexagon head screw
• Disconnect the battery's negative terminal.
• Remove plus cable.
• Unlock cable plug ( 1) and remove.
• Remove cable ties.
© 091201, 114
Starter W 44-03-01
OBJ_DOKU-31137-001 .fm
© soJgg.o
II
Starter W 44-03-01 A.
DEUTZ OBJ_DOKU-31137-001 .fm
• Unscrew screws (1).
• Remove starter (2).
• Visually inspect the component.
II Installing the starter
• Insert starter ( 1 ).
• Tigh1en screws (2).
'.c_;, ; 60 Nm
• Mount cable plug (1) and lock.
• Tighten cable ties_
• Fit plus cable.
• Connect the battery's negative terminal .
2/4
A. DEUTZ
Technical Data
Tightening specificatlons
ID no. Name A44 001 Starter on connection housin
Screw · e Notes / Remark
Starter W 44-03-01
OBJ_DOKU-31137-001.fm
Value 60 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
3/4
II
Starter W 44-03-01 A.
DEUTZ OBJ DOKU-31137-001.fm
II
©0912012 4/4
A. DEUTZ
Removing and installing the starter
[I] Standard tools
Removing the starter
1 Starter
2 Hexagon head screw
• Disconnect the battery's negative terminal .
• Remove plus cable.
• Unlock cable plug and remove.
• Unscrew screws (1 ).
• Remove starter (2).
• Visually inspect the components.
© 09120:2 114
Starter W 44-03-01
OBJ_DOKU-31138-001.fm
© 51440-0
II
Starter W 44-03-01 A.
DEUTZ OBJ_DOKU-31138-001 .fm
Installing the starter
• Insert starter ( 1 ).
• Insert screws (2).
• Tighten screws (2).
tj:-,c:::, 60 Nm
~ Attention! LJ2J L_ay the cables free from chafing and ten-
sion.
• Plug in and lock cable plug.
• Fit plus cable.
II • Connect the battery's negative terminal.
©09/2012 2/4
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name A44 001 Starter on connection housing
Screw e Notes I Remark
Starter W 44-03-01
OBJ_DOKU-31138-001.frn
Value 60 Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
Is: 0912012 314
II
Starter W 44-03-01 A.
DEUTZ OBJ_DOKU•31138-001 .fm
II
©0912012 414
A. DEUTZ
Generator rn Standard tools
Generator
2 Fan
3 Spacing washer
4 Washer
5 Hexagonal nut 90 Nm 6 Voltage regulator
8 V-belt pulley
9 Ring
10 Ring
© 0912012
6 1 2
1/2
Parts to generator W 44-90-42
OBJ_DOKU-31139-001.fm
3 9 8 10 4 5
II
II
Parts to generator W 44-90-42 OBJ_DOKU-31139-001 Im
A. DEUTZ
212
A. DEUTZ
Generator
[I] Standard tools
1 Generator
2 Voltage regulator
3 Hexagonal nut
4 Washer
5 V-rib belt pulley
~ 0912012
90 Nm
1 /2
Parts to generator W 44-90--42
OBJ_DOKU-31140-001 .fm
@5134B-O
II
II
Parts to generator W 44-90-42 OBJ_DOKU-31140-001 .frn
~ 0912012
A. DEUTZ
2/2
A. DEUTZ
Engine mounting rn Standard tools
1 Holder
2 Hexagon head screw 260 Nm
3 Stand foot
4 Hexagon head screw 200 Nm
5 Hexagonal nut
6 Washer
7 Washer
~ 0912012 112
7
' \ \,0 .,
Engine mounting W 46-90-15
OBJ_DOKU-31141-001 .fm
. ~-,':,,, ~-
e~
. 6~ ,
0\
©51485-0
II
II
Engine mounting W 46-90-15 OBJ_DOKU-31141-001 Jm
© 0912012
A. DEUTZ
2/2
A. DEUTZ
Engine mounting
[I] Standard tools
1 Stand foot
2 Hexagon head screw
3 Washer
© 0912012
200 Nm
1/2
Engine mounting W 46-90-15
OBJ DOKU-31142-001.fm
© 51481-0
II
II
Engine mounting W 46-90-15 OBJ_DOKU-31142-001 fm
© 0912012
A. DEUTZ
2/2
A. DEUTZ
Engine mounting
[]] Standard tools
1 Stand foot
2 Hexagon head screw
3 Washer
4 Mount buffer
5 Bushing
©arJJ12
200 Nm
2
112
Engine mounting W 46-90-15
OBJ_DOKU-31143-001.fm
©51<1B60
II
II
Engine mounting W 46-90-15 OBJ_0OKU-31143-001.fm
{:;-09.'2012
A. DEUTZ
212
A. DEUTZ
Impulse transmitter (camshaft) rn Standard tools
1 Impulse transmitter
2 Hexagon head screw
• Clean sealing surfaces. 1~1 Use new round sealing ring.
Os> 09/2012
8,5 Nm
1/2
Measuring instruments W 51-90-20
OBJ_DOKU-31144-001.fm
- Safety information I User information
Attention! Ensure utmost cleanliness for all work. Remove any paint residue and dirt particles before disassembly. Clean the area around the components concerned carefully. Blow wet parts dry with compressed air. Close all connections immediately after opening with new, clean plugs/caps. Do not remove plugs/caps until immediately before assembling.
II
II
Measuring instruments W 51-90-20 OBJ_DOKU-31144-001.fm
© 0912012
A. DEUTZ
2/2
A. DEUTZ
Removing and installing the connection housing
[I] Standard tools
Removing the connection housing
1 Connection housing
2 Hexagon head screw
3 Bushing
• Remove flywheel.
CJ Module 05
• Unscrew screws ( 1 ).
• Remove connection housing (2).
• Visually inspect the component.
© 09120\2 1/4
Connection housing W 52-01-01
OBJ_DOK U-31145-001 .fm
© 50430-0
© 50431-0
II
II
Connection housing W 52-01-01 OBJ_DOKU-31145-001 tm
Installing the connection housing
• Clean contact sunaces.
b] Make sure the clamping bushings ( 1) are EJ in place.
• Position connection housing ( 1 ).
• Centre connection housing over the clamping bushings .
• Tighten screws (1 ).
• Tighten all screws ( 1) alternately.
:"'· , .. 170Nm
• Install flywheel. _ .... - !
Module 05
(i:) (J~."}(11/ 2/4
A. DEUTZ
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A52 080 Connection housing on crankcase
Screw type Notes / Remart.
Connection housing W 52-01-01
OBJ_DOKU-31145-001 .fm
Value Tighten diagonally oppo-
170 Nm sed
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of+/- 10% is permissible.
© 0912012 3/4
II
II
Connection housing W 52-01-01 OBJ_DOKU-31145-001 .fm
A. DEUTZ
4/4
A. DEUTZ
Removing and installing the connection housing
[!] Standard tools
Removing the connection housing
1 Connection housing
2 Hexagon head screw 8,5 Nm
3 Cover plate
4 Hexagon head screw
5 Bushing
4
• Remove flywheel.
Module 05
• Unscrew screws ( 1 ).
• Remove connection housing (2).
• Visually inspect the component.
1/4
Connection housing W 52-01-01
OBJ_DOKU-31146-001 .fm
5
II
II
Ctl·on housing Conne w 52-01-01
U-31146-00 1.fm OBJ_OOK .
ection housing Installing the conn
t surfaces. ( 1) are • Clean contac . g bushings the clampIn Make sure 1~1 in place.
• housing ( 1) · · bush-• Position connection ·ng over the clamping nection hous1 • Centre con
ings.
crews (1 ). • Tighten s ( 1) alternately. • Tighten all screws
. 170 Nm
• Install flywheel.
~---... ,, _: Module 05
© 091201"2. 214
A. DEUTZ
© ~Ob72-0
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A52 080 Connection housing on crankcase
Screwtvoe Notes / Remark
Connection housing W 52-01-01
OBJ_DOKU-31146-001.fm
Value Tighten diagonally oppo•
170 Nm sed
For the tightening procedure according to torque using a torque wrench, a maximum .variation of the lightening torque of+/. 10% is permissible.
3/4
II
II
Connection housing W 52-01-01 OBJ_DOKU-31146-001 .fm
,e; 0912012
A. DEUTZ
414
A. DEUTZ
Removing and installing the connection housing
[I] Standard tools
Removing the connection housing
Connection housing
2 Hexagon head screw
3 Bushing
• Remove flywheel.
!_::_) Module 05
• Unscrew screws ( 1 ).
• Remove connection housing (2) .
• Visually inspect the component.
<a: 09/2012 1/4
Connection housing W 52-01-01
OBJ_DOKU-31147-001 .Im
© 51359-0
©50-'31-0
II
II
Connection housing W 52-01-01 OBJ_DOKU-31147-001 rm
Installing the connection housing
• Clean contac1 surfaces.
~ Make sure the clamping bushings (1) are EJ in place
• Position connection housing ( 1 )_
• Centre connection housing over the clamping bushings.
• Tighten screws ( 1)
• Tighten all screws ( 1) alternately.
,".r· •. - . 170 Nm
• Install flywheel.
--~-:_) Module 05
2/4
A. DEUTZ
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A52 080 Connection housing on crankcase
Screw type Notes / Remark
Connection housing W 52-01-01
OBJ_DOKU-31147-001 .Im
Value Tighten diagonally oppo-
170 Nm sed
For the tightening procedure according lo torque using a torque wrench. a maximum vanal1on of the lightening torque of +/- 10% is permissible.
3/4
II
II
Connection housing W 52-01-01 OBJ_OOKU-3)147-001 Im
A. DEUTZ
4/4
A. DEUTZ
Removing and installing the connection housing rn Standard tools
Removing the connection housing
1 Connection housing
2 Hexagon head screw
3 Bushing
• Remove flywheel.
G Module 05
• Unscrew screws ( 1 ).
• Remove connection housing (2).
• Visually inspect the component
1/4
Connection housing W 52-01-01
OBJ_DOKU-31148-001 .frn
2 3
@51360-0
©5D4J>·0
II
II
Connection housing W 52-01-01 OBJ_DOKU-31148-D01 fm
Installing the connection housing
• Clean contact surfaces.
r:::;;i Make sure the clamping bushings (1) are EJ in place.
• Position connection housing ( 1 ).
• Centre connection housing over the clamping bushings.
• Tighten screws (1)
• Tighten all screws (1) alternately
,,,.,, ., 170 Nm
• Install flywheel.
:_j Module 05
21<1
A. DEUTZ
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A§2 080 Connection housing on crankcase
Screw type Notes / Remark
Connection housing W 52-01-01
OBJ_OOKU-31148-001 .Im
Value Tighten diagonally oppo-
170 Nm sed
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/. 10% is permissible
~090012 3/4
II
II
Connection housing W 52-01-01 OBJ _DO KU-31148-001 Im
A. DEUTZ
4/4
A. DEUTZ
Removing and installing the connection housing rn Standard tools
Removing the connection housing
Hexagon head screw
2 Bushing
• Remove flywheel.
W Module 05
• Unscrew screws (1 ).
• Remove connection housing (2).
• Visually inspect the component.
1/4
Connection housing W 52-01-01
OBJ_OOKU-31149-001 .frn
2
© 50431-0
II
II
Connection housing W 52-01-01 OBJ_DOKU-31149-001.fm
Installing the connection housing
• Clean contact surfaces
r::;:;;;i Make sure the clamping bushings ( 1) are
~ inplace
• Position connection housing ( 1 ).
• Centre connection housing over the clamping bushings.
• Tighten screws (1 ).
• Tighten all screws (1) alternately.
170 Nm
• Install flywheel.
_-::J Module 05
2/'1
A. DEUTZ
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A52 080 Connection housing on crankcase
Screw type Notes / Remar1c:
Connection housing W 52-01-01
OBJ_DOKU-31149-001.fm
Value Tighten diagonally oppo-
170 Nm sed
For the tightening procedure according to torque using a torque wrench, a maximum variation of the tightening torque of +/- 10% is permissible.
!: 0912012 314
II
II
Connection housing W 52-01-01 OBJ_DOKU-31149-001 fm
~ 0912012
A. DEUTZ
4/4
A@ DEUTZ
Connection housing rn Standard tools
Connection housing
2 Hexagon head screw 8.5 Nm
3 Cover plate
4 Screw plug 80 Nm
5 Sealing ring
[u:EI Use a new sealing ring .
©0912012 112
Connection housing W 52-90-53
OBJ DOKU-31150 001.fm
2 3
© 51356-0
II
II
Connection housing W 52-90-53 OBJ DOKU-31150-001 Im
©,J912012
A. DEUTZ
2/2
A. DEUTZ
Removing and installing the glow plugs
Standard tools: - Crowfoot wrench size 10
Special tools: - Torque handle - Insert holder long
Removing the glow plugs
1 Glow plug
2 Connecting rail
3 Locking nut
• Disconnect the battery.
• Unscrew nuts (1 ).
• Remove connecting rail (2)
IE) 0912012
01899184 01899185
1/4
Start aid W 63-02-01
OBJ_DOKU-31151-001.fm
- Safety information/ User information
©51400·0
II
II
Start aid W 63-02-01 OBJ_DOKU-31151-001.tm
• Unscrew glow plugs ( 1 ).
• Visually inspect the components.
Installing the glow plugs
• Screw in glow plugs ( 1 ).
\iB Attention! L'...£J Ensure that the installation location is free
from faults.
• Tighten glow plugs (1)
,"!, '.:.:, 13.5 Nm
• Mount connecting rail ( 1)
• Turn on new nuts (2).
\iB Attention! L'...£J Ensure that the connection 1s periect.
• Tighten nuts (2) .
.. ,,., .. 2.25 Nm
A. DEUTZ
214
Ae DEUTZ
Technical Data
Tightening specifications
ID no. Name A63 032 Glow plug on cylinder head
A63 033 Connecting rail on glow plug
Screw type Notes / Remark
Use new lock nut
Start aid W 63-02-01
OBJ_DOKU-31151-001.fm
Value 13.5 Nm
2.25 Nm
For the tightening procedure according 10 torque using a torque wrench, a maximum variation of the lightening torque of +/- 10% 1s permissible.
3/4
II
Start aid W 63-02-01 A®
DEUTZ OBJ DOKU-31151-001.tm
II
~ 09/2012 41'1
A. DEUTZ
Console rn Standard tools
1 Console
3 Hexagon head screw 60 Nm
il.>09/201~ 1/2
Exhaust gas treatment W 71-90-51
OBJ_DOKU-31152-001.fm
2
© 51337-0
II
II
Exhaust gas treatment W 71-90-51 OBJ_DOKU-31152-001 Im
A. DEUTZ
212
A® DEUTZ
Removing and installing hydraulic pump drive
Standard tools
- Packing compound DEUTZ DW 73
Removing hydraulic pump drive
Hydraulic pump drive
3 Hexagon head screw
4 Hexagon head screw
244 Packing compound
• Unscrew screws ( 1 ).
• Unscrew screws (2).
• Remove hydraulic pump drive (3).
1 /4
4
Hydraulic pump drive W 83-02-01
OBJ_DOKU-31153-001.fm
24-4 I_
' ~..---© ~os2,-u
II
II
Hydraulic pump drive W 83-02-01 OBJ _DOKU-31153-001.fm
Installing hydraulic pump drive
• Apply sealing compound (1} evenly on the sealing surface.
~ Sealing cord strength approx 0.5 -
~ 0.6mm.
• Mount hydraulic pump drive ( 1 ),
• Tighten screws (2).
• Fasten screws (3).
• Tighten all screws according to the tightening sequence
P:, 30 Nrn
~ :J9.12Cl2 2/4
A. DEUTZ
2
3
(~) :1113S-O
A. DEUTZ
Technical Data
Tightening specifications
ID no. Name
A83 003 Hydraulic purnp on crankcase/gear case
Screw type Notes"/ Remark
Hydraulic pump drive W 83-02-01
OBJ_DOKU-31153-001.lm
Value
30Nm
For the tightening procedure according to torque using a torque wrench, a maximum variation of the lightening torque of+/- 10% is permissible.
3/4
II
II
Hydraulic pump drive W 83-02-01 0 BJ DOK U-31153-001 fm
©OYt~012
A® DEUTZ
4/4
A. DEUTZ
8 Special tools
© 0912012 1/10
Special tools W 49-01-01
OBJ_DOKU-31154-D01 fm
II
II
Special tools W 49-01-01 OBJ_OOKU-31154-001 . fm
Orders
1!:10912012
Special tools::
These must be ordered like a normal DEUTZ spare part by specifying the order number.
2/10
A. DEUTZ
01899031 Pressure pump
Checking cooling system for leak-tightness
01899037 Hose clip pliers
Loosen hose clips and fasten
01899050 Assembly pliers
Removing valve shaft seals
3110
Special tools W 49-01-01
OBJ_DOKU-31154-001 frn
© 35409-2
© 39426-'
© •9353-Q
II
II
Special tools W 49-01-01 OBJ DOKU-31154-001 fm
01899062 V-belt tension measuring device
150 to 600 N Check V-belt tension
01899092 T orx tool set
Contents of case: - Double-ended ring spanner E6/E8 - Double-ended ring spanner E 10/E 12 Socket wrench insert EB and E10 (1/4 inch) - Socket wrench insert E10 and E12 (3/8 inch) - Socket wrench insert E 18 ( 1 /2 inch)
01899093 Rotation angle disc
with magnet Setting valve clearance
A. DEUTZ
© 35•16-3
© 39432-1
~ 49342-0
4/10
A. DEUTZ
01899103 Pricker
Removing rotary shaft lip seal
01899110 Assembly lever
e. g. removing and installing valves
01899112 Spring band pliers
320 mm Tighten spring clamp
5/10
Special tools W 49-01-01
OBJ_DOKU-31154-001.fm
©37511-2
© :)M20-3
II
II
Special tools W 49-01-01 OBJ_DOKU-31154-001 fm
01899132 Socket wrench insert
long Installing ancl removing pressure sensors (rail pressure, oil pressure, fuel pressure)
01899144 Stoppers/caps
1 set of differently-sized stoppers and caps Sealing openings on the fuel system
01899184 Torque handle
0.6 - 1.5 Nm
~0912012 6110
..
..
..
t ··~ ..
A. DEUTZ
.. di
lil 49357-0
ls) 43663-0
©5,.98-0
A. DEUTZ
01899185 Insert holder
Drive square 1/4" Drive hexagon 1 /4"
02992112 Special wrench
Wrench size 17,
Removing and installing high-pressure lines
02992117 Lever tool
Removing the injector
7/10
Special tools W 49-01-01
OBJ_ DOK U-31154-001.fm
© 51 489-0
© 35•36-1
© 49375 -0
II
II
Special tools W 49-01-01 OBJ_DOKU-31154-001 .frn
02992127 Disassembly tool
Removing O-ring
02992138 Puller
(in conjunction with slide hammer 02992294) Removing jammed injector sealing ring
02992214 Assembly tool
Installing crankshaft sealing ring (flywheel side)
f ) 091~012
A. DEUTZ
© •9360-0
'1; 35,37. 1
. -,
8/10
A. DEUTZ
02992294 Slide hammer
(in conjunction with disassembly device 02992137) Disassembling injector sealing ring
02992301 Separating tool
Removing metal sheet lubricating oil pan from crankcase
9/10
Special tools W 49-01-01
OBJ_0OKU-31154-001.fm
© 49372-0
© 49373-0
II
II
Special tools W 49-01-01 OBJ _DOKU-31154-001 fm
:SJ 09/201 2
A. DEUTZ
10/ 10