A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES S-101 ... · symbia t, t2, t6 or t16 symbia spect...

5
SYMBIA S SYMBIA S TYPICAL FINAL DRAWING SET A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES A-102 SAFETY SERVICE CLEARANCE PLAN S-101 STRUCTURAL PLAN-DETAILS AND NOTES E-101 ELECTRICAL PLAN(S)-LEGEND AND NOTES Typical Drawing #: 06112 Contents: Sheet No. Description SIEMENS MEDICAL SOLUTIONS 51 Valley Stream Parkway Malvern, PA 19355 www.usa.siemens.com/medical

Transcript of A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES S-101 ... · symbia t, t2, t6 or t16 symbia spect...

Page 1: A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES S-101 ... · symbia t, t2, t6 or t16 symbia spect and spect\ct scanner the presence of magnetic fields in the vicinity of equipment

SY

MB

IA S

SYMBIA S

TY

PIC

AL

FIN

AL

DR

AW

ING

SE

T

A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES

A-102 SAFETY SERVICE CLEARANCE PLAN

S-101 STRUCTURAL PLAN-DETAILS AND NOTES

E-101 ELECTRICAL PLAN(S)-LEGEND AND NOTES

Typical Drawing #: 06112

Contents:Sheet No. Description

SIEMENS MEDICAL SOLUTIONS51 Valley Stream Parkway

Malvern, PA 19355www.usa.siemens.com/medical

Page 2: A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES S-101 ... · symbia t, t2, t6 or t16 symbia spect and spect\ct scanner the presence of magnetic fields in the vicinity of equipment

SYMBIA S04/09/13

SYMBIA STYPICAL FINAL DRAWING SET

06112

AS NOTED

4

04/09/13

C. MC DONNELL

THE USE OR REPRODUCTION OFTHIS TITLE BLOCK WITHOUT PROJECT #: SHEET:

SCALE: REF. #:

FULL EXTENT OF THE LAW.

SIEMENS AUTHORIZATION WILLRESULT IN PROSECUTION UNDER

SHEET OF

DATE:

SHEET OF DRAWN BY:

CHECKED:

DRAWN BY:

SYMBIA S

-ISSUE BLOCK-

DESCRIPTIONDATESYM

MINIMUM CEILING HEIGHT 8'-0"FOR THE SYMBIA S SYSTEM

FINISHED ROOM HEIGHT

12'-4"

5'-5"

6'-3

"

19'

LEFT PATIENT

LOAD RIGHT

PHS PIVOT

2019

111312 14 15

8

18

6'-5" x 2'-7"

SYNGOMULTIMODALITYWORKPLACELOCATED ATCUSTOMER'SDISCRETION.SCANNER

ROOM

IT IS THE RESPONSIBILITY OF THE

CUSTOMER/CONTRACTOR TO PROVIDE A MEANS OF

MOUNTING THE PC TOWER(S) OFF OF FINISHED

FLOOR FOR DAMAGE PROTECTION AGAINST

TIP-OVER, FLUIDS, IMPACT ETC.

SYMBIA.NETWORKPLACELOCATED ATCUSTOMER'SDISCRETION.

1

2

3

410 9 6

7

16 17

2221

WARNINGS:

THERE IS NO VIEW DOWN THE BORE OF THEGANTRY FROM THE SYNGO ACQUISITION WORKPLACE.

ORIENTATIONPOINT5

COLLIMATOR CARTTO BE LOCATED PERCUSTOMER'SDISCRETION.

SIEMENS HIGHLY RECOMMENDS THECUSTOMER'S ARCHITECT DESIGNATESSPACE FOR A HOT LAB, PATIENTWAITING AREA, AND UPTAKE ROOM.

A-1011ATTENTION:

RE

FE

RE

NC

E D

OC

UM

EN

T - N

OT

F

OR

C

ON

ST

RU

CT

IO

N

IT IS RECOMMENDED THAT THE SIEMENS DRAWINGS BE INCORPORATED WITH THE CONSTRUCTIONTHIS DRAWING IS DESIGNED TO CONFORM TO FEATURES AND EQUIPMENT REQUIREMENTS PRESENTEDAT THE TIME OF THEIR PREPARATION. SINCE BOTH THESE FACTORS ARE SUBJECT TO DESIGN

MODIFICATION, THEY ARE NOT TO BE USED FOR CONSTRUCTION PURPOSES.

DOCUMENTS FOR REFERENCE. THIS DRAWING DOES NOT PROVIDE RADIATION SHIELDING REQUIREMENTS FOR X-RAY AND ASSOCIATEDEQUIPMENT. THE CUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION

PHYSICIST TO SPECIFY RADIATION PROTECTION.

ALL DIMENSIONS SHOWN ON THIS DRAWING ARE FROM FINISHED SURFACES.

THIS SET OF PLANS REPRESENTS A COMPLETE SET OF DETAILS AND SHOULD NOT BE SEPARATED.

ALL RIGHTS ARE RESERVED.

DESIGNATION PG NUMBER DATE

RESOURCE LIST (SMS USE ONLY)

SYMBIA S NM02-001.891.01.06.02 03/12

SITE READINESS GUIDELINES

1) PROPER POWER AVAILABLE AT SMS EQUIPMENT POWER CABINETLOCATION.2) AIR CONDITIONING/HUMIDIFICATION SYSTEMS COMPLETE ANDFUNCTIONING PROPERLY.3) PROPER LIGHTING INSTALLED AND FUNCTIONING.4) PLUMBING COMPLETE EXCEPT FOR ANY FINAL CONNECTIONS TOSIEMENS EQUIPMENT.5) ALL CABLE TRAYS/DUCTS/CONDUITS CORRECTLY SIZEDACCORDING TO SIEMENS DRAWINGS. TERMINATION POINTS INSTALLEDIN CORRECT LOCATION ACCORDING TO SIEMENS DRAWINGS.6) ALL REINFORCEMENT PLATES INSTALLED AS REQUIRED.7) ROOM FOR EQUIPMENT INSTALLATION AND IMMEDIATE VICINITYDUST-FREE AND TO REMAIN SO FOR THE DURATION OF THEINSTALLATION.8) SECURE AREA AVAILABLE FOR INSTALLATION TOOLS.9) CUSTOMER SUPPLIED CAMERAS AND PROCESSORS INSTALLED.10) MODEM OUTLET, VOICE AND DATA TELEPHONE LINES INSTALLED.11) WALLS TO BE PRIMED AND PAINTED, FLOOR SURFACE TO BECOMMERCIAL GRADE TILE OR CEMENT ONLY.12) SPECT S CAMERA INSTALLATIONS REQUIRE A 10 mCi Co-57RECTANGULAR FLOOD SOURCE AT THE TIME OF INSTALLATION.

THE FOLLOWING GENERAL CONDITIONS ARE NECESSARY TO HAVETHE STATUS OF "READY SITE":

IF THESE CONDITIONS ARE NOT MET, THE SMS PROGRAM MANAGERAND THE DESIGNATED SMS INSTALLATION SUPERVISOR SHALLRESCHEDULE THE INSTALLATION START DATE. NOTE: ADDITIONALCOST MAY BE INCURRED BY THE CUSTOMER/CONTRACTOR WHENTHE SIEMENS SITE READINESS GUIDELINES ARE NOT MET, ANDDELIVERY DATES NEED TO BE RESCHEDULED.

IF THE CUSTOMER SITE PLANS TO UPGRADE TO A SYMBIA T, T2,T6 OR T16 SYSTEM IN THE NEAR FUTURE, THE FOLLOWINGREQUIREMENTS SHOULD BE CONSIDERED.

RADIATION SCATTERSYMBIA S SPECT ONLY SYSTEMS DO NOT HAVE RADIATIONSCATTER DIAGRAMS. SYMBIA T, T2, T6 AND T16 SYSTEMS DOHAVE RADIATION SCATTER DIAGRAMS DUE TO ADDITION OF THECT COMPONENT. AN UPGRADE MAY REQUIRE ADDITIONAL LEADSHIELDING.

ROOM PLANNINGSYMBIA S SYSTEMS ARE COMPOSED OF A SPECT ONLY CAMERA.UPGRADES TO SYMBIA T, T2, T6 AND T16 REQUIRE MORE SPACEBEHIND THE GANTRY OF THE CAMERA DUE TO THE ADDITION OFTHE CT COMPONENT. UPGRADES ALSO MAY REQUIRESTRUCTURAL REINFORCEMENT DUE TO THE ADDITIONAL WEIGHTOF THE CT COMPONENT. IF THE POSSIBILITY OF AN UPGRADE ISPROBABLE, PLEASE REQUEST SIEMENS PLANNING TO PLACE THESYMBIA S SPECT ONLY SYSTEM SO IT CAN BE EASILY UPGRADEDTO A SYMBIA T, T2, T6 OR T16 SYMBIA. CUSTOMER MAY ALSOREQUEST TYPICALS FOR AN UPGRADED SYSTEM IF SO DESIRED.

A SEPARATE CONTROL AREA IS ALSO RECOMMENDED WHENUPGRADING TO A SYMBIA T, T2, T6 OR T16 SYSTEM.

09/19/09 1-1

UPGRADE TOSYMBIA T, T2, T6 OR T16

SYMBIA SPECT AND SPECT\CT SCANNER

THE PRESENCE OF MAGNETIC FIELDS IN THE VICINITY OF

EQUIPMENT MAY HAVE AN ADVERSE EFFECT. IT IS THE

CUSTOMER'S RESPONSIBILITY TO VERIFY THAT THE FOLLOWING

VALUES ARE NOT EXCEEDED.

05/29/09 1-1

MAGNETIC FIELD PRECAUTIONS

MAXIMUM ALLOWABLE

MAGNETIC FIELD

DEVICES

1.0mT (10 GAUSS)

0.5mT (5 GAUSS)

0.2mT (2 GAUSS)

0.15mT (1.5 GAUSS)

0.05mT (0.5 GAUSS)

MAGNETIC FIELDS SHOULD BE MEASURED PRIOR TO DELIVERY

X-RAY IMAGE INTENSIFIERS, GAMMA CAMERAS,CYCLOTRON, OTHER LINEAR ACCELERATORS

COLOR MONITORS, SIEMENS LINEARACCELERATORS

SIEMENS CT SCANNERS

X-RAY TUBES, B/W MONITORS, MAGNETICDATA CARRIERS, DATA STORAGE DRIVES

COMPUTERS, MAGNETIC DISK DRIVES,OSCILLOSCOPES, PROCESSORS

0.1mT (1.0 GAUSS)

11-26-07

ENVIRONMENTAL/POWER AUDITAS AN INDICATION OF OUR COMMITMENT TO QUALITY, SIEMENSMAY, AT NO COST TO YOUR FACILITY, CHECK THE OPERATINGENVIRONMENT AFTER SYSTEM TURNOVER TO DETERMINE IF THEREQUIREMENTS FOR TEMPERATURE, HUMIDITY, POWER, ANDGROUNDING ARE MET AS PER SIEMENS' PUBLISHEDSPECIFICATIONS. SIEMENS WILL GENERATE A WRITTEN REPORTDETAILING THE ENVIRONMENTAL AND ELECTRICAL CONDITION OFTHE SITE AFTER TURNOVER AND WILL SHARE THE REPORT WITHYOU. IN THE EVENT WE IDENTIFY ANY ENVIRONMENTAL/POWERDEFICIENCIES AT THE SITE, YOUR FACILITY WILL BE REQUESTEDTO CORRECT DEFICIENCIES WITHIN THIRTY (30) DAYS. SHOULDANY CORRECTIVE ACTIONS BE NECESSARY, AND UPON REQUEST,SIEMENS WILL PROVIDE GUIDANCE IN AN EFFORT TO FACILITATERESOLUTION. PLEASE BE ADVISED THAT AFTER 30 DAYSNOTICE ANY REPAIR OR MAINTENANCE SERVICES NECESSITATEDBY SEVERE DEFICIENCIES WILL FALL OUTSIDE YOUR WARRANTYCOVERAGE.

CUSTOMER FROM THE APPROPRIATE STATE AGENCY, IF APPLICABLE.DIAGNOSTIC OR THERAPEUTIC PURPOSES, MUST BE OBTAINED BY THECONSTRUCTION OR STRUCTURAL MODIFICATIONS UTILIZING X-RAY FORPRIOR TO SIEMENS EQUIPMENT INSTALLATION, APPROVAL OF

STATE AGENCY REVIEW

9/23/97

RAM LICENSE NEEDS TO BE APPLIED FOR THROUGHGOVERNMENT AGENCY AS EARLY AS POSSIBLE. PLEASE ADDRESSWITH YOUR RSO (RADIATION SAFETY OFFICER).

RAM LICENSE MUST BE OBTAINED NO LATER THAT 4 WEEKSAHEAD OF SCHEDULED DELIVERY. DELAY OF INSTALLATION MAYOCCUR IF SITE HAS NOT OBTAINED RAM LICENSE AT THIS TIME.RADIOACTIVE SOURCES NEEDED TO COMPLETE CALIBRATION OFEQUIPMENT WILL NOT BE SHIPPED TO SITE WITHOUT VALID RAMLICENSE.

RAM LICENSE

05/27/09 1-1

06/28/12

ARCHITECTURAL NOTES1) ALL PRELIMINARY EQUIPMENT LAYOUTS SUBMITTED BY SIEMENSMEDICAL SOLUTIONS, INC. (SMS HEREAFTER) ARE BASED ON THERECOMMENDED SPACE NECESSARY FOR THE OPERATION ANDSERVICEABILITY OF THE EQUIPMENT BEING PROPOSED. SMS WILL NOTSUBMIT AN EQUIPMENT LAYOUT THAT IS NOT IN THE BEST INTERESTOF BOTH THE CUSTOMER AND SMS. ALL EQUIPMENT LAYOUTS AREBASED EITHER ON AN ACTUAL SITE LOCATION SURVEY ORARCHITECTURAL DRAWINGS SUPPLIED TO SMS. SMS WILL NOT BERESPONSIBLE FOR ANY ALTERATIONS THAT ENCROACH WITHINDESIGNATED SAFETY AND SERVICE CLEARANCE ZONES AS INDICATEDON DRAWINGS (IE. PIPE CHASES, VENTILATION DUCTS, CASEWORK, ANDSOFFITS, ETC.) MADE BY THE CUSTOMER OR REQUIRED BY ACUSTOMER'S ARCHITECTURAL FIRM ONCE PRELIMINARY DRAWINGS HAVEBEEN SUBMITTED AND APPROVED. DO NOT ALTER ANYSPECIFICATIONS AND/OR DIMENSIONS WITHOUT CONTACTING ANDRECEIVING WRITTEN CONFIRMATION FROM SMS PROJECT MANAGER.2) SMS IS NOT AN ARCHITECTURAL OR ENGINEERING FIRM.DRAWINGS SUPPLIED BY SMS ARE NOT CONSTRUCTION DRAWINGS.THEREFORE, THESE DRAWINGS ARE TO BE USED ONLY FORINFORMATION TO COMPLEMENT ACTUAL CONSTRUCTION DRAWINGSAVAILABLE FROM A CUSTOMER APPOINTED ARCHITECTURALREPRESENTATIVE OR A CUSTOMER'S ENGINEERING DESIGN GROUP. THECUSTOMER'S ARCHITECT AND GENERAL CONTRACTOR SHALL BEULTIMATELY RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLECODES AND PROFESSIONAL DESIGN REQUIREMENTS.3) THE CUSTOMER IS RESPONSIBLE FOR ALL ROOM AND AREAPREPARATION COSTS, PROFESSIONAL FEES, PERMITS, REPORTS, ANDINSPECTION FEES.4) EQUIPMENT WARRANTIES, EXPRESSED OR IMPLIED ON THE PARTOF SMS SHALL BE CONTINGENT UPON STRICT COMPLIANCE WITH THEARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL ANDRECOMMENDATIONS AND REQUIREMENTS CONTAINED IN THESEDRAWINGS, UNLESS SPECIFIED OTHERWISE.5) ALL DIMENSIONS SHOWN ARE TAKEN FROM FINISHED SURFACESUNLESS SPECIFIED OTHERWISE.6) THIS DRAWING DOES NOT PROVIDE RADIATION SHIELDINGREQUIREMENTS FOR X-RAY AND ASSOCIATED EQUIPMENT. THECUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTEREDRADIATION PHYSICIST. ACTUAL PROTECTION REQUIREMENTS SHALL BESPECIFIED BY A REGISTERED RADIATION PHYSICIST AT CUSTOMER'SENGAGEMENT AND EXPENSE. RESPONSIBILITY FOR ALL INFORMATIONAS TO THE ROOM LOCATION, USE, AND NUMBER OF ANTICIPATEDEXAMINATIONS TO BE PERFORMED PER TIME PERIOD SHALL BEPROVIDED TO THE PHYSICIST BY THE CUSTOMER. THE CUSTOMERSHALL FURTHER TAKE ALL RESPONSIBILITY IN THE COMMUNICATIONAND COORDINATION OF ACTIVITIES OF THE RADIATION PHYSICIST ANDTHE ARCHITECTURAL REPRESENTATIVE.7) SMS SHALL BE RESPONSIBLE FOR SMS EQUIPMENT INSTALLATIONAND CALIBRATION, CONNECTION AND INSTALLATION OF SMS PROVIDEDCABLES, AND CONNECTION OF CONTRACTOR PROVIDED WIRES TO SMSEQUIPMENT. IN THE EVENT THAT SPECIFIC TRADE RULES OR LICENSEREQUIREMENTS PROHIBIT THIS, THE CUSTOMER SHALL INITIATE THESERVICES OF APPROVED OTHER CONTRACTORS AND PAY FORSELECTED, APPROVED PARTIES TO PERFORM THIS WORK WITH JOBSUPERVISION TO BE PROVIDED BY SMS. CALIBRATION WHENACCOMPLISHED OUTSIDE OF NORMAL INSTALLATION SEQUENCES DUETO CONTRACTOR OR TRADE RULE ACTIONS OR REQUIREMENTS SHALLBE SUPPORTED BY, CHARGED TO, AND ACCEPTED BY THE CUSTOMERAS AN ADDITIONAL INSTALLATION EXPENSE.8) THE CUSTOMER SHALL VERIFY WITH SMS PROJECT MANAGER FINALINSTALLATION DRAWINGS THE LOCATIONS AND TRAVEL OF ALLANCILLARY EQUIPMENT TO BE CEILING OR WALL MOUNTED (IE: O.R.LIGHTS, MEDICAL GAS COLUMNS, PHYSIOLOGICAL MONITORINGINJECTORS, CRT PLATFORMS, SPRINKLER HEADS, SMOKE DETECTORS,ELECTRICAL OUTLETS, HVAC GRILLES, SPEAKERS, AND GENERAL ROOMLIGHTING, ETC.).9) THE GENERAL CONTRACTOR/CUSTOMER SHALL BE RESPONSIBLEFOR ALL FINAL PAINT, TOUCH-UP AND ANY COSMETIC OR TRIM WORKWHICH NEEDS TO BE OR IS REQUIRED TO BE COMPLETED AFTER THEINSTALLATION OF THE SMS EQUIPMENT AND ANY ASSOCIATED SUPPORTAPPARATUS.

PLEASE SEE EQUIPMENT LEGEND TO GET SPECIFIC COMPONENT HEATDISSIPATION.

SCANNER ROOMTHE SCANNER ROOM SHOULD MAINTAIN BETWEEN 65°F-86°F(± 8°F/HR.) WITH A RELATIVE HUMIDITY OF 20-80%,NON-CONDENSING.

CONTROL ROOM (REQ'D IF UPGRADING TO SYMBIA T,T2, OR T6).THE CONTROL ROOM SHOULD MAINTAIN 75°F(± 8°F/HR.) WITH ARELATIVE HUMIDITY OF 20-80%, NON-CONDENSING.

COMBINED CONTROL AND SCANNER ROOMTHE COMBINED ROOM AREA SHOULD MAINTAIN BETWEEN 65°F-96°F(± 8°F/HR.) WITH A RELATIVE HUMIDITY OF 20-80%,NON-CONDENSING.

VENTILATION AND AIR FILTERSFOR EXTERNAL AIR SUPPLY (FRESH AIR) IT IS RECOMMEND THATCOURSE FILTERS OF THE CLASS EU3 TO EU4 BE USED ON-SITE TOFILTER OUT DUST PARTICLES > 10µm.

THE VENTILATION SHOULD ENSURE THAT AGGRESSIVE POLLUTANTSARE PREVENTED FROM ENTERING THE ROOM. THE ROOM AIR SHOULDBE PROTECTED AGAINST CONTAMINATION BY HYDROGEN SULFIDE,EVEN IN SMALL AMOUNTS. THE MOST WELL KNOWN SOURCES OFHYDROGEN SULFIDE INCLUDE: EXHAUST FUMES AND WASTE WATERFROM DEVELOPERS, EXPOSED SEWER DRAINS, EXHAUST FUMES FROMDIESEL POWER UNITS. IF A DANGER OF SUCH CONTAMINATION EXISTS,CORRECTIVE ACTIONS HAVE TO BE TAKEN E.G.: EXTRACTOR FANS,SIPHON, AND MODIFICATION OF VENTILATION INTAKE.

07/30/09 1-1

ENVIRONMENTAL REQUIREMENTS

VERIFIED ON SITE PRIOR TO BEGINNING ANY CONSTRUCTION WORK.

ALL ROOM MEASUREMENTS AND ROOM DETAIL SPECIFICATIONS MUST BE

1/10/96

ROOM MEASUREMENTS

SYSTEM COMPONENT DECIBEL LEVEL(APPROXIMATELY AT2'-0" DISTANCE)

GANTRY <63.2

10/12/09 1/1

NOISE LEVEL

PHS <59.4

HALLWAY TRANSPORT

NORMAL TRANSPORT REQUIREMENTS: HALLWAY TO DOOR TRANSPORT:

DURING THE MOVEMENT OF THE GANTRY THROUGH CORRIDORS THETRANSPORT CASTERS ARE SWIVELED OUT FOR STABILITY.

FRONT PHS REQUIRES THE SAME HALLWAY TRANSPORT ROUTE ASTHE GANTRY AS SHOWN BELOW.

PLEASE CONSULT PLANNING GUIDE FOR ELEVATOR CLEARANCES FORGANTRY AND FRONT PHS.

TRANSPORTS MAY HAVE TO BE SWIVELED IN NARROW AREAS. ONCESYSTEM HAS PASSED THROUGH NARROW AREA, THE TRANSPORTROLLERS MUST BE SWIVELED OUT AGAIN FOR STABILITY.

8'-0" HALLWAY CONFIGURATION SHOWS THEGANTRY WITH THE TRUNNIONS IN THE FACTORYSHIPPED POSITION. 5'-9" CONFIGURATIONSHOWS THE GANTRY WITH THE TRUNNIONSRELOCATED TO THE TOP AND BOTTOM CENTERPOSITION. THIS ALLOWS FOR GREATER FLEXIBILITYIN MOVEMENT AND THE USE OF A NARROWERHALLWAY.

TOTAL SYMBIA S GANTRY WITH TRANSPORT DEVICE 4,118 LBS.

SYMBIA S GANTRY WITHOUT TRANSPORT DEVICE 3,979 LBS.FRONT PHS 2,742 LBS.REAR PHS 505 LBS.

TRANSPORTING GANTRY FLOOR LOAD:

ACCESS FLOORS MUST BE LAID OUT TO SUPPORT A LOAD MINIMUM1296 LBS. DURING TRANSPORT OF THE GANTRY, HIGHER LOADSCAN OCCUR AT INDIVIDUALS POINTS IF THE FLOOR IS NOT LEVEL.COVER THE TRANSPORT PATH WITH SHEET METAL TO DISTRIBUTETHE FLOOR LOAD.

03/02/10 1-1

8'-0

"

5'-9

" MIN

2'-10 1/2"

6'-8

"

7'-8 1/2"

6'-7

1/2

"

2'-10 1/2" MIN

8'-0

"

5'-9

" MIN

WIT

H T

RU

NN

ION

SR

ELO

CAT

ED

TRANSPORT AND DELIVERY NOTES

WIT

H T

RU

NN

ION

SR

ELO

CAT

ED

4'-7

" MIN

8'-2"

4'-7" MIN.

HALLWAY TRANSPORT FOR FRONT PHS

2'-10-1/2"

INSTALLATION & OPERATION OF THE SIEMENS EQUIPMENT.HEREWITH, AS THEY ARE ESSENTIAL FOR THE SUCCESSFULCONTRACTOR. FOLLOW DESIGN RECOMMENDATIONS INCLUDEDDETAILED, FURNISHED AND INSTALLED BY THE CUSTOMER AND/OR

AND CONTROL ROOMS ARE TO BE LOCATED, FURNISHED AND

1. ALL CASEWORK IS EITHER EXISTING OR IS TO BE DESIGNED,

2. THE SOUND SYSTEM AND INTERCOM BETWEEN THE EXAMINATION

CASEWORK & ACCESSORY NOTES

BE PROVIDED BY THE CUSTOMER.

INSTALLED BY THE CUSTOMER/CONTRACTOR.3. ALL FURNITURE (CHAIRS, ETC.) FOR THE CONTROL ROOM ARE TO

1/22/97

ARCHITECTURAL EQUIPMENT PLANSCALE: 1/4" = 1'-0"

THE FOLLOWING REQUIREMENTS MUST BE MET FOR LIGHTING INSOME ROOMS IN WHICH PLAYBACK DEVICES (MONITORS) ARE USEDFOR DIAGNOSTICS.1) CONTROLLABLE, GLARE FREE, REPRODUCIBLE ADJUSTMENTS OFLIGHTING INTENSITY (DIMMER WITH A SCALE).2) NO REFLECTION OR GLARE FROM WINDOWS, LIGHTS BOXES ATTHE LOCATIONS WHERE THE MONITORS ARE NORMALLY USED.

06/20/12 1-1

ROOM LIGHTING

EQUIPMENT LEGENDNO DESCRIPTION SMS WEIGHT BTU/HR DIMENSIONS (INCHES) REMARKS

SYM (LBS) TO AIR W D H

1 BSYMBIA "S" GANTRY WITH COLLIMATORS 5,184 5,122 89 83 89 3,415 BTU ON STANDBY.WORST CASE WEIGHT 5,744LBS. WITH 1 SET HIGHENERGY COLLIMATORS 280LBS. EACH.

2 ---FRONT PHS 2,512 --- 27 97 1/2 23 3/16 MAX. HEIGHT 41"

3 --AUTOMATIC COLLIMATOR CHANGER-ACC WITH AQC -PRODUCTIVITY PACKAGE (OPTION)

684 --- 33 97 1/2 23 3/16 WEIGHT CALCULATED WITH 1SET LOW AND MEDIUMENERGY COLLIMATORS.

4 ---PHS CABLE ON THE FLOOR STANDARD --- --- --- --- --- 41' CABLE EXPOSED ON THEFLOOR

5 ---PHS STANDARD PIVOT --- --- --- --- --- STANDARD 33 DEG PIVOT

6 ---REAR PHS WITH SNAC 504 --- --- --- --- ON FLOOR

7 ---PATIENT BOOM SWING ARM --- --- --- --- ---8 ---COLLIMATOR CART (EMPTY) (OPTION) 400 --- 41 32 47 1/2 NOTE INDIVIDUAL

COLLIMATORS ADD 80 LBS-275 LBS. PER COLLIMATORTO CART WEIGHT.

9 ---UPS FOR SPECT (OPTION) 120 1,024 10 28 3/8 17 7/8 ON FLOOR UNDER COUNTER

10 ---TVSS SURGE PROTECTION FOR SPECT (OPTION) 11 --- 8 6 10 ON FLOOR UNDER COUNTER

11 ACSSYMBIA S SYNGO ACQUISITION WORKPLACE CPU 31 1,400 8 16 5/8 19 LOCATED UNDER TABLE

12 ---SYMBIA S SYNGO ACQUISITION WORKPLACE MONITOR 55 *** 20 1/4 19 1/2 21 ***BTU'S INCL WITH CPU

13 ---SYMBIA S SYNGO MI WORKPLACE DVD/READ/WRITE DRIVE,

CD-R (OPTION)

2 81 7 1/8 12 1/8 2 1/8 ON CUSTOMER'S COUNTER

14 ---UPS FOR E.SOFT/C.CAM (OPTION) 46 --- 6 3/4 17 1/2 8 1/2 ON FLOOR UNDER COUNTER

15 ---TVSS FOR E.SOFT/C.CAM (OPTION) 11 --- 2 3/4 2 3/4 4 1/2 ON FLOOR UNDER COUNTER

16 DVDDVD (OPTION) --- --- --- --- --- ON CUSTOMER'S COUNTER

17 ---COMPUTER TABLE (OPTION) 86 --- 60 28 30

18 LCLASER CAMERA (OPTION) --- --- --- --- --- SEE MFG SPECIFICATIONS

19 MMWSYNGO MULTIMODALITY WORKPLACE CPU (OEM-OPTION) 55 1,400 19 3/4 10 23 5/8 ON CUSTOMER'S COUNTER

20 ---SYNGO MULTIMODALITY WORKPLACE KEYBOARD ANDMONITOR (OEM-OPTION)

--- *** --- --- --- ***BTU'S INCL WITH CPU

21 SNWSYMBIA.NET WORKPLACE CPU (OPTION) 12.8 956 16 5/8 8 5/16 16 1/8 LOCATED UNDER TABLE

22 ---SYMBIA.NET WORKPLACE KEYBOARD AND MONITOR (OPTION) 39.7 307 17 5/8 18 5/16 16 11/16 LOCATED ON TABLE

LEAD OR EQUIVALENT SHIELDING MAY BE REQUIRED IN THEWALLS OF THE SCANNER ROOM, HOTLAB AND/OR PATIENTPREPARATION AREAS. IT IS THE RESPONSIBILITY OF THECUSTOMER TO VERIFY WITH THE SITE'S RADIATION SAFETYOFFICER THAT RADIATION DOSE RATES FROM THE SPECT PATIENTAND/OR ISOTOPE WILL NOT EXCEED LOCAL RADIATION SAFETYGUIDELINES IN THE ROOM ADJACENT TO SCANNER, HOTLAB,AND/OR PATIENT PREPARATION AREAS.

IMPROPER SHIELDING MAY AFFECT CAMERA'S PERFORMANCE.05/29/09 1-1

RADIATION SAFETY

THE FOLLOWING RADIOACTIVE SOURCES ARE REQUIRED FOR THESYMBIA S AT THE TIME OF INSTALLATION FOR CALIBRATION:

1) 10-20 mCi Co57 (COBALT 57) OR LIQUID FILLED Tc99(TECHNETIUM 99) SHEET SOURCE (FOR EXTRINSIC FLOOD).2) POINT SOURCE 30-35 uCi Tc99 (FOR INTRINSIC FLOODS,TUNING AND PEAKING).3) QUANTITY OF 5 - 1 mCi Tc99 POINT SOURCES (FOR MHRCALIBRATION).

IT IS CUSTOMER'S RESPONSIBILITY TO OBTAIN THESE SOURCESPRIOR TO INSTALLATION. CO-57 RECTANGULAR FLOOD SHEETSOURCE MAY BE ORDERED FROM SIEMENS (ASK SIEMENS SALESASSOCIATE). Tc99 MUST OBTAINED THROUGH CUSTOMER'S LOCALRADIOACTIVE SOURCE PROVIDER.

THESE RADIOACTIVE SOURCES AREA NEEDED TO COMPLETECALIBRATION OF EQUIPMENT. PLEASE NOTE SOURCE PROVIDERSWILL NOT SHIP SOURCES TO SITE WITHOUT A VALID RAM LICENSE.04/09/13 1-1

RADIOACTIVE SOURCES

Page 3: A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES S-101 ... · symbia t, t2, t6 or t16 symbia spect and spect\ct scanner the presence of magnetic fields in the vicinity of equipment

SYMBIA S04/09/13

SYMBIA STYPICAL FINAL DRAWING SET

06112

AS NOTED

4

04/09/13

C. MC DONNELL

THE USE OR REPRODUCTION OFTHIS TITLE BLOCK WITHOUT PROJECT #: SHEET:

SCALE: REF. #:

FULL EXTENT OF THE LAW.

SIEMENS AUTHORIZATION WILLRESULT IN PROSECUTION UNDER

SHEET OF

DATE:

SHEET OF DRAWN BY:

CHECKED:

DRAWN BY:

MINIMUM CEILING HEIGHT 8'-0"FOR THE SYMBIA S SYSTEM

FINISHED ROOM HEIGHT SYMBIA S

-ISSUE BLOCK-

DESCRIPTIONDATESYM

5'-5"

6'-3

"

HATCH AREA NEEDS

TO BE FREE OF ANY

OBSTRUCTION FOR THE

COLLIMATOR CART TRAVEL

PATH.

SERVICECLEARANCE

SERVICECLEARANCE

SERVICECLEARANCE

ORIENTATIONPOINT

SCANNERROOM

A-102ATTENTION:

RE

FE

RE

NC

E D

OC

UM

EN

T - N

OT

F

OR

C

ON

ST

RU

CT

IO

N

IT IS RECOMMENDED THAT THE SIEMENS DRAWINGS BE INCORPORATED WITH THE CONSTRUCTIONTHIS DRAWING IS DESIGNED TO CONFORM TO FEATURES AND EQUIPMENT REQUIREMENTS PRESENTEDAT THE TIME OF THEIR PREPARATION. SINCE BOTH THESE FACTORS ARE SUBJECT TO DESIGN

MODIFICATION, THEY ARE NOT TO BE USED FOR CONSTRUCTION PURPOSES.

DOCUMENTS FOR REFERENCE. THIS DRAWING DOES NOT PROVIDE RADIATION SHIELDING REQUIREMENTS FOR X-RAY AND ASSOCIATEDEQUIPMENT. THE CUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION

PHYSICIST TO SPECIFY RADIATION PROTECTION.

ALL DIMENSIONS SHOWN ON THIS DRAWING ARE FROM FINISHED SURFACES.

THIS SET OF PLANS REPRESENTS A COMPLETE SET OF DETAILS AND SHOULD NOT BE SEPARATED.

ALL RIGHTS ARE RESERVED.2

IF THE SAFETY DISTANCES ARE NOT OBSERVED, SAFETY

MEASURES IN ACCORDANCE WITH LOCAL CODES SHOULD BE

UTILIZED (FOR EXAMPLE BARRIERS, WARNING SIGNS, AND

SAFETY MATS).

05/29/09 1-1

SAFETY CLEARANCE NOTE

SAFETY/SERVICE CLEARANCE PLANSCALE: 1/4" = 1'-0"

Page 4: A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES S-101 ... · symbia t, t2, t6 or t16 symbia spect and spect\ct scanner the presence of magnetic fields in the vicinity of equipment

SYMBIA S04/09/13

SYMBIA STYPICAL FINAL DRAWING SET

06112

AS NOTED

4

04/09/13

C. MC DONNELL

THE USE OR REPRODUCTION OFTHIS TITLE BLOCK WITHOUT PROJECT #: SHEET:

SCALE: REF. #:

FULL EXTENT OF THE LAW.

SIEMENS AUTHORIZATION WILLRESULT IN PROSECUTION UNDER

SHEET OF

DATE:

SHEET OF DRAWN BY:

CHECKED:

DRAWN BY:

SYMBIA S

-ISSUE BLOCK-

DESCRIPTIONDATESYM

LC

SCANNERROOM

MMW

SNW

ACSR1

B

R

1

ORIENTATIONPOINT

HD1

DVD

5'-5"

6'-3

"

4'

3'

6'

ACS

B

ORIENTATIONPOINT

HD1

DVD

SCANNERROOM

MINIMUM CEILING HEIGHT 8'-0"05/28/09 1-1

FOR THE SYMBIA S SYSTEM

FINISHED ROOM HEIGHT

E-101ATTENTION:

RE

FE

RE

NC

E D

OC

UM

EN

T - N

OT

F

OR

C

ON

ST

RU

CT

IO

N

IT IS RECOMMENDED THAT THE SIEMENS DRAWINGS BE INCORPORATED WITH THE CONSTRUCTIONTHIS DRAWING IS DESIGNED TO CONFORM TO FEATURES AND EQUIPMENT REQUIREMENTS PRESENTEDAT THE TIME OF THEIR PREPARATION. SINCE BOTH THESE FACTORS ARE SUBJECT TO DESIGN

MODIFICATION, THEY ARE NOT TO BE USED FOR CONSTRUCTION PURPOSES.

DOCUMENTS FOR REFERENCE. THIS DRAWING DOES NOT PROVIDE RADIATION SHIELDING REQUIREMENTS FOR X-RAY AND ASSOCIATEDEQUIPMENT. THE CUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION

PHYSICIST TO SPECIFY RADIATION PROTECTION.

ALL DIMENSIONS SHOWN ON THIS DRAWING ARE FROM FINISHED SURFACES.

THIS SET OF PLANS REPRESENTS A COMPLETE SET OF DETAILS AND SHOULD NOT BE SEPARATED.

ALL RIGHTS ARE RESERVED.

6/4/95

POWER QUALITY

POOR POWER WILL ALTER EQUIPMENT PERFORMANCE

IT IS IN THE CUSTOMER'S INTEREST THAT THE ELECTRICALCONTRACTOR BE RESPONSIBLE FOR TESTING AND VERIFYING

THAT THE EQUIPMENT POWER SUPPLY COMPLIES WITH THESIEMENS SPECIFICATIONS.

4

ELECTRICAL RACEWAY PLANSCALE: 1/4" = 1'-0"

ELECTRICAL DIMENSION PLANSCALE: 1/4" = 1'-0"

* OPTIONAL SWITCH AND CABLES ARE NOT INCLUDED, BUT CANBE ORDERED FROM SIEMENS.

SRS ROUTER, SUPPLIED BY SIEMENS(SIZE: 11.2"W X 8.7"D X 5.5"H, WEIGHT: 2 LBS.)

3'-3"3'-3"

110 V

4'-1

1"

CUSTOMERNETWORK

ORSWITCH*

ANALOG MODEM, SUPPLIED BY SIEMENS

2'-7"

ANALOG PHONE LINE, SUPPLIED BY CUSTOMER

ETHERNET SWITCH OR HUB, SUPPLIED BY CUSTOMER

SRS ROUTER CONNECTION DIAGRAM

SIEMENS REMOTE SERVICE

4

2

3

1

NONESCALE:

09/30/05

(PREFERRED) VPN CONNECTION

SIEMENS REMOTE SERVICES (SRS)

(OPTIONAL) SRS ROUTER CONNECTION

TO ENSURE THE UPTIME OF YOUR SYSTEM DURING THE WARRANTYPERIOD (AND BEYOND WITH A SERVICE AGREEMENT), SIEMENS REMOTESERVICES (SRS) REQUIRES REMOTE LOCAL AREA NETWORK ACCESS TOSIEMENS SYSTEMS.

SRS REQUIRES ONE OF THE FOLLOWING CONNECTION METHODS:

THE PREFERRED CONNECTION METHOD IS (VPN) VIRTUAL PRIVATENETWORK (WHERE THE CUSTOMER HAS AVAILABLE A VPN CAPABLEFIREWALL OR OTHER VPN APPLIANCE). THIS METHOD PROVIDES THEPOSSIBILITY FOR REMOTE SYSTEM DIAGNOSTICS WITHOUT ADDITIONALHARDWARE. PLEASE CONTACT SIEMENS REMOTE SERVICES(800-888-SIEM) TO DETERMINE IF THIS METHOD IS SUITABLE FORYOUR SITE.

- THE SRS ROUTER IS SUPPLIED BY SIEMENS AND INSTALLED AT THECUSTOMER'S SITE, WHILE STILL REMAINING THE PROPERTY OF SIEMENS.THE CUSTOMER'S NETWORK ADMINISTRATOR AND SIEMENS REMOTESERVICES SHALL DETERMINE THE TYPE AND LOCATION OF THE SRSROUTER REQUIRED.

- THE SRS ROUTER IS CONNECTED TO AN ANALOG MODEM THAT ISSUPPLIED BY SIEMENS, WHICH THEN IN TURN IS CONNECTED TO ANANALOG PHONE LINE THAT IS SUPPLIED BY THE CUSTOMER. ONE SRSROUTER ALLOWS REMOTE DIAGNOSTICS TO MULTIPLE MEDICAL SYSTEMS.

- THE SRS ROUTER SHOULD BE INSTALLED IN A SECURE LOCATION(CUSTOMER'S NETWORK COMPUTER ROOM) THAT HAS LIMITED ACCESS.IT CAN BE LOCATED ON A SHELF, TABLE, OR IN A CABINET. THECONNECTION CABLES (WITH INDICATED LENGTHS BELOW) ARE INCLUDEDWITH DELIVERY.

NOTE: ALL POWER OUTLETS ARE SUPPLIED/INSTALLED BY CUSTOMER.

110 V

1 2

3

4'-1

1"

4

110 V

SRSROUTER

ELECTRICAL NOTES

02/08/13

1) COMPLIANCE: ELECTRICAL WORK SHALL BE IN COMPLIANCE WITHTHE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE (NFPA-70),O.S.H.A. REGULATIONS, AS WELL AS APPLICABLE REGULATIONS OF CITY,COUNTY, STATE AND FEDERAL AGENCIES. PROVIDE MATERIALS ANDEQUIPMENT THAT COMPLY TO ANSI, IEEE AND NEMA STANDARDS.WHERE APPLICABLE, PROVIDE ONLY MATERIALS AND PRODUCTS THATARE U.L. LISTED AND LABELED. CUSTOMER'S/CONTRACTOR'S WORKSHALL COMPLY WITH THE LATEST EDITION OF NECA STANDARD OFINSTALLATION.

2) QUALITY ASSURANCE: THE CONTRACTOR SHALL VERIFY EXISTINGCONDITIONS IN THE FIELD TO INSURE THAT THE NEW WORK WILL FITTO THE EXISTING STRUCTURE AS SHOWN ON THE DRAWINGS. SHOULDANY CONDITIONS EXIST OR BE DISCOVERED THAT PREVENT THEINSTALLATION OF WORK AS SHOWN, THE CONTRACTOR SHALL NOTIFYTHE OWNER'S REPRESENTATIVE PRIOR TO FABRICATION OF EQUIPMENT,OR THE PERFORMANCE OF ANY WORK THAT MAY BE AFFECTED. DONOT ALTER DRAWINGS, DIMENSIONS, OR SPECIFICATIONS IN ANY WAYWITHOUT CONTACTING AND RECEIVING WRITTEN CONFIRMATION FROMSMS PROGRAM MANAGER. ALL DIMENSIONS ARE FROM FINISHEDSURFACES. CONDUIT AND PULL BOXES TO BE INSTALLED BY THECUSTOMER/CONTRACTOR WITH LOCATIONS BEING FIELD VERIFIED BYSMS PROJECT MANAGER.3) POWER SUPPLY SOURCE: POWER SUPPLIES FOR SIEMENSMEDICAL SOLUTIONS EQUIPMENT SHALL BE DEDICATED SERVICES KEPTENTIRELY FREE AND INDEPENDENT OF ALL OTHER BUILDING WIRINGAND EQUIPMENT, SUCH AS: ELEVATORS, GENERATORS, PUMPS, HVACSYSTEMS, ETC. THE CONTRACTOR SHALL COORDINATE THIS WORK WITHTHE CUSTOMER/UTILITY COMPANY FIELD REPRESENTATIVE.4) WORK FURNISHED BY CUSTOMER/CONTRACTOR: WORK NOTPROVIDED BY SIEMENS MEDICAL SOLUTIONS BUT SHOWN ON DRAWINGSTO BE FURNISHED AND INSTALLED BY CUSTOMER/CONTRACTORINCLUDES THE FOLLOWING BUT IS NOT LIMITED TO UNLESS NOTEDOTHERWISE: ELECTRICAL RACEWAYS AND DUCTS, WIRING TROUGHS, PULLBOXES, CONDUITS, CIRCUIT BREAKERS, EMERGENCY OFF BUTTONS,DOOR SWITCHES, WARNING LIGHTS, WIRING, WIRING DEVICES,CONNECTORS, LIGHTING EQUIPMENT AND GROUNDING.5) RACEWAY AND CONDUIT NOTES: RACEWAY SHALL BE ELECTRICMETALLIC TUBING (EMT) FOR RIGID CONDUIT WORK, OR WHERE SHORTOFF-SET CONNECTIONS ARE REQUIRED LIQUIDTIGHT FLEXIBLE METALCONDUIT SHALL BE USED. FIELD BENDS SHALL NOT BE LESS THANAS SHOWN IN TABLE 346-10 OF THE NATIONAL ELECTRICAL CODE.PROVIDE A JETLINE "SUPER TRUE TAPE", OR EQUIVALENT CONDUITMEASURING TAPE FISH LINE IN ALL RACEWAYS AND CONDUITS. CONDUIT BODIES SHALL NOT BE USED. WHERE A CONDUITENTERS A BOX, FITTING, OR OTHER ENCLOSURE, AN INSULATED THROATCONNECTOR SHALL BE PROVIDED TO PROTECT THE WIRE FROMABRASION. CONNECTORS SHALL BE DOUBLE SET SCREW TYPE, STEELCONCRETE TIGHT. KEEP RACEWAYS AT LEAST 6 INCHES AWAY FROM PARALLELRUNS OF FLUES OR STEAM AND HOT WATER PIPES. INSTALLRACEWAY RUNS ABOVE WATER AND STEAM PIPES PROVIDED THAT CABLERUN DISTANCES ARE MAINTAINED. USE TEMPORARY CLOSURES TOPREVENT FOREIGN MATTER FROM ENTERING RACEWAY. CONDUIT RUNS ARE SHOWN SCHEMATICALLY. INSTALL CONDUITWITH A MINIMUM OF BENDS IN THE SHORTEST PRACTICAL DISTANCECONSIDERING THE BUILDING CONSTRUCTION AND OBSTRUCTIONS,EXCEPT AS OTHERWISE INDICATED. THE CONTRACTOR SHALL MAKECERTAIN THAT ANY CONDUIT/RACEWAY RUNS CONTAINING SIEMENSMEDICAL SYSTEMS CABLES DO NOT EXCEED THE SPECIFIED MAXIMUMDISTANCES AS SHOWN ON THE ELECTRICAL DETAILS. PROVIDE ENCLOSED METAL RACEWAY SYSTEM (WIRE DUCT)WHERE SHOWN ON DRAWINGS WITH DIVIDERS TO SEPARATE THE DUCT(FOR POWER AND SIEMENS MEDICAL SOLUTIONS CABLING). DIVIDERSAND CROSSOVER PIECES TO BE PROVIDED AS NECESSARY. FOR ULCERTIFIED SYSTEMS, THE CABLE TO CABLE AS WELL AS THE CIRCUITTO CIRCUIT SEPARATION REQUIREMENT WAS EVALUATED DURING THE ULSYSTEM INVESTIGATION OF THIS EQUIPMENT. ADDITIONAL SEPARATIONOF THE SYSTEM CABLE ASSEMBLIES INTO SEPARATE OR PARTITIONEDRACEWAYS, UNLESS OTHERWISE NOTED, IS NOT NECESSARY TO INSURESEPARATION OF CIRCUITS, AS THEY CAN BE IN THE SAME RACEWAY. PROVIDE WIRE DUCT/RACEWAY WITH ACCESSIBLE REMOVABLECOVERS. LOCATIONS OF OPENINGS TO BE CUT IN FIELD ARE TO BECOORDINATED WITH SIEMENS PROJECT MANAGER. ELECTRICAL PULLBOXES AND RACEWAY COVERS SHALL BE INSTALLED IN A MANNER TOALLOW ACCESSIBILITY FOR INSTALLATION AND MAINTENANCE. IN-FLOOR TRENCH DUCT AND FLUSH FLOOR BOXES SHALL BE PROVIDEDWITH FULLY GASKETED REMOVABLE COVERS.6) WIRING: WIRING SHALL BE INSTALLED IN METAL RACEWAY, 600VOLT CLASS, STRANDED TYPE THHN-THWN, SINGLE CONDUCTORANNEALED COPPER FOR A MAXIMUM OPERATING TEMPERATURE OF 75°C (165° F). SIZED AS INDICATED. THE CUSTOMER/CONTRACTORSHALL LEAVE MINIMUM 10 FT. WIRE TAILS AT ALL OUTLET POINTS WITHWIRE IDENTIFICATION TAGGED AT BOTH ENDS FOR FINAL CONNECTIONBY SIEMENS MEDICAL SOLUTIONS.7) IN ADDITION TO THE CIRCUIT BREAKER LOAD CURRENT RATING,CONSIDERATION MUST ALSO BE GIVEN TO SELECTING CIRCUIT BREAKERSTHAT HAVE A HIGH ENOUGH SHORT CIRCUIT CURRENT WITHSTANDRATING TO SAFELY COORDINATE WITH THE POWER SYSTEM AVAILABLESHORT CIRCUIT CURRENT. GENERALLY, WHEN THE 480 VOLT, 3 PHASE,X-RAY EQUIPMENT IS SERVED FROM A POWER SUPPLY SYSTEM THAT ISPROVIDED WITH A 500 KVA OR SMALLER TRANSFORMER, A STANDARD14,000 RMS AMPERE WITHSTAND RATED CIRCUIT BREAKER WILL BEADEQUATE. HOWEVER, IF THE POWER SUPPLY SYSTEM TRANSFORMERIS LARGER THAN 500 KVA, THEN THE CIRCUIT BREAKERS HAVING ASHORT CIRCUIT WITHSTAND RATING GREATER THAN 14,000 RMSAMPERES MAY BE REQUIRED.

ITEM 1 (R) - 208 VAC SINGLE PHASE; 30 AMPS. DEDICATED OUTLETFOR SYMBIA S SYSTEM. INSTALL A TWIST-LOCK NEMA L6-30 RRECEPTACLE TO RECEIVE L6-30P PLUG FOR INSTALLATION OF THESIEMENS GANTRY POWER CABLES. LOCATED 12" A.F.F.

ITEM 2 (R1) - 115 VAC SINGLE PHASE; 20 AMPS. DEDICATEDQUADRUPLEX OUTLET FOR COMPUTERS.

NOTE: THE SPECT UPS (OPTION) IS RATED FOR 200-240 VAC INPUTVOLTAGE. THE SPECT UPS AUTO-CONFIGS OUT TO THE SPECT SYSTEMAT 208 VAC.

POWER SUPPLIED FOR SIEMENS MEDICAL SOLUTIONS EQUIPMENT SHALLBE DEDICATED SERVICES KEPT ENTIRELY FREE AND INDEPENDENT OFALL OTHER BUILDING WIRING AND EQUIPMENT SUCH AS: ELEVATORS,GENERATORS, PUMPS, HVAC SYSTEMS, ETC...

07/30/09 1-1

POWER REQUIREMENTS

A SURGE PROTECTOR MUST BE INSTALLED IN THE LINE CORD OF THESYMBIA S SYNGO ACQUISITION WORKPLACE (ACQUISITION COMPUTER). THESURGE PROTECTOR MUST BE OBTAINED LOCALLY TO MEET LOCALELECTRICAL REGULATIONS AND TO FIT LOCAL PLUGS AND SOCKETS. ITMUST BE AN APPROVED TYPE ACCEPTABLE TO THE AUTHORITIES IN THECOUNTRY WHERE THE EQUIPMENT IS USED, THE SURGE PROTECTOR MUSTMEET THE FOLLOWING REQUIREMENTS.

1) OPERATING LINE VOLTAGE: PER LOCAL REQUIREMENTS (120 VAC INTHE US).2) OPERATING LINE CURRENT: PER LOCAL COMMON USAGE (15 AMPSMIN. IN THE US).3) WATTAGE: 1800 WATTS MINIMUM.4) ENERGY DISSIPATION: 200 JOULES MINIMUM.5) FREQUENCY: 50 OR 60 HZ PER LOCAL REQUIREMENTS.6)SURGE CURRENT: 6500 AMPS MINIMUM WITH A 8 X 20 MSECWAVEFORM.7) MODES OF SURGE PROTECTION: HOT TO NEUTRAL, HOT TOGROUND, NEUTRAL TO GROUND.8) CLAMPING RESPONSE TIME: 1 NANOSECOND OR FASTER.9) SURGE VOLTAGE: 6000 VOLTS MINIMUM.10) SUPPRESSED VOLTAGE: 400 VOLTS MAX.

07/30/08 1-1

SURGEPROTECTOR

EQUIPMENT GROUND CONDUCTOR TO COMPLY WITH THEFOLLOWING:

1) SIZED EQUIVALENT TO THE PHASE CONDUCTORS (FULLSIZED GROUND).2) DERIVED FROM THE ELECTRICAL SERVICE, TRANSFORMEROR MAIN DISTRIBUTION PANEL FEEDING THE SIEMENSEQUIPMENT.3) RUN IN THE SAME CONDUIT, TROUGH OR RACEWAY ASTHE PHASE CONDUCTORS.4) CONTINUOUS, WITH NO BREAKS OR USE OF CONDUIT,CHASSIS OR EARTH AS THE SOLE GROUNDING PATH.5) BONDED TO CHASSIS AND/OR CONDUIT IN ACCORDANCEWITH THE NEC REQUIREMENTS.6) MINIMIZE CONNECTIONS OR TERMINALS TO ENSURECONTINUITY OVER THE LIFE OF THE INSTALLATION.7) AS A NORM, THERE SHOULD NOT BE ANY CURRENTPRESENCE ON THE GROUND CONDUCTOR, BUT IT ISACCEPTABLE TO HAVE <500mA DURING OPERATION OF THEIMAGING EQUIPMENT.8) THERE MAY BE SOME APPLICATIONS WHICH REQUIRE ANISOLATED GROUND AS PER NEC 250-96B. 03/01/11

GROUNDING NOTES

SYSTEMS NETWORK (VERIFY WITH SMS PROJECT MANAGER).ETHERNET CONNECTION TO CUSTOMER'S INFORMATION

03/29/12

ALL MAY NOT APPLY

UNDER FLOOR DUCT

CEILING DUCT

TRENCHDUCT

SYMBOLS

OPENING IN ACCESS FLOORING

(EPO) EMERGENCY POWER OFF BUTTON

DOOR SAFETY SWITCH

WARNING LIGHT (X-RAY ON)

VERTICAL DUCT

PULLBOX IN (FLOOR/WALL/CEILING)

OPENING IN RACEWAY OR TRENCHDUCT

MAIN PANEL OR ENCLOSURE BY CUSTOMER/CONTRACTOR

DS

110 VOLT, 20 AMP, HOSPITAL GRADE DUPLEX OUTLETUNLESS OTHERWISE STATED.

SURFACE DUCT

ELECTRICAL LEGENDSYM SIZE DESCRIPTION REMARKS

SUPPLIED AND INSTALLED BY CUSTOMER/CONTRACTOR

ACS AS REQUIRED PULL BOX MOUNTED FLUSH WITH FINISHED WALL 12" A.F.F. IN SHOWN LOCATION LOCATION. SNAC CABLE ACCESS ANDESTOP

B AS REQUIRED PULL BOX MOUNTED FLUSH WITH FINISHED WALL 12" A.F.F. IN SHOWN LOCATION. SNAC SYSTEM

DVD --- FIXPOINT DESIGNATION, SAME PULLBOX/OPENING AS ACS.

LC --- ETHERNET CONNECTION TO HOSPITAL NETWORK, EXACT LOCATION TO BE COORDINATED WITHSIEMENS PROJECT MANAGER.

LASER CAMERA OR CODONICSPRINTER

MMW --- ETHERNET CONNECTION TO HOSPITAL NETWORK, EXACT LOCATION TO BE COORDINATED WITHSIEMENS PROJECT MANAGER.

SYNGO MULTIMODALITYWORKPLACE

R --- 208 VAC SINGLE PHASE; 30 AMPS. DEDICATED OUTLET FOR SYMBIA S SYSTEM. INSTALL ATWIST-LOCK NEMA L6-30R RECEPTACLE TO RECEIVE L6-30P PLUG FOR INSTALLATION OF THESIEMENS GANTRY POWER CABLES. LOCATED 12" A.F.F.

R1 --- 115 VAC SINGLE PHASE; 20 AMPS. DEDICATED QUADRUPLEX OUTLET FOR COMPUTERS.

SNW --- ETHERNET CONNECTION TO HOSPITAL NETWORK, EXACT LOCATION TO BE COORDINATED WITHSIEMENS PROJECT MANAGER.

SYMBIA.NET WORKPLACE

HD1 6" x 3-1/2" ELECTRICAL DUCT THAT RUNS HORIZONTALLY ON THE WALL AT THE FLOORLINE AND SURFACEMOUNTED ON FINISHED WALL AS SHOWN FOR EXCESS CABLE STORAGE.

RACEWAY

1 1 1/2"Ø CONDUIT FROM "ACS" TO "B". MAX. CONDUIT LENGTH99'-0".

SIEMENS SUPPLIED CABLES

FROM VIA TO DESCRIPTION REMARKS

B 1 ACS ESTOP CABLE AND SYMBIA S SYNGO ACQUISITION WORKPLACE: 300V MAXIMUM LENGTH 99'-0"

Page 5: A-101 EQUIPMENT PLAN-LEGEND, DETAILS AND NOTES S-101 ... · symbia t, t2, t6 or t16 symbia spect and spect\ct scanner the presence of magnetic fields in the vicinity of equipment

SYMBIA S04/09/13

SYMBIA STYPICAL FINAL DRAWING SET

06112

AS NOTED

4

04/09/13

C. MC DONNELL

THE USE OR REPRODUCTION OFTHIS TITLE BLOCK WITHOUT PROJECT #: SHEET:

SCALE: REF. #:

FULL EXTENT OF THE LAW.

SIEMENS AUTHORIZATION WILLRESULT IN PROSECUTION UNDER

SHEET OF

DATE:

SHEET OF DRAWN BY:

CHECKED:

DRAWN BY:

SYMBIA S

-ISSUE BLOCK-

DESCRIPTIONDATESYM

5'-5"

6'-3

"

ORIENTATIONPOINT

SCANNERROOM

NOTE: FOR THE WEIGHTS OF ALL SIEMENS EQUIPMENT SHOWNON THIS PLAN, SEE THE "EQUIPMENT LEGEND" ON SHEET A-101.

S-101

1

S-101

3S-101

4S-101

5

S-101

2

MINIMUM CEILING HEIGHT 8'-0"FOR THE SYMBIA S SYSTEM

FINISHED ROOM HEIGHT

S-1013ATTENTION:

RE

FE

RE

NC

E D

OC

UM

EN

T - N

OT

F

OR

C

ON

ST

RU

CT

IO

N

IT IS RECOMMENDED THAT THE SIEMENS DRAWINGS BE INCORPORATED WITH THE CONSTRUCTIONTHIS DRAWING IS DESIGNED TO CONFORM TO FEATURES AND EQUIPMENT REQUIREMENTS PRESENTEDAT THE TIME OF THEIR PREPARATION. SINCE BOTH THESE FACTORS ARE SUBJECT TO DESIGN

MODIFICATION, THEY ARE NOT TO BE USED FOR CONSTRUCTION PURPOSES.

DOCUMENTS FOR REFERENCE. THIS DRAWING DOES NOT PROVIDE RADIATION SHIELDING REQUIREMENTS FOR X-RAY AND ASSOCIATEDEQUIPMENT. THE CUSTOMER IS RESPONSIBLE FOR CONSULTING WITH A REGISTERED RADIATION

PHYSICIST TO SPECIFY RADIATION PROTECTION.

ALL DIMENSIONS SHOWN ON THIS DRAWING ARE FROM FINISHED SURFACES.

THIS SET OF PLANS REPRESENTS A COMPLETE SET OF DETAILS AND SHOULD NOT BE SEPARATED.

ALL RIGHTS ARE RESERVED.

ANCHORAGE.)

FOR THE DESIGN AND DETAIL OF FLOOR, WALL AND CEILING STRUC-4) THE STRUCTURAL ENGINEER OF RECORD SHALL BE RESPONSIBLE

OF FORCES AS DETERMINED PER "CALIFORNIA ADMINISTRATIVE CODE,AS SHOWN ON OUR STRUCTURAL CALCULATIONS IN CONSIDERATIONTURES IN ACCORDANCE WITH THE WEIGHTS, MOMENTS AND FORCES

APPLICABLE IN PORTIONS OF THE COUNTRY THAT REQUIRE SEISMICDIVISION 22, PART 6, TITLE 24, TABLE T-22-23J" (THIS NOTE IS

08/01/00

INSTALLATION OF THE SIEMENS EQUIPMENT.

2) THE STRUCTURAL SUPPORT SYSTEM SHALL BE TRUE,

STRUCTURAL SUPPORT MEMBERS AND NEEDED HARDWARE FOR THE1) THE CUSTOMER/CONTRACTOR SHALL FURNISH AND INSTALL ALL

STRUCTURAL NOTES

SQUARE, LEVEL, PARALLEL AND COPLANAR WITH RESPECT TO EACH OTHER WITH A HORIZONTAL STRUCTURAL SUPPORT MEMBER TO BE LOCATED AND SET WITH A TRANSIT.

AT THE CUSTOMER'S EXPENSE. IN THE EVENT AN EXISTING SUPPORTBE PREPARED BY A PROFESSIONAL STRUCTURAL ENGINEER3) ALL CONSTRUCTION DETAILS AND SUPPORT CALCULATIONS SHALL

SYSTEM IS TO BE USED, IT WILL BE THE CUSTOMER'S RESPONSIBILITYSYSTEM TO VERIFY THE INTEGRITY OF THAT SYSTEM.

STRUCTURAL FLOOR PLANSCALE: 1/4" = 1'-0"

SCALE:NO SCALE1

BACK

FRONT

ANCHOR HOLELOCATION-BASEFRAME FOOTPAD (X4)

THE GANTRY IS FULLY ADJUSTABLE AT ALL FOUR BASE FRAME

PADS. THE BASE FRAME FOOT PADS ARE MOUNTED TO THE

FLOOR USING 5/8" X 3 1/2" ANCHORS. THE BASE FRAME FOR

THE GANTRY SITS ON TOP OF THE FOOT PADS. LEVELING

SCREWS ARE THEN USED TO LEVEL THE GANTRY FRONT TO

BACK AND SIDE TO SIDE. ONCE THE GANTRY IS LEVEL, LOCKING

SCREWS ARE TIGHTENED AT ALL FOUR PADS.4'- 0 3/4"

5'-7 3/4"

2'-5

3/8

"

LOCKINGSCREW (X8)

LEVELINGSCREW (X4)

SYMBIA S BASE FRAME

4-5/8" HOLES, 4" DEEP DRILLED FROM THE TOP SURFACE OFEACH OF THE FOUR BASE FRAME FOOT PADS.

CONCRETE SLAB MUST BE A MINIMUM OF 4" THICK.

EACH PAD SURFACE HAS AN AREA OF 30.16 SQ IN. LOAD PER

PAD IS APPROXIMATELY 40 LBS./SQ. IN.

TOP VIEW

SIDE VIEW

4"

8 5/8"

4" M

IN

5/8"

FLOORSURFACE

5/8" X 4" HOLEFROM TOPSURFACE

5/8" 3 1/2"ANCHOR"

4"

BASE FRAME FOOT PAD

05/29/09 1-1

THE SCANNER ROOM FLOOR MUST BE LEVELED AND THESURFACE MUST BE SMOOTH. ANY DEVIATION IN LEVELS WILLHAVE A DETRIMENTAL EFFECT ON THE PATIENT HANDLING TABLE(PHS) TO THE GANTRY ALIGNMENT WHICH MAY EFFECTCOLLIMATOR EXCHANGE.

IT IS RECOMMENDED THAT THE FLOOR IN THE ENTIRE ROOMWILL BE LEVELED AND FLATTENED ACCORDING TO THE SIEMENSSPECIFICATIONS GIVEN BELOW. IT IS IMPERATIVE THAT THESYSTEM INSTALLATION AREA, AS INDICATE BY THE HATCH AREABELOW, IS LEVELED AND FLATTENED.

UPON COMPLETION OF THE INSTALLATION FLOOR AREA, VERIFYTHE SURFACE FLATNESS, USING A STRAIGHT EDGE 4'-0" INLENGTH OR LONGER.

PREPARATION LEVELING AND FLATTENING THE FLOOR AREA

06/20/12 1-48

PREPARATION/PROCEDURE FOR FLOOR LEVELING AND FLATTENING

LEVELING SPECIFICATIONS

FLOOR LEVELING AREA 12'-6" (150") X 7'-6" (90").

SLOPE WITHIN ±1" OVER 12'-6" (150").

FLATNESS FLOOR SURFACE SHOULD BE

SMOOTH AND HAVE NO MORE

THAN 3/16" DEVIATION IN ANY

4'-0" (48") THROUGHOUT THE

SCANNER ROOM OR SYSTEM

INSTALLATION AREA.

FLOOR SURFACE FLOOR SHOULD HAVE ONE SINGLE

POURED SURFACE. NO FILL MATERIAL

SHOULD BE USED TO COMPENSATE

FOR HOLES OR DEPRESSIONS IN

THE FLOOR SURFACE.

FLOOR CHECKING PROCEDURE

THIS PROCEDURE PROVIDES DETAILS ON HOW TO VERIFY THAT THEFLOOR IS BOTH FLAT AND LEVEL BEFORE SYSTEM INSTALLATIONBEGINS. THIS PROCEDURE SHOULD BE COMPLETE BY THE SIEMENSPROJECT MANAGER AND CUSTOMER/CONTRACTOR. MEASUREMENTSSHOULD BE TAKEN LEFT TO RIGHT OR RIGHT TO LEFT, FRONT TOBACK OR BACK TO FRONT AND DIAGONALLY IN EITHER DIRECTION.REFER TO THE DIAGRAM ON THE LEFT.

SLOPE - FLOOR SLOPE SHOULD BE WITHIN ±1" OVER 12'-6"(150")

1) PLACE LASER LEVEL ON FLOOR.

2) MAKE SURE THAT THE LASER LEVELING DEVICE IS ABSOLUTELYLEVEL.

3) TURN ON LASER.

4) USE A RULE TO MEASURE THE HEIGHT OF THE LASER LIGHTFROM THE FLOOR NEXT TO THE LASER LEVEL. THIS IS REFERENCEPOINT ON THE RULER FOR ALL OTHER MEASUREMENTS.

5) KEEP THE LASER ON AND USE A RULE TO MEASURE THEHEIGHT OF THE LASER LIGHT BEAM AT VARIOUS POINTS 12'-6"(150") FROM THE LASER. THE MEASUREMENT FROM THE FLOORSHOULD BE WITHIN 1" OF THE ORIGINAL LASER LIGHT REFERENCEPOINT. REPEAT AT VARIOUS POINTS AND DIRECTIONSREPRESENTED AS HATCH AREA IN THE DIAGRAM TO THE LEFT.

CONCRETE FLOORLASER LEVEL

LEVEL BUBBLE

LASER

LIGHT

REFERENCE

POINT

RULER

1"MAXIMUM

DEVIATION

SLOP OUT OF

ACCEPTABLE

LIMIT

FLATNESS - FLOOR SURFACE SHOULD BE SMOOTH AND HAVE

NO MORE THEN 3/16" DEVIATION IN ANY 4'-0" (48")

SEGMENT IN ENTIRE THE SCANNER ROOM AREA.

1) VERIFY SURFACE FLATNESS FOR THE ENTIRE SCANNER ROOM

AREA, USE STRAIGHT EDGE OR BUBBLE LEVEL THAT IS 4'-0"

(48") LONG.

4'-0"MEASUREMENT SPAN

3/16

"

MA

XIM

UMCONCRETE

FLOOR

LASER LEVEL

LEVEL BUBBLE

IT IS THE CUSTOMER/CONTRACTOR'S RESPONSIBILITY IF

ANY MEASUREMENT OUT OF ACCEPTABLE LIMITS ARE AN

INDICATION THAT THE FLOOR NEEDS TO BE LEVELED WITH

SOME SORT OF LEVELING COMPOUND.

WHERE THE UNACCEPTABLE DEVIATION EXIST, THE WHOLE

(MINIMUM SYSTEM AREA) SHOULD BE RE-SUFACED.

(48")

3'-5"

4'-3

"

12'-6

"

7'-6"

AREA

12'-6" (150") X 7'-6" (90")

(41")

(51"

)

(150

")

REAR PHS IS RIGIDLY MOUNTED TO THE GANTRY. LOAD IS

TRANSMITTED TO FLOOR VIA TWO CASTERS AND A PAD AT

THE FRONT OF THE DOCKING DEVICE.

CASTERCENTER

REAR PHSCG WEIGHT504 LBS.

304 LBS.

FIXED304 LBS.

FIXED

2563 LBS.

FIXED

879 LBS.CASTER(1093 LBS.CASTER WITHICC OPTION)

2563 LBS.

FIXED

879 LBS.CASTER(1093 LBS.CASTER WITHICC OPTION)

377 LBS.CASTER(468 LBS.CASTER WITHICC/AQCOPTION)

377 LBS. CASTER(468 LBS. CASTERWITH ICC/AQC OPTION)

3'-1

0 15

/16"

2'-5 1/8" 2'-5 1/8"

4'-1

1 3/

8"

4'-5

5/8

"

8'-2

1/8

"

3'-8

13/

16"

2'-3 1/2"

07/30/09 1-24

SCALE:1/2"=1'-0"LOAD CONCENTRATIONS

2'-5

3/8

"

1'-6"

1'-5

5/8

"

5

ANCHORSUSED FORRIGHT PHSPIVOT

FIXED GUIDEPIN FORRIGHT PHSPIVOT

ANCHORS USEDFOR LEFT PHSPIVOT

FIXED GUIDE PINFOR LEFTPHS PIVOT

2'-0 3/8" 2'-0 3/8"

5" 5"

4'-1

0 13

/16"

5'-1

3/1

6"

2'-5

3/8

"

3'-1

1"

2'-9 7/8"2'-9 7/8"

1 15

/16"

7'-6

11/

16"

7'-8

5/8

"

1 15

/16"

13/16"

1 15/16"

11 11/16"

1 15/16"

11 11/16"

13/16"

SCALE:3/8"=1'-0"

07/30/09 1-32

ANCHOR LOCATION4

05/29/09 1-32

STANDARD RIGHTANGLE PHS PIVOT

4'-4

1/1

6"

1'-1 15/16"

5'-6

1/1

6"

8'-2

5/8

"

2'-11 1/8"

1'-0 11/16"11 11/16"

7'-8

5/8

"

CASTERLOCATIONS

FIXED GUIDEPIN FORRIGHTPHS PIVOT

USE THIS DETAIL ALONG WITH THE "LOAD CONCENTRATION"

DETAIL TO LOCATE THE LOAD CONCENTRATIONS FOR THE PHS

WHEN IT IS PIVOTED TO THE RIGHT.

SCALE:3/8"=1'-0"

3

1) THE MINIMUM ALLOWABLE CONCRETE THICKNESS FOR NONSEISMICREGIONS OF THE SCANNER ROOM FLOOR IS 4".

2) CONDITIONS OF FLOORING:

VIBRATION FREE LOCATION AS FOUND IN A TYPICAL CLINICAL ENVIRONMENT.

INSTALLATION OF THE GANTRY AND PATIENT TABLE ON:

CONCRETE FLOORING CLASS C20/25 TO C50/60. COMPOSITE FLOORING OR ACCESS FLOOR WITH SUITABLE ON SITE MOUNTING FRAME, SUB CONSTRUCTION. OR EQUIVALENT STRUCTURE.

3) WEIGHT CAPACITY OF FLOORING SHOULD BE TESTED BY A STRUCTURALENGINEER.

4) ANY FLOORING OTHER THAN LISTED ABOVE REQUIRES AN ON SITEFRICTION FREE SUB CONSTRUCTION MADE FROM STEEL IN THE AREAS OFSUPPORT. PLEASE CONSULT STRUCTURAL ENGINEER.

5) THE MINIMUM EXTRACTION FORCE FOR THE POINTS WHERE THE PATIENTTABLE IS ATTACHED IS 610 LBF PER ANCHOR.

INSTALLATION ON A FLOATING FLOOR WITHOUT SUB-CONSTRUCTION ISPROHIBITED.

6) FLOOR LEVELNESS REFER TO THE PREPARATION/PROCEDURE FLOORLEVELING AND FLATTENING DETAIL.

7) THE BASE FRAME FOOT PADS ARE MOUNTED TO THE FLOOR USING (4)5/8" X 3 1/2" ANCHORS.

8) THE MINIMUM REQUIREMENTS FOR COMPRESSIVE STRENGTH FOR THEFLOOR COVERING BASED ON SYMBIA COLLIMATOR CART SHALL BE 375 PSI.THIS IS BASE ON WORSE CASE LOADING WITH 2-HIGH ENERGY AND2-MEDIMUM ENERGY COLLIMATORS PLACED ON THE COLLIMATOR CART.

02/23/12 1-1

FLOOR REQUIREMENTS 07/02/12 1-24

SCALE:1/2"=1'-0"COLIMATOR CART

2'-8

5/8

"

2'-5

3/8

"

3 5/

8"

2'-0 3/8"

1'-0

"

2'-1

3/8

"

3'-2

"

2'-0 3/8"

3'-5"

3'-11 3/8"

3'-3

7/8

"

2'-4

3/4

"

2'-8 5/8"

3'-3

7/8

"

CART IS AVAILABLE IN LEFT AND RIGHTCONFIGURATIONS DEPENDING ON BED PIVOT.

WEIGHT AND LOCATION OF CG VARIES WITHCOLLIMATOR TYPE. HEAVIEST LOAD SHOWN:

1-SET HIGH ENERGY1-SET MEDIUM ENERGYTOTAL WEIGHT: 1330 LBS.

BACK VIEW

VAR

IES

WIT

HC

ART

HEI

GH

T

SIDE VIEW

WH

EEL

CEN

TER

374 LBS. 254 LBS.

418 LBS.

284 LBS.

TOP VIEW

2