NetNumen Function Operation

ZTE University

Page 2: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Objects

Understand the eNodeB NetNumen System Structure and Functions

Master the the eNodeB NetNumen System Operation

Page 3: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Contents

eNodeB NetNumen System Overview eNodeB Configuration Management Inventory Management Fault Management Performance Management Version Management Data Tracing

Page 4: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

ZXSDR NetNumen System Overview

Page 5: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Management Scope

Page 6: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Contents

eNodeB NetNumen System Overview eNodeB Configuration Management Inventory Management Fault Management Performance Management Version Management Data Tracing

Page 7: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Base Station Configuration Flow

Page 8: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Starting the EMS Client

Page 9: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating an NE Agent

1. Right-click the root node of topology tree, and from the prompt drop-down menu, choose Create Object > BaseStation > Multi-mode > MO SDR NE Agent .

2. On the Create MO SDR NE Agent interface, input the related information and click OK.

Page 10: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Starting an NE Agent

Page 11: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating a SubNetwork

Page 12: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating an NE

Page 13: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Configuration Operator and PLMN Double-click Operator or PLMN node, set the operator and PLMN

parameters.

Page 14: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating Equipment – BBU Boards

The device node is automatically created on the Managed Element node tree when creating NE. Only one device node can be created on one NE.

Double-click the Equipment node to display the Rack Graph window.

Page 15: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating Equipment – RRUDouble-click the device nodes under each RRU board to perform modification or creation operations on RRU devices, including PA devices, Tx devices, Rx devices, AISG devices, optical port device, and dry contact devices.

Page 16: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Configuration Transmission Network

Page 17: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Configuration Radio Parameters

Page 18: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Data Synchronization

After users configure an eNodeB in the network management system, the configuration data is only saved in the database of the back-end network management system. Users must perform synchronization to update the configuration data of the front-end eNodeB to validate the configuration.

Page 19: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Synchronizing All Tables

Page 20: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Contents

eNodeB NetNumen System Overview eNodeB Configuration Management Inventory Management Fault Management Performance Management Version Management Data Tracing

Page 21: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Inventory Management Interface

1

2

Page 22: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Querying SW/FW Inventory

Page 23: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Contents

eNodeB NetNumen System Overview eNodeB Configuration Management Inventory Management Fault Management Performance Management Version Management Data Tracing

Page 24: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Fault Management Functions

Page 25: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Alarm Classification

Page 26: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Alarm Handling Flow and Suggestion

Page 27: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Notification Introduction

Page 28: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Alarm Management Interface

1. Menu bar2. Toolbar3. Navigation pane4. Alarm information pane

Page 29: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Customizing a Query Task

3. Enter the Query Name, click OK.

1. In the Fault Management window, select Fault > Query Active Alarms.

2. Custom the query conditions, and click OK.

Page 30: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Monitoring Alarm and Notification by Realtime

Page 31: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Contents

eNodeB NetNumen System Overview eNodeB Configuration Management Inventory Management Fault Management Performance Management Version Management Data Tracing

Page 32: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Basic Concepts

Page 33: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Operation Flow

Page 34: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Performance Management Window

1. Menu bar 2. Main toolbar 3. Navigation pane4. Performance management toolbar 5. Performance data pane

Page 35: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating a Measurement Task

1. On the

Measurement

Task

Management tab,

click on the

performance

management

toolbar.

2. On the

Measurement

Task/Location/Ge

neral tab, set the

parameters.

3. Click OK.

Page 36: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Querying Performance Data by Realtime

Page 37: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating an Index(1)1. On the menu bar of the

client window, click Performance > Counter And Index Management.

2. Expand the Resource Type tree in the Model Management pane to find the measure object you want.

3. Click “+” before the measure object node, right-click the Key PI node, and then click Create Index on the shortcut menu.

4. On the Basic Information tab of the Create Index dialog box, enter the index name in the Name box and other information in the Description box.

Page 38: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating an Index(2)

5. Select NE Type and MO Type from drop-down box.

6. Select the format of the index value from the Display Format drop-down list box according the index type: "Integer“, "Float", "Percent" or "Boolean (1/0)“.

The following introduces the constraint relationship between index type and value format:

Key PI : Integer , Float , Percent or Boolean (1/0). Ordinary PI : Integer , Float or Percent . Statistics PI : Boolean (1/0).

7. If “Float” or “Percent” is selected from the Display Format drop-down box, set the format in the Format box further.

8. Enter the exception value of the index in the Index value box, which is the calculation result when the denominator of the index formula is zero.

9. In the Create Index dialog box, click the Index Formula tab, and then edit the index formula.

Page 39: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating an Index(3)

Page 40: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating an Index(4)10. In the Create Index dialog

box, click the Preset QoS tab, and then select the direction, set the thresholds and corresponding deltas.

11. Click OK, The system judges the validity of the index formula.

If the formula does not comply with the specification, a message will pop up to prompt the error.

If the formula is valid, the system prompts the successful creation of the index and allocates a unique ID to the index. The new index appears in corresponding index list.

Page 41: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating a Threshold Task(1)

1. On the menu bar of the client window, click Performance > Threshold Task Management.

2. Click on the task management toolbar.

3. On the Threshold Task tab of the Create Threshold Task dialog box, select the NE type from the NE Type drop-down box and select the MO type from the MO Type drop-down box.

4. In the Threshold Index area on the Threshold Task tab, click the Add index button to open the Select dialog box.

5. Select the index you want to use, and then click OK.

Page 42: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating a Threshold Task(2)

6. In the Threshold Index area, select the counter (or index) and then click the Modify index button.

Page 43: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating a Threshold Task(3)

7. set the thresholds and deltas (that is, hysteresis values) corresponding to four different severity levels, enter other information, and then click OK.

Page 44: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating a Threshold Task(4)

8. On the Location tab, set the collection location, including the Monitor Level , Wildcard Level , NE Location and MO Location.

Page 45: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating a Threshold Task(5)

9. On the General tab, set the general information of the threshold task according to the instructions.

10. Click OK.

Page 46: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Contents

eNodeB NetNumen System Overview eNodeB Configuration Management Inventory Management Fault Management Performance Management Version Management Data Tracing

Page 47: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Starting eNodeB Version Management

Page 48: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

BS Version Upgrade Flow

Page 49: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Package Status Conversion

Package status conversion on the NE during the upgrade

Page 50: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Upgrading Version - 1

1. Preparation: Copy the version package file required. Back up the NE configuration data of the current version.

2. Adding Version Packages:

Page 51: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Upgrading Version - 23. Viewing Version Packages

Right-click the package record, and select Open to view the software version details.

Select the Version Library Management node, and double-click a package record in Version Package List.

Page 52: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Upgrading Version - 34. Creating an Upgrade Task

Page 53: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Querying NE Version Packages①

Page 54: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Exporting/Importing NE Status Information - 1

This procedure describes how to export and import NE status information for upgrade task management. If multiple NEs are selected, you can export the NE status information to an Excel file to upgrade or query versions in batches.

Page 55: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Exporting/Importing NE Status Information - 2

Open the exported Excel file, and modify the corresponding value in the Y/N column of the NE. If the value in the Y/N column is Y, the corresponding NE node is selected in the Select NE area after the Excel file is imported to the system.

Page 56: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Contents

eNodeB NetNumen System Overview eNodeB Configuration Management Inventory Management Fault Management Performance Management Version Management Data Tracing

Page 57: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Data Tracing

Page 58: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Creating Data Tracing Task Flow

Page 59: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Setting a Common Tracing Task

Page 60: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Setting an LTE Tracing Task

PrerequisiteThe common tracing task setting is completed.

Page 61: 9.LF_OC2008_E02_1 NetNumen Function Operation 62

Management Tracing task

Synchronize

History Setting

Stop

Page 62: 9.LF_OC2008_E02_1 NetNumen Function Operation 62