9/8 THUR 16:00 | 4-County Climate Change Planning 2
-
Upload
apa-florida -
Category
Technology
-
view
352 -
download
0
description
Transcript of 9/8 THUR 16:00 | 4-County Climate Change Planning 2
![Page 1: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/1.jpg)
Four-County Climate Change Planning
Post-Disaster Redevelopment
2011 APA FLORIDA ANNUAL CONFERENCESeptember 7-10, 2011
The Breakers, Palm Beach
![Page 2: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/2.jpg)
Post-Disaster Redevelopment Plans
• A Concurrent State Effort of Pilot Projects guiding local solutions
• Funded by a grant from FEMA• Applicable in Adaptation Action Areas and
wherever natural hazard strikes• Should be coordinated with the Regional
Action Plan
![Page 3: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/3.jpg)
Post-Disaster RedevelopmentRecent Initiatives
• 2006 PBC Adopts a Countywide PDR Plan• 2007 state-wide pilot projects based on
PBC’s PDR Plan• State Publishes Guidebook: “Post-disaster
Redevelopment Planning: A Guide for Florida Communities”
![Page 4: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/4.jpg)
Post-Disaster RedevelopmentProject Next Phases
• Phase IV: Implementation, maintenance & updates of adopted plans
• Phase V : Incorporation of climate change factors – PBC selected as Pilot Community
• Expected completion time end of 2011
![Page 5: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/5.jpg)
Palm Beach County PDRP
• Comprehensive Guideline for Pre- and Post Disaster Actions
• Involves working groups from public and private sectors, homeowners and businesses, from planning through implementation and activation
• Incorporates detailed Pre-Disaster & Post-Disaster actions for the short and long terms for several disaster levels
![Page 6: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/6.jpg)
PDRP Action Plan Matrix
• PDRP Action Plan is comprised of multiple, complex matrix series organized by the factors mentioned above and identifying:– Responsible working group– Issue or Topic areas– Specific Action(s)– Disaster Level– Jurisdictions involved– Funding Considerations and timeframes
![Page 7: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/7.jpg)
Incorporating Climate Change into PDRP
• Joint effort of Palm Beach, Broward, Miami-Dade and Monroe counties
• Regional Climate Change Action Plan• Adaptation Action Areas
![Page 8: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/8.jpg)
Climate Change Factorsto consider in PDRPs
• Sea Level Rise (SLR) with dramatic long-term implications for coastal communities
• Heightened Cyclonic activity• Severe droughts and extended rainy seasons
![Page 9: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/9.jpg)
Irene – NC Aug 2011
![Page 10: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/10.jpg)
Irene – NJ Aug 2011
![Page 11: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/11.jpg)
Irene – Soho/Manhattan Aug 2011
![Page 12: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/12.jpg)
Irene – Mass. Aug 2011
![Page 13: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/13.jpg)
Irene – Conn. Aug 2011
![Page 14: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/14.jpg)
Typhoon Talas – Japan Sep 2011
![Page 15: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/15.jpg)
Tohoku –Earthquake & Tsunami
![Page 16: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/16.jpg)
Missouri Tornados - 2010
![Page 17: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/17.jpg)
Tennessee Flooding 2010
![Page 18: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/18.jpg)
Colombia Floods – Early 2011
![Page 19: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/19.jpg)
La Nina Floods – S. Africa Early 2011
![Page 20: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/20.jpg)
Venice, Italy Flooding
![Page 21: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/21.jpg)
Texas Wildfire – Sep 2011
![Page 22: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/22.jpg)
Tropical Storm Lee Hits New Orleans- Sep 2011
![Page 23: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/23.jpg)
Linking Climate ChangeIssues and Opportunities
• Short and long-term approach of PDRPs an opportunity to address SLR and other hazardous events
• Ideal to incorporate climate change factors after regional action plan is unveiled
• PDRPs should have consistent implementation throughout the region
![Page 24: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/24.jpg)
Linking Climate ChangeIssues and Opportunities
• PDRPs provide redevelopment guidelines but need to be supported by specific local policies
• County coordination with local governments critical challenge
• PDRPs must balance the immediate need to rebuild homes and businesses on site with decisions to relocate them out of vulnerable areas
![Page 25: 9/8 THUR 16:00 | 4-County Climate Change Planning 2](https://reader035.fdocuments.us/reader035/viewer/2022062704/5562a836d8b42a6e4f8b4e53/html5/thumbnails/25.jpg)
LinksPost Disaster Redevelopment:DCA: http://www.dca.state.fl.us/fdcp/dcp/PDRP/index.cfmPBC:
http://www.pbcgov.com/publicsafety/emergencymanagement/programs/planning/postdisredev.htm
Climate Change Compact:Palm Beach: http://www.pbcgov.com/gogreen/Broward:
http://www.broward.org/NATURALRESOURCES/CLIMATECHANGE/Pages/SoutheastFloridaRegionalClimateCompact.aspx
Miami-Dade: http://green.miamidade.gov/climatechangesummit.htmMonroe: http://fl-monroecounty.civicplus.com/index.aspx?nid=386