    Notice of Availability of Environmental Assessment (EA) and Public Hearing

    Chicago Transit Authority

    95th Street Terminal Improvement Project

    The Project

    The Chicago Transit Authority (CTA) is proposing to make transportation improvements by expanding

    and refurbishing the 95th/Dan Ryan Terminal, the southern terminus of the Dan Ryan Branch of CTAs

    Red Line. The purpose of the project is to expand and significantly improve the 95th/Dan Ryan Terminal

    which serves thousands of customers each day and is a vital part of Chicagos South Side.

    The proposed work includes two new station houses fronting along 95 th Street; a new Terminal south of

    95th Street; renovations/expansion of the existing Terminal north of 95th Street; a pedestrian bridge

    spanning across 95th Street to connect the north and south Terminals; an expanded platform to provide

    more room and easier passenger flow; wider bus lanes and increased spacing between bus bays to reduce

    congestion; wider sidewalks and waiting areas in the bus Terminal for increased passenger comfort and

    safety; new bus canopies to provide shelter for boarding and alighting customers; additional escalators

    and elevators to increase vertical circulation; bright, airy spaces with clear sightlines; additional areas for

    retail amenities; and additional space surrounding ticket vending machines and fare gates. The project

    also includes acquisition of adjacent land, as required for construction staging. This location is served by

    the CTA Red Line (95th/Dan Ryan Terminal), CTA bus routes, and Pace bus routes.

    Availability of Environmental Assessment (EA)

    CTA and the Federal Transit Administration (FTA), in accordance with the Federal requirements of 23CFR 771.119, are hereby notifying the public of the availability of the Environmental Assessment (EA).

    Copies of the document are available for review between 8:00 A.M. and 4:30 P.M. Wednesday, February

    20, 2013 through March 21, 2013 at the CTA reception desk, second floor, Chicago Transit Authority,

    567 W. Lake Street, Chicago, Illinois, 60661. Copies of the EA are also available for viewing on CTAs

    website transitchicago.com/95thTerminal or at the following Chicago Public Library locations: Woodson

    Library, 9525 S. Halsted Street, Chicago, Illinois 60628 and the Beverly Library, 1962 W. 95 th Street,

    Chicago, Illinois 60643.

    How to Comment in Writing

    Interested parties are invited to comment on the project utilizing the following methods: Via email: Please submit your comments to [email protected]

    Via US mail: Written comments may be sent to the following address:

    95th Street Terminal Improvement Project

    CTA

    567 W. Lake Street

    Chicago, IL 60661

    All comments must be submitted by 4:30 P.M. on Thursday, March 21, 2013.

    Public Hearing

    CTA will also conduct a public hearing regarding the proposed 95th Street Terminal Improvement Project,

    which includes a presentation as indicated below and an opportunity for public comment. This facility isaccessible to people with disabilities.

    Thursday, March 14, 2013

    6:00 to 8:00 P.M.Harlan High School

    9652 S. Michigan Avenue

    mailto:[email protected]:[email protected]
  • 7/29/2019 95th Street Terminal Improvement Notice of Public Hearing

    2/2

    6:00-8:00 P.M.

    There will be a presentation on the Project and the EA beginning at 6:00 P.M. followed by an opportunity

    for public comment until 8:00 P.M..

    For hearing and speech impaired, callTTY:1-888-CTATTY1 (1-888-282-8891).