9-2-10 TAC Meeting Update

Transcript of 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update...

Page 1: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

9-2-10 TAC Meeting Update

Page 2: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

TAC 9-2 Meeting Agenda and Related Discussion Items

• ERCOT Board Update including Subcommittee Restructure• Nodal Advisory Task Force Report*Day Ahead Market (DAM)

Available Credit Limit (ACL) (Possible Vote)• Texas Nodal Implementation• ERCOT Program Update• Network Operations Model Update• Nodal Testing• Market Cut-Over Overview• Market Readiness   • Market Reform Market Design Report• TAC Committee Structure Review• Subcommittee Updates Protocol Revisions • Subcommittee Updates

Page 3: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Subcommittee Restructure Report

TAC Chair asked each Subcommittee Chair to explain to TAC an update of how their Subcommittee would change (based on discussion at the TAC Subcommittee Workshop) as well as provide added benefits.

It was noted that changes might be needed to By-laws and TAC operating procedures as well as other documentation.

Page 4: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Subcommittee Restructure Highlights

COPs Subcommittee

• Transition to a Single Working Group• Primarily Settlement Focused• Combination of all Working Groups• COP Market Guide – Transition to a User Guide • COPs will elect leadership in January (as usual) • Last COPs meeting currently discussed as February 2011• Final COPs meeting – will draft first Settlement Working Group

Agenda

Page 5: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Subcommittee Restructure Highlights – cont.

Other Subcommittees – Major Changes being discussed

- Many Working groups To be combined- Changes to Voting Procedures being proposed- Current Voting Segments/Structure to stay in place

Page 6: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

NATF Update from Sept. 2nd NATF Meeting

Motion for ERCOT to reduce ACL for the DAM on non-business days as it does today, except:

• ERCOT should reduce exposure from three part offers by the product of DAM clearing price times cleared qty for each cleared transaction

• No longer increase exposure for three part offers based on the difference between historic DAM and RTM prices

• Reduce exposure from each cleared energy only offer by the product of DAM clearing price, cleared qty, and e2.  e2 is set by ERCOT for each counterparty, and only counterparties with favorable pre-DAM treatment qualify this reduction.“

• Conditioned on the market participants being able to test a DAM weekend prior to go-live with these changes.”

Page 7: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

PRRs – Approved!

• PRR850, Weather Responsiveness Determination for Interval Data Recorders - URGENT • Nodal Protocol Revision Requests • NPRR220, Nodal Requirement of Declaring an EEA for Reserves More than 500 MW• NPRR231, Treatment of RMR Units in the Day-Ahead Market (formerly “Remove RMR Units

from the Day-Ahead Market”)• NPRR232, Clarification of Block Load Transfer Registration and Deployment• NPRR238, Resolution of Alignment Item A47, A59, A104, A105, A114, A115, A130, A188, and

A189 - Provides Clarification and Updates to Network Operations Model Processes for Resource Entities

• NPRR240, Proxy Energy Offer Curveo   NPRR241, Aggregate Incremental Liability (AIL) Calculation and Credit Reports Publish Corrections

• NPRR243, Load Resource Disqualification, Unannounced Testing, and Complianceo   NPRR247, Retail Market Testing Updates Due to the Merger of the TX SET and TTPT Working Groups

• NPRR248, Removal of Loads from Pre-1999 NOIE Load Zone• NPRR249, Resolution of Alignment Item A155 and A159 – Removal of Text Reason

Requirement (formerly “Removal of Text Reason Requirement”• NPRR250, Suspension of Annual Profile ID Validation With Advanced Meter Deployment• NPRR251, Synchronization of PRR845, Definition for IDR Meters and Optional Removal of

IDR Meters at a Premise Where an Advanced Meter Can be Provisioned• NPRR252, Synchronization of PRR758, Clarification of Language Related to Generation

Netting for ERCOT Polled Settlement Meters• NPRR254, Updates to Protocol Sections 14 and 18Revision Requests Tabled at TAC (Vote):• PRR846, Deadlines for Initiating Alternative Dispute Resolution (Vote) • NPRR213, Deadlines for Initiating Alternative Dispute Resolution (Vote) • NPRR209, Data Posting Changes to Comply with P.U.C. Subst. R. 25.505

Page 8: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

ROS

Reliability and Operations Subcommittee Report

• Revisions to TAC0706060, Telemetry Standards• SCR759, ac Line Segment Name Length Increase in

Information Model Manager NOGRR039, • Synchronization of Section 1 with Nodal Protocols

Page 9: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

COPs – Two Voting Items – Approved!

Commercial Operations Subcommittee Report

• LPGRRR038, Revisions for Texas Nodal Market Implementation and Synchronization with PRR821, Update of Section 21, Process for Protocol Revision (Vote)

• LPGRRR039,  Revisions for Texas Nodal Market Implementation Part Two (Vote)

Page 10: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

RMS – Two Voting Items – Approved!

Retail Market Subcommittee Report

• RMGRR086, Submission of Distributed Generation Data for Advanced Meters

• RMGRR088, Updates to the IDR Meter Installation and Removal Processes

Page 11: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

General Updates

Board: All NPRRS presented to the Board were approved• ERCOT Operations, Planning, and IT Report• 2011 Ancillary Services Methodology• 2011 Project Priority List (PPL) • Renewable Technology Working Group Report* Texas

Renewables Integration Plan • Wholesale Market Subcommittee Report*  

11

Page 12: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

NATF

NATF: Don Blackburn provided the updateDAM Technical Workshops – • Meetings each Tuesday and Thursday at 10AM

• Sept. 17th – double meeting. If plugged into the calls might want to attend the meeting in Taylor

– Lots of things from a NATF perspective that need to be addressed.– Looking at 168 hour test (1 week)– Documentation – Will have a focused look at those tests ERCOT Business practice Manuals

Reliability and Wholesale Market Commercial PracticesCurrent operating plan practices by QSEs

Network OperationsModeling expectations for TSPs, REs and QSEs

Comment period – deadline for comments for these two documents is Tuesday, September 7th

Future agenda items: all importantDAM Credit issuesACL Calculation for non-business daysERCOT system changes priot to go-live separate presentation from the meeting held

on Sept. 2

Page 13: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

DAM Credit update

• DAM was run over non-business days for the first time with credit constraints of there weekend of Aug 14 through 16

• A significant amount of credit was consumed resulting in some CPs being constrained in the Monday DAM

• CWG and MCWG joint meetings – 4 meetings to resolve• Current practice – every transaction in the DAM reduced your credit

limit in the DAM – no allowance for “offsets”• See presentation for details…• Proposed motion• Move that ERCOT reduce ACL for the DAM on non-business days as it

does today with 4 exceptions: (see presentation)• Comments…consider holiday weekends such as Thanksgiving• Ten significant holidays throughout the year• ERCOT CIO – Cleary noted that he has to look at benefit to market and

staffing impacts • Motion was modified to include that ACL will be “determined” on the

weekend. SCR will be needed to implement.

Page 14: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Cleary Update

• Cleary provided an update – • Turned it over to Ken Ragsdale

• Focused on “quality of solution” instead of the “technical defects that ERCOT is aware of.

• Making sure the right solutions are in place• Project status update – all on schedule • Updates to the Board will be look forward to components

involved, 168 hour test, other key components• Getting into cutover procedures – cut over timeline• Market trials running over 31 weeks

Page 15: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Ken Ragsdale update

• 168 hour test• Document has been approved – ERCOT is internally prepared to go forward

with the 168 hour test and are planning out the details• This will be a full rehearsal• Dam• RUC• Real-time• 48 hour period for LFC test• This test will be consecutive for 7 days• Generate and post settlement statements and invoices and applicable reports

and extracts• Ercot needs good reasonable offers and bids put into the system no rogue

testing going on need bilateral trades and other business behavior like that• Set of Market Trials test • There is a handbook for the breakdown of activities in the 168 hour test which

was approved by TAC• Summary will be provided to TAC and Board – Sept 17th meeting with NATF end

of the 168 hour test

Page 16: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Ken Ragsdale presentation continued

Full system market and reliability test

New issue for CRR came to view recently Nodal program communication21.12.3 – paragraph from Zonal protocols related to certification – making

sure all requirements have been metBeen looking at system, process and people readiness

Key issuyes- load distribution factorslooking at different methodology

Go live decision will be made on October 7th

TAC chair comment - Need to look at things from a trajectory standpoint before the decision on October 7th

Page 17: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Ken Ragsdale continued - Settlements, Billing and Data Aggregation

• Running settlements since mid April• Some defects noted• If software cannot perform accurately then there is a manual

workaround• Readiness is being examined• Credit - CLM – some defects will be resolved with fixes

implemented on Labor Day weekend• MIS - Reports showing up on MIS are meeting expectations

Page 18: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Steve Reddy’s update

Descriptions of issues – see ppt for complete update

CRR always a hot topic…

Security around CRRS being received is that is taking around 3 hours which is not good since ERCOT is only allowed 3.5 hours for running and approving. Must speed that up!

Other critical processes are being evaluated to verify acceptable timing

Page 19: 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update including Subcommittee Restructure Nodal Advisory Task.

Thank You