Transcript of 9-2-10 TAC Meeting Update. TAC 9-2 Meeting Agenda and Related Discussion Items ERCOT Board Update...
9-2-10 TAC Meeting Update
TAC 9-2 Meeting Agenda and Related Discussion Items
• ERCOT Board Update including Subcommittee Restructure• Nodal Advisory Task Force Report*Day Ahead Market (DAM)
Available Credit Limit (ACL) (Possible Vote)• Texas Nodal Implementation• ERCOT Program Update• Network Operations Model Update• Nodal Testing• Market Cut-Over Overview• Market Readiness • Market Reform Market Design Report• TAC Committee Structure Review• Subcommittee Updates Protocol Revisions • Subcommittee Updates
Subcommittee Restructure Report
TAC Chair asked each Subcommittee Chair to explain to TAC an update of how their Subcommittee would change (based on discussion at the TAC Subcommittee Workshop) as well as provide added benefits.
It was noted that changes might be needed to By-laws and TAC operating procedures as well as other documentation.
Subcommittee Restructure Highlights
COPs Subcommittee
• Transition to a Single Working Group• Primarily Settlement Focused• Combination of all Working Groups• COP Market Guide – Transition to a User Guide • COPs will elect leadership in January (as usual) • Last COPs meeting currently discussed as February 2011• Final COPs meeting – will draft first Settlement Working Group
Agenda
Subcommittee Restructure Highlights – cont.
Other Subcommittees – Major Changes being discussed
- Many Working groups To be combined- Changes to Voting Procedures being proposed- Current Voting Segments/Structure to stay in place
NATF Update from Sept. 2nd NATF Meeting
Motion for ERCOT to reduce ACL for the DAM on non-business days as it does today, except:
• ERCOT should reduce exposure from three part offers by the product of DAM clearing price times cleared qty for each cleared transaction
• No longer increase exposure for three part offers based on the difference between historic DAM and RTM prices
• Reduce exposure from each cleared energy only offer by the product of DAM clearing price, cleared qty, and e2. e2 is set by ERCOT for each counterparty, and only counterparties with favorable pre-DAM treatment qualify this reduction.“
• Conditioned on the market participants being able to test a DAM weekend prior to go-live with these changes.”
PRRs – Approved!
• PRR850, Weather Responsiveness Determination for Interval Data Recorders - URGENT • Nodal Protocol Revision Requests • NPRR220, Nodal Requirement of Declaring an EEA for Reserves More than 500 MW• NPRR231, Treatment of RMR Units in the Day-Ahead Market (formerly “Remove RMR Units
from the Day-Ahead Market”)• NPRR232, Clarification of Block Load Transfer Registration and Deployment• NPRR238, Resolution of Alignment Item A47, A59, A104, A105, A114, A115, A130, A188, and
A189 - Provides Clarification and Updates to Network Operations Model Processes for Resource Entities
• NPRR240, Proxy Energy Offer Curveo NPRR241, Aggregate Incremental Liability (AIL) Calculation and Credit Reports Publish Corrections
• NPRR243, Load Resource Disqualification, Unannounced Testing, and Complianceo NPRR247, Retail Market Testing Updates Due to the Merger of the TX SET and TTPT Working Groups
• NPRR248, Removal of Loads from Pre-1999 NOIE Load Zone• NPRR249, Resolution of Alignment Item A155 and A159 – Removal of Text Reason
Requirement (formerly “Removal of Text Reason Requirement”• NPRR250, Suspension of Annual Profile ID Validation With Advanced Meter Deployment• NPRR251, Synchronization of PRR845, Definition for IDR Meters and Optional Removal of
IDR Meters at a Premise Where an Advanced Meter Can be Provisioned• NPRR252, Synchronization of PRR758, Clarification of Language Related to Generation
Netting for ERCOT Polled Settlement Meters• NPRR254, Updates to Protocol Sections 14 and 18Revision Requests Tabled at TAC (Vote):• PRR846, Deadlines for Initiating Alternative Dispute Resolution (Vote) • NPRR213, Deadlines for Initiating Alternative Dispute Resolution (Vote) • NPRR209, Data Posting Changes to Comply with P.U.C. Subst. R. 25.505
ROS
Reliability and Operations Subcommittee Report
• Revisions to TAC0706060, Telemetry Standards• SCR759, ac Line Segment Name Length Increase in
Information Model Manager NOGRR039, • Synchronization of Section 1 with Nodal Protocols
COPs – Two Voting Items – Approved!
Commercial Operations Subcommittee Report
• LPGRRR038, Revisions for Texas Nodal Market Implementation and Synchronization with PRR821, Update of Section 21, Process for Protocol Revision (Vote)
• LPGRRR039, Revisions for Texas Nodal Market Implementation Part Two (Vote)
RMS – Two Voting Items – Approved!
Retail Market Subcommittee Report
• RMGRR086, Submission of Distributed Generation Data for Advanced Meters
• RMGRR088, Updates to the IDR Meter Installation and Removal Processes
General Updates
Board: All NPRRS presented to the Board were approved• ERCOT Operations, Planning, and IT Report• 2011 Ancillary Services Methodology• 2011 Project Priority List (PPL) • Renewable Technology Working Group Report* Texas
Renewables Integration Plan • Wholesale Market Subcommittee Report*
11
NATF
NATF: Don Blackburn provided the updateDAM Technical Workshops – • Meetings each Tuesday and Thursday at 10AM
• Sept. 17th – double meeting. If plugged into the calls might want to attend the meeting in Taylor
– Lots of things from a NATF perspective that need to be addressed.– Looking at 168 hour test (1 week)– Documentation – Will have a focused look at those tests ERCOT Business practice Manuals
Reliability and Wholesale Market Commercial PracticesCurrent operating plan practices by QSEs
Network OperationsModeling expectations for TSPs, REs and QSEs
Comment period – deadline for comments for these two documents is Tuesday, September 7th
Future agenda items: all importantDAM Credit issuesACL Calculation for non-business daysERCOT system changes priot to go-live separate presentation from the meeting held
on Sept. 2
DAM Credit update
• DAM was run over non-business days for the first time with credit constraints of there weekend of Aug 14 through 16
• A significant amount of credit was consumed resulting in some CPs being constrained in the Monday DAM
• CWG and MCWG joint meetings – 4 meetings to resolve• Current practice – every transaction in the DAM reduced your credit
limit in the DAM – no allowance for “offsets”• See presentation for details…• Proposed motion• Move that ERCOT reduce ACL for the DAM on non-business days as it
does today with 4 exceptions: (see presentation)• Comments…consider holiday weekends such as Thanksgiving• Ten significant holidays throughout the year• ERCOT CIO – Cleary noted that he has to look at benefit to market and
staffing impacts • Motion was modified to include that ACL will be “determined” on the
weekend. SCR will be needed to implement.
Cleary Update
• Cleary provided an update – • Turned it over to Ken Ragsdale
• Focused on “quality of solution” instead of the “technical defects that ERCOT is aware of.
• Making sure the right solutions are in place• Project status update – all on schedule • Updates to the Board will be look forward to components
involved, 168 hour test, other key components• Getting into cutover procedures – cut over timeline• Market trials running over 31 weeks
Ken Ragsdale update
• 168 hour test• Document has been approved – ERCOT is internally prepared to go forward
with the 168 hour test and are planning out the details• This will be a full rehearsal• Dam• RUC• Real-time• 48 hour period for LFC test• This test will be consecutive for 7 days• Generate and post settlement statements and invoices and applicable reports
and extracts• Ercot needs good reasonable offers and bids put into the system no rogue
testing going on need bilateral trades and other business behavior like that• Set of Market Trials test • There is a handbook for the breakdown of activities in the 168 hour test which
was approved by TAC• Summary will be provided to TAC and Board – Sept 17th meeting with NATF end
of the 168 hour test
Ken Ragsdale presentation continued
Full system market and reliability test
New issue for CRR came to view recently Nodal program communication21.12.3 – paragraph from Zonal protocols related to certification – making
sure all requirements have been metBeen looking at system, process and people readiness
Key issuyes- load distribution factorslooking at different methodology
Go live decision will be made on October 7th
TAC chair comment - Need to look at things from a trajectory standpoint before the decision on October 7th
Ken Ragsdale continued - Settlements, Billing and Data Aggregation
• Running settlements since mid April• Some defects noted• If software cannot perform accurately then there is a manual
workaround• Readiness is being examined• Credit - CLM – some defects will be resolved with fixes
implemented on Labor Day weekend• MIS - Reports showing up on MIS are meeting expectations
Steve Reddy’s update
Descriptions of issues – see ppt for complete update
CRR always a hot topic…
Security around CRRS being received is that is taking around 3 hours which is not good since ERCOT is only allowed 3.5 hours for running and approving. Must speed that up!
Other critical processes are being evaluated to verify acceptable timing
Thank You