October 2, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 31 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 31 for the period of September 22, 2019 through September 28, 2019.
Federal Energy Regulatory Commission -2- October 2, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.
Respectfully submitted,
EL PASO NATURAL GAS COMPANY, L.L.C.
By___________/s/______________ Francisco Tarin Director, Regulatory
Enclosures
EPNG We
Docket N
Project N
County/S
Reportin
Environm
1. Summ
Line NDurinComp
Mainformsadditconst2‐inc
Line pendin th43+1weldethe pdunepipe and reporComm
2. Relev
DurinhundDelaw
All eq All opNo an
3. Envir
No en
eekly Enviro
No. CP19‐28‐
Name:
State:
ng Period:
mental Inspe
mary of Con
No. 31111 Long this repopressor Stati
nline Valve as continuedtion, electrictructed and h equalizing
No. 1105 Hing the repahe previous 445 and Med into the pipe at the t field. Addiat this site. found to hrted in EPNmission in 20
vant Environng this reporred ninety eware Basin E
quipment wa
pen ditch wnimals were
ronmental Pnvironmenta
onmental Ins
‐000
Nor
WinCou
Sep
ector: Dav
nstruction Ac
oop Line: orting periodion.
and Pig Laud to be concal conduit poured for
g line were w
Hydrostatic air of EPNG’weekly enP 29+2080 Line No. 11hird ruptureitional temp A 2‐acre wave no cultNG’s annual020.
nmental Actrting period,eight (698) Expansion Pr
as checked f
as walked o noted in the
Problems/Issal problems/
spector Rep
rthern Delaw
nkler, Ector,unties, Texas
ptember 22,
vid McCullou
ctivity for In
d, pipe sup
uncher/Recestructed forwas buriedthe concretewelded onto
Testing: Hs Line No. 1vironmentawere excav105, sand ble site locatedporary work orkspace aretural sites. l 2.55(b) an
ivities: , five (5) peopeople haveroject.
for noxious w
on a daily bae ditch durin
sues and Co/issues were
port No. 31
ware Basin E
, Crane ands
2019 to Sep
ugh
nspection Pe
ports and t
eiver Modifir pipe suppd at MLV e pad for a sa pigging re
ydrostatic t1105 at threl report. Tvated and cuasted, and cd at approxispace was rea (250’ x 3 These emnd blanket
ople receivee received e
weeds and fo
asis to ensurng this repor
rrective Acte identified d
Expansion Pr
d Upton D
ptember 28,
eriod:
the concret
ications: Dports for the1 on Line solar panel. ceiver barre
testing active pipeline ruThe ruptureut out. Necoated. Woimate MP 4required in 50’) was surergency pipproject rep
d environmeenvironment
ound to be c
re that no arting period.
ions Taken:during this re
roject
Date: 10/2/2
2019
e pad was
uring this re Keystone No. 2000 a Finally, a 4el.
vities have upture locate sites at aw pipe wasork has begu1+4750 whiorder to safrveyed for cpeline replaports to be
ental trainintal training
clean.
nimals had .
eporting per
2019
poured at
reporting pebypass lineand forms ‐inch drain a
been suspetions as repoapproximates brought inun on excavch is locatedfely excavatultural resocements we filed with
ng. A total oon the Nort
been entrap
riod.
Wink
eriod, e. In were and a
ended orted e MP n and vating d in a e the urces ill be h the
of six‐thern
pped.
4. Envir
No en 5. Issue
No la 6. Work
ronmental Cnvironmenta
es and Concendowner iss
k Planned fo
During tCompressCompress
On the Linwill be ccompleteand MLV site.
The pipinLine No. 1with conc
Work wilworkspacthe works
Compliance Ial complianc
erns Identifisues or conc
or the Follow
he next resor Station sor Station w
ne No. 1105completed ad, Line No. 5, and teste
g at the int1103 will be crete.
l be complece will be clespace.
Issues/Resoce issues we
ed by Landocerns were id
wing Reporti
eporting peand the p
will be painte
hydrotest, and repairs 1105 will bed between
ersection ofsand blaste
eted on theeared and t
lutions: re identified
owners: dentified du
ing Period:
eriod, cleanpiping at thed.
excavation awill then
be refilled w Hogg Mete
f the Keystod and coate
e barrel at the contract
d during this
ring this rep
nup activitihe pig laun
at the third rbe made.
with water ber Station an
one Compreed, and the s
the Line Notor will insta
s reporting p
porting perio
es will conncher/receiv
rupture site When all
between Hognd the Line
ssor Stationsupport form
o. 2000 MLVall a chain li
period.
od.
ntinue at ver at Keys
in the dunethe repairsgg Meter StNo. 3103 ta
n bypass linems will be po
V 1 site andink fence ar
Wink stone
e field s are tation keoff
e and oured
d the round
Report N
Photos
Location31111 atCompresDirectionNorth DescriptiConcreteend of thlauncher
Location31111 atCompresDirectionNorth DescriptiConcreteunder thpig launcher
No. 31
: Line No. t Wink ssor Station n of Photo:
ion: e pad at the he pig r/receiver.
: Line No. t Wink ssor Station n of Photo:
ion: e supports e pipe at the
r/receiver.
e
Photos
Location31111 at83+00 DirectionWest Descriptigrowing new loop
Location31111 at53+00 DirectionNorth Descriptialong theline ROW
: Line No. t Station No.
n of Photo:
ion: Grass along the p line ROW.
: Line No. t Station No.
n of Photo:
ion: View e new loop W.
Photos
Location1105 at MDirectionNorthweDescriptipipe weldinto Line the first r
Location1105 at MDirectionNorth Descriptithe weldpipe at thrupture s
: Line No. MP 43+1445n of Photo: est ion: New ded and tiedNo. 1105 atrupture site.
: Line No. MP 29+2080n of Photo:
ion: Coatings on the newhe second site.
5
d t .
0
g w
Photos
Location1105 at MDirectionNorth DescriptiRemovinoverburdthird rupthe dune
LocationCompresDirectionNorth DescriptiConstrucfor pipe sunder ththe interthe bypaLine No.
: Line No. MP 41+4750n of Photo:
ion: g den at the pture site in e area.
: Keystone ssor Station n of Photo:
ion: cting forms supports e piping at section of ss line and 1105.
0
Photos
LocationCompresDirectionNortheasDescriptiConstrucfor the coat the enbarrel on2000.
Location2000 MLDirectionNorth Descriptia ditch foconduit.
: Wink ssor Station n of Photo: st ion: cting forms oncrete padnd of the n Line No.
: Line No. V 1 n of Photo:
ion: Digging or electrical
Photos
Location2000 MLDirectionSouthweDescriptiinstalled line weldbarrel.
: Line No. V 1 n of Photo: est ion: Newly 2” equalizin
ded onto theng e
Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 2nd day of October 2019.
/s/ Francisco Tarin
Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517