October 2, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 31 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 31 for the period of September 22, 2019 through September 28, 2019.

Transcript of 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be...

Page 1: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

October 2, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 31 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 31 for the period of September 22, 2019 through September 28, 2019.

Page 2: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

Federal Energy Regulatory Commission -2- October 2, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.

Respectfully submitted,

EL PASO NATURAL GAS COMPANY, L.L.C.

By___________/s/______________ Francisco Tarin Director, Regulatory

Enclosures

Page 3: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

EPNG We

Docket N

Project N

County/S

Reportin

Environm

 1. Summ 

Line NDurinComp

 Mainformsadditconst2‐inc

 Line pendin  th43+1weldethe pdunepipe and reporComm

 2. Relev

DurinhundDelaw

 All eq All opNo an

 3. Envir

No en

eekly Enviro

No. CP19‐28‐

Name: 

State: 

ng Period: 

mental Inspe

mary of Con

No. 31111 Long  this  repopressor Stati

nline  Valve  as  continuedtion,  electrictructed and h equalizing

No.  1105  Hing the repahe  previous 445  and  Med  into the pipe at the t field.   Addiat this site. found  to  hrted  in  EPNmission in 20

vant Environng this reporred ninety eware Basin E

quipment wa

pen ditch wnimals were

ronmental Pnvironmenta

onmental Ins

‐000 

Nor

WinCou

Sep

ector:  Dav

nstruction Ac

oop Line:   orting  periodion. 

and  Pig  Laud  to  be  concal  conduit poured for 

g line were w

Hydrostatic air of EPNG’weekly  enP  29+2080 Line No. 11hird ruptureitional temp A 2‐acre wave  no  cultNG’s  annual020.   

nmental Actrting period,eight  (698) Expansion Pr

as checked f

as walked o noted in the

Problems/Issal problems/

spector Rep

rthern Delaw

nkler,  Ector,unties, Texas

ptember 22, 

vid McCullou

ctivity for In

d,  pipe  sup

uncher/Recestructed  forwas  buriedthe concretewelded onto 

Testing:    Hs Line No. 1vironmentawere  excav105, sand ble site locatedporary work orkspace aretural  sites. l  2.55(b)  an

ivities: , five (5) peopeople haveroject.   

for noxious w

on a daily bae ditch durin

sues and Co/issues were

port No. 31

ware Basin E

,  Crane  ands 

2019 to Sep

ugh 

nspection Pe

ports  and  t

eiver  Modifir  pipe  suppd  at  MLV e pad for a sa pigging re

ydrostatic  t1105 at threl  report.    Tvated  and  cuasted, and cd at approxispace was rea (250’ x 3  These  emnd  blanket 

ople receivee  received e

weeds and fo

asis to ensurng this repor

rrective Acte identified d

Expansion Pr

d  Upton  D

ptember 28, 

eriod: 

the  concret

ications:    Dports  for  the1  on  Line solar panel. ceiver barre

testing  active pipeline ruThe  ruptureut  out.    Necoated.   Woimate MP 4required in 50’) was surergency  pipproject  rep

d environmeenvironment

ound to be c

re that no arting period.

ions Taken:during this re

roject 

Date: 10/2/2

2019 

e  pad  was 

uring  this  re  Keystone No.  2000  a Finally, a 4el.   

vities  have upture locate  sites  at  aw  pipe  wasork has begu1+4750 whiorder to safrveyed for cpeline  replaports  to  be

ental trainintal  training 

clean.   

nimals had .   

eporting per

2019 

poured  at 

reporting  pebypass  lineand  forms ‐inch drain a

been  suspetions as repoapproximates  brought  inun on excavch is locatedfely excavatultural resocements  we  filed  with

ng.  A total oon  the Nort

been entrap

riod. 

 

Wink 

eriod, e.    In were and a 

ended orted e  MP n  and vating d in a e the urces ill  be h  the 

of six‐thern 

pped.  

Page 4: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

 4. Envir

No en 5. Issue

No la 6. Work

  

 

ronmental Cnvironmenta

es and Concendowner iss

k Planned fo

During  tCompressCompress

On the Linwill  be  ccompleteand MLV site.   

The pipinLine No. 1with conc

Work  wilworkspacthe works

Compliance Ial complianc

erns Identifisues or conc

or the Follow

he  next  resor  Station sor Station w

ne No. 1105completed  ad,  Line No. 5, and teste

g at  the  int1103 will be crete.   

l  be  complece will be  clespace.   

 

Issues/Resoce issues we

ed by Landocerns were id

wing Reporti

eporting  peand  the  p

will be painte

 hydrotest, and  repairs 1105 will  bed between

ersection ofsand blaste

eted  on  theeared and  t

lutions: re identified

owners: dentified du

ing Period:

eriod,  cleanpiping  at  thed.   

excavation awill  then 

be  refilled w Hogg Mete

f  the Keystod and coate

e  barrel  at  the contract

d during this

ring this rep

nup  activitihe  pig  laun

at the third rbe  made. 

with water ber Station an

one Compreed, and the s

the  Line  Notor will  insta

s reporting p

porting perio

es  will  conncher/receiv

rupture site   When  all 

between Hognd the Line 

ssor Stationsupport form

o.  2000  MLVall  a  chain  li

period.   

od. 

ntinue  at ver  at  Keys

in the dunethe  repairsgg Meter  StNo. 3103 ta

n bypass  linems will be po

V  1  site  andink  fence ar

 

Wink stone 

e field s  are tation keoff 

e and oured 

d  the round 

Page 5: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

Report N

Photos 

Location31111 atCompresDirectionNorth DescriptiConcreteend of thlauncher

Location31111 atCompresDirectionNorth DescriptiConcreteunder thpig launcher 

 

No. 31 

: Line No. t Wink ssor Station n of Photo: 

ion: e pad at the he pig r/receiver.   

: Line No. t Wink ssor Station n of Photo: 

ion:  e supports e pipe at the

r/receiver. 

 

 

 

Page 6: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

Photos 

Location31111 at83+00 DirectionWest Descriptigrowing new loop

Location31111 at53+00 DirectionNorth Descriptialong theline ROW

 

: Line No. t Station No.

n of Photo: 

ion: Grass along the p line ROW. 

: Line No. t Station No.

n of Photo: 

ion: View e new loop W.   

 

 

 

 

 

 

 

Page 7: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

Photos 

Location1105 at MDirectionNorthweDescriptipipe weldinto Line the first r

Location1105 at MDirectionNorth Descriptithe weldpipe at thrupture s

 

: Line No. MP 43+1445n of Photo: est ion:  New ded and tiedNo. 1105 atrupture site.

: Line No. MP 29+2080n of Photo: 

ion: Coatings on the newhe second site. 

d t .   

g w 

 

 

Page 8: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

Photos 

Location1105 at MDirectionNorth DescriptiRemovinoverburdthird rupthe dune

LocationCompresDirectionNorth DescriptiConstrucfor pipe sunder ththe interthe bypaLine No. 

 

 

: Line No. MP 41+4750n of Photo: 

ion:  g den at the pture site in e area. 

: Keystone ssor Station n of Photo: 

ion: cting forms supports e piping at section of ss line and 1105.   

 

 

Page 9: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

Photos 

LocationCompresDirectionNortheasDescriptiConstrucfor the coat the enbarrel on2000.   

Location2000 MLDirectionNorth Descriptia ditch foconduit. 

 

 

: Wink ssor Station n of Photo: st ion:  cting forms oncrete padnd of the n Line No. 

: Line No. V 1 n of Photo: 

ion: Digging or electrical   

 

 

 

Page 10: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

  

 

Photos 

Location2000 MLDirectionSouthweDescriptiinstalled line weldbarrel.   

 

: Line No. V 1 n of Photo: est ion:  Newly 2” equalizin

ded onto theng e 

 

Page 11: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D.

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 2nd day of October 2019.