July 10, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 19 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 19 for the period of June 30, 2019 through July 6, 2019.

Transcript of 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin...

Page 1: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

July 10, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 19 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG will be required to hydrotest approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 19 for the period of June 30, 2019 through July 6, 2019.

Page 2: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

Federal Energy Regulatory Commission -2- July 10, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.

Respectfully submitted,

EL PASO NATURAL GAS COMPANY, L.L.C.

By___________/s/______________ Francisco Tarin Director, Regulatory

Enclosures

Page 3: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

EPNG We

Docket N

Project N

County/S

Reportin

Environm

1. SummDurinto  incdurin DitchAdditNo.  6Statiolowe668+Comp

 2. Relev

Durintotal North

 All eqwalkenoted

 3. Envir

No en 4. Envir

No en 5. Issue

No la 6. Work

Durinloop Additsite w

 

eekly Enviro

No. CP19‐28‐

Name: 

State: 

ng Period: 

mental Inspe

mary of Conng this reporclude ditching this repor

hing  activitietionally,  a  tr608+00  andon  No.  511+red  into  the00  to  Statpressor Stati

vant Environng  this  repoof four‐hunhern Delawa

quipment wed on a dailyd in the ditch

ronmental Pnvironmenta

ronmental Cnvironmenta

es and Concendowner iss

k Planned fong the next rline  and  ctionally, it iswork on the 

onmental Ins

‐000 

Nor

WinCou

Jun

ector:  Dav

nstruction Acrting period,ng,  loweringting period. 

es were  conrenching mad  Station  N+00  and  Acce  ditch  fromion  No.  57ion at Statio

nmental Actrting  periodndred sixty‐eare Basin Exp

was checked y basis to enh during this

Problems/Issal problems 

Compliance Ial complianc

erns Identifisues or conc

or the Followreporting pelean‐up  act anticipatedLine No. 110

spector Rep

rthern Delaw

nkler,  Ector,unties, Texas

e 30, 2019 t

vid McCullou

ctivity for In, work focusg  in, and ba

ducted  betwachine  excavo.  573+00.cess  Road  Am  Access  Ro74+00).    Baon No. 759+0

ivities: d,  twenty‐tweight (468) ppansion Proj

for noxiousnsure that nos reporting p

sues and Coor issues we

Issues/Resoce issues we

ed by Landocerns were id

wing Reportieriod, loweritivities  will d that work w05 hydrostat

port No. 19

ware Basin E

,  Crane  ands 

o July 6, 201

ugh 

nspection Pesed completckfill  activit

ween  Statiovated  ditch   Lowering‐

A13  at  Statiooad  A15a  nackfill  activ00 to Station

wo  (22)  peoppeople have ject.   

 weeds ando animals haperiod.   

rrective Actere identifie

lutions: re identified

owners: dentified du

ing Period:ng‐in and babegin  on  cwill begin ontic test porti

Expansion Pr

d  Upton  D

19 

eriod: ely on consties.   Ditchin

on No.  544+north  along‐in  activitieson  No.  544+north  to  Accvities  were n No. 608+00

ple  receivedreceived en

d found to bad become e

ions Taken:d during this

d during this

ring this rep

ackfill activitcertain  sectin pigging facion of the pr

roject 

Date: 7/10/2

truction of tng activities 

00  and  Statg  the  ROW s  were  con+00.    Additicess  Road  Aconducted 

0.   

d  environmenvironmenta

be clean.   Alentrapped.  

s reporting p

s reporting p

porting perio

ties will contions  of  thecility modificroject.   

2019 

the new loopwere comp

tion No.  573between  Stducted  betwionally,  pipeA14  (Stationbetween 

ental  traininal training o

l open ditchNo animals 

period.   

period.   

od. 

tinue on thee  new  loop cations as w

 

p line pleted 

3+00.  tation ween e  was n  No. Wink 

ng.    A n the 

h was were 

e new line.  

well as 

Page 4: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Report N

Photos 

Location31111 ROStation NDirectionSouth DescriptiBackfillinafter padpipeline. 

Location31111 ROStation NDirectionNorth Descriptiditch. 

 

No. 19 

: Line No. OW at No. 756+00 n of Photo: 

ion: ng the ditch dding the   

: Line No. OW at No. 754+00 n of Photo: 

ion:  Paddedd 

 

 

 

Page 5: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

 

Photos 

Location31111 ROStation NDirectionSouth Descriptithe pipe 

Location31111 ROStation NDirectionNorth Descriptialong theditch.   

 

: Line No. OW at No. 752+00 n of Photo: 

ion: Paddingin the ditch.

: Line No. OW at No. 734+00 n of Photo: 

ion: North e backfilled 

g . 

 

 

 

 

Page 6: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Photos 

Location31111 ROStation NDirectionSouth DescriptiBackfilled

Location31111 ROStation NDirectionNorth Descriptiwith a tra

 

: Line No. OW at No. 680+00 n of Photo: 

ion:  d ditch.   

: Line No. OW at No. 646+00 n of Photo: 

ion: Ditchingackhoe.   

 

 

 

Page 7: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Photos 

Location31111 ROStation NDirectionNorth Descriptiditch. 

Location31111 ROStation NDirectionNorth DescriptiBackfillin

 

: Line No. OW at No. 642+00 n of Photo: 

ion:  Open 

: Line No. OW at No. 642+00 n of Photo: 

ion: ng the ditch.   

 

 

Page 8: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Photos 

Location31111 ROStation NDirectionEast DescriptiTrenchinline with maching

Location31111 ROStation NDirectionSouth DescriptiLoweringthe ditch

 

: Line No. OW at No. 573+00 n of Photo: 

ion:  g the ditch a trenching. 

: Line No. OW at No. 524+00 n of Photo: 

ion: g pipe into h. 

 

 

 

Page 9: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Photos 

Location31111 RONo. 523+DirectionNorth DescriptiSurveyinlocations

Location31111 RONo. 478+DirectionNortheasDescriptiCounty Rthe borin

 

: Line No. OW at Statio+00 n of Photo: 

ion: g in the welds. 

: Line No. OW at Statio+00 n of Photo: st ion: Boring Road 101 witng maching. 

on 

on 

th 

 

 

Page 10: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Photos 

Location31111 RONo. 400+DirectionNortheasDescriptiBackfillinpit on theof Texas 

Location31111 RONo. 398+DirectionNortheasDescriptithe pipe ditch.  

 

: Line No. OW at Statio+00 n of Photo: st ion:  ng the bore e north side874. 

: Line No. OW at Statio+00 n of Photo: st ion: Lowerininto the 

on 

 

on 

ng 

 

 

 

Page 11: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Photos 

Location31111 RONo. 395+DirectionSouthweDescriptitie‐in we

Location31111 RONo. 394+DirectionNorth Descriptithe ditchforeign li

 

: Line No. OW at Statio+00 n of Photo: est ion: Making ld. 

: Line No. OW at Statio+00 n of Photo: 

ion: Pipe in h under a ne.   

on 

on 

 

 

 

Page 12: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

  

 

Photos 

Location31111 RONo. 394+DirectionNortheasDescriptijeeping t

Location31111 RONo. 0+00DirectionWest Descriptipiers at tsite. 

 

: Line No. OW at Statio+00 n of Photo: st ion: Pre‐he pipe.   

: Line No. OW at Statio0 n of Photo: 

ion: Concretthe kick‐off 

on 

on 

te 

 

Page 13: 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso Natural … · 2019-07-10 · re Basin Exp as checked basis to en during this roblems/Iss l problems ompliance I l complianc

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 10th day of July 2019.

/s/ Francisco Tarin

Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517