November 22, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 38 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 38 for the period of November 10, 2019 through November 16, 2019.

Transcript of 888 First Street, N.E. Washington, D.C. 20426 Re: El Paso ......(24”) O.D. Line No. 1105 that...

November 22, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP19-28-000 Northern Delaware Basin Expansion Project Weekly Environmental Inspector Report No. 38 Commissioners: El Paso Natural Gas Company, L.L.C. ("EPNG") is hereby filing with the Federal Energy Regulatory Commission ("Commission") in Docket No. CP19-28-000, its weekly status report related to the Northern Delaware Basin Expansion Project (“Project”). Description of Proceeding On December 19, 2018, EPNG filed a prior notice application pursuant to sections 157.205, 157.208(b), and 157.210 of the Commission’s regulations under the Natural Gas Act and EPNG’s blanket certificate issued in Docket No. CP82-435-000 for authorization to construct an approximate 14-mile twenty-four-inch (24”) outside diameter (“O.D.”) loop line of its existing 20-inch (20”) O.D. Line No. 3162 in Winkler County, Texas, as well as make minor appurtenant facility modifications at existing compressor station and other facility locations in Winkler, Crane, and Upton Counties, Texas. Additionally, EPNG is hydrotesting approximately 51 miles of its existing 24-inch (24”) O.D. Line No. 1105 that traverses Winkler, Ector, and Crane Counties, Texas. On December 27, 2018, the Commission issued a Notice of Request Under Blanket Authorization initiating the 60 day comment period to allow for any person or Commission’s staff to file motions or notice to intervene and protests. Since no protests were filed within the comment period, the Project was deemed to be authorized on February 26, 2019. Submittal of Status Report In compliance with Section 157.208(c)(10) of the Natural Gas Act, EPNG is providing Environmental Inspector Report No. 38 for the period of November 10, 2019 through November 16, 2019.

Federal Energy Regulatory Commission -2- November 22, 2019 Filing Information EPNG is e-Filing this letter and report with the Commission's Secretary in accordance with the Commission's Order No. 703, Filing Via the Internet, guidelines issued on November 15, 2007 in Docket No. RM07-16-000.

Respectfully submitted,

EL PASO NATURAL GAS COMPANY, L.L.C.

By__________/s/_______________ Francisco Tarin Director, Regulatory

Enclosures

  

 

EPNG We

Docket N

Project N

County/S

Reportin

Environm

 1. Summ 

Line NNo wcomp

 Mainadditof the

 Line N1105EPNGlocatlevelsprope Tie‐inand c

 2. Relev

DurinsevenDelaw All eq

 3. Envir

No en 4. Envir

Durinand cof  a wokswas c

eekly Enviro

No. CP19‐28‐

Name: 

State: 

ng Period: 

mental Inspe

mary of Con

No. 31111 Lowork occurreplete at that 

nline  Valve  ational punche bypass line

No. 1105 Hywas filled w

G began to ped at MLV 5s from the herty owned 

ns were madcoated.   

vant Environng  this  repon‐hundred fware Basin E

quipment wa

ronmental Pnvironmenta

ronmental Cng this reporconsisted of hydraulic  h

space at MLVcontained to

onmental Ins

‐000 

Nor

WinCou

Nov

ector:  Dav

nstruction Ac

oop Line:   ed on this pothis location

and  Pig  Lauh list items we and Line N

ydrostatic Tewith water apump water5.  After the hydrostatic tby the Unive

de at MLV 4

nmental Actrting periodifteen (715) Expansion Pr

as checked f

Problems/Issal problems/

Compliance Irting period,approximat

hose  seal  onV 5 on Line o minimize t

spector Rep

rthern Delaw

nkler,  Ector,unties, Texas

vember 10, 2

vid McCullou

ctivity for In

ortion of then with the e

uncher/Recewere compleo. 1103 at K

esting:  Durinand successf back into tinstallation est water, Eersity of Tex

4 and the M

ivities: d,  seven  (7) people hav

roject.   

for noxious w

sues and Co/issues were

Issues/Reso, one fluid stely two galln  a  truck  thNo. 1105.  Tthe amount 

port No. 38

ware Basin E

,  Crane  ands 

2019 to Nov

ugh 

nspection Pe

e project durxception of 

eiver  Modifieted to incluKeystone Com

ng this reporfully tested he abovegroof a treatmPNG will bexas Lands.  

P 41.0 test 

people  receve received e

weeds and fo

rrective Acte identified d

lutions: spill was recons of hydrahat  was  picThe truck wof contamin

Expansion Pr

d  Upton  D

vember 16, 2

eriod: 

ring this repa few remai

ications:    Dde touchup mpressor St

rting period,on 11/12/1ound tanks ament system gin to discha

break sites, 

eived enviroenvironmen

ound to be c

ions Taken:during this re

orded.  Thisaulic fluid thcking  up  a  fwas immedianated soil.  A

roject 

Date: 11/22/

2019 

porting perioining puch li

uring  this  r painting onation.   

, the final se9.   After theat the tempintended toarge the rem

and the we

onmental  trantal training 

clean.   

eporting per

s spill occurrhat was causfrac  tank  atately shut doAn area of a

/2019 

od.  Most wost items.   

reporting  pen the interse

ection of Line successfulporary workso reduce chlmaining wat

elds were bla

aining. A  toton the Nort

riod. 

red on 11/1sed by the fat  the  tempown and thebout 3‐feet 

 

ork is 

eriod, ection 

e No.  test, space oride er on 

asted 

tal of thern 

4/19, ailure orary e spill by 4‐

  

 

feet Trans

 5. Issue

No la 6. Work

Opsu

InthInb

Ap

  

 

was  contamsportation d

es and Concendowner iss

k Planned fo

On the new loig  launcher/upport.   

nstallation ohe remainden  addition,  tackfilled.   

Additional puig launcher/

minated.    Thrum to awai

erns Identifisues or conc

or the Follow

oop line por/receiver  at 

of a treatmeer of the wathe  excavat

unch list item/receiver mo

 

he  material it disposal.

ed by Landocerns were id

wing Reporti

rtion of the pWink  Comp

nt system toater from thtions  at  the

ms will be coodifications.

was  picked

owners: dentified du

ing Period:

project, excapressor  Stat

o reduce che above gro  previously 

onducted as   

d  up  and  pl

ring this rep

avation withtion  in  orde

hloride levelsound tanks aidentified  s

needed in r

laced  into  a

porting perio

h a hydrovacer  to  add  an

s and continat MLV 5 ansuspected  le

egards to m

a  Departme

od. 

c will occur an  additional 

nuing to dewnd Line No. 1eak  sites  w

mainline valve

 

nt  of 

at the   pipe 

water 1105.  ill  be 

e and 

  

 

Report N

Photos 

Locationon Line NDirectionWest DescriptiDewaterinto one abovegroat MLV 5successfuof the finLine No. 

LocationTest BreaLine No. DirectionNorthweDescriptiup equipthe test bafter thehydrotessection o1105.    

 

No. 38 

: MLV 5 SiteNo. 1105  n of Photo: 

ion: ing the pipeof the ound tanks 5 after the ul hydrotest nal section o1105.   

: MP 41.0 ak Site on 1105 n of Photo:  est ion: Loadingpment from break site  successful st of the finaof Line No. 

 

 

 

 

  

 

Photos 

Locationon Line NDirectionEast Descriptiup the hyspill.   

LocationBreak Sit1105 DirectionSoutheasDescriptiup the pitie‐in wesuccessfu

 

: MLV 5 SiteNo. 1105 n of Photo: 

ion: Cleaninydraulic fluid

: MLV 4 Testte on Line No

n of Photo: st ion: Lining ipe to make ld after the ul hydrotest

g d 

t o. 

 

 

 

  

 

Photos 

LocationBreak Sit1105 DirectionNorthweDescriptiblasting twelds pr

LocationBreak Sit1105 DirectionSoutheasDescriptithe tie‐in

 

 

: MLV 4 Testte on Line No

n of Photo: est ion: Abrasivthe tie‐in ior to coatin

: MLV 4 Testte on Line No

n of Photo: st ion: Coatingn welds.   

t o. 

ng. 

t o. 

 

 

  

 

Photos 

LocationTest BreaLine No. DirectionNorthweDescriptithe pipe making twelds aftsuccessfu

LocationTest BreaLine No. DirectionNorthweDescriptipipe at thsite. 

 

 

: MP 41.0 ak Site on 1105 n of Photo: est ion: Lining uprior to he tie‐in ter the ul hydrotest

: MP 41.0 ak Site on 1105 n of Photo: est ion: Tied‐in he test brea

up 

 

 

  

 

Photos 

Locationat KeystoCompresDirectionEast Descriptithe pipin

Locationat KeystoCompresDirectionNorthweDescriptipipe. 

 

: Bypass Lineone ssor Station n of Photo: 

ion: Paintingng. 

: Bypass Lineone ssor Station n of Photo: est ion: Painted

 

 

Certificate of Service I hereby certify that I have this day caused a copy of the foregoing documents to be served upon each person designated on the official service list compiled by the Commission's Secretary in this proceeding in accordance with the requirements of Section 385.2010 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure. Dated at Colorado Springs, Colorado as of this 22nd day of November 2019.

/s/ Francisco Tarin

Two North Nevada Avenue Colorado Springs, Colorado 80903 (719) 667-7517