50 Years of History and More to Come
8798 10/10
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
Fernald Area
8798 10/10
National Concerns
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
8798 10/10
Large-scale, integrated facility designed to produce high-purity uranium metal for the U.S. Department of Energy defense programs.
Feed Materials Production Center
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
First Link
8798 10/10
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
Feed Materials Production CenterProduction Mission
8798 10/10
• Converted uranium ore into high-purity uranium metal through chemical and metallurgical processes
• Construction began in 1951
• Operational in 1952
• Facility designed for 1,200 employees/3,000 in 1962
• Production contractors: National Lead of Ohio/Westinghouse
• Produced 500 million pounds of uranium metal
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
1951–1989
Feed Materials Production CenterProduction Mission
8798 10/10
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
Community involvement• Future use of the site• Cleanup levels• Balanced approach to waste disposition
CommunityCleanup Mission
8798 10/10
• Operable Unit 1
• Operable Unit 2
• Operable Unit 5
• Operable Unit 4
• Operable Unit 3
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
– Waste pits
– Other waste units
– Production area
– Silos
– Environmental media (soil, groundwater, surface water)
CleanupCleanup Mission
Cleanup
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
8798 10/10
Cleanup Mission
• Partnering for a higher cleanup standard– Fernald Citizens Advisory Board– Citizen and community groups– U.S. EPA and Ohio EPA– Contractor – U.S. Department of Energy
• Remediation infrastructure • $4.4 billion cleanup and restoration
– OSHA recordable rate of 0.74 (DOE average 1.9, construction average 5.9)• Worker transition
– $20 million invested in “life after Fernald” – Staffed Career Development Center – Over 600 degrees/certificates achieved
CleanupCleanup Mission
-----------------------------------------------------------------------------1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005
8798 10/10
Fernald Preserve
Manage DOE’s post-closure responsibilities and ensure the protection of human health and the environment.
8798 10/10
Legacy Mission
As a community asset, the Fernald Preserve will foster wildlife habitat and provide educational opportunities through environmental stewardship.
8798 10/10
Fernald PreserveLegacy Mission
Long-Term Surveillance and Maintenance
8798 10/10
Legacy Mission
Long-Term Surveillance and Maintenance
8798 10/10
Legacy Mission
Land Use
8798 10/10
• 395 acres of forest• 332 acres of prairie• 120 acres of OSDF• 81 acres of wetland• 60 acres of open water• 33 acres of savanna• 29 acres of infrastructure
Legacy Mission
8798 10/10
Nature
8798 10/10
Legacy Mission
• Public Reading Room
• Exhibits – History and cultural– Production mission– Cleanup mission– Legacy mission– Environmental and ecological
• Education programs• Community meeting room
Visitors Center
8798 10/10
Legacy Mission
Visitors Center
8798 10/10
Legacy Mission
Fernald Preserve
8798 10/10
Legacy Mission
Fernald Preserve