Northwestern Avenue Improvements Phase 4 City of West Lafayette
NAME OF PROJECT: OWNER: CONTRACTOR:
CHANGE ORDER
Northwestern Avenue Improvements Phase 4 City of West Lafayette Milestone Contractors, L.P.
Order No.: Date:
The following changes are hereby made to the CONTRACT DOCUMENTS:
Item No. Description Quantity Unit 6 PAVEMENT REMOVAL 204.00 SYS $ 7 CURB, CONCRETE, REMOVE 276.00 LFT $ 8 CURB AND GUTTER, CONCRETE, REMOVE (33.00) LFT $ 9 SIDEWAlK AND CURB RMlP, VA/lJABLE DEPTH, CCI'lCRETE, RWOVE 272.22 SYS $ 11 BORROW (155.25) CYS $ 14 SUBGRADE TREATMENT, TYPE It (141 .35) SYS $ 15 SUBGRADE TREATMENT, TYPE Ill 21 .55 SYS $ 16 STRUCTURAL BACKFILL, TYPE 1 (82.88) CYS $ 17 COMPACTED AGGREGATE, NO. 53, BASE 206.10 TON $ 18 MILLING ASPHALT, 1.5 IN 81 .22 SYS $ 19 HMA PATCHING, TYPE C, FULL DEPTH PATCH (UNDISTRIBUTED) (97.63) SYS $ 20 QC/QA-HMA, 3, 70, SURFACE, 9.5 mm 14.11 TON $ 21 HMA WEDGE AND LEVEL, TYPE C 59.23 TON $ 24 HMA FOR SIDEWALl< 12.21 TON $ 25 SIDEWALK, CONCRETE, 41N (271.35) SYS $ 26 SIDEWALK, CONCRETE, 6 IN 27.83 SYS $ 27 CURB RAMP, CONCRETE, A (6.32) SYS $ 28 CURB RAMP, CONCRETE, L (0.89) SYS $ 29 CURB RAMP, CONCRETE (215.44) SYS $ 30 CURB, CONCRETE, 6 IN 277.00 LFT $ 31 CURB,CONCRETE,81N 60.00 LFT $ 32 CURB AND GUTTER, CONCRETE 309.50 LFT $ 33 CENTER CURB, C, CONCRETE, MODIFIED 2.00 LFT $ 34 CURB TURNOUT, CONCRETE (8.00) LFT $ 35 CONCRETE CURB AND GUTTER, TYPE B 6.00 LFT $ 36 PCCP FOR APPROACHES, 6 IN 55.51 SYS $ 37 PCCP FOR APPROACHES, 9 IN 53.78 SYS $ 38 GEOTEXTILE FABRIC, NON-WOVEN . (4.00) SYS $ 39 WATER (1.00) I< GAL $ 40 TOPSOIL (181.00) CYS $ 41 SODDING, NURSERY (250.00) SYS $ 42 MULCH, HARDWOOD SHREDDED BARK (2.00) CYS $ 43 SOIL, BIOENGINEERED (1.00) CYS $ 47 NO.9, GRAVEL (2.00) TON $ 48 EROS:ON COmROI., BIOOEGRADNllE COCl\'JIIT COR LOG, 12jN O'J..\IEIER (16.00) LFT $ 51 PIPE, TYPE 2 CIRCULAR 12 IN 2.00 LFT $ 52 CASTING, ADJUST TO GRADE (1 .00) EACH $ 55 TEMPORARY PAVEMENT MARKING, REMOVABLE, 41N (138.00) LFT $ 56 DETOUR ROUTE MARKER ASSEMBLY (1 .00) EACH $ 57 CONSTRUCTION SIGN, A 10.00 EACH $ 59 FLASHING ARROW SIGN 136.00 DAY $ 62 SIGN, OVERHEAD, RELOCATE 2.00 EACH $ 63 SIGN POST, SQUARE, TYPE 1, REINFORCED ANCHOR BASE 36.00 LFT $ 66 SIGN, SHEET, WITH LEGEND 0.080" 17.50 SFT $ 67 SIGN, SHEET, WITH LEGEND 0.100" 7.25 SFT $ 73 SIGNAL POLE, PEDESTAL, 4FT (1 .00) EACH $ 74 CONDUIT, PVC, 2 IN (FOR SIGNALS) 37.00 LFT $ 75 SIGNAL CONDUIT, REMOVE (UNDISTRIBUTED) (55.00) LFT $ 81 CONDUIT, HDPE, 2 IN, SCHEDULE 80 (FOR SIGNALS) (45.00) LFT $ 82 PEDESTRIAN PUSH BUTTON, APS 1.00 EACH $
3 12/07/2015
Unit Price Price 10.00 $ 2,040.00 10.00 $ 2,760.00 10.00 $ (330.00) 33.00 $ 8,983.26 31.00 $ (4,812.75) 24.00 $ (3,392.40) 24.00 $ 517.20 50.00 $ (4, 144.00)
100.00 $ 20,610.00 15.00 $ 1,218.30
140.00 $ (13,668.20) 150.00 $ 2,116.50 110.00 $ 6,515.30 175.00 $ 2,136.75 52.00 $ (14, 11 0.20) 60.00 $ 1,669.80
150.00 $ (948.00) 150.00 $ (133.50) 150.00 $ (32,316.00) 35.00 $ 9,695.00 50.00 $ 3,000.00 24.00 $ 7,428.00 95.00 $ 190.00
100.00 $ (800.00) 45.00 $ 270.00 80.00 $ 4,440.80 82.00 $ 4,409.96 4.00 $ (16.00)
31 .75 $ (31.75) 140.00 $ (25,340.00)
5.00 $ (1 ,250.00) 100.00 $ (200.00) 300.00 $ (300.00) 100.00 $ (200.00) 40.00 $ (640.00) 70.00 $ 140.00
500.00 $ (500.00) 1.00 $ (138.00)
100.00 $ (100.00) 140.00 $ 1,400.00 15.00 $ 2,040.00
125.00 $ 250.00 13.00 $ 468.00 22.00 $ 385.00 22.00 $ 159.50
1,600.00 $ (1 ,600.00) 7.00 $ 259.00
10.00 $ (550.00) 12.00 $ (540.00)
1,100.00 $ 1,100.00
Item No. Description Quantity Unit Unit Price Price
86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH $ 1,000.00 $ -1,000.00
87 HANDHOLE SIGNAL, ADJUST TO GRADE (2 .00) EACH $ 500.00 $ (1,000.00)
91 SIGNAL CABLE, SERVICE, COPPER. 3C/8GA 45.00 LFT $ 3.00 $ 135.00
92 SIGNAL CABLE, CONTROL, COPPER 3C/14GA 1,582.00 LFT $ 1.25 $ 1,977.50
93 SIGNAL CABLE, CONTROL, COPPER 5C/14GA 354.00 LFT $ 2.29 $ 810.66
94 SIGNAL CABLE, CONTROL, COPPER 7C/"14GA 582.00 LFT $ 2.25 $ 1,309.50
95 SIGNAL CABLE CONTROL, COPPER 9C/14GA 34.00 LFT $ 2.50 $ 85.00
96 SIGNAL POLE, PEDESTAL, 10FT 2.00 EACH $ 2,700.00 $ 5,400.00
99 HANDHOLE, LIGHTING (3.00) EACH $ 1,000.00 $ (3,000.00)
104 CONNECTOR KIT, UN FUSED 2.00 EACH $ 40.00 $ 80.00
105 CONNECTOR KIT, FUSED 2.00 EACH $ 40.00 $ 80.00
106 MULTIPLE COMPRESSION FITTING, NON-WATERPROOFED 29.00 EACH $ 18.00 $ 522.00
107 MULTIPLE COMPRESSION FITTING, WATERPROOFED (31.00) EACH $ 65.00 $ (2,015.00)
108 INSULATION LINK, NON-WATERPROOFED 35.00 EACH $ 16.00 $ 560.00
109 INSULATION LINK, WATERPROOFED (109.00} EACH $ 60.00 $ (6,540.00)
110 WIRE, NO 10 COPPER, 1/C 1,558.00 LFT $ 1.00 $ 1,558.00
111 WIRE, NO 6 COPPER, GROUND 1/C (670.00) LFT $ 1.50 $ (1 ,005.00)
112 WIRE, NO 4, IN PLASTIC DUCT, IN TRENCH 4 1/C 2,397.00 LFT $ 9.50 $ 22,771.50
113 WIRE, NO 4, IN PLASTIC DUCT, IN CONDUIT 4 1/C (1 ,800.00) LFT $ 9.40 $ (16,920.00)
114 CONDUIT, PVC, 2 IN (FOR LIGHTING) (222.00) LFT $ 7.00 $ (1 ,554.00)
115 CONDUIT, HOPE, 21N, SCHEDULE 80 (FOR LIGHTING) (399.00) LFT $ 12.00 $ (4,788.00)
116 TRANSVERSE !.lARKING THERMOPLASTIC CROSSWALK, WHITE 24' 587.00 LFT $ 9.00 $ 5,283.00
117 PAVEMENT MESSAGE MARKING, REMOVE (1.00) SYS $ 47.00 $ (47.00)
11 8 LINE, THERMOPLASTIC, BROKEN, WHITE, 4 IN (195.00) LFT $ 1.00 $ (195.00)
11 9 LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN. (610.00) LFT $ 1.00 $ (610.00)
120 LINE, REMOVE 1,869.00 LFT $ 0.85 $ 1,588.65
121 TRANSVERSE ~WlKINGS, THERI.'DPLASTIC YIELD, Vtrli TE, 27 1tl. 52.50 LFT $ 5.00 $ 262.50
122 LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN 38.00 LFT $ 0.80 $ 30.40
123 TRANSVERSE MARKING, THERMO, STOP LINE, 24 IN 32.00 LFT $ 9.00 $ 288.00
124 PAVHIENHIESSAGE l.lftm~\1. THERMOPlASTK;, lANE ii~CI.TION MRfil'l 4.00 EACH $ 90.00 $ 360.00
1000 STRUCTURAL BACKFILL, TYPE 1 (7.00) CYS $ 120.00 $ (840.00)
1001 COMPACTED AGGREGATE NO. 53, BASE 3.00 TON $ 100.00 $ 300.00
1002 H,\\1\PATCHING, TYPE C, FULL DEPTH PATCH (UNDISTRIBUTED) 28.44 SYS $ 140.00 $ 3,981 .60
1003 SIDEWALK, CONCRETE, 4 IN 39.78 SYS $ 52.00 $ 2,068.56
1004 CURB,CONCRETE,61N 93.50 LFT $ 35.00 $ 3,272.50
1005 PIPE, TYPE 2 CIRCULAR 12 IN (2.00) LFT $ 70.00 $ (140.00)
1008 LINE, THERMOPLASTIC, SOLID, WHITE, 41N. (75.00) LFT $ 1.00 $ (75.00)
1009 !RAUSVERSE lv.RXING, THERMOPlASTIC, CROSSHATCH UNE, WHITE, 12' (45.00) LFT $ 4.50 $ (202.50)
3001 COMPACTED AGGREGATE NO. 53, BASE {6.00) TON $ 100.00 $ (600.00)
3002 SIDEWALK, CONCRETE, 6 IN 82.82 SYS $ 52.00 $ 4,306.64
3003 SODDING, NURSERY (19.00) SYS $ 5.00 $ {95.00)
3004 INSTALLATION OF MASTER CONTROLLER (1 .00) EACH $ 1,100.00 $ (1,100.00)
3005 CONDUIT, 2 IN (FOR FIBER) 239.00 LFT $ 9.25 $ 2,210.75 . 5001 EXPOSED AGGREGATE CONCRETE 1.00 LS $ 10,335.20 $ 10,335.20
5002 TEMPORARY SIGNAL POLE (GRANT) 1.00 LS $ 4,963.00 $ 4,963.00
TOTAL $ 10,955.03
JUSTIFICATION
6 Quantity Adjustment per Field Measurements
7 Quantity Acljustmenl per Field Measurements
8 Quantity Adjustment per Field Measurements
9 Quantity Adjustment per Field Measurements
. 11 Quantity Adjustment per Field Measurements
14 Quantity Adjustment per Field Measurements
15 Quantity Adjustment per Field Measurements
16 Quantity Adjustment per Field Measurements
17 Quantity Adjustment per Field Measurements
18 Quantity Adjus tment per Field Measurements
19 Quantity Adjustment per Field Measurements
20 Quantity Adjustment per Field Measurements
21 Quantity Adjustment per Field Measurements
24 Quantity Adjustment per Field Measurements
25 Quantity Adjustment per Field Measurements
26 Quantity Adjustment per Field Measurements
27 Quantity Adjustment per Field Measurements
28 Quantity Adjustment per Field Measurements
29 Quantity Adjustment per Field Measurements
30 Quantity Adjustment per Field Measurements
31 Quantity Adjustment per Field Measurements
32 Quantity Adjustment per Field Measurements
33 Quantity Adj ustment per Field Measurements
34 Quantity Adjustment per Field Measurements
35 Quantity Adjustment per Field Measurements
36 Quantity Adjustment per Field Measurements
37 Quantity Adjustment per Field Measurements
38 Quantity Adjustment per Field Measurements
39 Quanti ty Adjustment per Field Measurements
40 Quanti ty Adjustment per Field Measurements
41 Quantity Adjustment per Field Measurements
42 Quantity Adjustment per Field Measurements
43 Quantity Adjustment per Field Measurements
47 Quantity Adjustment per Field Measurements
48 Quantity Adjustment per Field Measurements
51 Quantity Adjustment per Field Measurements
52 Quantity Adjustment per Field Measurements
55 Quantity Adjustment per Field Measurements
56 Quanti ty Adju stment per Field Measurements
57 Quantity Adjustment per Field Measurements
59 Quantity Adjustment per Field Measurements
62 Quantity Adjustment per Field Measurements
63 Quantity Adjustment per Field Measurements
66 Quantity Adjustment per Field Measurements
67 Quantity Adjustment per Field Measurements
73 Quantity Adjustment per Field Measurements
74 Quantity Adjustment per Field Measurements
75 Quantity Adjustment per Field Measurements
81 Quantity Adjustment per Field Measurements
82 Quantity Adjustment per Field Measurements
86 Quantity Adjustment per Field Measurements
87 Quantity Adjustment per Field Measurements
91 Quantity Adjustment per Field Measurements
92 Quantity Adjustment per Field Measurements
93 Quantity Adjustment per Field Measurements
94 Quantity Adjustment per Field Measurements
95 Quantity Adjustment per Field Measurements
96 Quantity Adjustment per Field Measurements
99 Quantity Adjustment per Field Measurements
104 Quantity Adjustment per Field Measurements
105 Quantity Adjustment per Field Measurements
106 Quantity Adjustment per Field Measurements
107 Quantity Adjustment per Field Measurements
108 Quantity Adjustment per Field Measurements
1 09 Quantity Adjustment per Field Measurements
110 Quantity Adjustment per Field Measurements
111 Quantity Adjustment per Field Measurements
11 2 Quantity Adjustment per Field Measurements
113 Quantity Adjustment per Field Measurements
114 Quantity Adjustment per Field Measurements
115 Quantity Adjustment per Field Measurements
116 Quantity Adjustment per Field Measurements
117 Quantity Adjustment per Field Measurements
118 Quantity Adjustment per Field Measurements
119 Quantity Adjustment per Field Measurements
120 Quantity Adjustment per Field Measurements
121 Quantity Adjustment per Field Measurements
122 Quantity Adjustment per Field Measurements
123 Quantity Adjustment per Field Measurements
124 Quantity Adjustment per Field Measurements
1000 Quantity Adjustment per Field Measurements
1001 Quantity Adjustment per Field Measurements
1002 Quantity Adjustment per Field Measurements
1003 Quantity Adjustment per Field Measurements
1004 Quantity Adjustment per Field Measurements
1 005 Quantity Adjustment per Field Measurements
1008 Quantity Adjustment per Field Measurements
1009 Quantity Adjustment per Field Measurements
3001 Quantity Adjustment per Field Measurements
3002 Quantity Adjustment per Field Measurements
3003 Quantity Adjustment per Field Measurements
3004 Quantity Adjustment per Field Measurements
3005 Quantity Adjustment per Field Measurements
5001 The City of West Lafayette has elected to utilize exposed aggregate concrete in lieu of sod from Station 67+00 to 68+00 Line "B"; needed due large vehicle turn radius
5002 A temporary signal pole was used to transfer the old signal heads making room for the construction of the new signal pole at the NW corner of Grant & Northwestern.
CHANGE TO CONTRACT PRICE:
Original CONTRACT PRICE Current CONTRACT PRICE adjusted by previous CHANGE ORDER
The CONTRACT PRICE due this CHANGE ORDER (Increased) (deereBsed) by:
The new CONTRACT PRICE including this CHANGE ORDER will be
The CONTRACT TIME will be (increased) (decreased) b._,_y_~O __
The date for completion of all work will be
calendar days.
08/14/2015
Requested By: /fdltY!L Milestone Contractors, L.P.
Recommended By:
West lafayette Redevelopment Commission, City of West Lafayette
$ 1,792,610.75
$ 2,008,830.96
$ 10,955.03
$ 2,019,785.99