86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50...

6
Northwestern Avenue Improvements Phase 4 City of West Lafayette NAME OF PROJECT: OWNER: CONTRACTOR: CHANGE ORDER Northwestern Avenue Improvements Phase 4 City of West Lafayette Milestone Contractors, L.P. Order No.: Date: The following changes are hereby made to the CONTRACT DOCUMENTS: Item No. Description Quantity Unit 6 PAVEMENT REMOVAL 204.00 SYS $ 7 CURB, CONCRETE, REMOVE 276 .00 LFT $ 8 CURB AND GUTTER, CONCRETE, REMOVE (33.00) LFT $ 9 SIDEWAlK AND CURB RMlP, VA/lJABLE DEPTH, CCI'lCRETE, RWOVE 272.22 SYS $ 11 BORROW (155.25) CYS $ 14 SUBGRADE TREATMENT, TYPE It (141 .35) SYS $ 15 SUBGRADE TREATMENT, TYPE Ill 21 .55 SYS $ 16 STRUCTURAL BACKFILL, TYPE 1 (82.88) CYS $ 17 COMPACTED AGGREGATE, NO. 53, BASE 206.10 TON $ 18 MILLING ASPHALT, 1.5 IN 81 . 22 SYS $ 19 HMA PATCHI NG, TYPE C, FULL DEPTH PATCH (UNDISTRIBUTED) (97.63) SYS $ 20 QC/QA-HMA, 3, 70, SURFACE, 9.5 mm 14.11 TON $ 21 HMA WEDGE AND LEVEL, TYPE C 59.23 TON $ 24 HMA FOR SIDEWALl< 12. 21 TON $ 25 SIDEWALK, CONCRETE, 41N (271.35) SYS $ 26 SIDEWALK, CONCRETE, 6 IN 27.83 SYS $ 27 CURB RAMP, CONCRETE, A (6.32) SYS $ 28 CURB RAMP, CONCRETE, L (0 . 89) SYS $ 29 CURB RAMP, CONCRETE (215.44) SYS $ 30 CURB, CONCRETE, 6 IN 277 .00 LFT $ 31 CURB,CONCRETE,81N 60.00 LFT $ 32 CURB AND GUTTER, CONCRETE 309 . 50 LFT $ 33 CENTER CURB, C, CONCRETE, MODIFIED 2. 00 LFT $ 34 CURB TURNOUT, CONCRETE (8 .00) LFT $ 35 CONCRETE CURB AND GUTTER, TYPE B 6. 00 LFT $ 36 PCCP FOR APPROACHES, 6 IN 55 .51 SYS $ 37 PCCP FOR APPROACHES, 9 IN 53 . 78 SYS $ 38 GEOTEXTILE FABRIC, NON-WOVEN . (4.00) SYS $ 39 WATER (1.00) I< GAL $ 40 TOPSOIL (181.00) CYS $ 41 SODDING, NURSERY (250.00) SYS $ 42 MULCH, HARDWOOD SHREDDED BARK (2 .00) CYS $ 43 SOIL, BIOENGINEERED (1.00) CYS $ 47 NO.9, GRAVEL (2.00) TON $ 48 EROS: ON COmROI., BIOOEGRADNllE COCl\'JIIT COR L OG, 12jN O'J..\IEIER (16.00) LFT $ 51 PIPE, TYPE 2 CIRCULAR 12 IN 2.00 LFT $ 52 CASTING, ADJUST TO GRADE (1 .00) EACH $ 55 TEMPORARY PAVEMENT M ARKING, REMO VABLE, 41N (138 .00) LFT $ 56 DETOUR ROUTE MARKER ASSEMBLY (1 . 00) EACH $ 57 CONSTRUCTION SIGN, A 10.00 EACH $ 59 FLASHING ARROW SIGN 136.00 DAY $ 62 SIGN , OVERHEAD, RELO CATE 2.00 EACH $ 63 S I GN POST, SQUARE, TYPE 1, REINFORCED ANCHOR BASE 36.00 LFT $ 66 SIGN, SHEET, WITH LEGEND 0.080" 17.50 SFT $ 67 SIGN, SHEET, WITH LEGEND 0.100" 7.25 SFT $ 73 SIGNAL POLE, PEDESTAL, 4FT (1 .00) EACH $ 74 CONDU IT, PVC, 2 IN (FOR SIGNALS) 37.00 LFT $ 75 SI GNAL CONDUIT, REMOVE (UNDI STRIBUTED) (55.00) LFT $ 81 CONDUIT, HDPE, 2 IN, SCHEDULE 80 (FOR SIGN ALS) (45 .00) LFT $ 82 PEDESTRIAN PUSH BUTTON, APS 1.00 EACH $ 3 12/07/2015 Unit Price Price 10.00 $ 2,040.00 10.00 $ 2,760.00 10.00 $ (330.00) 33 .00 $ 8,983.26 31.00 $ (4,812 .75) 24.00 $ (3,392.40) 24.00 $ 517 . 20 50.00 $ (4, 144.00) 100. 00 $ 20,610.00 15. 00 $ 1,218.30 140. 00 $ (13,668.20) 150.00 $ 2,116.50 110.00 $ 6,515.30 175.00 $ 2,136 .75 52.00 $ (14, 11 0.20) 60.00 $ 1,669.80 150. 00 $ (948.00) 150.00 $ (133.50) 150.00 $ (32, 316.00) 35.00 $ 9,695. 00 50.00 $ 3,000.00 24 .00 $ 7,428.00 95.00 $ 190.00 100.00 $ (800 . 00) 45 . 00 $ 270.00 80 . 00 $ 4,440.80 82 . 00 $ 4,409.96 4.00 $ (16.00) 31 . 75 $ (31.75) 140.00 $ (25,340.00) 5. 00 $ (1 ,250.00) 100. 00 $ (200 . 00) 300.00 $ (300.00) 100.00 $ (200.00) 40.00 $ (640.00) 70.00 $ 140.00 500.00 $ (500.00) 1.00 $ (138.00) 100.00 $ (100 . 00) 140.00 $ 1,400. 00 15.00 $ 2, 040 . 00 125.00 $ 250.00 13.00 $ 468.00 22.00 $ 385.00 22.00 $ 159.50 1, 600 .00 $ (1 ,600.00) 7. 00 $ 259.00 10.00 $ (5 50 .00) 12.00 $ (540.00) 1,100.00 $ 1,100.00

Transcript of 86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50...

Page 1: 86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50 $ 85.00 96 signal pole, pedestal, 10ft 2.00 each $ 2,700.00 5,400.00 99 handhole,

Northwestern Avenue Improvements Phase 4 City of West Lafayette

NAME OF PROJECT: OWNER: CONTRACTOR:

CHANGE ORDER

Northwestern Avenue Improvements Phase 4 City of West Lafayette Milestone Contractors, L.P.

Order No.: Date:

The following changes are hereby made to the CONTRACT DOCUMENTS:

Item No. Description Quantity Unit 6 PAVEMENT REMOVAL 204.00 SYS $ 7 CURB, CONCRETE, REMOVE 276.00 LFT $ 8 CURB AND GUTTER, CONCRETE, REMOVE (33.00) LFT $ 9 SIDEWAlK AND CURB RMlP, VA/lJABLE DEPTH, CCI'lCRETE, RWOVE 272.22 SYS $ 11 BORROW (155.25) CYS $ 14 SUBGRADE TREATMENT, TYPE It (141 .35) SYS $ 15 SUBGRADE TREATMENT, TYPE Ill 21 .55 SYS $ 16 STRUCTURAL BACKFILL, TYPE 1 (82.88) CYS $ 17 COMPACTED AGGREGATE, NO. 53, BASE 206.10 TON $ 18 MILLING ASPHALT, 1.5 IN 81 .22 SYS $ 19 HMA PATCHING, TYPE C, FULL DEPTH PATCH (UNDISTRIBUTED) (97.63) SYS $ 20 QC/QA-HMA, 3, 70, SURFACE, 9.5 mm 14.11 TON $ 21 HMA WEDGE AND LEVEL, TYPE C 59.23 TON $ 24 HMA FOR SIDEWALl< 12.21 TON $ 25 SIDEWALK, CONCRETE, 41N (271.35) SYS $ 26 SIDEWALK, CONCRETE, 6 IN 27.83 SYS $ 27 CURB RAMP, CONCRETE, A (6.32) SYS $ 28 CURB RAMP, CONCRETE, L (0.89) SYS $ 29 CURB RAMP, CONCRETE (215.44) SYS $ 30 CURB, CONCRETE, 6 IN 277.00 LFT $ 31 CURB,CONCRETE,81N 60.00 LFT $ 32 CURB AND GUTTER, CONCRETE 309.50 LFT $ 33 CENTER CURB, C, CONCRETE, MODIFIED 2.00 LFT $ 34 CURB TURNOUT, CONCRETE (8.00) LFT $ 35 CONCRETE CURB AND GUTTER, TYPE B 6.00 LFT $ 36 PCCP FOR APPROACHES, 6 IN 55.51 SYS $ 37 PCCP FOR APPROACHES, 9 IN 53.78 SYS $ 38 GEOTEXTILE FABRIC, NON-WOVEN . (4.00) SYS $ 39 WATER (1.00) I< GAL $ 40 TOPSOIL (181.00) CYS $ 41 SODDING, NURSERY (250.00) SYS $ 42 MULCH, HARDWOOD SHREDDED BARK (2.00) CYS $ 43 SOIL, BIOENGINEERED (1.00) CYS $ 47 NO.9, GRAVEL (2.00) TON $ 48 EROS:ON COmROI., BIOOEGRADNllE COCl\'JIIT COR LOG, 12jN O'J..\IEIER (16.00) LFT $ 51 PIPE, TYPE 2 CIRCULAR 12 IN 2.00 LFT $ 52 CASTING, ADJUST TO GRADE (1 .00) EACH $ 55 TEMPORARY PAVEMENT MARKING, REMOVABLE, 41N (138.00) LFT $ 56 DETOUR ROUTE MARKER ASSEMBLY (1 .00) EACH $ 57 CONSTRUCTION SIGN, A 10.00 EACH $ 59 FLASHING ARROW SIGN 136.00 DAY $ 62 SIGN, OVERHEAD, RELOCATE 2.00 EACH $ 63 SIGN POST, SQUARE, TYPE 1, REINFORCED ANCHOR BASE 36.00 LFT $ 66 SIGN, SHEET, WITH LEGEND 0.080" 17.50 SFT $ 67 SIGN, SHEET, WITH LEGEND 0.100" 7.25 SFT $ 73 SIGNAL POLE, PEDESTAL, 4FT (1 .00) EACH $ 74 CONDUIT, PVC, 2 IN (FOR SIGNALS) 37.00 LFT $ 75 SIGNAL CONDUIT, REMOVE (UNDISTRIBUTED) (55.00) LFT $ 81 CONDUIT, HDPE, 2 IN, SCHEDULE 80 (FOR SIGNALS) (45.00) LFT $ 82 PEDESTRIAN PUSH BUTTON, APS 1.00 EACH $

3 12/07/2015

Unit Price Price 10.00 $ 2,040.00 10.00 $ 2,760.00 10.00 $ (330.00) 33.00 $ 8,983.26 31.00 $ (4,812.75) 24.00 $ (3,392.40) 24.00 $ 517.20 50.00 $ (4, 144.00)

100.00 $ 20,610.00 15.00 $ 1,218.30

140.00 $ (13,668.20) 150.00 $ 2,116.50 110.00 $ 6,515.30 175.00 $ 2,136.75 52.00 $ (14, 11 0.20) 60.00 $ 1,669.80

150.00 $ (948.00) 150.00 $ (133.50) 150.00 $ (32,316.00) 35.00 $ 9,695.00 50.00 $ 3,000.00 24.00 $ 7,428.00 95.00 $ 190.00

100.00 $ (800.00) 45.00 $ 270.00 80.00 $ 4,440.80 82.00 $ 4,409.96 4.00 $ (16.00)

31 .75 $ (31.75) 140.00 $ (25,340.00)

5.00 $ (1 ,250.00) 100.00 $ (200.00) 300.00 $ (300.00) 100.00 $ (200.00) 40.00 $ (640.00) 70.00 $ 140.00

500.00 $ (500.00) 1.00 $ (138.00)

100.00 $ (100.00) 140.00 $ 1,400.00 15.00 $ 2,040.00

125.00 $ 250.00 13.00 $ 468.00 22.00 $ 385.00 22.00 $ 159.50

1,600.00 $ (1 ,600.00) 7.00 $ 259.00

10.00 $ (550.00) 12.00 $ (540.00)

1,100.00 $ 1,100.00

Page 2: 86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50 $ 85.00 96 signal pole, pedestal, 10ft 2.00 each $ 2,700.00 5,400.00 99 handhole,

Item No. Description Quantity Unit Unit Price Price

86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH $ 1,000.00 $ -1,000.00

87 HANDHOLE SIGNAL, ADJUST TO GRADE (2 .00) EACH $ 500.00 $ (1,000.00)

91 SIGNAL CABLE, SERVICE, COPPER. 3C/8GA 45.00 LFT $ 3.00 $ 135.00

92 SIGNAL CABLE, CONTROL, COPPER 3C/14GA 1,582.00 LFT $ 1.25 $ 1,977.50

93 SIGNAL CABLE, CONTROL, COPPER 5C/14GA 354.00 LFT $ 2.29 $ 810.66

94 SIGNAL CABLE, CONTROL, COPPER 7C/"14GA 582.00 LFT $ 2.25 $ 1,309.50

95 SIGNAL CABLE CONTROL, COPPER 9C/14GA 34.00 LFT $ 2.50 $ 85.00

96 SIGNAL POLE, PEDESTAL, 10FT 2.00 EACH $ 2,700.00 $ 5,400.00

99 HANDHOLE, LIGHTING (3.00) EACH $ 1,000.00 $ (3,000.00)

104 CONNECTOR KIT, UN FUSED 2.00 EACH $ 40.00 $ 80.00

105 CONNECTOR KIT, FUSED 2.00 EACH $ 40.00 $ 80.00

106 MULTIPLE COMPRESSION FITTING, NON-WATERPROOFED 29.00 EACH $ 18.00 $ 522.00

107 MULTIPLE COMPRESSION FITTING, WATERPROOFED (31.00) EACH $ 65.00 $ (2,015.00)

108 INSULATION LINK, NON-WATERPROOFED 35.00 EACH $ 16.00 $ 560.00

109 INSULATION LINK, WATERPROOFED (109.00} EACH $ 60.00 $ (6,540.00)

110 WIRE, NO 10 COPPER, 1/C 1,558.00 LFT $ 1.00 $ 1,558.00

111 WIRE, NO 6 COPPER, GROUND 1/C (670.00) LFT $ 1.50 $ (1 ,005.00)

112 WIRE, NO 4, IN PLASTIC DUCT, IN TRENCH 4 1/C 2,397.00 LFT $ 9.50 $ 22,771.50

113 WIRE, NO 4, IN PLASTIC DUCT, IN CONDUIT 4 1/C (1 ,800.00) LFT $ 9.40 $ (16,920.00)

114 CONDUIT, PVC, 2 IN (FOR LIGHTING) (222.00) LFT $ 7.00 $ (1 ,554.00)

115 CONDUIT, HOPE, 21N, SCHEDULE 80 (FOR LIGHTING) (399.00) LFT $ 12.00 $ (4,788.00)

116 TRANSVERSE !.lARKING THERMOPLASTIC CROSSWALK, WHITE 24' 587.00 LFT $ 9.00 $ 5,283.00

117 PAVEMENT MESSAGE MARKING, REMOVE (1.00) SYS $ 47.00 $ (47.00)

11 8 LINE, THERMOPLASTIC, BROKEN, WHITE, 4 IN (195.00) LFT $ 1.00 $ (195.00)

11 9 LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN. (610.00) LFT $ 1.00 $ (610.00)

120 LINE, REMOVE 1,869.00 LFT $ 0.85 $ 1,588.65

121 TRANSVERSE ~WlKINGS, THERI.'DPLASTIC YIELD, Vtrli TE, 27 1tl. 52.50 LFT $ 5.00 $ 262.50

122 LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN 38.00 LFT $ 0.80 $ 30.40

123 TRANSVERSE MARKING, THERMO, STOP LINE, 24 IN 32.00 LFT $ 9.00 $ 288.00

124 PAVHIENHIESSAGE l.lftm~\1. THERMOPlASTK;, lANE ii~CI.TION MRfil'l 4.00 EACH $ 90.00 $ 360.00

1000 STRUCTURAL BACKFILL, TYPE 1 (7.00) CYS $ 120.00 $ (840.00)

1001 COMPACTED AGGREGATE NO. 53, BASE 3.00 TON $ 100.00 $ 300.00

1002 H,\\1\PATCHING, TYPE C, FULL DEPTH PATCH (UNDISTRIBUTED) 28.44 SYS $ 140.00 $ 3,981 .60

1003 SIDEWALK, CONCRETE, 4 IN 39.78 SYS $ 52.00 $ 2,068.56

1004 CURB,CONCRETE,61N 93.50 LFT $ 35.00 $ 3,272.50

1005 PIPE, TYPE 2 CIRCULAR 12 IN (2.00) LFT $ 70.00 $ (140.00)

1008 LINE, THERMOPLASTIC, SOLID, WHITE, 41N. (75.00) LFT $ 1.00 $ (75.00)

1009 !RAUSVERSE lv.RXING, THERMOPlASTIC, CROSSHATCH UNE, WHITE, 12' (45.00) LFT $ 4.50 $ (202.50)

3001 COMPACTED AGGREGATE NO. 53, BASE {6.00) TON $ 100.00 $ (600.00)

3002 SIDEWALK, CONCRETE, 6 IN 82.82 SYS $ 52.00 $ 4,306.64

3003 SODDING, NURSERY (19.00) SYS $ 5.00 $ {95.00)

3004 INSTALLATION OF MASTER CONTROLLER (1 .00) EACH $ 1,100.00 $ (1,100.00)

3005 CONDUIT, 2 IN (FOR FIBER) 239.00 LFT $ 9.25 $ 2,210.75 . 5001 EXPOSED AGGREGATE CONCRETE 1.00 LS $ 10,335.20 $ 10,335.20

5002 TEMPORARY SIGNAL POLE (GRANT) 1.00 LS $ 4,963.00 $ 4,963.00

TOTAL $ 10,955.03

JUSTIFICATION

6 Quantity Adjustment per Field Measurements

7 Quantity Acljustmenl per Field Measurements

8 Quantity Adjustment per Field Measurements

9 Quantity Adjustment per Field Measurements

. 11 Quantity Adjustment per Field Measurements

14 Quantity Adjustment per Field Measurements

15 Quantity Adjustment per Field Measurements

Page 3: 86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50 $ 85.00 96 signal pole, pedestal, 10ft 2.00 each $ 2,700.00 5,400.00 99 handhole,

16 Quantity Adjustment per Field Measurements

17 Quantity Adjustment per Field Measurements

18 Quantity Adjus tment per Field Measurements

19 Quantity Adjustment per Field Measurements

20 Quantity Adjustment per Field Measurements

21 Quantity Adjustment per Field Measurements

24 Quantity Adjustment per Field Measurements

25 Quantity Adjustment per Field Measurements

26 Quantity Adjustment per Field Measurements

27 Quantity Adjustment per Field Measurements

28 Quantity Adjustment per Field Measurements

29 Quantity Adjustment per Field Measurements

30 Quantity Adjustment per Field Measurements

31 Quantity Adjustment per Field Measurements

32 Quantity Adjustment per Field Measurements

33 Quantity Adj ustment per Field Measurements

34 Quantity Adjustment per Field Measurements

35 Quantity Adjustment per Field Measurements

36 Quantity Adjustment per Field Measurements

37 Quantity Adjustment per Field Measurements

38 Quantity Adjustment per Field Measurements

39 Quanti ty Adjustment per Field Measurements

40 Quanti ty Adjustment per Field Measurements

41 Quantity Adjustment per Field Measurements

42 Quantity Adjustment per Field Measurements

43 Quantity Adjustment per Field Measurements

47 Quantity Adjustment per Field Measurements

48 Quantity Adjustment per Field Measurements

51 Quantity Adjustment per Field Measurements

52 Quantity Adjustment per Field Measurements

55 Quantity Adjustment per Field Measurements

56 Quanti ty Adju stment per Field Measurements

Page 4: 86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50 $ 85.00 96 signal pole, pedestal, 10ft 2.00 each $ 2,700.00 5,400.00 99 handhole,

57 Quantity Adjustment per Field Measurements

59 Quantity Adjustment per Field Measurements

62 Quantity Adjustment per Field Measurements

63 Quantity Adjustment per Field Measurements

66 Quantity Adjustment per Field Measurements

67 Quantity Adjustment per Field Measurements

73 Quantity Adjustment per Field Measurements

74 Quantity Adjustment per Field Measurements

75 Quantity Adjustment per Field Measurements

81 Quantity Adjustment per Field Measurements

82 Quantity Adjustment per Field Measurements

86 Quantity Adjustment per Field Measurements

87 Quantity Adjustment per Field Measurements

91 Quantity Adjustment per Field Measurements

92 Quantity Adjustment per Field Measurements

93 Quantity Adjustment per Field Measurements

94 Quantity Adjustment per Field Measurements

95 Quantity Adjustment per Field Measurements

96 Quantity Adjustment per Field Measurements

99 Quantity Adjustment per Field Measurements

104 Quantity Adjustment per Field Measurements

105 Quantity Adjustment per Field Measurements

106 Quantity Adjustment per Field Measurements

107 Quantity Adjustment per Field Measurements

108 Quantity Adjustment per Field Measurements

1 09 Quantity Adjustment per Field Measurements

110 Quantity Adjustment per Field Measurements

111 Quantity Adjustment per Field Measurements

11 2 Quantity Adjustment per Field Measurements

113 Quantity Adjustment per Field Measurements

114 Quantity Adjustment per Field Measurements

115 Quantity Adjustment per Field Measurements

Page 5: 86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50 $ 85.00 96 signal pole, pedestal, 10ft 2.00 each $ 2,700.00 5,400.00 99 handhole,

116 Quantity Adjustment per Field Measurements

117 Quantity Adjustment per Field Measurements

118 Quantity Adjustment per Field Measurements

119 Quantity Adjustment per Field Measurements

120 Quantity Adjustment per Field Measurements

121 Quantity Adjustment per Field Measurements

122 Quantity Adjustment per Field Measurements

123 Quantity Adjustment per Field Measurements

124 Quantity Adjustment per Field Measurements

1000 Quantity Adjustment per Field Measurements

1001 Quantity Adjustment per Field Measurements

1002 Quantity Adjustment per Field Measurements

1003 Quantity Adjustment per Field Measurements

1004 Quantity Adjustment per Field Measurements

1 005 Quantity Adjustment per Field Measurements

1008 Quantity Adjustment per Field Measurements

1009 Quantity Adjustment per Field Measurements

3001 Quantity Adjustment per Field Measurements

3002 Quantity Adjustment per Field Measurements

3003 Quantity Adjustment per Field Measurements

3004 Quantity Adjustment per Field Measurements

3005 Quantity Adjustment per Field Measurements

5001 The City of West Lafayette has elected to utilize exposed aggregate concrete in lieu of sod from Station 67+00 to 68+00 Line "B"; needed due large vehicle turn radius

5002 A temporary signal pole was used to transfer the old signal heads making room for the construction of the new signal pole at the NW corner of Grant & Northwestern.

Page 6: 86 HAND HOLE SIGNAL, TYPE 2 -1.00 EACH · 95 signal cable control, copper 9c/14ga 34.00 lft $ 2.50 $ 85.00 96 signal pole, pedestal, 10ft 2.00 each $ 2,700.00 5,400.00 99 handhole,

CHANGE TO CONTRACT PRICE:

Original CONTRACT PRICE Current CONTRACT PRICE adjusted by previous CHANGE ORDER

The CONTRACT PRICE due this CHANGE ORDER (Increased) (deereBsed) by:

The new CONTRACT PRICE including this CHANGE ORDER will be

The CONTRACT TIME will be (increased) (decreased) b._,_y_~O __

The date for completion of all work will be

calendar days.

08/14/2015

Requested By: /fdltY!L Milestone Contractors, L.P.

Recommended By:

West lafayette Redevelopment Commission, City of West Lafayette

$ 1,792,610.75

$ 2,008,830.96

$ 10,955.03

$ 2,019,785.99