802.16m Closing Report
description
Transcript of 802.16m Closing Report
802.16m Closing Report
July 15, 2010San Diego, USA
Session #68
802.16m-10/00212010-07-15
802.16m Closing Report – San Diego• Into Session #68:• SB initial circulation: 81% return rate; 58% approval
– SB Comments to be resolved at Session #68 on D6 Amendment Text (802.16-10/0040)• 817 technical:
– 466 MAC– 175 PHY– 13 General– 136 Other
• 187 editorial comments– Hundreds of reply comments– 233 contributions
• 135 MAC• 57 PHY• 11 Femto/SON• 2 Multi-BS MIMO• 10 Relay• 3 LBS• 10 e-MBS• 5 Other
802.16m-10/00212010-07-15
802.16m Closing Report- San Diego• Results for the week:• Met in parallel sessions on Tuesday and Wednesday
and Thursday AM• Resolved ALL Sponsor Ballot comments (Congrats!!)• SDD CRs Withdrawn• Reviewed WorkPlan and schedule• Accepted Comment database 802.16-10/0040r2 and
Authorized Editor to create D7• Request initiation of SB recirc
802.16m-10/00212010-07-15
802.16m Closing Report- San Diego• Results for the week (cont):– 179 editorial– 825 technical & general
• 369 Agree• 334 Principle• 301 Disagree
• Current Ballot Status– 338 Voters (81% Return)
• 152 Approve (58%) • 107 Disapprove• 16 Abstains
802.16m-10/00212010-07-15
802.16m Closing Report- San Diego• Motions to WG:1. To approve the Session #68 resolutions to
comments contained in 802.16-10/0040r2, and to authorize the editor to create a new draft P802.16m/D7
Moved by: Seconded by:Result:
802.16m-10/00212010-07-15
802.16m Closing Report- San Diego
• Motions to WG:2. To request the WG chair to initiate a
recirculation SB on draft P802.16m/D7 in which the entire document is open for comment.
Moved by:Seconded by:Result:
802.16m-10/00212010-07-15