    STUCK PIPESTUCK PIPESTUCK PIPESTUCK PIPE

    SCOMI OILTOOLS

    Stuck Pipe

    Stuck pipe is a long-standing problem in the drillingindustry.

    It is estimated $200 - $500 million is spent annually as aresult of stuck pipe.

    This amount could be drastically reduced bypreventative action and rapid response to keep minorsticking from developing into severe sticking.

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    2/24

    SCOMI OILTOOLS

    Stuck Pipe Prevention

    Communicate effectively

    Plan ahead

    Listen to the hole constantly

    Maintain good mud

    Keep the pipe moving

    Clean out the hole as fast as you can drill it

    Take action early

    Stuck pipe is not inevitable

    SCOMI OILTOOLS

    Stuck Pipe Prevention

    Operate BHA and string within limits

    Keep the BHA as simple as possible

    Run a drilling jar whenever possible

    Whenever possible use spiral drill collars

    Stabilize the BHA to minimise wall contact

    Always gauge bits and stabilizers accurately

    Bottom hole assemblies

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    3/24

    SCOMI OILTOOLS

    Stuck Pipe Prevention

    Failure to clean the hole

    Monitor the hole for changes in drilling trends

    Perform wiper trips as hole conditions dictate

    Wipe/Ream the last stand before making a connection

    Wipe the last stand or single before taking a survey

    When drilling to casing point, calculate a target depth

    Drilling

    SCOMI OILTOOLS

    Stuck Pipe Prevention

    Plan the trip

    Know the swab and surge pressures

    Circulate clean prior to tripping

    Ream and condition the hole while tripping in

    Be careful while running with new bits

    Tripping

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    4/24

    SCOMI OILTOOLS

    Stuck Pipe Prevention

    Ensure hole is clean & mud properties are in spec.

    Calculate running speeds - do not exceed.

    Centralize the casing string

    Wash the casing through problem formations

    Know the theoretical cement thickening time of cementbefore drilling out

    When drilling cement establish circulation before drilling, drillwith low weight on bit.

    Casing and Cementing

    SCOMI OILTOOLS

    Mechanism of Stuck Pipe

    Formation related sticking

    Mechanical sticking

    Differential sticking

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    5/24

    SCOMI OILTOOLS9

    STUCK PIPE

    Formation Related Sticking

    SCOMI OILTOOLS

    Unconsolidated Formations

    Usually encountered in top hole Loose sands Gravels Silts

    Formation may collapse Indicators

    Rough drilling Fill on trips Excessive drag & torque

    Cavings Mud loss

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    6/24

    SCOMI OILTOOLS

    Unconsolidated Formation

    Build low permeability filter cake

    May require adjustments to rheology

    Do not exceed flow rate required to clean the hole

    Avoid rotating bits or stabilizers near problem area

    Trip past problem area carefully

    Clean out hole fill prior to drilling ahead

    Consider soaking viscous pills into formation

    XC Polymer/Bentonite/Fibrous LCM/Calcium Carbonate pills

    w/- 10 minute soaking time

    Stuck Pipe Prevention

    SCOMI OILTOOLS

    Unconsolidated Formations

    If pipe is stuck due to formation collapse, circulation will belost.

    Try to regain circulation while working the pipe downwards tobreak the bridge.

    Once circulation is regained, clean the hole before drillingahead.

    At this point, raising mud weight might be considered to

    stabilize the hole.

    Freeing stuck pipe

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    7/24

    SCOMI OILTOOLS

    Reactive Formations

    Water sensitive clays absorb waterand swell and restrict the annulus Problem confined to WBM

    Prevention Drill and case off quickly Choose suitable inhibitive mud and

    mud weight. Monitor MBT closely Wipe hole regularly Prepare to dump and dilute

    Freeing Use of drilling jar Once pipe is free, increase

    inhibition levels and mud weight

    SCOMI OILTOOLS

    Fractured and Faulted Formations

    Formations may give rise to ledges. May stabilize as wellbore collapses to

    stable condition Risk of lost circulation and differential

    stickingPrevention Circulate well before tripping Checking the hole during wiper trips Ream the hole on the way in Restrict tripping speeds and circulating

    pressuresFreeing Work the pipe to break up pack-off/

    obstruction In limestone, use inhibited HCl to

    dissolve obstruction at stuck point

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    8/24

    SCOMI OILTOOLS

    Mobile Formation

    Formations that deform under pressure(salt and plastic shales)

    Prevention Increased / Correct mud weight Ream while RIH Perform wiper trips Spot Freshwater pills Pump lubricants/base oil Use of eccentric PDC bits

    Freeing (sticking in salt) Displace mud with freshwater until

    drill collars/open hole annulus is filledwith water

    SCOMI OILTOOLS

    Geopressured Formations

    Formations which pressured due to

    loading pressures from the rock above

    and below.

    Signs

    Pressure cavings (splintery) Hole enlargement Tight hole (due to hole cleaning

    problems)

    Prevention

    Stabilize wellbore ASAP by

    increasing mud weightFreeing

    Increase mud weight Adjust rheology to improve hole

    cleaning

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    9/24

    SCOMI OILTOOLS17

    STUCK PIPE

    Mechanical Sticking

    SCOMI OILTOOLS

    Undergauge Hole

    Excessive bit wear

    Jammed while RIH

    Prevention

    Always gauge bits

    Trip carefully if known

    Run gauge protected bits

    Consider roller reamer

    Jar upwards to free

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    10/24

    SCOMI OILTOOLS

    Wellbore Geometry

    Doglegs & Ledges

    Often different BHA's will be less flexible and can get stuck.

    Prevention

    Minimise dogleg severity

    Ream after BHA change

    SCOMI OILTOOLS

    Poor Hole Cleaning

    Poor hole cleaning results inoverloading the annulus withcuttings, potentially sticking thedrillstring, accompanied by partialloss of circulation

    This is most likely in washoutswhere annular velocity decreasesand cuttings accumulate.

    In deviated wells, cuttings form beds

    on the low side of the hole canmigrate up hole like shifting sanddunes.

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    11/24

    SCOMI OILTOOLS

    Good Hole Cleaning Practices

    Clean the hole as fast as drilled

    Ensure mud is within specification

    Circulate clean prior to tripping

    Reciprocate and rotate the pipe continuously

    Plan and perform wiper trips as hole conditions dictate

    Monitor the shakers

    Keep all circulating and SRE in good working order

    SCOMI OILTOOLS

    Hole Cleaning Calculations

    Calculate hole cleaning for the section with highestinclination.

    Vertical Wells

    High yield point Viscous mud High viscosity sweeps for large hole sections

    Maintain adequate gels. Increase flow rate with hole angle 30o inclination requires 20% higher velocity 60o requires twice the AV of a vertical well

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    12/24

    SCOMI OILTOOLS

    Hole Cleaning Calculations

    Deviated Wells

    High velocity

    Use lower viscosity mud to induce turbulence

    Clean cuttings beds with;

    low viscosity pills followed by high viscosity, highweight pills (used with caution)

    Rotation and reciprocation are critical > 45o

    SCOMI OILTOOLS

    Key Seating

    Side ViewSide View Over Head ViewOver Head View

    Extra hole made by action of pipe Originalrubbing against the formation Hole

    Key Seat

    Key seats

    Grooves in the borehole wall cut by rotating drillpipe.

    Not possible to pull drillpipe through the zone, but possible

    to rotate.

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    13/24

    SCOMI OILTOOLS

    Key Seating

    Prevention Drill with stiff BHA that tends to minimize chance o

    severe doglegs

    Use key seat wipers properly positioned in string

    Freeing Apply downward force to drillstring

    SCOMI OILTOOLS

    Collapsed Casing

    Formation forces exceed casingcollapse pressure

    Casing is too light duty.

    Casing is old.

    Casing is landed with too muchtension or compaction reducingits collapse rating.

    Casing shoe is poorly cementedand damaged during trips.

    Casing joints come undone dueto poor make up and/or poorcement

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    14/24

    SCOMI OILTOOLS

    Junk

    Parts of downhole equipment

    Common inside casing

    Prevention

    Inspect all tools

    Keep hole covered

    Drillpipe wipers

    Freeing

    Work and jar the pipe

    RIH to overgauge section

    SCOMI OILTOOLS

    Cement Related

    Cement-related sticking

    occurs when blocks of

    cement fall into the

    wellbore from casing

    ratholes or cement plugs,

    jamming the drillstring.

    It also occurs when the

    drillstring becomes plantedin soft or "green" cement

    that flash sets when

    pressure is applied.

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    15/24

    SCOMI OILTOOLS

    Differential Sticking

    Criteria lead to diff. sticking: Hydrostatic pressure

    exceeds formation pressure There exists zone of

    permeable Thick filter cake is being

    deposited There is contact between

    pipe and wall This is the most preventable

    type of sticking, sincecontact area, mud weightand filter cake can becontrolled.

    POROUS

    AND

    PERMEABLE

    ZONE

    IMPERMEABLE

    ZONE

    IMPERMEABLE

    ZONE

    IMPERMEABLE

    ZONE

    IMPERMEABLE

    ZONE

    MUD

    FILTRATE

    MUD

    FILTRATE

    MUD

    FILTRATE

    Phyd

    SCOMI OILTOOLS

    Differential Pressure Sticking

    IMPERMEABLE

    ZONE

    IMPERMEABLE

    ZONE

    POROUS

    AND

    PERMEABLE

    ZONE

    IMPERMEABLE

    ZONE

    IMPERMEABLE

    ZONE

    MUD FILTRATE

    MUD FILTRATE

    MUD FILTRATE

    Phyd

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    16/24

    SCOMI OILTOOLS

    Differential Pressure Sticking

    Phyd

    SCOMI OILTOOLS

    Differential Sticking

    Signs Increase torque and drag Fluid circulation unaffected Inability to move or rotate pipe

    Prevention Maintain low fluid loss, thin filter cake, minimum contact area Use NAF mud better lubricity, thinner filter cake Alterations to location of stabilizers Use of friction coefficient reducers (lubricant)

    Freeing Reduce hydrostatic pressure Use spotting fluids

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    17/24

    SCOMI OILTOOLS

    Differential Sticking - Avoidance

    Plan ahead

    Contingency planning

    Select BHAs with minimumcontact

    Minimise mud weight

    Have pit space available

    Keep pipe moving andcirculate whenever possible

    Continuously monitor pore

    pressure

    OverbalanceOverbalancepressurepressure MudMud

    DrillpipeDrillpipe

    FiltercakeFiltercake

    SCOMI OILTOOLS

    Differential Sticking

    Probability of differentialsticking versus differentialpressure, established from

    analysis of 600 well historiesin the gulf of Mexico.

    An "acceptable" probability of20% is achieved if differential

    pressure never exceeds 2000psi.

    100

    50

    20

    0

    1 000 1 500 2 000 2 500 3 000

    Differential pressure, psi

    Stuckpipeprobability,

    %

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    18/24

    SCOMI OILTOOLS

    Differential Sticking

    Three ways mudcake can be removed, diminishing theprobability of differential sticking :

    While drilling, the rotating pipe wears one side of theborehole removing the cake.

    During a wiper trip, the stabilisers and bit remove a largeportion of the cake. Reaming does the best job of removingcake, but it takes the most time.

    Another method of removing filter cake is to use casingscratchers.

    SCOMI OILTOOLS

    Pipe Stuck Diagnoses

    Drag trend increasing when

    moving string from static

    Is circulation restricted ?Are known

    problem formations

    exposed ?

    Moving pipe from static after making/breaking connections

    during drilling, tripping and reaming or after surveys

    Y

    Are permeable

    formations

    exposed ?

    N

    Reactive formations

    fractured/faulted forms

    mobile formations

    unconsolidated forms

    geopressured formations

    Is drag reduced

    when pumping ?

    Y N Y N

    Can drill string

    be moved ?

    Junk cement blocks string

    component

    failure stabilisers

    hanging upon ledges

    Reactive formations

    fractured/faulted forms

    mobile formations

    unconsolidated forms

    geopressured formations

    Inadequate

    hole cleaning

    Y N

    Y N

    Junk cement blocks string

    component

    failure stabilisers

    hanging upon ledges

    Differential

    sticking

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    19/24

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    20/24

    SCOMI OILTOOLS

    Spotting Fluids

    These consist of a blend of surfactants and emulsifiersmixed in either a base oil or environmentally friendlyfluid.

    The spotting fluid reduces the surface tension betweenthe well bore and the drill string, it also penetrates thewallcake promoting it's removal from the well bore.

    The spotting fluid density should be slightly higherthan the mud to avoid migration, although someoperators prefer it lighter. In this case the loss of

    hydrostatic head may be the important factor.

    SCOMI OILTOOLS

    Spotting Fluids

    The success of spotting fluids depends on:

    The volume displaced, the stuck point is located and sufficientpill is mixed up to cover all the pipe below this point. A 50%excess is normally mixed to cover for hole enlargement.

    Proper placement. The pill is spotted across the stuck pointleaving 10 bbls in the drill string. 1/2 a bbl is then pumpedevery half hour while working the pipe.

    The pill should be left for a minimum of 8 hours to soakbefore giving up. If pipe is not free after 40 hours consider

    sidetracking.

    The pill should be pumped as soon as possible after gettingstuck.

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    21/24

    SCOMI OILTOOLS

    Spotting Fluids

    These are either supplied with emulsifiers for weightedsystems or without for non weighted systems.

    Formulations depend on the supplier. Ensure an adequatesupply of spotting fluid is kept on the rig and formulation datais available for the required mud weights.

    SCOMI OILTOOLS

    Stuck Pipe Warning Sign

    Fractured/faulted

    formations

    N

    N

    N

    N

    N

    N

    N

    N

    N

    Y

    Y

    Y

    YY

    Y

    Y

    Y

    Y

    Y

    N

    Rotary Drilling

    Increased Torque

    Is there a formationchange ?

    Increase in torquerelated to formation

    change

    Are bit hoursexcessive?Have abrasive

    formations beendrilled ? If tri-cone bit bearings worn

    Is circulation restricted?Can drag be

    related todog legs

    Have abrasiveformations been

    drilled

    Are drags reducedwhen pumping

    Have problem formationsalready been exposed

    Newly drilledGeopressured forms

    unconsolidated formsfractured/faulted forms

    fast movingmobile form

    Is it possible thata fault has been

    drilled ?WellboreGeometry

    Cementblocksjunk

    casingkeyseat

    Inadequate hole

    cleaningUndergauge hole

    causingstabilizersto hang up

    Have formations of

    varying hardnessbeen drilled ?

    Bit failurestring

    componentfailure

    Stabilizershanging up

    on formationledges

    Slow movingmobile

    formationsreactive

    formations

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    22/24

    SCOMI OILTOOLS

    Differential Sticking

    Select alternative freeing method

    Is overbalance for

    well control/wellbore stability

    Differentially stuck

    Is a Suitable PRA

    available on site ?

    Work/jar pipe

    Is U -tubingpossible

    Prepare PRA pill and spacerAgree procedure and prepare to U-tube

    Use selective alternative

    freeing method

    Pump PRAU-Tube

    Pipe freePipe free

    U-Tube for second time

    Pipe free

    Continue operation -check low

    gravity solids and fluid lossCut pipe and fish/sidetrack/

    abandon

    Worked Pipe free

    YES

    YES

    NO

    YESYES

    YES

    YES

    YES

    NO

    NO

    NO

    NO

    SCOMI OILTOOLS

    Diff. Sticking Spotting Fluids

    80

    60

    40

    20

    0 10 20 30 40 50

    percent

    probabilityofpipefreeing

    soaking time (Hours)

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    23/24

    SCOMI OILTOOLS

    Spotting Fluids Unweighted

    BREAK-FREE NW Unique blend of surfactants and carrier fluid

    Can be mixed in all types of non aqueous base fluids and glycols

    Add 3 -4 gals of BREAK-FREE NW per bbl of base fluid

    Other companies products:

    Pipe-Lax (Miswaco)

    Mil-Free(Baker Hughes)

    Envirospot (Halliburton)

    SCOMI OILTOOLS

    Spotting Fluids Weighted

    BREAK-FREE Blend of Surfactants, Emulsifiers and an Oil Soluble, Water

    Emulsifiable Polymer

    Used where a weighted pill is required.

    Normal treatment level is 5 gal of BREAK-FREE per bbl offinished spotting fluid

  • 8/22/2019 8 - Stuck Pipe_PTM_Handout

    24/24

    SCOMI OILTOOLS

    Spotting Fluids Weighted

    BREAK-FREERecommended Formulation - 100 bbl

    Density

    lb/gal

    BREAK-

    FREE

    Base Fluid

    (bbl)

    Water

    (bbl)

    Barite

    25 kg sacks

    8 9 64 27 69

    10 9 58 26 254

    12 9 54 22 456

    14 9 51 21 636

    16 9 49 11 84618 9 44 10 1036