7%!,4(/&+%.45#+9 .BUUIFX( #FWJO TRANSPORTATION CAB … · 2019-03-18 · (3)Revised – Material...
Transcript of 7%!,4(/&+%.45#+9 .BUUIFX( #FWJO TRANSPORTATION CAB … · 2019-03-18 · (3)Revised – Material...
Governor
An Equal Opportunity Employer M/F/D
TRANSPORTATION CAB
March 18, 2019
CALL NO. 204 CONTRACT ID NO. 195066 ADDENDUM # 2
Subject: ALLEN-TODD-WARREN COUNTIES, 121GR19D066-STP Letting March 22, 2019
(1)Revised - Special Notes for Concrete Coating – Pages 59-61 of 266(2)Revised - Special Notes for Contract Completion Date and Liquidated
Damages – Page 102 of 266 (3)Revised – Material Summary – Pages 214-218 of 266(4)Revised - Proposal Bid Items – Pages 263-266 of 266(5)Revised - Plan Sheets – S1, S2, S3, S5, S7, and S8
Proposal revisions are available at http://transportation.ky.gov/Construction-Procurement/.
If you have any questions, please contact us at 502-564-3500.
Sincerely,
Rachel Mills, P.E. Director Division of Construction Procurement
RM:mr Enclosures
Bridging KY 1 of 3
SPECIAL NOTE FOR CONCRETE COATING03-10011.00 Allen 002B00021N
I. DESCRIPTION
Perform all work in accordance with the Kentucky Transportation Cabinet, Department ofHighways 2012 Standard Specifications for Road and Bridge Construction and applicableSupplemental Specifications, the Standard Drawings, this Note, and the Contract Documents.Section references are to the Standard Specifications.
This work consists of the following:1. Furnish all labor, materials, tools, equipment, and incidental items necessary to complete
the work.2. Provide safe access to the bridge, in accordance with Section 107.01.01, for the Engineer
to sound possible repair areas and for workers to complete the construction.3. Repair cracks as applicable in accordance with the Special Note for Epoxy Injection
Crack Repair.4. Repair delaminated or spalled areas as applicable in accordance with the Special Note for
Concrete Patching.5. Apply Ordinary Surface Finish6. Prepare the surfaces to receive coating.7. Apply concrete coating.8. Any other work as specified as part of this contract.
II. MATERIALS
One of the following coating systems shall be used:
Manufacturer Prime Coat Finish CoatSherwin Williams Macropoxy 646 Acrolon 218 HS
PPG Amerlock 2 Devoe Devflex HPCarboline Carboguard 890 Carbothane 133 HBTnemec Elastogrip 151 Envirocrete 156
The finish product shall be opaque and satin or semi-gloss. The contractor must apply sufficientcoats as required to achieve this goal. The finish coat shall be gray and will meet the followingvalues:
L* a* b*Gray 74.94 -1.54 3.92
Furnish to the Engineer copies of the manufacturer’s technical data sheets, installationguidelines, material safety data sheets, and other pertinent data at least two (2) days prior tobeginning the work.
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 59 of 266
Bridging KY 2 of 3
III. CONSTRUCTION
A. Perform Concrete Repairs. Repair concrete surface in accordance with the SpecialNote for Epoxy Injection Crack Repair and/or the Special Note for Concrete PatchingRepair if included in the contract documents.
B. Apply Ordinary Surface Finish. Areas receiving epoxy injection, concretepatching, and other surface imperfections, including areas of minor cracking, shouldreceive Ordinary Surface Finish in accordance with Section 601.03.18 of the StandardSpecifications. Use mortar of the same cement and fine aggregate as the concretepatching, or as directed by the Engineer. Payment will be incidental to ConcreteSealing.
C. Areas to Receive Concrete Coating:1. Every exposed surface above a point 6” below ground or fill line of
abutments, wing walls, end bent and pier caps, pedestals, back walls, columns,and exposed footings.
2. All exposed surfaces of concrete barrier walls, parapets, curbs, and plinths.Do not apply to the riding surface of the concrete deck.
3. The underneath surfaces of slab overhangs outside of exterior girders and tothe exterior side and bottom of exterior concrete girders, beams, and boxbeams.
D. Prepare Concrete Surfaces for Repair. All areas specified shall be pressurewashed. Equip the pressure washers with calibrated gages and pressure regulators toascertain and regulate water pressure. All equipment for pressure washing shall beoperated at a minimum pressure of up 3,500 to 4,500 psi with 0 degree spinner tipand/or fan tips as determined by the engineer at the working location with a minimumflow rate of 3.5 gal/minute provided that these pressures do not damage anycomponents of the structure. Pressure and flow rates shall be reduced to a levelsatisfactory to the Engineer should any damage occur due to power washingprocedures. The washing wand must be approximately perpendicular to the washedsurface and within a maximum of 12 inches of the surface. Wand extensions greaterthan 36 inches will be subject to Division of Construction approval. Pressurewashing of any bridge element will proceed from top of wash area to bottom of washarea. Preform all pressure washing at temperatures above 40 degrees Fahrenheit.
E. Apply Concrete Coating. All areas specified shall have concrete coating applied toas specified after debris removal and power washing. New concrete shall be allowedto properly cure in accordance with the manufacturer’s recommendations prior toapplication. Use compressed air to remove any loose debris from the surfaces that areto be coated after power washing. All coatings shall be applied within manufacturersrecommended dry film thickness range. Comply with KYTC “Standard Specificationsfor Road and Bridge Construction” Section 614.03.02 and coatings supplierrecommended conditions for application. Allow the surfaces to be coated to dry aminimum of 24 hours before any coating is applied. The coating must be applied with72 hours of pressure washing. The coating must be applied to a clean and dry surface.
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 60 of 266
Bridging KY 3 of 3
All coating application shall be executed using brushes, rollers, etc. No sprayapplication will be permitted.
The Department requires acceptance testing of samples obtained on a per-lotbasis per-shipment. The Division of Materials shall perform acceptance testing. Testsamples shall be taken at the Contractor’s paint storage site. Department personnelshall perform sampling. Allow (10) working days for testing and approval of thesampled paint. It is the Contractor’s responsibility to maintain an adequate inventoryof approved paint. The Department shall assume no responsibility for lost work due torejection of paint or approved paint subsequently found to be defective during theapplication process. Preform all concrete coating application at temperatures above40 degrees Fahrenheit or in accordance with manufactures specifications.
IV. MEASUREMENT
The Department will measure the quantity as lump sum. The Department will not measurepreparation of the site for the Engineer’s access or removal and reapplication of coatings that donot satisfy the Engineer’s approval for payment and will consider them incidental to “ConcreteCoating”.
V. PAYMENT.
The Department will make payment for the completed and accepted quantities of concretecoating under the following:
Code Pay Item Pay Unit24982EC Concrete Coating Lump Sum
The plans may show an estimate quantity in square feet. The Department will consider paymentas full compensation for all work required as described in this note.
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 61 of 266
Bridge 002B00021N 1 of 1
SPECIAL NOTE FOR CONTRACT COMPLETION DATE AND LIQUIDATED DAMAGES ON BRIDGE REPAIR CONTRACTS
03-10011.00 Allen 002B00021N
I. COMPLETION DATE.
Upon Notice to Proceed, the Contractor has the option of selecting the Begin Work date. Once selected, notify the Department in writing of the date selected at least two weeks prior to beginning work and provide a proposed project schedule. All work is to be completed by the specified contract completion date. The Contractor is allotted 60 calendar days once the bridge is closed to complete all work to safely reopen the structure with no lane closures. At a minimum, prior to reopening the bridge to traffic, all strength requirements and curing for materials used shall be completed per Division 600 of the Standard Specifications. Guardrail shall be installed to the satisfaction of the Engineer prior to reopening the bridge to traffic unless prior approval is obtained from the engineer for use of temporary railing.
The Engineer will begin charging calendar days for a structure on the day the Contractor closes the structure to traffic, regardless of holidays or seasonal weather limitations.
II. LIQUIDATED DAMAGES.
Liquidated damages will be assessed to the Contractor in accordance with the Transportation Cabinet, Department of Highway’s 2012 Standard Specifications for Road and Bridge
Construction, Section 108.09, when either the allotted number of calendar days or the specified completion date is exceeded.
Contrary to the Standard Specifications, liquidated damages will be assessed to the Contractor during the months of December, January, February and March when the contract time has expired on any individual bridge. Contract time will be charged during these months. All construction must be completed in accordance with the weather limitations specified in Section 606 and/or Section 601 as applicable. No extension of Contract time will be granted due to inclement weather or temperature limitations that occur due to starting work on the Contract or a structure late in the construction season.
Any approval of cold weather plans or allowance of construction operations to occur outside Section 606 and/or Section 601 does not alleviate the 60 day maximum bridge closure. In the event the closure lasts longer than 60 calendar days as specified, liquidated damages will apply to all excess days regardless of weather limitations.
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 102 of 266
ALLEN - TODD - WARREN COUNTIES121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 214 of 266
ALLEN - TODD - WARREN COUNTIES121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 21 of 266
ALLEN - TODD - WARREN COUNTIES121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 216 of 266
ALLEN - TODD - WARREN COUNTIES121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 217 of 266
ALLEN - TODD - WARREN COUNTIES121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 218 of 266
PROPOSAL BID ITEMS
Report Date 3/18/19Page 1 of 4
195066
Section: 0001 - BRIDGE - 002B00021NLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
0005 01890ISLAND HEADER CURB TYPE 1(ADDED: 3-18-19) 100.00 LF $
0010 01987DELINEATOR FOR GUARDRAIL BIDIRECTIONAL WHITE 24.00 EACH $
0020 02223 GRANULAR EMBANKMENT 28.00 CUYD $0030 02355 GUARDRAIL-STEEL W BEAM-S FACE A 100.00 LF $
0035 02363
GUARDRAIL CONNECTOR TO BRIDGE ENDTY A(ADDED: 3-18-19) 4.00 EACH $
0040 02399 EXTRA LENGTH GUARDRAIL POST 32.00 EACH $0050 02671 PORTABLE CHANGEABLE MESSAGE SIGN 4.00 EACH $0060 02731 REMOVE STRUCTURE 1.00 LS $
0070 03299ARMORED EDGE FOR CONCRETE(REVISED: 3-18-19) 42.33 LF $
0080 03304 BRIDGE OVERLAY APPROACH PAVEMENT 133.00 SQYD $0090 08003 FOUNDATION PREPARATION 1.00 LS $
0100 08104CONCRETE-CLASS AA(REVISED: 3-18-19) 135.00 CUYD $
0120 08151STEEL REINFORCEMENT-EPOXY COATED(REVISED: 3-18-19) 29,272.00 LB $
0130 08633 PRECAST PC I BEAM TYPE 3 626.00 LF $0150 21415ND EROSION CONTROL 1.00 LS $
0155 21532EDRAIL SYSTEM TYPE III(ADDED: 3-18-19) 318.00 LF $
0160 21741NC MAINTAIN & CONTROL TRAFFIC 1.00 EACH $0170 22146EN CONCRETE PATCHING REPAIR 108.00 SQFT $0180 23744EC EPOXY INJECTION CRACK REPAIR 60.00 LF $
0190 24982ECCONCRETE COATINGApprox. 5800 SF 1.00 LS $
Section: 0002 - BRIDGE - 002B00004NLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
0200 01987DELINEATOR FOR GUARDRAIL BIDIRECTIONAL WHITE 24.00 EACH $
0210 02223 GRANULAR EMBANKMENT 28.00 CUYD $0220 02231 STRUCTURE GRANULAR BACKFILL 10.00 CUYD $0230 02355 GUARDRAIL-STEEL W BEAM-S FACE A 100.00 LF $0240 02360 GUARDRAIL TERMINAL SECTION NO 1 1.00 EACH $0250 02399 EXTRA LENGTH GUARDRAIL POST 32.00 EACH $0260 02671 PORTABLE CHANGEABLE MESSAGE SIGN 2.00 EACH $0270 02731 REMOVE STRUCTURE 1.00 LS $0280 03299 ARMORED EDGE FOR CONCRETE 44.00 LF $
0290 03304BRIDGE OVERLAY APPROACH PAVEMENT(REVISED: 3-8-19) 105.00 SQYD $
0300 08003 FOUNDATION PREPARATION 1.00 LS $0310 08019 CYCLOPEAN STONE RIP RAP 48.00 TON $0320 08100 CONCRETE-CLASS A 3.70 CUYD $0330 08104 CONCRETE-CLASS AA 40.50 CUYD $
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 263 of 266
PROPOSAL BID ITEMS
Report Date 3/18/19Page 2 of 4
195066
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT0340 08151 STEEL REINFORCEMENT-EPOXY COATED 6,183.00 LB $0350 08670 PRECAST PC BOX BEAM SB27 156.00 LF $0360 08801 GUARDRAIL-STEEL W BEAM-S FACE BR 106.00 LF $0370 21415ND EROSION CONTROL 1.00 LS $0380 21741NC MAINTAIN & CONTROL TRAFFIC 1.00 EACH $0390 22146EN CONCRETE PATCHING REPAIR 20.00 SQFT $0400 23744EC EPOXY INJECTION CRACK REPAIR 30.00 LF $
0410 24982ECCONCRETE COATINGApprox. 5800 SF 1.00 LS $
Section: 0003 - BRIDGE - 110C00061NLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
0420 01987DELINEATOR FOR GUARDRAIL BIDIRECTIONAL WHITE 4.00 EACH $
0430 02223 GRANULAR EMBANKMENT 28.00 CUYD $0440 02351 GUARDRAIL-STEEL W BEAM-S FACE 125.00 LF $0450 02360 GUARDRAIL TERMINAL SECTION NO 1 3.00 EACH $0460 02371 GUARDRAIL END TREATMENT TYPE 7 1.00 EACH $0470 02399 EXTRA LENGTH GUARDRAIL POST 6.00 EACH $
0480 02545CLEARING AND GRUBBINGLess than 1 acre 1.00 LS $
0490 02650 MAINTAIN & CONTROL TRAFFIC 1.00 LS $0500 02671 PORTABLE CHANGEABLE MESSAGE SIGN 2.00 EACH $0510 02726 STAKING 1.00 LS $0520 02731 REMOVE STRUCTURE 1.00 LS $0530 03299 ARMORED EDGE FOR CONCRETE 46.00 LF $0540 03304 BRIDGE OVERLAY APPROACH PAVEMENT 167.00 SQYD $0550 08002 STRUCTURE EXCAV-SOLID ROCK 46.00 CUYD $0560 08003 FOUNDATION PREPARATION 1.00 LS $0570 08019 CYCLOPEAN STONE RIP RAP 75.00 TON $0580 08100 CONCRETE-CLASS A 91.00 CUYD $0590 08104 CONCRETE-CLASS AA 32.00 CUYD $0600 08151 STEEL REINFORCEMENT-EPOXY COATED 18,500.00 LB $0610 21415ND EROSION CONTROL 1.00 LS $0620 24896ED RAIL SYSTEM TYPE T631 52.00 LF $
0630 24982ECCONCRETE COATINGApprox. 590 SF 1.00 LS $
Section: 0004 - BRIDGE - 110C00059NLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
0640 01987DELINEATOR FOR GUARDRAIL BIDIRECTIONAL WHITE 14.00 EACH $
0650 02223 GRANULAR EMBANKMENT 30.00 CUYD $0660 02355 GUARDRAIL-STEEL W BEAM-S FACE A 100.00 LF $0670 02360 GUARDRAIL TERMINAL SECTION NO 1 1.00 EACH $0680 02371 GUARDRAIL END TREATMENT TYPE 7 3.00 EACH $
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 264 of 266
PROPOSAL BID ITEMS
Report Date 3/18/19Page 3 of 4
195066
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT0690 02399 EXTRA LENGTH GUARDRAIL POST 32.00 EACH $
0700 02545CLEARING AND GRUBBINGLess than 1 acre 1.00 LS $
0710 02650 MAINTAIN & CONTROL TRAFFIC 1.00 LS $0720 02651 DIVERSIONS (BY-PASS DETOURS) 1.00 LS $0730 02671 PORTABLE CHANGEABLE MESSAGE SIGN 2.00 EACH $0740 02726 STAKING 1.00 LS $0750 02731 REMOVE STRUCTURE 1.00 LS $0760 03299 ARMORED EDGE FOR CONCRETE 32.00 LF $0770 03304 BRIDGE OVERLAY APPROACH PAVEMENT 135.00 SQYD $0780 08003 FOUNDATION PREPARATION 1.00 LS $0790 08019 CYCLOPEAN STONE RIP RAP 65.00 TON $0800 08033 TEST PILES 36.00 LF $0810 08046 PILES-STEEL HP12X53 52.00 LF $0820 08094 PILE POINTS-12 IN 6.00 EACH $0830 08100 CONCRETE-CLASS A 15.50 CUYD $0840 08104 CONCRETE-CLASS AA 12.60 CUYD $0850 08151 STEEL REINFORCEMENT-EPOXY COATED 3,250.00 LB $0860 08661 PRECAST PC BOX BEAM CB12-48 134.00 LF $0870 08801 GUARDRAIL-STEEL W BEAM-S FACE BR 68.00 LF $0880 21415ND EROSION CONTROL 1.00 LS $
0890 24982ECCONCRETE COATINGApproximately 622 SF 1.00 LS $
Section: 0005 - BRIDGE - 114B00071NLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT
0900 01987DELINEATOR FOR GUARDRAIL BIDIRECTIONAL WHITE 12.00 EACH $
0910 02223 GRANULAR EMBANKMENT 28.00 CUYD $0920 02351 GUARDRAIL-STEEL W BEAM-S FACE 100.00 LF $0930 02355 GUARDRAIL-STEEL W BEAM-S FACE A 100.00 LF $0940 02381 REMOVE GUARDRAIL 262.00 LF $0950 02399 EXTRA LENGTH GUARDRAIL POST 32.00 EACH $
0960 02545CLEARING AND GRUBBINGLess than 1 acre 1.00 LS $
0970 02650 MAINTAIN & CONTROL TRAFFIC 1.00 LS $0980 02671 PORTABLE CHANGEABLE MESSAGE SIGN 2.00 EACH $0990 02726 STAKING 1.00 LS $1000 02731 REMOVE STRUCTURE 1.00 LS $1010 03299 ARMORED EDGE FOR CONCRETE 49.70 LF $1020 03304 BRIDGE OVERLAY APPROACH PAVEMENT 170.00 SQYD $1030 08002 STRUCTURE EXCAV-SOLID ROCK 166.70 CUYD $1040 08003 FOUNDATION PREPARATION 1.00 LS $1050 08019 CYCLOPEAN STONE RIP RAP 130.00 TON $1060 08100 CONCRETE-CLASS A 175.60 CUYD $1070 08104 CONCRETE-CLASS AA 12.10 CUYD $1080 08150 STEEL REINFORCEMENT 18,466.00 LB $1090 08151 STEEL REINFORCEMENT-EPOXY COATED 1,547.00 LB $
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 265 of 266
PROPOSAL BID ITEMS
Report Date 3/18/19Page 4 of 4
195066
LINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT1100 08661 PRECAST PC BOX BEAM CB12-48 183.00 LF $1110 08801 GUARDRAIL-STEEL W BEAM-S FACE BR 61.00 LF $1120 21415ND EROSION CONTROL 1.00 LS $
1130 24982ECCONCRETE COATINGApproximately 883 SF 1.00 LS $
Section: 0006 - DEMOBILIZATION &/OR MOBILIZATIONLINE BID CODE ALT DESCRIPTION QUANTITY UNIT UNIT PRIC FP AMOUNT1140 02569 DEMOBILIZATION 1.00 LS $
ALLEN - TODD - WARREN COUNTIES 121GR19D066-STP
REVISED ADDENDUM #2: 3-18-19 Contract ID: 195066
Page 266 of 266
NI
LC
ED
SE
STAT
EOF
KE
NT
UCKY
REENI
GN
EL
AN
OI
SS
EFORP
JO
N A
.
MIL
ES
24
48
5
PH
AS
ING
PL
AN
AN
D E
LE
VA
TIO
N
PC
IB
TY
PE
3
AB
UT
ME
NT
DE
TA
ILS
PIE
R D
ET
AIL
S
S4
S5
S6
S7
S8
S3
TY
PIC
AL
SE
CT
ION
S2
GE
NE
RA
L N
OT
ES
S1
TIT
LE
AN
D L
OC
AT
ION
MA
P
S9
INT
ER
ME
DIA
TE
DIA
PH
RA
GM
DE
TA
ILS
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
TIT
LE
AN
D L
OC
AT
ION
MA
P
S1
27
88
2
1/1
8/1
9
CONSTRUCTION PROJECT NO.LETTING DATE
IND
EX
OF
SH
EE
TS
Sh
eet
No
.D
escri
pti
on
SP
EC
IAL
NO
TE
S
ST
AN
DA
RD
DR
AW
ING
S
SP
EC
IFIC
AT
ION
S
DE
PA
RT
ME
NT
OF
HIG
HW
AY
S
BR
IDG
E R
EH
AB
ILIT
AT
ION
PL
AN
S
KE
NT
UC
KY
TR
AN
SP
OR
TA
TIO
N C
AB
INE
T
BR
IDG
E N
UM
BE
RP
RE
PA
RE
D B
Y
FILE NAME: DATE PLOTTED:
USER:
9:59:32 AM...\Drawing\Working\S1 Title.dgn
C
urrent Interim
s.
AA
SH
TO
LR
FD
Brid
ge C
on
stru
ctio
n S
pecificatio
ns w
ith
LO
CA
TIO
N M
AP
cquinn
3/11/2019
C
on
stru
ctio
n.
20
12
Stan
dard
Sp
ecificatio
ns f
or R
oad
an
d B
rid
ge
AC
TIV
E S
EP
IAS
For C
oncrete
Patc
hin
g R
epair
Fo
r C
on
crete
Co
ati
ng
For T
raffic
Contr
ol
on B
rid
ge R
epair
Contr
acts
Fo
r E
po
xy
In
jecti
on
Crack
Rep
air
in B
rid
ge R
ep
air
Co
ntr
acts
For C
ontr
act
Com
ple
tion D
ate
and L
iquid
ate
d D
am
ages
For E
rosio
n P
reventi
on a
nd S
edim
ent
Contr
ol
For O
ver t
he S
ide D
rain
age
Fo
r B
rid
ge O
verla
y A
pp
ro
ach
Pav
em
en
t
BB
P-0
01
-12
BB
P-0
02
-04
BG
X-0
06
-10
BJE
-00
1-1
3
Ela
sto
meric
Bearin
g P
ads f
or P
restr
essed B
eam
s
Bearin
g D
eta
ils
Sten
cils f
or S
tru
ctu
res
Neo
pren
e E
xp
an
sio
n D
am
s a
nd
Arm
ored
Ed
ges
024
027
028
032
033
035
Typic
al
Guardrail
Insta
llati
ons
Ste
el
Beam
Guard
rail
"W
" B
eam
Ste
el
Guardrail
Posts
Deli
neato
rs f
or G
uard
rail
Gu
ard
rail
Sy
ste
m T
ran
sit
ion
Rail
ing
Sy
ste
m T
yp
e I
I G
uard
rail
Treatm
en
t
36
°4
5' 1
0",-
86
°2
4' 3
7"
Mid
dle
Fo
rk
Drak
es C
r.
KY
58
5 O
ver
00
2B
00
02
1N
NI
LC
ED
SE
STAT
EOF
KE
NT
UCKY
REENI
GN
EL
AN
OI
SS
EFORP
JO
N A
.
MIL
ES
24
48
5
PL
AN
AN
D E
LE
VA
TIO
N
PC
IB
TY
PE
3
AB
UT
ME
NT
DE
TA
ILS
PIE
R D
ET
AIL
S
S4
S5
S6
S7
S8
S3
TY
PIC
AL
SE
CT
ION
S2
GE
NE
RA
L N
OT
ES
S1
TIT
LE
AN
D L
OC
AT
ION
MA
P
S9
INT
ER
ME
DIA
TE
DIA
PH
RA
GM
DE
TA
ILS
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
TIT
LE
AN
D L
OC
AT
ION
MA
P
S1
27
88
2
1/1
8/1
9
CONSTRUCTION PROJECT NO.LETTING DATE
IND
EX
OF
SH
EE
TS
Sh
eet
No
.D
escri
pti
on
SP
EC
IAL
NO
TE
S
ST
AN
DA
RD
DR
AW
ING
S
SP
EC
IFIC
AT
ION
S
DE
PA
RT
ME
NT
OF
HIG
HW
AY
S
BR
IDG
E R
EH
AB
ILIT
AT
ION
PL
AN
S
KE
NT
UC
KY
TR
AN
SP
OR
TA
TIO
N C
AB
INE
T
BR
IDG
E N
UM
BE
RP
RE
PA
RE
D B
Y
FILE NAME: DATE PLOTTED:
USER:
9:58:04 AM...\Revised 03-06-19\S1 Title.dgn
C
urrent Interim
s.
AA
SH
TO
LR
FD
Brid
ge C
on
stru
ctio
n S
pecificatio
ns w
ith
LO
CA
TIO
N M
AP
mwoosley
3/11/2019
C
on
stru
ctio
n.
20
12
Stan
dard
Sp
ecificatio
ns f
or R
oad
an
d B
rid
ge
AC
TIV
E S
EP
IAS
(NO
T U
SE
D)
For C
oncrete
Patc
hin
g R
epair
Fo
r C
on
crete
Co
ati
ng
For T
raffic
Contr
ol
on B
rid
ge R
epair
Contr
acts
Fo
r E
po
xy
In
jecti
on
Crack
Rep
air
in B
rid
ge R
ep
air
Co
ntr
acts
For C
ontr
act
Com
ple
tion D
ate
and L
iquid
ate
d D
am
ages
For E
rosio
n P
reventi
on a
nd S
edim
ent
Contr
ol
Fo
r B
rid
ge O
verla
y A
pp
ro
ach
Pav
em
en
t
BB
P-0
01
-12
BB
P-0
02
-04
BG
X-0
06
-10
BJE
-00
1-1
3
Ela
sto
meric
Bearin
g P
ads f
or P
restr
essed B
eam
s
Bearin
g D
eta
ils
Sten
cils f
or S
tru
ctu
res
Neo
pren
e E
xp
an
sio
n D
am
s a
nd
Arm
ored
Ed
ges
024
027
028
032
033
Typic
al
Guardrail
Insta
llati
ons
Ste
el
Beam
Guard
rail
"W
" B
eam
Ste
el
Guardrail
Posts
Deli
neato
rs f
or G
uard
rail
Gu
ard
rail
Sy
ste
m T
ran
sit
ion
36
°4
5' 1
0",-
86
°2
4' 3
7"
Mid
dle
Fo
rk
Drak
es C
r.
KY
58
5 O
ver
00
2B
00
02
1N
BH
S-0
08-0
2
BG
X-0
15
Brid
ge D
rain
s
Rail
Sy
ste
m T
yp
e 3
1R
ev
ised
No
tes f
or M
OT
3/6
/19
01
3
01
5
Gu
ard
rail
Co
nn
ecto
r t
o B
rid
ge E
nd
Ty
pe A
an
d A
-1
Co
mp
on
en
ts
Guardrail
Connecto
r t
o B
rid
ge E
nd T
ype A
1
MA
TE
RIA
LS
FO
R D
ES
IGN
SP
EC
IFIC
AT
ION
S:
For C
lass A
C
oncrete:
F'C
= 3
,50
0 p
si
Fo
r C
lass A
A C
on
crete:
F'C
= 4
,000 p
si
FY
= 6
0,0
00 p
si
Th
e S
pecificatio
ns, C
urren
t E
ditio
n, as d
esig
nated
b
elo
w sh
all g
ov
ern
th
e fo
llo
win
g m
aterials fu
rn
ish
ed
:
Grout
Material
Specification
Fo
r S
teel R
ein
fo
rcem
en
t:
site.
concrete. T
he C
ontractor shall dispose all rem
oved m
aterial off state right of w
ay in an approved
oil, grease, dirt, slurry, or any m
aterials w
hich could interfere w
ith the bond of freshly placed
rem
ove all fractured surface concrete and all traces of any unsound m
aterial or contam
inants such as
rem
ov
ed
; th
e rep
air su
rface sh
all b
e p
rep
ared
b
y ab
rasiv
e b
last clean
in
g. A
brasiv
e b
last clean
in
g sh
all
prev
en
t feath
er ed
gin
g u
nless o
th
erw
ise ap
pro
ved
b
y th
e E
ng
in
eer. A
fter all co
ncrete h
as b
een
except that the outer edges of all chipped areas shall be saw
cut to m
inim
um
depth of 1 inch to
perim
eter of all areas w
here concrete is rem
oved shall be tapered at an approxim
ately 45° angle,
to
n
ot d
am
ag
e b
on
d to
ad
jacen
t n
on
-ex
po
sed
rein
fo
rcin
g steel d
urin
g co
ncrete rem
ov
al p
ro
cesses. T
he
pn
eu
matic h
am
mers in
d
irect co
ntact w
ith
rein
fo
rcin
g steel th
at is to
b
e retain
ed
. C
are sh
all b
e tak
en
Contractor m
ay use ham
mers not exceeding 90 pounds upon the approval of the E
ngineer. D
o not place
35
p
ou
nd
s fo
r rem
ov
al w
ith
in
1
8 in
ch
es o
f p
ortio
ns to
b
e p
reserv
ed
. O
utsid
e th
e 1
8 in
ch
lim
it, th
e
Hydraulic hoe-ram
type ham
mers w
ill not be perm
itted. T
he w
eight of the ham
mer shall not be m
ore than
Rem
ov
e c
on
crete b
y m
ean
s o
f a
pp
ro
ved
pn
eu
matic h
am
mers e
mp
lo
yin
g p
oin
ted
an
d b
lu
nt c
hisel t
oo
ls.
B.
MA
TE
RIA
L N
OT
ES
req
uired
to
co
mp
lete th
e C
on
tract.
all o
r p
arts o
f th
e ex
istin
g stru
ctu
re, p
hase co
nstru
ctio
n, in
cid
en
tal m
aterials, lab
or, o
r an
yth
in
g else
in
cid
en
tal to
th
e C
on
tract. T
his m
ay
in
clu
de co
fferd
am
s, sh
orin
g, ex
cav
atio
ns, b
ack
fillin
g, rem
ov
al o
f
are to be included in the bid item
m
ost appropriate for the w
ork involved and otherw
ise considered
with
th
e P
lan
s an
d S
pecificatio
ns. M
aterial, lab
or, o
r co
nstru
ctio
n o
peratio
ns, n
ot o
th
erw
ise sp
ecified
,
CO
MP
LE
TIO
N O
F T
HE
ST
RU
CT
UR
E: T
he C
ontractor i
s r
equired t
o c
om
plete t
he s
tructure i
n a
ccordance
property of the C
ontractor and shall be rem
oved from
the right-of-w
ay.
DIS
PO
SA
L O
F M
AT
ER
IA
LS
: A
ll m
aterials a
nd
deb
ris r
em
ov
ed
fro
m o
r b
en
eath
th
e b
rid
ge s
hall b
eco
me t
he
BE
VE
LE
D E
DG
ES
: B
ev
el a
ll e
xp
osed
ed
ges ƒ
", u
nless o
th
erw
ise n
oted
.
sh
all b
e in
cid
en
tal to
th
e rep
air item
b
ein
g co
mp
leted
.
EX
IS
TIN
G S
TE
EL
RE
IN
FO
RC
EM
EN
T: T
he c
ost o
f c
uttin
g,
ben
din
g,
an
d c
lean
in
g e
xistin
g s
teel r
ein
fo
rcem
en
t
is 2" unless otherw
ise noted.
RE
IN
FO
RC
EM
EN
T: S
pacing of bars is from
center to center of bars. C
lear distance to face of concrete
used on the substructure.
CO
NC
RE
TE
: C
lass "
AA
" C
oncrete i
s t
o b
e u
sed t
hroughout t
he s
uperstructure. C
lass "
A" C
oncrete i
s t
o b
e
disturb existing utilities.
Contractor m
ust m
ake his ow
n determ
ination. E
xcept as show
n on the P
lans, w
ork around and do not
warran
t th
e lo
catio
ns an
d assu
mes n
o resp
on
sib
ility
fo
r th
e accu
racy
o
r co
mp
leten
ess. T
he
draw
ings to be approxim
ate only and for inform
ational purposes only. T
he D
epartm
ent does not
UT
IL
IT
IE
S: B
efore b
eginning w
ork, locate a
ll e
xisting u
tilities. C
onsider l
ocation o
f u
tilities s
how
n o
n t
he
be m
ade.
sh
all fu
rn
ish
all p
lan
s, eq
uip
men
t, an
d lab
or n
ecessary
to
d
o th
e w
ork
fo
r w
hich
n
o d
irect p
ay
men
t w
ill
im
prin
ted
in
th
e co
ncrete w
ith
1
" letters at a lo
catio
n d
esig
nated
b
y th
e E
ng
in
eer. T
he C
on
tracto
r
CO
NS
TR
UC
TIO
N I
DE
NT
IF
IC
AT
IO
N: T
he n
am
es o
f t
he P
rim
e C
ontractor a
nd t
he S
ub-C
ontractor s
hall b
e
bridge is prohibited.
CO
NS
TR
UC
TIO
N L
OA
D: T
he C
on
tracto
r s
hall a
bid
e b
y t
he p
osted
brid
ge l
im
its.
Sto
rag
e o
f m
aterial o
n t
he
DW
G #
9740.
guaranteed and no responsibility is assum
ed for their accuracy. P
lans of the existing structure are
av
ailab
le fro
m th
e D
iv
isio
n o
f M
ain
ten
an
ce, u
po
n req
uest. T
he co
mp
leten
ess o
f th
ese d
raw
in
gs is n
ot
PL
AN
S O
F E
XIS
TIN
G S
TR
UC
TU
RE
: A
s a
n a
id
to
th
e C
on
tracto
r,
th
e p
lan
s o
f t
he e
xistin
g s
tru
ctu
re a
re
th
at th
e req
uirem
en
t o
f A
rticle 1
04
.0
2.0
2 o
f th
e S
tan
dard
S
pecificatio
ns is satisfied
.
wo
rk
. In
ad
ditio
n, th
e o
verru
n an
d u
nd
erru
n fo
rm
ulas m
ay
b
e ap
plied
to
ap
pro
priate rep
airs p
ro
vid
ed
how
ever, the C
ontractor w
ill be paid for the quantity actually furnished at the unit price bid for the
variations shall not be cause for additional com
pensation for a change in the scope of the w
ork;
an
d m
ak
e th
e n
ecessary
ap
pro
ved
ad
ju
stm
en
ts p
rio
r to
co
nstru
ctio
n o
r o
rd
erin
g o
f m
aterials. S
uch
variatio
ns. It sh
all b
e th
e C
on
tracto
r's
resp
on
sib
ility
to
v
erify
su
ch
d
im
en
sio
ns an
d d
etails in
th
e field
dim
en
sio
ns an
d d
etails relativ
e to
th
e ex
istin
g stru
ctu
re are su
bject to
n
om
in
al co
nstru
ctio
n
VE
RIF
YIN
G F
IE
LD
CO
ND
IT
IO
NS
: D
im
ensions s
how
n o
n t
hese P
lans a
re t
aken f
rom
Existing P
lans. T
he P
lan
will not be honored by the D
epartm
ent of H
ighw
ays.
co
nsid
ered
ev
id
en
ce o
f th
is in
sp
ectio
n h
av
in
g b
een
m
ad
e. A
ll claim
s resu
ltin
g fro
m th
e site co
nd
itio
ns
so
th
at w
ork
can
ex
ped
itio
usly
p
erfo
rm
ed
after a C
on
tract is aw
ard
ed
. S
ub
missio
n o
f a b
id
w
ill b
e
th
e p
ro
ject site p
rio
r to
su
bm
ittin
g a b
id
an
d sh
all b
e th
oro
ug
hly
fam
iliarized
w
ith
ex
istin
g co
nd
itio
ns
ON
-S
IT
E I
NS
PE
CT
IO
N: E
ach C
ontractor s
ubm
itting a
bid f
or t
his w
ork s
hall m
ake a
thorough i
nspection o
f
FU
TU
RE
WE
AR
IN
G S
UR
FA
CE
: T
he d
esig
n i
nclu
des a
n a
llo
wan
ce f
or 1
5 p
sf f
or a
fu
tu
re w
earin
g s
urface.
designed b
y t
he L
RF
D m
ethod a
s s
pecified i
n t
he c
urrent A
AS
HT
O S
pecifications.
by i
ncreasing t
he s
tandard H
L93 l
oad a
s s
pecified i
n t
he A
AS
HT
O S
pecifications b
y 2
5%
. A
ll m
em
bers a
re
DE
SIG
N L
OA
D: T
his s
uperstructure i
s d
esigned f
or K
Y-H
L93 L
ive L
oad. T
he K
Y-H
L93 l
ive l
oad i
s a
rrived a
t
the A
AS
HT
O L
RF
D B
ridge C
onstruction S
pecifications, w
ith I
nterim
s.
supplem
ental S
pecifications. A
ll references to the A
AS
HT
O S
pecifications are to the current edition of
of H
ig
hw
ay
s S
tan
dard
S
pecificatio
ns fo
r R
oad
an
d B
rid
ge C
on
stru
ctio
n in
clu
din
g an
y cu
rren
t
SP
EC
IF
IC
AT
IO
NS
: R
eferen
ces t
o t
he S
pecificatio
ns a
re t
o t
he 2
01
2 E
ditio
n o
f t
he K
en
tu
ck
y D
ep
artm
en
t
GE
NE
RA
L N
OT
ES
A.
fro
m o
ut to
o
ut b
efo
re th
e co
ncrete is allo
wed
to
set.
SU
PE
RS
TR
UC
TU
RE
SL
AB
:
Th
e s
up
erstru
ctu
re s
lab
sh
all b
e p
ou
red
co
ntin
uo
usly
perm
itted provided the corrugations are filled w
ith styrofoam
.
ST
AY
-IN
-P
LA
CE
ME
TA
L F
OR
MS
: T
he u
se o
f s
tay
-in
-p
lace m
etal f
orm
wo
rk
fo
r t
he b
rid
ge d
eck
is
All paym
ent for this w
ork is incidental to the contract.
of d
eck
elev
atio
ns fo
r d
eterm
in
in
g X
-d
im
en
sio
ns. T
he p
ro
po
sed
p
ro
file g
rad
e sh
all n
early
m
atch
ex
istin
g.
Co
ntracto
r is req
uired
to
set th
e p
ro
file g
rad
e, d
eterm
in
e th
e b
rid
ge seat elev
atio
ns, an
d set to
p
ST
AK
IN
G: In
ad
ditio
n to
th
e req
uirem
en
ts sp
elled
o
ut in
S
ectio
n 2
01
o
f th
e S
tan
dard
S
pecificatio
ns, th
e
areas o
f rem
ain
in
g co
ncrete o
r rein
fo
rcin
g steel d
urin
g co
ncrete rem
ov
al o
peratio
ns.
rem
ain in place to be reused in the rehabilitated structure. C
are shall be exercised not to dam
age
partial rem
oval of the abutm
ents as show
n in the P
lans. P
ortions of the existing abutm
ents shall
su
perstru
ctu
re (rein
fo
rced
co
ncrete d
eck
, ralin
g, b
eam
s an
d rein
fo
rced
co
ncrete d
iap
hrag
ms), an
d
RE
MO
VE
ST
RU
CT
UR
E: T
his p
ay
item
fo
r "
Rem
ov
e S
tru
ctu
re" s
hall c
on
sist o
f t
he r
em
ov
al o
f t
he
th
at is in
acco
rd
an
ce w
ith
S
ectio
n 1
05
.1
2 o
f th
e S
pecificatio
ns.
th
e C
on
tract. A
fter co
mp
letio
n o
f all o
peratio
ns, th
e stru
ctu
re an
d site sh
all b
e left in
a co
nd
itio
n
un
til after th
e b
rid
ge h
as b
een
reo
pen
ed
to
n
orm
al traffic fo
llo
win
g co
mp
letio
n o
f all w
ork
req
uired
in
Co
ntracto
r is co
mp
letely
resp
on
sib
le fo
r th
e stab
ility
o
f th
e stru
ctu
re fro
m th
e tim
e o
f m
ob
ilizatio
n
and all dam
age to the structure, should such dam
age result from
the C
ontractor's
actions. T
he
DA
MA
GE
TO
TH
E S
TR
UC
TU
RE
: T
he C
on
tracto
r s
hall b
ear f
ull r
esp
on
sib
ility
an
d e
xp
en
se f
or r
ep
air o
f a
ny
sh
ou
ld
an
y d
am
ag
e resu
lt fro
m th
e C
on
tracto
r's
actio
ns.
construction during the life of the project shall be repaired by the C
ontractor at his expense,
DA
MA
GE
OU
TS
ID
E C
ON
ST
RU
CT
IO
N L
IM
IT
S: A
ny a
rea t
hat i
s d
isturbed o
utside o
f t
he l
im
its o
f t
he
shall be incidental to the unit bid price for D
ry C
yclopean S
tone R
ip R
ap.
protection in accordance w
ith the S
tandard S
pecification 214 and 843. P
aym
ent for G
eotextile F
abric T
ype 1
th
e P
lan
s an
d S
pecificatio
ns. G
eo
tex
tile F
ab
ric T
yp
e 1
sh
all b
e p
laced
b
etw
een
th
e em
ban
km
en
t an
d th
e slo
pe
SL
OP
E P
RO
TE
CT
IO
N:
Slo
pe p
ro
tectio
n s
hall b
e d
ry
cy
clo
pean
sto
ne s
lo
pe p
ro
tectio
n i
n a
cco
rd
an
ce w
ith
AA
SH
TO
M-3
1D
eform
ed a
nd P
lain B
illet-S
teel f
or C
oncrete R
einforcem
ent, G
rade 6
0
AA
SH
TO
M1
53
Prem
olded C
ork F
iller
reflecting these changes shall be subm
itted to the consultant through the contractor.
Wh
en
an
y ch
an
ges in
th
e d
esig
n p
lan
s are p
ro
po
sed
b
y th
e fab
ricato
r o
r su
pp
lier, th
e sh
op
d
raw
in
gs
by case basis.
of p
ap
er co
pies, C
on
stru
ctio
n M
an
ag
em
en
t T
eam
reserv
es th
e rig
ht to
req
uire su
ch
co
pies o
n a case
Man
ag
em
en
t T
eam
" are to
b
e u
sed
fo
r fab
ricatio
n. W
hile th
is p
ro
cess d
oes n
ot req
uire th
e su
bm
issio
n
Managem
ent T
eam
will b
e d
istributed, and o
nly p
lans e
lectronically s
tam
ped "
Distributed b
y C
onstruction
Co
nstru
ctio
n M
an
ag
em
en
t T
eam
fo
r d
istrib
utio
n. O
nly
p
lan
s su
bm
itted
d
irectly
to
th
e C
on
stru
ctio
n
desig
ner. E
ach
sh
eet w
ill b
e electro
nically
stam
ped
b
y th
e d
esig
ner an
d p
lan
s w
ill b
e fo
rw
ard
ed
to
th
e
to the fabricator. U
pon reconciliation of the designer's
com
ments, files shall be returned to the
sh
eets. D
esig
ners w
ill m
ak
e rev
iew
co
mm
en
ts o
n th
ese electro
nic su
bm
issio
ns as n
eed
ed
an
d retu
rn
th
em
rev
iew
. T
hese s
ub
missio
ns s
hall d
ep
ict t
he s
ho
p p
lan
s,
in
.p
df f
orm
at,
as e
ith
er 1
1" x
17
" o
r 2
2" x
36
"
SH
OP
DR
AW
IN
GS
: F
ab
ricato
rs s
hall s
ub
mit a
ll r
eq
uired
sh
op
plan
s,
by
e-m
ail,
to
th
e d
esig
n c
on
su
ltan
t f
or
feet for P
recast B
eam
s.
co
st o
f b
earin
g p
ad
s is to
b
e in
clu
ded
in
th
e u
nit p
rice p
er lin
ear
testin
g req
uirem
en
ts co
rresp
on
din
g to
D
esig
n M
eth
od
B
. T
he
betw
een 95 psi and 130 psi and shall be subjected to the load
Bearings s
hall b
e L
ow
Tem
perature G
rade 3
with a
shear m
odulus
Sectio
n 1
8.
th
e A
AS
HT
O S
tan
dard
Sp
ecificatio
ns f
or H
ig
hw
ay
Brid
ges,
Div
isio
n I
I,
EL
AS
TO
ME
RIC
BE
AR
IN
G P
AD
S:
Ela
sto
meric
Bearin
g P
ads s
hall
conform
to
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
GE
NE
RA
L N
OT
ES
S2
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:01:09 AM...\Working\S2- General Notes.dgn
cquinn
3/11/2019
quantity is different than this estim
ate.
to
v
erify
th
is estim
ate an
d b
id
ap
pro
priately
. N
o p
ay
men
t ad
ju
stm
en
ts w
ill b
e m
ad
e if th
e actu
al
CO
NC
RE
TE
CO
AT
IN
G: C
oncrete C
oating i
s e
stim
ated a
t 5
800 S
F. It i
s t
he r
esponsibility o
f t
he c
ontractor
Co
ncrete an
d n
o sep
arate m
easu
rem
en
t o
r p
ay
men
t sh
all b
e m
ad
e.
furnishing and installing M
astic T
ape shall be considered incidental to the unit price bid for C
lass "A
A"
Th
e co
st o
f th
is w
ork
, in
clu
din
g all m
aterials, lab
or, eq
uip
men
t, to
ols an
d in
cid
en
tals n
ecessary
fo
r
with t
he o
verlap r
unning d
ow
nhill.
spliced by lapping a m
inim
um
of six inches and in accordance w
ith the m
anufacturer's
recom
mendations
Mastic T
ap
e sh
all co
ver th
e jo
in
t co
ntin
uo
usly
u
nless o
th
erw
ise sh
ow
n in
th
e P
lan
s. M
astic T
ap
e sh
all b
e
CA
DIL
LO
C b
y U
P R
UB
BE
R C
O.
IN
C.
or a
n a
pp
ro
ved
eq
uiv
ale
nt.
SE
AL
WR
AP
by
MA
R M
AC
MA
NU
FA
CT
UR
ING
CO
. IN
C.,
EZ
-WR
AP
RU
BB
ER
by P
RE
SS
-SE
AL
GA
SK
ET
CO
RP
OR
AT
ION
,
Mastic T
ap
e sh
all b
e eith
er:
ap
plied
fo
r a m
in
im
um
w
id
th
o
f n
in
e in
ch
es o
n each
sid
e o
f th
e jo
in
t.
free of dirt, debris, or deleterious m
aterial. P
rim
er, if required by the tape m
anufacturer, shall be
to
b
e co
vered
w
ith
1
2-in
ch
w
id
e m
astic tap
e. P
rio
r to
ap
plicatio
n, th
e jo
in
t su
rface sh
all b
e clean
an
d
Mastic T
ap
e u
sed
to
seal jo
in
ts sh
all m
eet th
e req
uirem
en
ts o
f A
ST
M C
-8
77
T
yp
e I, II, o
r III. T
he jo
in
t is
su
perstru
ctu
re sh
all b
e w
aterp
ro
ofed
as d
etailed
o
n th
ese P
lan
s.
The joint betw
een the abutm
ent seats and superstructure and betw
een the abutm
ent w
ings and
JO
INT
WA
TE
RP
RO
OF
ING
AT
AB
UT
ME
NT
SC
.
MA
TE
RIA
LS
FO
R D
ES
IGN
SP
EC
IFIC
AT
ION
S:
For C
lass A
C
oncrete:
F'C
= 3
,50
0 p
si
Fo
r C
lass A
A C
on
crete:
F'C
= 4
,000 p
si
FY
= 6
0,0
00 p
si
Th
e S
pecificatio
ns, C
urren
t E
ditio
n, as d
esig
nated
b
elo
w sh
all g
ov
ern
th
e fo
llo
win
g m
aterials fu
rn
ish
ed
:
Grout
Material
Specification
Fo
r S
teel R
ein
fo
rcem
en
t:
site.
concrete. T
he C
ontractor shall dispose all rem
oved m
aterial off state right of w
ay in an approved
oil, grease, dirt, slurry, or any m
aterials w
hich could interfere w
ith the bond of freshly placed
rem
ove all fractured surface concrete and all traces of any unsound m
aterial or contam
inants such as
rem
ov
ed
; th
e rep
air su
rface sh
all b
e p
rep
ared
b
y ab
rasiv
e b
last clean
in
g. A
brasiv
e b
last clean
in
g sh
all
prev
en
t feath
er ed
gin
g u
nless o
th
erw
ise ap
pro
ved
b
y th
e E
ng
in
eer. A
fter all co
ncrete h
as b
een
except that the outer edges of all chipped areas shall be saw
cut to m
inim
um
depth of 1 inch to
perim
eter of all areas w
here concrete is rem
oved shall be tapered at an approxim
ately 45° angle,
to
n
ot d
am
ag
e b
on
d to
ad
jacen
t n
on
-ex
po
sed
rein
fo
rcin
g steel d
urin
g co
ncrete rem
ov
al p
ro
cesses. T
he
pn
eu
matic h
am
mers in
d
irect co
ntact w
ith
rein
fo
rcin
g steel th
at is to
b
e retain
ed
. C
are sh
all b
e tak
en
Contractor m
ay use ham
mers not exceeding 90 pounds upon the approval of the E
ngineer. D
o not place
35
p
ou
nd
s fo
r rem
ov
al w
ith
in
1
8 in
ch
es o
f p
ortio
ns to
b
e p
reserv
ed
. O
utsid
e th
e 1
8 in
ch
lim
it, th
e
Hydraulic hoe-ram
type ham
mers w
ill not be perm
itted. T
he w
eight of the ham
mer shall not be m
ore than
Rem
ov
e c
on
crete b
y m
ean
s o
f a
pp
ro
ved
pn
eu
matic h
am
mers e
mp
lo
yin
g p
oin
ted
an
d b
lu
nt c
hisel t
oo
ls.
B.
MA
TE
RIA
L N
OT
ES
req
uired
to
co
mp
lete th
e C
on
tract.
all o
r p
arts o
f th
e ex
istin
g stru
ctu
re, p
hase co
nstru
ctio
n, in
cid
en
tal m
aterials, lab
or, o
r an
yth
in
g else
in
cid
en
tal to
th
e C
on
tract. T
his m
ay
in
clu
de co
fferd
am
s, sh
orin
g, ex
cav
atio
ns, b
ack
fillin
g, rem
ov
al o
f
are to be included in the bid item
m
ost appropriate for the w
ork involved and otherw
ise considered
with
th
e P
lan
s an
d S
pecificatio
ns. M
aterial, lab
or, o
r co
nstru
ctio
n o
peratio
ns, n
ot o
th
erw
ise sp
ecified
,
CO
MP
LE
TIO
N O
F T
HE
ST
RU
CT
UR
E: T
he C
ontractor i
s r
equired t
o c
om
plete t
he s
tructure i
n a
ccordance
property of the C
ontractor and shall be rem
oved from
the right-of-w
ay.
DIS
PO
SA
L O
F M
AT
ER
IA
LS
: A
ll m
aterials a
nd
deb
ris r
em
ov
ed
fro
m o
r b
en
eath
th
e b
rid
ge s
hall b
eco
me t
he
disturb existing utilities.
Contractor m
ust m
ake his ow
n determ
ination. E
xcept as show
n on the P
lans, w
ork around and do not
warran
t th
e lo
catio
ns an
d assu
mes n
o resp
on
sib
ility
fo
r th
e accu
racy
o
r co
mp
leten
ess. T
he
draw
ings to be approxim
ate only and for inform
ational purposes only. T
he D
epartm
ent does not
UT
IL
IT
IE
S: B
efore b
eginning w
ork, locate a
ll e
xisting u
tilities. C
onsider l
ocation o
f u
tilities s
how
n o
n t
he
be m
ade.
sh
all fu
rn
ish
all p
lan
s, eq
uip
men
t, an
d lab
or n
ecessary
to
d
o th
e w
ork
fo
r w
hich
n
o d
irect p
ay
men
t w
ill
im
prin
ted
in
th
e co
ncrete w
ith
1
" letters at a lo
catio
n d
esig
nated
b
y th
e E
ng
in
eer. T
he C
on
tracto
r
CO
NS
TR
UC
TIO
N I
DE
NT
IF
IC
AT
IO
N: T
he n
am
es o
f t
he P
rim
e C
ontractor a
nd t
he S
ub-C
ontractor s
hall b
e
bridge is prohibited.
CO
NS
TR
UC
TIO
N L
OA
D: T
he C
on
tracto
r s
hall a
bid
e b
y t
he p
osted
brid
ge l
im
its.
Sto
rag
e o
f m
aterial o
n t
he
DW
G #
9740.
guaranteed and no responsibility is assum
ed for their accuracy. P
lans of the existing structure are
av
ailab
le fro
m th
e D
iv
isio
n o
f M
ain
ten
an
ce, u
po
n req
uest. T
he co
mp
leten
ess o
f th
ese d
raw
in
gs is n
ot
PL
AN
S O
F E
XIS
TIN
G S
TR
UC
TU
RE
: A
s a
n a
id
to
th
e C
on
tracto
r,
th
e p
lan
s o
f t
he e
xistin
g s
tru
ctu
re a
re
th
at th
e req
uirem
en
t o
f A
rticle 1
04
.0
2.0
2 o
f th
e S
tan
dard
S
pecificatio
ns is satisfied
.
wo
rk
. In
ad
ditio
n, th
e o
verru
n an
d u
nd
erru
n fo
rm
ulas m
ay
b
e ap
plied
to
ap
pro
priate rep
airs p
ro
vid
ed
how
ever, the C
ontractor w
ill be paid for the quantity actually furnished at the unit price bid for the
variations shall not be cause for additional com
pensation for a change in the scope of the w
ork;
an
d m
ak
e th
e n
ecessary
ap
pro
ved
ad
ju
stm
en
ts p
rio
r to
co
nstru
ctio
n o
r o
rd
erin
g o
f m
aterials. S
uch
variatio
ns. It sh
all b
e th
e C
on
tracto
r's
resp
on
sib
ility
to
v
erify
su
ch
d
im
en
sio
ns an
d d
etails in
th
e field
dim
en
sio
ns an
d d
etails relativ
e to
th
e ex
istin
g stru
ctu
re are su
bject to
n
om
in
al co
nstru
ctio
n
VE
RIF
YIN
G F
IE
LD
CO
ND
IT
IO
NS
: D
im
ensions s
how
n o
n t
hese P
lans a
re t
aken f
rom
Existing P
lans. T
he P
lan
will not be honored by the D
epartm
ent of H
ighw
ays.
co
nsid
ered
ev
id
en
ce o
f th
is in
sp
ectio
n h
av
in
g b
een
m
ad
e. A
ll claim
s resu
ltin
g fro
m th
e site co
nd
itio
ns
so
th
at w
ork
can
ex
ped
itio
usly
p
erfo
rm
ed
after a C
on
tract is aw
ard
ed
. S
ub
missio
n o
f a b
id
w
ill b
e
th
e p
ro
ject site p
rio
r to
su
bm
ittin
g a b
id
an
d sh
all b
e th
oro
ug
hly
fam
iliarized
w
ith
ex
istin
g co
nd
itio
ns
ON
-S
IT
E I
NS
PE
CT
IO
N: E
ach C
ontractor s
ubm
itting a
bid f
or t
his w
ork s
hall m
ake a
thorough i
nspection o
f
FU
TU
RE
WE
AR
IN
G S
UR
FA
CE
: T
he d
esig
n i
nclu
des a
n a
llo
wan
ce f
or 1
5 p
sf f
or a
fu
tu
re w
earin
g s
urface.
designed b
y t
he L
RF
D m
ethod a
s s
pecified i
n t
he c
urrent A
AS
HT
O S
pecifications.
by i
ncreasing t
he s
tandard H
L93 l
oad a
s s
pecified i
n t
he A
AS
HT
O S
pecifications b
y 2
5%
. A
ll m
em
bers a
re
DE
SIG
N L
OA
D: T
his s
uperstructure i
s d
esigned f
or K
Y-H
L93 L
ive L
oad. T
he K
Y-H
L93 l
ive l
oad i
s a
rrived a
t
the A
AS
HT
O L
RF
D B
ridge C
onstruction S
pecifications, w
ith I
nterim
s.
supplem
ental S
pecifications. A
ll references to the A
AS
HT
O S
pecifications are to the current edition of
of H
ig
hw
ay
s S
tan
dard
S
pecificatio
ns fo
r R
oad
an
d B
rid
ge C
on
stru
ctio
n in
clu
din
g an
y cu
rren
t
SP
EC
IF
IC
AT
IO
NS
: R
eferen
ces t
o t
he S
pecificatio
ns a
re t
o t
he 2
01
2 E
ditio
n o
f t
he K
en
tu
ck
y D
ep
artm
en
t
GE
NE
RA
L N
OT
ES
A.
fro
m o
ut to
o
ut b
efo
re th
e co
ncrete is allo
wed
to
set.
SU
PE
RS
TR
UC
TU
RE
SL
AB
:
Th
e s
up
erstru
ctu
re s
lab
sh
all b
e p
ou
red
co
ntin
uo
usly
perm
itted provided the corrugations are filled w
ith styrofoam
.
ST
AY
-IN
-P
LA
CE
ME
TA
L F
OR
MS
: T
he u
se o
f s
tay
-in
-p
lace m
etal f
orm
wo
rk
fo
r t
he b
rid
ge d
eck
is
All paym
ent for this w
ork is incidental to the contract.
of d
eck
elev
atio
ns fo
r d
eterm
in
in
g X
-d
im
en
sio
ns. T
he p
ro
po
sed
p
ro
file g
rad
e sh
all n
early
m
atch
ex
istin
g.
Co
ntracto
r is req
uired
to
set th
e p
ro
file g
rad
e, d
eterm
in
e th
e b
rid
ge seat elev
atio
ns, an
d set to
p
ST
AK
IN
G: In
ad
ditio
n to
th
e req
uirem
en
ts sp
elled
o
ut in
S
ectio
n 2
01
o
f th
e S
tan
dard
S
pecificatio
ns, th
e
areas o
f rem
ain
in
g co
ncrete o
r rein
fo
rcin
g steel d
urin
g co
ncrete rem
ov
al o
peratio
ns.
rem
ain in place to be reused in the rehabilitated structure. C
are shall be exercised not to dam
age
partial rem
oval of the abutm
ents as show
n in the P
lans. P
ortions of the existing abutm
ents shall
su
perstru
ctu
re (rein
fo
rced
co
ncrete d
eck
, ralin
g, b
eam
s an
d rein
fo
rced
co
ncrete d
iap
hrag
ms), an
d
RE
MO
VE
ST
RU
CT
UR
E: T
his p
ay
item
fo
r "
Rem
ov
e S
tru
ctu
re" s
hall c
on
sist o
f t
he r
em
ov
al o
f t
he
th
at is in
acco
rd
an
ce w
ith
S
ectio
n 1
05
.1
2 o
f th
e S
pecificatio
ns.
th
e C
on
tract. A
fter co
mp
letio
n o
f all o
peratio
ns, th
e stru
ctu
re an
d site sh
all b
e left in
a co
nd
itio
n
un
til after th
e b
rid
ge h
as b
een
reo
pen
ed
to
n
orm
al traffic fo
llo
win
g co
mp
letio
n o
f all w
ork
req
uired
in
Co
ntracto
r is co
mp
letely
resp
on
sib
le fo
r th
e stab
ility
o
f th
e stru
ctu
re fro
m th
e tim
e o
f m
ob
ilizatio
n
and all dam
age to the structure, should such dam
age result from
the C
ontractor's
actions. T
he
DA
MA
GE
TO
TH
E S
TR
UC
TU
RE
: T
he C
on
tracto
r s
hall b
ear f
ull r
esp
on
sib
ility
an
d e
xp
en
se f
or r
ep
air o
f a
ny
sh
ou
ld
an
y d
am
ag
e resu
lt fro
m th
e C
on
tracto
r's
actio
ns.
construction during the life of the project shall be repaired by the C
ontractor at his expense,
DA
MA
GE
OU
TS
ID
E C
ON
ST
RU
CT
IO
N L
IM
IT
S: A
ny a
rea t
hat i
s d
isturbed o
utside o
f t
he l
im
its o
f t
he
shall be incidental to the unit bid price for D
ry C
yclopean S
tone R
ip R
ap.
protection in accordance w
ith the S
tandard S
pecification 214 and 843. P
aym
ent for G
eotextile F
abric T
ype 1
th
e P
lan
s an
d S
pecificatio
ns. G
eo
tex
tile F
ab
ric T
yp
e 1
sh
all b
e p
laced
b
etw
een
th
e em
ban
km
en
t an
d th
e slo
pe
SL
OP
E P
RO
TE
CT
IO
N:
Slo
pe p
ro
tectio
n s
hall b
e d
ry
cy
clo
pean
sto
ne s
lo
pe p
ro
tectio
n i
n a
cco
rd
an
ce w
ith
AA
SH
TO
M-3
1D
eform
ed a
nd P
lain B
illet-S
teel f
or C
oncrete R
einforcem
ent, G
rade 6
0
AA
SH
TO
M1
53
Prem
olded C
ork F
iller
reflecting these changes shall be subm
itted to the consultant through the contractor.
Wh
en
an
y ch
an
ges in
th
e d
esig
n p
lan
s are p
ro
po
sed
b
y th
e fab
ricato
r o
r su
pp
lier, th
e sh
op
d
raw
in
gs
by case basis.
of p
ap
er co
pies, C
on
stru
ctio
n M
an
ag
em
en
t T
eam
reserv
es th
e rig
ht to
req
uire su
ch
co
pies o
n a case
Man
ag
em
en
t T
eam
" are to
b
e u
sed
fo
r fab
ricatio
n. W
hile th
is p
ro
cess d
oes n
ot req
uire th
e su
bm
issio
n
Managem
ent T
eam
will b
e d
istributed, and o
nly p
lans e
lectronically s
tam
ped "
Distributed b
y C
onstruction
Co
nstru
ctio
n M
an
ag
em
en
t T
eam
fo
r d
istrib
utio
n. O
nly
p
lan
s su
bm
itted
d
irectly
to
th
e C
on
stru
ctio
n
desig
ner. E
ach
sh
eet w
ill b
e electro
nically
stam
ped
b
y th
e d
esig
ner an
d p
lan
s w
ill b
e fo
rw
ard
ed
to
th
e
to the fabricator. U
pon reconciliation of the designer's
com
ments, files shall be returned to the
sh
eets. D
esig
ners w
ill m
ak
e rev
iew
co
mm
en
ts o
n th
ese electro
nic su
bm
issio
ns as n
eed
ed
an
d retu
rn
th
em
rev
iew
. T
hese s
ub
missio
ns s
hall d
ep
ict t
he s
ho
p p
lan
s,
in
.p
df f
orm
at,
as e
ith
er 1
1" x
17
" o
r 2
2" x
36
"
SH
OP
DR
AW
IN
GS
: F
ab
ricato
rs s
hall s
ub
mit a
ll r
eq
uired
sh
op
plan
s,
by
e-m
ail,
to
th
e d
esig
n c
on
su
ltan
t f
or
feet for P
recast B
eam
s.
co
st o
f b
earin
g p
ad
s is to
b
e in
clu
ded
in
th
e u
nit p
rice p
er lin
ear
testin
g req
uirem
en
ts co
rresp
on
din
g to
D
esig
n M
eth
od
B
. T
he
betw
een 95 psi and 130 psi and shall be subjected to the load
Bearings s
hall b
e L
ow
Tem
perature G
rade 3
with a
shear m
odulus
Sectio
n 1
8.
th
e A
AS
HT
O S
tan
dard
Sp
ecificatio
ns f
or H
ig
hw
ay
Brid
ges,
Div
isio
n I
I,
EL
AS
TO
ME
RIC
BE
AR
IN
G P
AD
S:
Ela
sto
meric
Bearin
g P
ads s
hall
conform
to
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
GE
NE
RA
L N
OT
ES
S2
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
9:59:33 AM...\S2- General Notes.dgn
mwoosley
3/11/2019
BE
VE
LE
D E
DG
ES
: B
ev
el a
ll e
xp
osed
ed
ges ƒ
", u
nless o
th
erw
ise n
oted
.
sh
all b
e in
cid
en
tal to
th
e rep
air item
b
ein
g co
mp
leted
.
EX
IS
TIN
G S
TE
EL
RE
IN
FO
RC
EM
EN
T: T
he c
ost o
f c
uttin
g,
ben
din
g,
an
d c
lean
in
g e
xistin
g s
teel r
ein
fo
rcem
en
t
is 2
" u
nless o
th
erw
ise n
oted
. A
ll rein
fo
rcin
g b
ars are to
b
e ep
ox
y co
ated
.
RE
IN
FO
RC
EM
EN
T: S
pacing of bars is from
center to center of bars. C
lear distance to face of concrete
used on the substructure.
CO
NC
RE
TE
: C
lass "
AA
" C
oncrete i
s t
o b
e u
sed t
hroughout t
he s
uperstructure. C
lass "
A" C
oncrete i
s t
o b
e
1C
larify
Ep
ox
y C
oated
Rein
fo
rcin
g3/6/19
1
quantity is different than this estim
ate.
to
v
erify
th
is estim
ate an
d b
id
ap
pro
priately
. N
o p
ay
men
t ad
ju
stm
en
ts w
ill b
e m
ad
e if th
e actu
al
CO
NC
RE
TE
CO
AT
IN
G: C
oncrete C
oating i
s e
stim
ated a
t 7
200 S
F. It i
s t
he r
esponsibility o
f t
he c
ontractor
Co
ncrete an
d n
o sep
arate m
easu
rem
en
t o
r p
ay
men
t sh
all b
e m
ad
e.
furnishing and installing M
astic T
ape shall be considered incidental to the unit price bid for C
lass "A
A"
Th
e co
st o
f th
is w
ork
, in
clu
din
g all m
aterials, lab
or, eq
uip
men
t, to
ols an
d in
cid
en
tals n
ecessary
fo
r
with t
he o
verlap r
unning d
ow
nhill.
spliced by lapping a m
inim
um
of six inches and in accordance w
ith the m
anufacturer's
recom
mendations
Mastic T
ap
e sh
all co
ver th
e jo
in
t co
ntin
uo
usly
u
nless o
th
erw
ise sh
ow
n in
th
e P
lan
s. M
astic T
ap
e sh
all b
e
CA
DIL
LO
C b
y U
P R
UB
BE
R C
O.
IN
C.
or a
n a
pp
ro
ved
eq
uiv
ale
nt.
SE
AL
WR
AP
by
MA
R M
AC
MA
NU
FA
CT
UR
ING
CO
. IN
C.,
EZ
-WR
AP
RU
BB
ER
by P
RE
SS
-SE
AL
GA
SK
ET
CO
RP
OR
AT
ION
,
Mastic T
ap
e sh
all b
e eith
er:
ap
plied
fo
r a m
in
im
um
w
id
th
o
f n
in
e in
ch
es o
n each
sid
e o
f th
e jo
in
t.
free of dirt, debris, or deleterious m
aterial. P
rim
er, if required by the tape m
anufacturer, shall be
to
b
e co
vered
w
ith
1
2-in
ch
w
id
e m
astic tap
e. P
rio
r to
ap
plicatio
n, th
e jo
in
t su
rface sh
all b
e clean
an
d
Mastic T
ap
e u
sed
to
seal jo
in
ts sh
all m
eet th
e req
uirem
en
ts o
f A
ST
M C
-8
77
T
yp
e I, II, o
r III. T
he jo
in
t is
su
perstru
ctu
re sh
all b
e w
aterp
ro
ofed
as d
etailed
o
n th
ese P
lan
s.
The joint betw
een the abutm
ent seats and superstructure and betw
een the abutm
ent w
ings and
JO
INT
WA
TE
RP
RO
OF
ING
AT
AB
UT
ME
NT
SC
.
2Š
"3ƒ"
fo
r C
on
crete Q
uan
tities)
(A
ssu
med
Hau
nch
Dim
en
sio
ns
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
TY
PIC
AL
SE
CT
ION
S3
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:02:38 AM...\Working\S3 Typical Section.dgn
cquinn
3/11/2019
24'-
2"
2'-
1"
10
'-0
"2'-
1"
10
'-0
"
6'-
0•"
6'-
0"
6'-
0•"
2'-
2•" 1
'-8"
2'-
2•"
1'-
8"
4'-
4•"
1'-
8"
4'-
4"
1'-
8"
4'-
4•"
4"
1'-
11•"
1•"
10
ˆ"
1'-
3"
1"
1"
1'-
5"
3'-
8"
3'-
8‘"
3'-
8"
3'-
8‘"
3'-
8"
3'-
8"
EX
. T
YP
ICA
L S
EC
TIO
N
3'-
8•"
3'-
8•"
PR
. T
YP
ICA
L S
EC
TIO
N
24
'-6
"9
"9
"
3'-
10
"6
'-0
"6'-
4"
6'-
0"
3'-
10
"
1'-
2"
8" (
Typ.)
5'-
8"
10
"
2'-
10
"
TY
PE
1 B
AR
rein
f.
Ty
pe 1
Bar
betw
een
ty
p. tran
sv
erse
#5
Bar @
8" S
pa.
#5
Bars @
8" T
&B
#5 B
ars @
12" T
&B
10
"1
0"
betw
een
#
5 B
ars o
ver P
iers
2~
#6 B
ars 1
0'-
0" L
ong
! B
ridge
! B
ridge
3'-
2"
2%
2%
Drip S
trip, (T
yp.)
Type 2
(T
yp.)
Install R
ail S
ystem
Mechanic
al
Couple
rs
1" C
LR
2•" C
LR
2Š
"3ƒ"
fo
r C
on
crete Q
uan
tities)
(A
ssu
med
Hau
nch
Dim
en
sio
ns
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
TY
PIC
AL
SE
CT
ION
S3
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:00:38 AM...\S3 Typical Section.dgn
mwoosley
3/11/2019
24'-
2"
2'-
1"
10
'-0
"2'-
1"
10
'-0
"
6'-
0•"
6'-
0"
6'-
0•"
2'-
2•" 1
'-8"
2'-
2•"
1'-
8"
4'-
4•"
1'-
8"
4'-
4"
1'-
8"
4'-
4•"
4"
1'-
11•"
1•"
10
ˆ"
1'-
3"
1"
1"
1'-
5"
3'-
8"
3'-
8‘"
3'-
8"
3'-
8‘"
3'-
8"
3'-
8"
EX
. T
YP
ICA
L S
EC
TIO
N
3'-
8•"
3'-
8•"
PR
. T
YP
ICA
L S
EC
TIO
N
2'-
11"
6'-
0"
6'-
4"
6'-
0"
2'-
11"
8" (
Typ.)
TY
PE
1 B
AR
! B
ridge
! B
ridge
3'-
2"
2%
2%
Type 3
(T
yp.)
Install R
ail S
ystem
1" C
LR
2•" C
LR
Revised D
etails f
or M
OT
3/6/19
24
'-2
" O
ut t
o O
ut
1'-
6"
21'-
2" R
oadw
ay W
idth
1'-
6"
1
1'-
6"
5'-
9"
1
tran
sv
erse b
ar
w/ ev
ery
o
th
er
#5 T
ype 1
Bar @
12" S
pa.
3'-
0" M
in.
#5 B
ars @
6" T
&B
betw
een
#
4 B
ars o
ver P
iers
#6
Bars 1
0'-
0" L
on
g
#4 B
ars @
12" (
Top)
#5 B
ars @
8" (
Bottom
)
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
PL
AN
AN
D E
LE
VA
TIO
N
S5
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:06:32 AM...\S5 Plan and Elevation.dgn
cquinn
3/11/2019
PL
AN
Flow
-2
% Grade
54
1.2
07
Seat E
l.
159'-
0" O
ut t
o O
ut
53
'-0
"5
3'-
0"
53
'-0
"
21
'-0
"2
1'-
0"
29
'-0
"2
8'-
0"
13'-
6"
26
'-6
"
54
4.3
87
Seat E
l.
54
3.3
27
Seat E
l.
54
2.2
67
Seat E
l.
EL
EV
AT
ION
Pier 2
Pier 3
Ab
ut.
1
Ab
ut.
4
for L
im
its of E
xcavation (T
yp.)
Ov
erlay
Ap
pro
ach
Pav
em
en
t
See S
pecial N
ote f
or B
ridge
25
'-0
"2
5'-
0"
Pavem
ent (
Typ.)
Overlay A
pproach
Lim
its o
f B
ridge
DE
TA
IL
JOIN
T W
AT
ER
PR
OO
FIN
G
En
d o
f B
rid
ge
Mastic T
ape
Back F
ace of A
but.
of bridge to prevent dam
age to tape.
shall be looped as sh
ow
n at expansion en
ds
betw
een beam
ends and abutm
ent. T
ape
mastic tape to w
ater-proof the joint
Note: C
ontractor s
hall p
rovide 1
2" w
ide
quarter points of span
betw
een beam
s at
In
term
ed
iate D
iap
hrag
ms
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
PL
AN
AN
D E
LE
VA
TIO
N
S5
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:01:44 AM...\S5 Plan and Elevation.dgn
mwoosley
3/11/2019
PL
AN
Flow
-2
% Grade
54
1.2
07
Seat E
l.
159'-
0" O
ut t
o O
ut
53
'-0
"5
3'-
0"
53
'-0
"
21
'-0
"2
1'-
0"
29
'-0
"2
8'-
0"
13'-
6"
26
'-6
"
54
4.3
87
Seat E
l.
54
3.3
27
Seat E
l.
54
2.2
67
Seat E
l.
EL
EV
AT
ION
Pier 2
Pier 3
Ab
ut.
1
Ab
ut.
4
for L
im
its of E
xcavation (T
yp.)
Ov
erlay
Ap
pro
ach
Pav
em
en
t
See S
pecial N
ote f
or B
ridge
25
'-0
"2
5'-
0"
Pavem
ent (
Typ.)
Overlay A
pproach
Lim
its o
f B
ridge
DE
TA
IL
JOIN
T W
AT
ER
PR
OO
FIN
G
En
d o
f B
rid
ge
Mastic T
ape
Back F
ace of A
but.
of bridge to prevent dam
age to tape.
shall be looped as sh
ow
n at expansion en
ds
betw
een beam
ends and abutm
ent. T
ape
mastic tape to w
ater-proof the joint
Note: C
ontractor s
hall p
rovide 1
2" w
ide
quarter points of span
betw
een beam
s at
In
term
ed
iate D
iap
hrag
ms
1
24'-
2"
Revised D
etails f
or M
OT
3/6/19
1
1'-
0"
1'-
0"
2'-
6"
2'-
0"
1'-
11"
11"
1'-
11"
11"
AA
BB
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
AB
UT
ME
NT
DE
TA
ILS
S7
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:10:33 AM...\S7 Abutment Details.dgn
cquinn
3/11/2019
Abutm
ent
1(L
oo
kin
g B
ack
)A
butm
ent
4
Pad T
ype 2
E (
typ.)
Elasto
meric B
earin
gS
tyrofoam
3‚" C
ork
o
r
•" C
ork
Lim
its of S
tructure R
em
oval
Lim
its o
f C
on
crete P
atch
in
g R
ep
air
Leg
en
d
5'-
0"
3'-
0"
5'-
6"
2'-
10•"
2'-
10
"
30
'-0
"
24'-
2•"
•"
•"
2'-
10•"
2'-
10
"
30
'-0
"
24'-
2•"
•"
•"
4'-
3•"
Ap
pro
xim
ate L
im
its o
f E
po
xy
In
jectio
n R
ep
air
4'-
0"
3'-
0"
5'-
6"
Pad T
ype 2
E (
typ.)
Elasto
meric B
earin
gS
tyrofoam
3‚" C
ork
o
r
•" C
ork
(L
ookin
g A
head)
2'-
0" 1'-
1"
11"
Styrofoam
3‚" C
ork
o
r
8"
Varies
Hau
nch
Beam
3'-
9"
Slab
Bars
#5 Bars @ 12"
Beam
s
betw
een
4~
#5 B
ars
Brg. P
ad
Ty
pe 2
E E
lasto
meric
Std
. D
wg
. B
JE
-0
01
-1
3)
Arm
ored
Ed
ge (
See
•" C
ork
T
yp
.•" C
ork
T
yp
.
4'-
3•"
Secti
on A
-A
~4'-
0"
~4'-
0"
(T
yp
e 2
Bar)
#5
Bar @
12
" m
ax
.
4'-
2"
1'-
8"
Ty
pe 2
Bar
1'-
0"
1'-
0"
2'-
6"
2'-
0"
AA
BB
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
AB
UT
ME
NT
DE
TA
ILS
S7
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:02:57 AM...\S7 Abutment Details.dgn
mwoosley
3/11/2019
Abutm
ent
1(L
oo
kin
g B
ack
)A
butm
ent
4
Pad T
ype 2
E (
typ.)
Elasto
meric B
earin
gS
tyrofoam
3‚" C
ork
o
r
•" C
ork
Lim
its o
f C
on
crete P
atch
in
g R
ep
air
Leg
en
d
5'-
0"
3'-
0"
5'-
6"
2'-
10•"
2'-
10
"
30
'-0
"
24'-
2•"
•"
•"
2'-
10•"
2'-
10
"
30
'-0
"
24'-
2•"
•"
•"
4'-
3•"
Ap
pro
xim
ate L
im
its o
f E
po
xy
In
jectio
n R
ep
air
4'-
0"
3'-
0"
5'-
6"
Pad T
ype 2
E (
typ.)
Elasto
meric B
earin
gS
tyrofoam
3‚" C
ork
o
r
•" C
ork
(L
ookin
g A
head)
2'-
0" 1'-
1"
11"
Styrofoam
3‚" C
ork
o
r
8"
Varies
Hau
nch
Beam
3'-
9"
Slab
Bars
#5 Bars @ 12"
Beam
s
betw
een
4~
#5 B
ars
Brg. P
ad
Ty
pe 2
E E
lasto
meric
Std
. D
wg
. B
JE
-0
01
-1
3)
Arm
ored
Ed
ge (
See
•" C
ork
T
yp
.•" C
ork
T
yp
.
4'-
3•"
Secti
on A
-A
~4'-
0"
~4'-
0"
(T
yp
e 2
Bar)
#5
Bar @
12
" m
ax
.
4'-
2"
1'-
8"
Ty
pe 2
Bar
1R
evise D
etails f
or M
OT
3/6/19
1
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
PIE
R D
ET
AIL
S
S8
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:11:43 AM...\Working\S8 Pier Details.dgn
cquinn
3/11/2019
CO
LU
MN
SE
CT
ION
CO
LU
MN
SE
CT
ION
PIE
R C
AP
PL
AN
PIE
R C
AP
PL
AN
(L
ookin
g A
head)
(L
ookin
g A
head)
21
'-0
"
3'-
4"
19
'-0
"
1'-
0"
2'-
6"
1'-
0"
10
'-0
"1'-
0"
2'-
6"
1'-
0"
3'-
4"
21
'-0
"
19
'-0
"
1'-
0"
2'-
6"
1'-
0"
10
'-0
"1'-
0"
2'-
6"
1'-
0"
(E
po
xy
Co
ate
d) (
12
" m
in E
mb
ed
.)
Drill a
nd
Gro
ut #
8 D
ow
el B
ars
(E
poxy C
oate
d) (
12" m
in E
mbed.)
Drill a
nd G
rout #
8 D
ow
el B
ars
Ty
pe 2
E (
Ty
p.)
Elasto
meric B
rg
. P
ad
Ty
pe 2
E (
Ty
p.)
Elasto
meric B
rg
. P
ad
Styrofoam
3‚" C
ork
o
r
Styrofoam
3‚" C
ork
o
r
(N
ear F
ace)
Crack F
ull H
t.
Epoxy I
nject
and E
nd)
(B
oth F
aces
Patch
Pier C
ap
and E
nd)
(B
oth F
aces
Patch
Pier C
ap
(N
ear F
ace)
Rep
air
Co
nc.
Patch
(N
ear F
ace)
Crack F
ull H
t.
Epoxy I
nject
(B
ack F
ace)
Rep
air
Co
nc.
Patch
and E
nd)
(B
oth F
aces
Patch
Pier C
ap
3'-
0" 1'-
6"
1'-
6"
8" S
lab
Varies
Haunch
Type 2
E
Brg. P
ad
Elasto
meric
Sty
ro
fo
am
3‚" C
ork
o
r
Beam
s (
both s
ides)
4~
#5 B
ars b
etw
een
PIE
R D
IAP
HR
AG
M
Beam
3'-
9"
PIE
R 2
EL
EV
AT
ION
PIE
R 2
SE
CT
ION
PIE
R 3
EL
EV
AT
ION
PIE
R 3
SE
CT
ION
Detail
Dia
phragm
See P
ier
Detail
Dia
phragm
See P
ier
(T
yp
e 3
Bar)
#5
Bars @
12
" m
ax
.
Ty
pe 3
Bar
4'-
2"
2'-
8"
E-SHEET NAME: MicroStation v8.11.9.459
DR
AW
ING
NO
.
SH
EE
T N
O.
Com
monw
ealt
h o
f K
entu
cky
DE
PA
RT
ME
NT
OF
HIG
HW
AY
SC
OU
NT
Y
RO
UT
EC
RO
SS
ING
PR
EP
AR
ED
BY
DE
TA
IL
ED
BY
:
DE
SIG
NE
D B
Y:
DA
TE
:C
HE
CK
ED
BY
RE
VIS
IO
ND
AT
E
002B
00021N
J. M
IL
ES
S.
WE
BE
R
C.
QU
INN
J. M
IL
ES
AL
LE
N
KY
585
MID
DL
E F
OR
K D
RA
KE
S C
RE
EK
PIE
R D
ET
AIL
S
S8
27
88
2
1/1
8/1
9
BR
IDG
E N
UM
BE
R
DATE PLOTTED:
USER: FILE NAME:
10:04:06 AM...\S8 Pier Details.dgn
mwoosley
3/11/2019
CO
LU
MN
SE
CT
ION
CO
LU
MN
SE
CT
ION
PIE
R C
AP
PL
AN
PIE
R C
AP
PL
AN
(L
ookin
g A
head)
(L
ookin
g A
head)
21
'-0
"
3'-
4"
19
'-0
"
1'-
0"
2'-
6"
1'-
0"
10
'-0
"1'-
0"
2'-
6"
1'-
0"
3'-
4"
21
'-0
"
19
'-0
"
1'-
0"
2'-
6"
1'-
0"
10
'-0
"1'-
0"
2'-
6"
1'-
0"
Ty
pe 2
E (
Ty
p.)
Elasto
meric B
rg
. P
ad
Ty
pe 2
E (
Ty
p.)
Elasto
meric B
rg
. P
ad
Styrofoam
3‚" C
ork
o
r
Styrofoam
3‚" C
ork
o
r
(N
ear F
ace)
Crack F
ull H
t.
Epoxy I
nject
and E
nd)
(B
oth F
aces
Patch
Pier C
ap
and E
nd)
(B
oth F
aces
Patch
Pier C
ap
(N
ear F
ace)
Rep
air
Co
nc.
Patch
(N
ear F
ace)
Crack F
ull H
t.
Epoxy I
nject
(B
ack F
ace)
Rep
air
Co
nc.
Patch
and E
nd)
(B
oth F
aces
Patch
Pier C
ap
3'-
0" 1'-
6"
1'-
6"
8" S
lab
Varies
Haunch
Type 2
E
Brg. P
ad
Elasto
meric
Sty
ro
fo
am
3‚" C
ork
o
r
Beam
s (
both s
ides)
4~
#5 B
ars b
etw
een
PIE
R D
IAP
HR
AG
M
Beam
3'-
9"
PIE
R 2
EL
EV
AT
ION
PIE
R 2
SE
CT
ION
PIE
R 3
EL
EV
AT
ION
PIE
R 3
SE
CT
ION
Detail
Dia
phragm
See P
ier
Detail
Dia
phragm
See P
ier
(T
yp
e 3
Bar)
#5
Bars @
12
" m
ax
.
Ty
pe 3
Bar
4'-
2"
2'-
8"
(In
cid
en
tal t
o B
eam
s)
(E
po
xy
Co
ate
d) (
12
" m
in E
mb
ed
.)
Drill a
nd
Gro
ut #
8 D
ow
el B
ars
(In
cid
en
tal t
o B
eam
s)
(E
poxy C
oate
d) (
12" m
in E
mbed.)
Drill a
nd G
rout #
8 D
ow
el B
ars
1C
larify
Pay
men
t f
or D
ow
el B
ars
3/6/19
11