    RELEASE: 7.1 MAY 16TH

    , 2012VERSION: 0.1 DATE: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page i

    THE HOME DEPOT

    7.1 RELEASE CHARTER

    Release Go Live Date: 05/16/2012

    Version Number 0.1

    Draft/Final as of 1/12 /2012

    Printed on 2/20/2012

    Document

    Owner(s)

    Kaushal Patel

    Annie Barua

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    2/17

    RELEASE: 7.1 MAY 16

    TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page i

    Document Information

    Document Purpose

    The purpose of this document is to confirm scope and schedule for online technology

    PIP/PLP/Check out redesign Release 7.1 (Go Live: May 16 2012). The document serves to

    enable us as a team to make sure that all resources (Quality Analyst, Project Management,

    Business Analyst, Development and Management) have a shared understanding of the release

    contents, priorities, constraints, timelines, environments, resources and document repositories. If

    or when additional projects are added to the release after the commencement of QA activities,

    this document will help to serve as a baseline for determining impact to current milestones or

    timelines.

    This document and any related project documents are accessible via the PIP/PLP/Check Out

    Redesign Release 7.1 on SharePoint site at the end of this document. For any questions

    regarding this project, please contact Kaushal Patel; Ext# 85576.

    Email:[email protected].

    Revision History

    Version Date Summary of ChangesRevision

    Marks

    0.1 1/12/2012 Initial Draft

    0.2 1/30/2012 Updated Project information and Timelines

    0.3 Included additional scope

    1.0 Added approvals

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    3/17

    RELEASE: 7.1 MAY 16

    TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page ii

    Approvals:

    The following have approved this document.

    Name Title & Department Approval Date Signature

    Juanita Smith Online Technology QA Mgr.

    Annie Barua Release Management Lead

    John Anthony Performance Lead

    Christopher Grant Architect

    Dahesh Patel Sr. Architect

    Bonnie Jones Project Mgr. (PIP)

    Romona Denial Project Mgr. (PLP)

    Tia Likely Sr. IT Mgr. FED (PIP/PLP)

    Tiffany HaymanSolutions Delivery Manager

    (PIP/PLP)

    Venkateswarlu Pabbuleti QA Lead (PIP)

    Surabhi Chowdhary QA Lead (PLP)

    Ravi Nudurumati Dev. Mgr. (PIP/PLP)

    Mike Marcella QA/QP Manager (PIP/PLP)

    Tadi Prabhakar QA Lead(PLP)

    Barrios Guillermo UAT Manager

    Devangi GandhiProject Manager (Check out

    redesign)

    David Albracht Business Lead Manager

    Craig Sultan Business Sponsor - Sr. Mgr.,Major Business Initiatives

    Cara KinzeyIT VP Sr. Vice President,

    Information Technology

    Matt JonesGeneral Mgr., MobileHomedepot.com

    Tom SweeneySr Director, ProgramManagement

    Lyn MuellerDirector, ProductManagement

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    4/17

    RELEASE: 7.1 MAY 16

    TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page iii

    Additional Distribution:

    Track Lead

    Catalog & Navigation Venkat KatpalliSearch & Page Builder Eugene Liang

    Checkout & Promotions Doug Robinson

    DB Migration Dan Perritte

    CMC, Account & Multi

    Variant Vijay Jeevaraj

    Integrations Meyyappan

    Infrastructure Devangi / Scott

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    5/17

    RELEASE: 7.1 MAY 16

    TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page iv

    Table of Contents:

    1. RELEASE SCOPE...06

    1.1. IN SCOPE..06

    1.2. OUT OF SCOPE .. 07

    1.3. RELEASE COMMUNICATION PLAN ................................................................................. 09

    2. RELEASE TEST STRATEGY...09

    2.1.INCLUSIONS..09

    2.2. EXCLUSIONS................................................................................................................. 09

    2.3. LINK TO WEEKLY RELEASE DASHBOARD..09

    2.4. TOUCH POINTS FROM REGRESSION.10

    3. RELEASE RESOURCES10

    3.1. RELEASE RESOURCES.................................................................................................... 10

    3.2. PROJECT RESOURCES ................................................ERROR!BOOKMARK NOT DEFINED.

    4. ROLL BACK PLAN11

    4.1. ROLL BACKPLAN...................................................................................................... 13

    4.2. ROLLBACKDECISION PROCEDURE ............................................................................. 13

    5. ENVIRONMENT AVAILABILITY..14

    5.1. IMPLEMENTATION AND VALIDATION PLANS ................................................................... 14

    6. RELEASE DETAILS...15

    7. RELEASE ENTRANCE CRITERIA16

    7.1 GENERAL ENTRANCE CRITERIA:...16

    8. FINAL RELEASE CANDIDATE CRITERIA

    ..166

    THE FINAL RELEASE CANDIDATE WILL BE BUILT FOLLOWING COMPLETION OF

    FINAL UAT, PERFORMANCE, FUNCTIONAL AND REGRESSION TESTING. THIS WILL

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    6/17

    RELEASE: 7.1 MAY 16

    TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page v

    BE USED FOR BACK-OUT AND RE-IMPLEMENTATION VALIDATION.

    .166

    9. SHAREPOINT SITE

    ...166

    10. LINK TO SUPPORT TRANSITION DOCUMENT, PRODUCTION SUPPORT

    DOCUMENT.

    ..166

    11. CODE BRANCH DETAILS

    ...166

    DEVELOPERS TO INCLUDE NOTES EXCHANGED DURING BUILD IN THIS

    FOLDER

    ..166

    Critical Success Factors

    Introduction:

    This section describes Critical Success factors (CSFs) for the ReleaseManagement process.

    Success Factors:

    The Critical Success Factors (CSFs) are:

    y Producing Operable Solutions

    y Controlling Releases into Production

    y Implementing Releases into Production on Time

    Deployment Notes (ECRs):

    Release Notes :

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    7/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 6

    1 Release Scope

    Projects approved as part ofPIP/PLP/Check out redesign for Release 7.1 here:

    1.1.1 In Scope: PIP

    1. Page Functionality Enhancements - new functionality and UI enhancements to itemson a PIP itself.

    2. Analytics - New metrics that will be tracked on a PIP.3. Defect Fixes - Fixes of defects previously documented within QC and directly

    affecting a PIP.

    1.1.2 In Scope: PLP

    1. Product and Content Relevancy.

    2. Online Monetization.3. Product Recommendations.4. Performance

    y Improve page performance (Per IT the assumption is that upgrade to WCS7 wouldprovide performance improvements) (required performance metrics documented inSLA document)

    5. Defects -Fixing selected high priority defects

    1.1.3 In Scope: Check out redesign

    1 SSL Certificate LogoSwitch SSL certificate provider from COMODO to VeriSign. Users should see the

    VeriSign trust mark in the global footer, in the cart, and in the Checkout pages tobolster their confidence in purchasing online at homedepot.com.

    2 Checkout Sign-In Page Redesign

    The primary call to action should be existing user sign-in rather than guest

    checkout to promote ease of checkout and higher conversion rates.

    3 Tax Exempt PurchasesCustomers who (1) have an existing Home Depot tax exempt ID or (2) utilize

    government credit cards with certain BIN numbers should be able to have no taxapplied to their order.

    4 Commercial Credit Card Purchase Order EnhancementUsers of commercial credit cards (issued by THD or commercial banks) should have

    the ability to enter PO numbers for exact replication on the users credit card statementto facilitate invoicing of purchased items.

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    8/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 7

    1.2 Out of Scope:

    1.2.1 Out of Scope: PIP

    The following table identifies out of scope items for this initiative.

    # Out of Scope Comments

    1. Performance EnhancementsPerformance enhancements previously recommended by IThave been de-scoped for this project phase due to the updates

    made during WCS7.

    2. Defect 12578- Searching on Product in Google does notdisplay the right PIP.

    3. Changes to display all price points have been deferred.The System will display all applicable price points on all PIPs.

    For example,

    - List Price- Was Price (promotional price)

    - Price (current price)

    4. DEFECTS_10285 - Search results back from PIP does notretain sort.

    5. Hide IRG PODsIf Collections, Accessories, and Coordinating items have fewer

    than three (3) products, then that section should be hidden from

    the PIP, and the page should hide the white space where thatIRG POD was displayed, and all content below the IRG, will beshifted upwards on the page

    6. Display Order of PIP ContentAbility to display Robust Product Content above and below

    IRG Display (e.g. Product Description and Shipping Info aboveIRG and Specs, Reviews, More Info below IRG content).

    7. Certona Recommendations Display LocationMove Certona Recommendations from Right Rail and move to

    a horizontal display below IRG PODs. Expand width of displayof product content below product imagery (i.e. IRG, Robust

    Product Content) to accommodate removal of CertonaRecommendations from Right Rail. If there is no Certona

    content, shift up other product content.

    8. Expose Reviews for organic search on PIPsThe System will allow Reviews (located in the SuppportContent section) to be searched by external search engines.

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    9/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 8

    1.2.2 Out of Scope: PLP

    The following table identifies out of scope items for this initiative.

    # Out of Scope Item Comments

    1. Performance enhancements previously recommended by IThave been de-scoped for this project phase due to the

    updates made during WCS7.

    2. Manual ordering of left navigation refinement filters.

    3. Any functionality requiring changes to Certona API.4. SKU Level promotion messaging.

    5. DEFECTS_10193 - R4.6 IRG Enhancement: Many of theProducts are displaying Product Description in Two linesand Ellipses in 3rd line

    6. Removing duplicates in Breadcrumb.

    7. Changes to display all price points have been deferred.

    The System will display all applicable price points on allPLPs.

    For example,

    List PriceWas Price (promotional price)

    - Price (current price)

    8. Updating Google Ads is not part of Release 1.

    1.2.3 Out of Scope: Check out redesign

    The following list of features have been defined as out of scope for the Checkout Redesign

    Release 1 project

    1 Mobile Application Development

    While customers will have the ability to checkout using a mobile or tablet device,

    there will not be mobile application development within the scope of this project.

    2 CTC Development

    While customers can place orders by calling Customer Service, there will not be CTCdevelopment to allow for the entry of a commercial PO number.

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    10/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 9

    1.3 Release Communication Plan:

    Audience Content Vehicle Target

    Date

    Owner Status

    Name and

    role of person

    who will be

    communicate

    d

    Purpose for

    communicatin

    g (i.e. project

    status update,

    financial

    status update,

    review issue

    Method of

    communicating(i.

    e. email, meeting,

    report)

    When

    the

    message

    is to be

    delivere

    d by

    Person

    responsible

    for ensuring

    that the

    message is

    received

    When the

    communicatio

    n is completed

    Onlinetechnology

    leadership

    Project status Email Weekly Bonnie /Romona

    /Devangi

    Project PMs,

    RCs

    Environment

    Readiness

    updates

    Email Daily Bartholome

    w Burkhard

    / Annie

    Barua

    2 Release Test Strategy:

    2.1 Attached Spreadsheet:

    QA Approach for PLP

    Redesign.docx

    2.3 Dash Board Link:

    https://portal.homedepot.com/sites/OnlineITPlan/PM/RlsMgmt/Release%20Documents/Forms/AllItems.aspx?RootFolder=%2Fsites%2FOnli

    neITPlan%2FPM%2FRlsMgmt%2FRelease%20Documents%2FRelease%207%2E1%20%28%20features%20release%29&FolderCTID=0x

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    11/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 10

    01200043F3E3C214A9C54B9C33B09BF60C036A&View={9B697AE4-0C3E-4D8C-8897-

    34D45C8F13C4}&InitialTabId=Ribbon%2EDocument&VisibilityContext=WSSTabPersistence

    2.4Touch points from Regression:

    3 Release Resources

    3.1Release Resources

    y Release Coordinator/Manager : Kaushal Patel/Annie Barua

    y Build Engineer: /James

    3.2Project Resource:

    Developer

    Manager

    Project

    Manager

    Development

    LeadArchitect

    QA Lead

    QA

    manager

    PIP

    Tiffany

    Hayman/Rav

    i Nudurumati

    Bonnie

    Jones

    Iyengar

    Geethanjali

    Christopher

    Grant

    Pabbuleti,

    Venkatesw

    arlu

    Mike

    Marcella

    PLP

    Tiffany

    Hayman/Ndu

    rumati Ravi

    Romona

    Daniels

    Barnett

    Damond R

    Christopher

    Grant

    Surabhi

    /Tadi P

    Mike

    Marcella

    CCRM

    Barthlolome

    w Burkhard

    Raghu

    Emmadi

    Enhancem

    ent/Defects

    Muzzamil

    Akram

    Vijay

    Eamani

    Kavitha

    Veeturi

    Check out

    redesign

    Devangi

    Gandhi

    Dahesh

    Patel

    4. Build details

    4.1. Impact analysis by defect

    4.1.1. Impact to Mobile platform, George Augustine.

    4.1.2. Impact to .com

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    12/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 11

    4.1.3. Impact to Vendor management system

    4.1.4. FED Impact analysis Brandon Moore

    Version Date Summary of Changes

    Revision

    Marks

    1.0

    1.1

    1.2

    1.3

    1.4

    Release Timelines (High Level)

    High level timelines below show dates by which each participating project will have to adhere

    to in order for the release to be successfully released on the scheduled Go-Live date.

    7.1 schedule

    Date

    Due

    Task/Event Days

    to

    go

    live

    Activity Delivery

    date

    Comments

    1/31 Event 106 7.1 1/31

    2/29 Event Scope Freeze Date after which no

    additional functionality will

    be included in the release.

    1/27-

    3/23

    Task 110-

    61

    Development

    3/29 Event Functional

    Code Freeze

    This is the date by which

    individual project

    functionality and known Sev

    3, 4 and 5 defects should be

    finalized and delivered to

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    13/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 12

    QA. (No new functionality

    added to code base).

    Task Integrated

    testing/

    Unit testing

    3/16-

    4/13

    Task 60-

    27

    QA 4/13

    4/13 Event Soft Code

    Freeze

    4/13 Date by which all project

    and development

    enhancements that are to be

    delivered to QA in

    preparation for testing.

    4/16-

    4/27

    Task 30-

    26

    UAT 4/20

    4/30 Event 16 Final Code

    Update

    Date on which latest

    production code (or code

    about to go to production) is

    merged with the release

    code. All efforts should be

    made to ensure that this date

    happens before

    UAT/Regression testing.

    Signals end of UAT and

    Business Sign off.

    4/13-

    5/3

    Task 33-

    13

    QP 4/20

    4/27 Event 19 Hard code

    freeze

    4/27

    Event Build

    candidate

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    14/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 13

    identified

    Event Pre-prod Back out/final

    implementation testing can

    begin. No additional changes

    to code.

    5/15 Task 1 Go no go 5/15

    5/16 Event 0 GO LIVE 5/16 Pending

    5/30 Task -15 Warranty

    period

    4 Roll back Plan

    4.1Roll Back Plan:

    4.2Rollback Decision Procedure:

    Description Details Who When

    1

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    15/17

    RELEASE: 7.1 MAY 16TH, 2012

    Version: 0.1 Date: 02/13/2012

    This document is confidential and proprietary information of The Home Depot. Page 14

    5 Environment Availability

    Environment availability shows what QA environments have been reserved for projects in the

    release and when they will be available for use.

    Environment URLs Available Dates

    AD72-Development 1/17/2012

    QA72 2/28/2012

    QP71- cell 1 3/17/2012

    QP 71 Cell 2

    OMS etc

    POS Stores

    Documentum + any other

    envs used

    Pagebuilder

    5.1Implementation and validation plans

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    16/17

    15

    This document is confidential and proprietary information of The Home Depot. Page 15

    6 Release details

    6.1Release Entrance Criteria:

    After this charter has been signed off, the information below will be required in order to

    accept a project or break fix into the release.

    6.2General Entrance Criteria:

    This is the information that is required from all projects or break fixes prior to acceptance into

    the release:

    y Billing Information (Where will the project or break fix be billed to).

    y

    Completed LOEs from QA and Dev.y QA and Dev resources identified

    6.3Required Signoffs per Milestone:

    This highlights the impact and signoff required based on what milestones have been reached

    by the project:

    6.3.1 Functional Code Freeze

    Variance Risk Level 1: After this date, any unplanned enhancements require approval of the

    following roles:

    y Impacted Project Manager(s)

    y Impacted Development Manager(s)

    y QA Manager.

    6.3.2 Soft Code Freeze

    Variance Risk Level 2: After this date, any new functionality or fixes require the approval

    of the following roles:

    y All release Project Managers

    y All release Development Managers

    y QA Manager(s)

    y Impacted Product Owner(s)

  • 8/3/2019 7.1 Release Charter v3 02.17.12 New

    17/17

    16

    This document is confidential and proprietary information of The Home Depot. Page 16

    Targeted regression testing will be scheduled during UAT to accommodate any

    fixes/additional code. There is a risk that timelines may not allow for full regression and/or

    cross browser testing.

    In addition, non functional testing such as kiosk, web terms, etc. may occur after this date.

    All deferred defects must be reviewed and agreed up by Web Operations and Product

    Management minimum of 3 business days prior to end of UAT.

    6.3.3 Hard Code Freeze

    Variance Risk Level 3: After this date, any code changes require the approval of all the

    following:

    y All release Project Managers

    y All release Development Manager

    y QA Manager(s)

    y Web Operations Manager

    y Lyn Mueller

    y Naveen Krishna

    6.4Final Release Candidate Criteria

    The final release candidate will be built following completion of final UAT, Performance,

    Functional and Regression Testing. This will be used for back-out and re-implementation

    validation.

    7 SharePoint Site:

    The SharePoint will be contain this document, any other related release documents and a

    continually update on the current release status.

    7.1.0 Release share point link:

    https://portal.homedepot.com/sites/PMO_PLP_Redesign/Project%20Documents/Forms/AllItems.aspx

    https://portal.homedepot.com/sites/OnlineITPlan/PM/RlsMgmt/Release%20Documents/Forms/AllItems.aspx?RootFolder=%2Fsites%2FOnli

    neITPlan%2FPM%2FRlsMgmt%2FRelease%20Documents%2FRelease%207%2E1%20%28%20features%20release%29&FolderCTID=0x

    01200043F3E3C214A9C54B9C33B09BF60C036A&View={9B697AE4-0C3E-4D8C-8897-

    34D45C8F13C4}&InitialTabId=Ribbon%2EDocument&VisibilityContext=WSSTabPersistence

    8.1 Link to support transition document, production support document.

    8.2 Code branch details

    Developers to include notes exchanged during build in this folder