Transcript of 7.1 Release Charter v3 02.17.12 New
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
1/17
RELEASE: 7.1 MAY 16TH
, 2012VERSION: 0.1 DATE: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page i
THE HOME DEPOT
7.1 RELEASE CHARTER
Release Go Live Date: 05/16/2012
Version Number 0.1
Draft/Final as of 1/12 /2012
Printed on 2/20/2012
Document
Owner(s)
Kaushal Patel
Annie Barua
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
2/17
RELEASE: 7.1 MAY 16
TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page i
Document Information
Document Purpose
The purpose of this document is to confirm scope and schedule for online technology
PIP/PLP/Check out redesign Release 7.1 (Go Live: May 16 2012). The document serves to
enable us as a team to make sure that all resources (Quality Analyst, Project Management,
Business Analyst, Development and Management) have a shared understanding of the release
contents, priorities, constraints, timelines, environments, resources and document repositories. If
or when additional projects are added to the release after the commencement of QA activities,
this document will help to serve as a baseline for determining impact to current milestones or
timelines.
This document and any related project documents are accessible via the PIP/PLP/Check Out
Redesign Release 7.1 on SharePoint site at the end of this document. For any questions
regarding this project, please contact Kaushal Patel; Ext# 85576.
Email:[email protected].
Revision History
Version Date Summary of ChangesRevision
Marks
0.1 1/12/2012 Initial Draft
0.2 1/30/2012 Updated Project information and Timelines
0.3 Included additional scope
1.0 Added approvals
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
3/17
RELEASE: 7.1 MAY 16
TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page ii
Approvals:
The following have approved this document.
Name Title & Department Approval Date Signature
Juanita Smith Online Technology QA Mgr.
Annie Barua Release Management Lead
John Anthony Performance Lead
Christopher Grant Architect
Dahesh Patel Sr. Architect
Bonnie Jones Project Mgr. (PIP)
Romona Denial Project Mgr. (PLP)
Tia Likely Sr. IT Mgr. FED (PIP/PLP)
Tiffany HaymanSolutions Delivery Manager
(PIP/PLP)
Venkateswarlu Pabbuleti QA Lead (PIP)
Surabhi Chowdhary QA Lead (PLP)
Ravi Nudurumati Dev. Mgr. (PIP/PLP)
Mike Marcella QA/QP Manager (PIP/PLP)
Tadi Prabhakar QA Lead(PLP)
Barrios Guillermo UAT Manager
Devangi GandhiProject Manager (Check out
redesign)
David Albracht Business Lead Manager
Craig Sultan Business Sponsor - Sr. Mgr.,Major Business Initiatives
Cara KinzeyIT VP Sr. Vice President,
Information Technology
Matt JonesGeneral Mgr., MobileHomedepot.com
Tom SweeneySr Director, ProgramManagement
Lyn MuellerDirector, ProductManagement
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
4/17
RELEASE: 7.1 MAY 16
TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page iii
Additional Distribution:
Track Lead
Catalog & Navigation Venkat KatpalliSearch & Page Builder Eugene Liang
Checkout & Promotions Doug Robinson
DB Migration Dan Perritte
CMC, Account & Multi
Variant Vijay Jeevaraj
Integrations Meyyappan
Infrastructure Devangi / Scott
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
5/17
RELEASE: 7.1 MAY 16
TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page iv
Table of Contents:
1. RELEASE SCOPE...06
1.1. IN SCOPE..06
1.2. OUT OF SCOPE .. 07
1.3. RELEASE COMMUNICATION PLAN ................................................................................. 09
2. RELEASE TEST STRATEGY...09
2.1.INCLUSIONS..09
2.2. EXCLUSIONS................................................................................................................. 09
2.3. LINK TO WEEKLY RELEASE DASHBOARD..09
2.4. TOUCH POINTS FROM REGRESSION.10
3. RELEASE RESOURCES10
3.1. RELEASE RESOURCES.................................................................................................... 10
3.2. PROJECT RESOURCES ................................................ERROR!BOOKMARK NOT DEFINED.
4. ROLL BACK PLAN11
4.1. ROLL BACKPLAN...................................................................................................... 13
4.2. ROLLBACKDECISION PROCEDURE ............................................................................. 13
5. ENVIRONMENT AVAILABILITY..14
5.1. IMPLEMENTATION AND VALIDATION PLANS ................................................................... 14
6. RELEASE DETAILS...15
7. RELEASE ENTRANCE CRITERIA16
7.1 GENERAL ENTRANCE CRITERIA:...16
8. FINAL RELEASE CANDIDATE CRITERIA
..166
THE FINAL RELEASE CANDIDATE WILL BE BUILT FOLLOWING COMPLETION OF
FINAL UAT, PERFORMANCE, FUNCTIONAL AND REGRESSION TESTING. THIS WILL
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
6/17
RELEASE: 7.1 MAY 16
TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page v
BE USED FOR BACK-OUT AND RE-IMPLEMENTATION VALIDATION.
.166
9. SHAREPOINT SITE
...166
10. LINK TO SUPPORT TRANSITION DOCUMENT, PRODUCTION SUPPORT
DOCUMENT.
..166
11. CODE BRANCH DETAILS
...166
DEVELOPERS TO INCLUDE NOTES EXCHANGED DURING BUILD IN THIS
FOLDER
..166
Critical Success Factors
Introduction:
This section describes Critical Success factors (CSFs) for the ReleaseManagement process.
Success Factors:
The Critical Success Factors (CSFs) are:
y Producing Operable Solutions
y Controlling Releases into Production
y Implementing Releases into Production on Time
Deployment Notes (ECRs):
Release Notes :
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
7/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 6
1 Release Scope
Projects approved as part ofPIP/PLP/Check out redesign for Release 7.1 here:
1.1.1 In Scope: PIP
1. Page Functionality Enhancements - new functionality and UI enhancements to itemson a PIP itself.
2. Analytics - New metrics that will be tracked on a PIP.3. Defect Fixes - Fixes of defects previously documented within QC and directly
affecting a PIP.
1.1.2 In Scope: PLP
1. Product and Content Relevancy.
2. Online Monetization.3. Product Recommendations.4. Performance
y Improve page performance (Per IT the assumption is that upgrade to WCS7 wouldprovide performance improvements) (required performance metrics documented inSLA document)
5. Defects -Fixing selected high priority defects
1.1.3 In Scope: Check out redesign
1 SSL Certificate LogoSwitch SSL certificate provider from COMODO to VeriSign. Users should see the
VeriSign trust mark in the global footer, in the cart, and in the Checkout pages tobolster their confidence in purchasing online at homedepot.com.
2 Checkout Sign-In Page Redesign
The primary call to action should be existing user sign-in rather than guest
checkout to promote ease of checkout and higher conversion rates.
3 Tax Exempt PurchasesCustomers who (1) have an existing Home Depot tax exempt ID or (2) utilize
government credit cards with certain BIN numbers should be able to have no taxapplied to their order.
4 Commercial Credit Card Purchase Order EnhancementUsers of commercial credit cards (issued by THD or commercial banks) should have
the ability to enter PO numbers for exact replication on the users credit card statementto facilitate invoicing of purchased items.
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
8/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 7
1.2 Out of Scope:
1.2.1 Out of Scope: PIP
The following table identifies out of scope items for this initiative.
# Out of Scope Comments
1. Performance EnhancementsPerformance enhancements previously recommended by IThave been de-scoped for this project phase due to the updates
made during WCS7.
2. Defect 12578- Searching on Product in Google does notdisplay the right PIP.
3. Changes to display all price points have been deferred.The System will display all applicable price points on all PIPs.
For example,
- List Price- Was Price (promotional price)
- Price (current price)
4. DEFECTS_10285 - Search results back from PIP does notretain sort.
5. Hide IRG PODsIf Collections, Accessories, and Coordinating items have fewer
than three (3) products, then that section should be hidden from
the PIP, and the page should hide the white space where thatIRG POD was displayed, and all content below the IRG, will beshifted upwards on the page
6. Display Order of PIP ContentAbility to display Robust Product Content above and below
IRG Display (e.g. Product Description and Shipping Info aboveIRG and Specs, Reviews, More Info below IRG content).
7. Certona Recommendations Display LocationMove Certona Recommendations from Right Rail and move to
a horizontal display below IRG PODs. Expand width of displayof product content below product imagery (i.e. IRG, Robust
Product Content) to accommodate removal of CertonaRecommendations from Right Rail. If there is no Certona
content, shift up other product content.
8. Expose Reviews for organic search on PIPsThe System will allow Reviews (located in the SuppportContent section) to be searched by external search engines.
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
9/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 8
1.2.2 Out of Scope: PLP
The following table identifies out of scope items for this initiative.
# Out of Scope Item Comments
1. Performance enhancements previously recommended by IThave been de-scoped for this project phase due to the
updates made during WCS7.
2. Manual ordering of left navigation refinement filters.
3. Any functionality requiring changes to Certona API.4. SKU Level promotion messaging.
5. DEFECTS_10193 - R4.6 IRG Enhancement: Many of theProducts are displaying Product Description in Two linesand Ellipses in 3rd line
6. Removing duplicates in Breadcrumb.
7. Changes to display all price points have been deferred.
The System will display all applicable price points on allPLPs.
For example,
List PriceWas Price (promotional price)
- Price (current price)
8. Updating Google Ads is not part of Release 1.
1.2.3 Out of Scope: Check out redesign
The following list of features have been defined as out of scope for the Checkout Redesign
Release 1 project
1 Mobile Application Development
While customers will have the ability to checkout using a mobile or tablet device,
there will not be mobile application development within the scope of this project.
2 CTC Development
While customers can place orders by calling Customer Service, there will not be CTCdevelopment to allow for the entry of a commercial PO number.
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
10/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 9
1.3 Release Communication Plan:
Audience Content Vehicle Target
Date
Owner Status
Name and
role of person
who will be
communicate
d
Purpose for
communicatin
g (i.e. project
status update,
financial
status update,
review issue
Method of
communicating(i.
e. email, meeting,
report)
When
the
message
is to be
delivere
d by
Person
responsible
for ensuring
that the
message is
received
When the
communicatio
n is completed
Onlinetechnology
leadership
Project status Email Weekly Bonnie /Romona
/Devangi
Project PMs,
RCs
Environment
Readiness
updates
Email Daily Bartholome
w Burkhard
/ Annie
Barua
2 Release Test Strategy:
2.1 Attached Spreadsheet:
QA Approach for PLP
Redesign.docx
2.3 Dash Board Link:
https://portal.homedepot.com/sites/OnlineITPlan/PM/RlsMgmt/Release%20Documents/Forms/AllItems.aspx?RootFolder=%2Fsites%2FOnli
neITPlan%2FPM%2FRlsMgmt%2FRelease%20Documents%2FRelease%207%2E1%20%28%20features%20release%29&FolderCTID=0x
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
11/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 10
01200043F3E3C214A9C54B9C33B09BF60C036A&View={9B697AE4-0C3E-4D8C-8897-
34D45C8F13C4}&InitialTabId=Ribbon%2EDocument&VisibilityContext=WSSTabPersistence
2.4Touch points from Regression:
3 Release Resources
3.1Release Resources
y Release Coordinator/Manager : Kaushal Patel/Annie Barua
y Build Engineer: /James
3.2Project Resource:
Developer
Manager
Project
Manager
Development
LeadArchitect
QA Lead
QA
manager
PIP
Tiffany
Hayman/Rav
i Nudurumati
Bonnie
Jones
Iyengar
Geethanjali
Christopher
Grant
Pabbuleti,
Venkatesw
arlu
Mike
Marcella
PLP
Tiffany
Hayman/Ndu
rumati Ravi
Romona
Daniels
Barnett
Damond R
Christopher
Grant
Surabhi
/Tadi P
Mike
Marcella
CCRM
Barthlolome
w Burkhard
Raghu
Emmadi
Enhancem
ent/Defects
Muzzamil
Akram
Vijay
Eamani
Kavitha
Veeturi
Check out
redesign
Devangi
Gandhi
Dahesh
Patel
4. Build details
4.1. Impact analysis by defect
4.1.1. Impact to Mobile platform, George Augustine.
4.1.2. Impact to .com
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
12/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 11
4.1.3. Impact to Vendor management system
4.1.4. FED Impact analysis Brandon Moore
Version Date Summary of Changes
Revision
Marks
1.0
1.1
1.2
1.3
1.4
Release Timelines (High Level)
High level timelines below show dates by which each participating project will have to adhere
to in order for the release to be successfully released on the scheduled Go-Live date.
7.1 schedule
Date
Due
Task/Event Days
to
go
live
Activity Delivery
date
Comments
1/31 Event 106 7.1 1/31
2/29 Event Scope Freeze Date after which no
additional functionality will
be included in the release.
1/27-
3/23
Task 110-
61
Development
3/29 Event Functional
Code Freeze
This is the date by which
individual project
functionality and known Sev
3, 4 and 5 defects should be
finalized and delivered to
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
13/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 12
QA. (No new functionality
added to code base).
Task Integrated
testing/
Unit testing
3/16-
4/13
Task 60-
27
QA 4/13
4/13 Event Soft Code
Freeze
4/13 Date by which all project
and development
enhancements that are to be
delivered to QA in
preparation for testing.
4/16-
4/27
Task 30-
26
UAT 4/20
4/30 Event 16 Final Code
Update
Date on which latest
production code (or code
about to go to production) is
merged with the release
code. All efforts should be
made to ensure that this date
happens before
UAT/Regression testing.
Signals end of UAT and
Business Sign off.
4/13-
5/3
Task 33-
13
QP 4/20
4/27 Event 19 Hard code
freeze
4/27
Event Build
candidate
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
14/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 13
identified
Event Pre-prod Back out/final
implementation testing can
begin. No additional changes
to code.
5/15 Task 1 Go no go 5/15
5/16 Event 0 GO LIVE 5/16 Pending
5/30 Task -15 Warranty
period
4 Roll back Plan
4.1Roll Back Plan:
4.2Rollback Decision Procedure:
Description Details Who When
1
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
15/17
RELEASE: 7.1 MAY 16TH, 2012
Version: 0.1 Date: 02/13/2012
This document is confidential and proprietary information of The Home Depot. Page 14
5 Environment Availability
Environment availability shows what QA environments have been reserved for projects in the
release and when they will be available for use.
Environment URLs Available Dates
AD72-Development 1/17/2012
QA72 2/28/2012
QP71- cell 1 3/17/2012
QP 71 Cell 2
OMS etc
POS Stores
Documentum + any other
envs used
Pagebuilder
5.1Implementation and validation plans
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
16/17
15
This document is confidential and proprietary information of The Home Depot. Page 15
6 Release details
6.1Release Entrance Criteria:
After this charter has been signed off, the information below will be required in order to
accept a project or break fix into the release.
6.2General Entrance Criteria:
This is the information that is required from all projects or break fixes prior to acceptance into
the release:
y Billing Information (Where will the project or break fix be billed to).
y
Completed LOEs from QA and Dev.y QA and Dev resources identified
6.3Required Signoffs per Milestone:
This highlights the impact and signoff required based on what milestones have been reached
by the project:
6.3.1 Functional Code Freeze
Variance Risk Level 1: After this date, any unplanned enhancements require approval of the
following roles:
y Impacted Project Manager(s)
y Impacted Development Manager(s)
y QA Manager.
6.3.2 Soft Code Freeze
Variance Risk Level 2: After this date, any new functionality or fixes require the approval
of the following roles:
y All release Project Managers
y All release Development Managers
y QA Manager(s)
y Impacted Product Owner(s)
-
8/3/2019 7.1 Release Charter v3 02.17.12 New
17/17
16
This document is confidential and proprietary information of The Home Depot. Page 16
Targeted regression testing will be scheduled during UAT to accommodate any
fixes/additional code. There is a risk that timelines may not allow for full regression and/or
cross browser testing.
In addition, non functional testing such as kiosk, web terms, etc. may occur after this date.
All deferred defects must be reviewed and agreed up by Web Operations and Product
Management minimum of 3 business days prior to end of UAT.
6.3.3 Hard Code Freeze
Variance Risk Level 3: After this date, any code changes require the approval of all the
following:
y All release Project Managers
y All release Development Manager
y QA Manager(s)
y Web Operations Manager
y Lyn Mueller
y Naveen Krishna
6.4Final Release Candidate Criteria
The final release candidate will be built following completion of final UAT, Performance,
Functional and Regression Testing. This will be used for back-out and re-implementation
validation.
7 SharePoint Site:
The SharePoint will be contain this document, any other related release documents and a
continually update on the current release status.
7.1.0 Release share point link:
https://portal.homedepot.com/sites/PMO_PLP_Redesign/Project%20Documents/Forms/AllItems.aspx
https://portal.homedepot.com/sites/OnlineITPlan/PM/RlsMgmt/Release%20Documents/Forms/AllItems.aspx?RootFolder=%2Fsites%2FOnli
neITPlan%2FPM%2FRlsMgmt%2FRelease%20Documents%2FRelease%207%2E1%20%28%20features%20release%29&FolderCTID=0x
01200043F3E3C214A9C54B9C33B09BF60C036A&View={9B697AE4-0C3E-4D8C-8897-
34D45C8F13C4}&InitialTabId=Ribbon%2EDocument&VisibilityContext=WSSTabPersistence
8.1 Link to support transition document, production support document.
8.2 Code branch details
Developers to include notes exchanged during build in this folder