7 Ways to Optimize SAP | Morgan Foods Mines for Gold!
Morgan Foods Mines for Gold in SAP | Introduction
Cheryl Bogenschutz
Senior Director, Strategic Engagements
Roger Heaverin
IT Director
AGENDAMorgan Foods BackgroundAssessment Process/Findings7 TipsRoadmapSummary
The Company Family Business – Started 1899 Soups, Broths and Beans Customers – Wal-Mart, Kroger, Aldi, Sav-A-Lot Publix, Topco, HEB, Wegman’s, AWG, Sam’s Club Explosive Growth Customer Demands Compliance Demands
Morgan Foods Mines for Gold in SAP | History
Information Technology 1984-1999 Legacy Systems 1999 – SAP Installed SAP 4.0B 6-Month Project Holland Technology – Big Bang Core Modules – FI-CO, MM, SD, PP-PI, WM 2004 – SAP Upgraded to R3 Enterprise 4.70 CSC – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI, WM 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI, WM, QM 2016-2017 – Assessment – itelligence, Determine Next Steps
Morgan Foods Mines for Gold in SAP | History
Project Preparation Discovery Workshops(Current State)
Discovery Workshops
(Future State)Assessment Report
• Team Selection• Project Kickoff• High-level Scoping• Initial System
Questionnaire• System Access• Scheduling &
Logistics
• Conduct Review Sessions/Interviews
• Current State Review (AS-IS)
• Analyze Business Process(es).
• Review System Configuration
• Examine Master Data• Evaluate Architecture
Design• Identify Issues/
Improvement Opportunities
• Prepare and Present Alternatives
• Establish Course of Action
• Develop Future State/Solution
• Explore People, Process, Data, Technology
• Document Limitations & Opportunities
Prepare Final Assessment, Executive Summary, Recommendations
Deliver Executive Summary
Deliver Report and/or SOW
Opportunity Prioritization & Classification
Establish Remediation Plan(s)
Project Sequencing Prepare Next Phase
Project Plan
1 -2 days 2 days1-2 Weeks
Morgan Foods Mines for Gold in SAP | Assessment Process
Executive SummaryHigh-level summary and gauge for executive distribution and review.
Return on Investment / Quick Win AnalysisIdentification of quick wins, detailed benefits, and return on investment opportunities.
Morgan Foods Mines for Gold in SAP | Assessment Findings
7 Ways to Boost ROI with Automation
Follow the 7 Ways to Optimize SAP Blog
Leverage ACH to reduce Accounts Payable manual activities
Warehouse operations utilize more RF capabilities
Streamline Quality Management documents within SAP
Warehouse Monitoring tools will give needed visibility to operations
Tip #1: Identify Manual Processes to Automate by Looking for Productivity Gains
Article: 7 Ways to Optimize SAP | Automate Manual Processes
• Procurement Contracts entered into SAP will automate PO processes and reduce dependency on employee’s knowledge
• Superstars provide strong value, but they may be holding you back
• Superstars can be better leveraged in new ways
Tip #2: Transition Tribal Knowledge to Formal Processes and Systems
Follow the 7 Ways to Optimize SAP Blog
Downstream pain point may be due to upstream culprit
Blocked invoices may be caused by incorrect freight or pricing being entered upstream
Morgan Foods buried freight in the cost of the product rather than as separate, controllable costs
By stepping back and looking at end-to-end processes, you can identify the root cause
Tip #3: Staple Yourself to an Order
Follow the 7 Ways to Optimize SAP Blog
Downtime and activity types can be captured and updated, resulting in more visibility of product cost
Explosive growth is a trigger to examine and formalize current processes
By automating processes, you can meet customer demands more cost effectively
Tip #4: Don’t Let the Gravitational Force of Old Processes Prevail
Follow the 7 Ways to Optimize SAP Blog
Implement SAP’s standard invoice blocking functionality to enable system driven resolution
Batch characteristics functionality improves visibility of materials
Standard Production reporting functionality provides vital operations information
Use the system created best practices to streamline and simplify
Don’t be afraid to leap frog beyond simply automating the manual processes
Tip #5: Don’t Pave a Cow Path, Put in a Highway
Follow the 7 Ways to Optimize SAP Blog
Governance of your master data does not have to be costly and burdensome
It’s worthwhile to put into place owners of your key data to reduce inaccurate analysis
For example, base unit of measure is set to “can”
Tip #6: Master Your Data!
Follow the 7 Ways to Optimize SAP Blog
Actual activity values can be used on process orders instead of planned values to provide more accurate variances
Manufacturing instructions can be added inside SAP to allow the instructions to print automatically when the process order is released
Eliminate auxiliary systems, leverage the integration value of SAP; use the right tool for the job
Tip #7: If You Only Have a Hammer, Everything Looks Like a Nail
Follow the 7 Ways to Optimize SAP Blog
Roadmap2017 2018 2019 2020
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Pricing and Costing Initiatives
Eliminate Manual Processes
SAP Moved to Cloud
Implement Material Ledger
Suite on HANA
S4 HANA
Morgan Foods Mines for Gold in SAP | Roadmap
A fresh look at both process and system can result in quick
improvements and eliminate pain points.
Balance immediate initiatives with positioning for future SAP
upgrades and investments.
Customer involvement from both Business and IT leaders is
essential.
Examine Process, Data and Technology to be successful.
Focus assessment on “practical” vs “futuristic”.
Be on the lookout for these 7 tips to find gold in your SAP investment
Morgan Foods Mines for Gold in SAP | Summary
Cheryl BogenschutzSenior Director – Advisory Services
10856 Reed Hartman HighwayCincinnati, OH 45242Web: http://www.itelligencegroup.com
Contact Us!
Morgan Foods Mines for Gold in SAP | Questions?
Copyright itelligence AG - All rights reserved
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of itelligence AG. The information contained herein may be changed without prior notice.
Some software products marketed by itelligence AG and its distributors contain proprietary software components of other software vendors. All product and service names mentioned and associated logos displayed are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
The information in this document is proprietary to itelligence. This document is a preliminary version and not subject to your license agreement or any other agreement with itelligence. This document contains only intended strategies, developments and product functionalities and is not intended to be binding upon itelligence to any particular course of business, product strategy, and/or development. itelligence assumes no responsibility for errors or omissions in this document. itelligence does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.
itelligence shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence.
The statutory liability for personal injury and defective products is not affected. itelligence has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.
3/14
/201
9©
201
5 ite
llige
nce
19