7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5...

19
7 Ways to Optimize SAP | Morgan Foods Mines for Gold!

Transcript of 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5...

Page 1: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

7 Ways to Optimize SAP | Morgan Foods Mines for Gold!

Page 3: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

AGENDAMorgan Foods BackgroundAssessment Process/Findings7 TipsRoadmapSummary

Page 4: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

The Company Family Business – Started 1899 Soups, Broths and Beans Customers – Wal-Mart, Kroger, Aldi, Sav-A-Lot Publix, Topco, HEB, Wegman’s, AWG, Sam’s Club Explosive Growth Customer Demands Compliance Demands

Morgan Foods Mines for Gold in SAP | History

Page 5: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Information Technology 1984-1999 Legacy Systems 1999 – SAP Installed SAP 4.0B 6-Month Project Holland Technology – Big Bang Core Modules – FI-CO, MM, SD, PP-PI, WM 2004 – SAP Upgraded to R3 Enterprise 4.70 CSC – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI, WM 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI, WM, QM 2016-2017 – Assessment – itelligence, Determine Next Steps

Morgan Foods Mines for Gold in SAP | History

Page 6: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Project Preparation Discovery Workshops(Current State)

Discovery Workshops

(Future State)Assessment Report

• Team Selection• Project Kickoff• High-level Scoping• Initial System

Questionnaire• System Access• Scheduling &

Logistics

• Conduct Review Sessions/Interviews

• Current State Review (AS-IS)

• Analyze Business Process(es).

• Review System Configuration

• Examine Master Data• Evaluate Architecture

Design• Identify Issues/

Improvement Opportunities

• Prepare and Present Alternatives

• Establish Course of Action

• Develop Future State/Solution

• Explore People, Process, Data, Technology

• Document Limitations & Opportunities

Prepare Final Assessment, Executive Summary, Recommendations

Deliver Executive Summary

Deliver Report and/or SOW

Opportunity Prioritization & Classification

Establish Remediation Plan(s)

Project Sequencing Prepare Next Phase

Project Plan

1 -2 days 2 days1-2 Weeks

Morgan Foods Mines for Gold in SAP | Assessment Process

Page 7: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Executive SummaryHigh-level summary and gauge for executive distribution and review.

Return on Investment / Quick Win AnalysisIdentification of quick wins, detailed benefits, and return on investment opportunities.

Morgan Foods Mines for Gold in SAP | Assessment Findings

Page 8: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

7 Ways to Boost ROI with Automation

Follow the 7 Ways to Optimize SAP Blog

Page 9: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Leverage ACH to reduce Accounts Payable manual activities

Warehouse operations utilize more RF capabilities

Streamline Quality Management documents within SAP

Warehouse Monitoring tools will give needed visibility to operations

Tip #1: Identify Manual Processes to Automate by Looking for Productivity Gains

Article: 7 Ways to Optimize SAP | Automate Manual Processes

Page 10: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

• Procurement Contracts entered into SAP will automate PO processes and reduce dependency on employee’s knowledge

• Superstars provide strong value, but they may be holding you back

• Superstars can be better leveraged in new ways

Tip #2: Transition Tribal Knowledge to Formal Processes and Systems

Follow the 7 Ways to Optimize SAP Blog

Page 11: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Downstream pain point may be due to upstream culprit

Blocked invoices may be caused by incorrect freight or pricing being entered upstream

Morgan Foods buried freight in the cost of the product rather than as separate, controllable costs

By stepping back and looking at end-to-end processes, you can identify the root cause

Tip #3: Staple Yourself to an Order

Follow the 7 Ways to Optimize SAP Blog

Page 12: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Downtime and activity types can be captured and updated, resulting in more visibility of product cost

Explosive growth is a trigger to examine and formalize current processes

By automating processes, you can meet customer demands more cost effectively

Tip #4: Don’t Let the Gravitational Force of Old Processes Prevail

Follow the 7 Ways to Optimize SAP Blog

Page 13: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Implement SAP’s standard invoice blocking functionality to enable system driven resolution

Batch characteristics functionality improves visibility of materials

Standard Production reporting functionality provides vital operations information

Use the system created best practices to streamline and simplify

Don’t be afraid to leap frog beyond simply automating the manual processes

Tip #5: Don’t Pave a Cow Path, Put in a Highway

Follow the 7 Ways to Optimize SAP Blog

Page 14: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Governance of your master data does not have to be costly and burdensome

It’s worthwhile to put into place owners of your key data to reduce inaccurate analysis

For example, base unit of measure is set to “can”

Tip #6: Master Your Data!

Follow the 7 Ways to Optimize SAP Blog

Page 15: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Actual activity values can be used on process orders instead of planned values to provide more accurate variances

Manufacturing instructions can be added inside SAP to allow the instructions to print automatically when the process order is released

Eliminate auxiliary systems, leverage the integration value of SAP; use the right tool for the job

Tip #7: If You Only Have a Hammer, Everything Looks Like a Nail

Follow the 7 Ways to Optimize SAP Blog

Page 16: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Roadmap2017 2018 2019 2020

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Pricing and Costing Initiatives

Eliminate Manual Processes

SAP Moved to Cloud

Implement Material Ledger

Suite on HANA

S4 HANA

Morgan Foods Mines for Gold in SAP | Roadmap

Page 17: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

A fresh look at both process and system can result in quick

improvements and eliminate pain points.

Balance immediate initiatives with positioning for future SAP

upgrades and investments.

Customer involvement from both Business and IT leaders is

essential.

Examine Process, Data and Technology to be successful.

Focus assessment on “practical” vs “futuristic”.

Be on the lookout for these 7 tips to find gold in your SAP investment

Morgan Foods Mines for Gold in SAP | Summary

Page 18: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Cheryl BogenschutzSenior Director – Advisory Services

10856 Reed Hartman HighwayCincinnati, OH 45242Web: http://www.itelligencegroup.com

Contact Us!

Morgan Foods Mines for Gold in SAP | Questions?

Page 19: 7 Ways to Optimize SAP Morgan Foods Mines for Gold! · 2012 – SAP Upgraded to ECC6 EP5 itelligence – 3-Month Project – Oracle Database Core Modules – FI-CO, MM, SD, PP-PI,

Copyright itelligence AG - All rights reserved

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of itelligence AG. The information contained herein may be changed without prior notice.

Some software products marketed by itelligence AG and its distributors contain proprietary software components of other software vendors. All product and service names mentioned and associated logos displayed are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

The information in this document is proprietary to itelligence. This document is a preliminary version and not subject to your license agreement or any other agreement with itelligence. This document contains only intended strategies, developments and product functionalities and is not intended to be binding upon itelligence to any particular course of business, product strategy, and/or development. itelligence assumes no responsibility for errors or omissions in this document. itelligence does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringement.

itelligence shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use of these materials. This limitation shall not apply in cases of intent or gross negligence.

The statutory liability for personal injury and defective products is not affected. itelligence has no control over the information that you may access through the use of hot links contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.

3/14

/201

201

5 ite

llige

nce

19