7 8 Wastes In Manuf Hc
1
7 Wastes in 7 Wastes in Manufacturing Manufacturing • Overproduction Overproduction • Transportation Transportation • Inventory Inventory • Motion Motion • Correction Correction • Over-processing Over-processing • Waiting Waiting Or OTIMCOW Or OTIMCOW 8 Wastes in Healthcare • Transportation • Under-Utilization of People • Motion of People • Misapplication of Resources • Irregular Processes • Stock • Errors • Waiting Or TUMMISEW
-
Upload
thomas-abraham -
Category
Business
-
view
870 -
download
10
Transcript of 7 8 Wastes In Manuf Hc
![Page 1: 7 8 Wastes In Manuf Hc](https://reader031.fdocuments.us/reader031/viewer/2022020218/55a80ad21a28ab51748b46f0/html5/thumbnails/1.jpg)
7 Wastes in 7 Wastes in ManufacturingManufacturing
•OverproductionOverproduction
•TransportationTransportation
•InventoryInventory
•MotionMotion
•CorrectionCorrection
•Over-processingOver-processing
•WaitingWaiting
Or OTIMCOWOr OTIMCOW
8 Wastes in Healthcare
•Transportation
•Under-Utilization of People
•Motion of People
•Misapplication of Resources
•Irregular Processes
•Stock
•Errors
•Waiting
Or TUMMISEW