G1 Chile May 15-18, 2006: Structural elements and excavations 2
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Plates and shells
3 or 5 noded line elements
3 degrees of freedom per node
Elastic or elastoplastic behaviour
To model walls, floors, tunnels
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Input parameters for plates
Flexural rigidity (b=1 m)
Normal stiffness (b=1 m)
Element thickness
12
3 bhEEI =
bhEEA =
EA
EIhd 12==
b
hh
b
b = 1 m in plane strain
b = 1 meter in axisymmetry
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
3/13
G1 Chile May 15-18, 2006: Structural elements and excavations 3
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Plate weights
Compensate for overlap:
For soil weight use:unsat above phreatic level
satbelow phreatic level
realsoilconcrete dw = )(
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Plate weights for tunnels
Overlap is only for half the lining thickness
rinsideroutside
lining soil
r
d real
( )outsideinside rrr += 21
( ) ( )realsoilrealconcrete ddw 21=
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
4/13
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
5/13
G1 Chile May 15-18, 2006: Structural elements and excavations 5
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Anchor material properties
Normal stiffness, EA (for one anchor) [kN]
Spacing, Ls (distance between anchors) [m]
Maximum anchor force for compression
and tension, |Fmax,comp| and |Fmax,tens| [kN]
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Pre-stressing of anchors
Defined in Staged construction phase
Both tension (grout anchor) or
compression (strut) possible
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
6/13
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
7/13
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
8/13
G1 Chile May 15-18, 2006: Structural elements and excavations 8
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Interfaces
Suggestions for Rinter
:
Interaction sand/steel = R inter 0.6 0.7
Interaction clay/steel = R inter 0.5
Interaction sand/concrete = R inter 1.0 0.8
Interaction clay/concrete = R inter 1.0 0.7
Interaction soil/geogrid = R inter 1.0
(interface may not be required)
Interaction soil/geotextile = Rinter 0.9 0.5(foil, textile)
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Interfaces
Try to omit stress oscillations at corners
of stiff structures
Inflexible corner
points, causing bad
stress results
Flexible corner
points with
improved stress
results
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
9/13
G1 Chile May 15-18, 2006: Structural elements and excavations 9
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Excavations in Plaxis
Dennis WatermanPlaxis BV
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Material behaviour
Unloading due to excavation
Primary loading due to pre-stressing
Hardening Soil model is preferred
Non-linear elastic unloading/reloading behaviour
Sometimes better to use Mohr-Coulomb with
known parameters than HS with unverified
parameters.
When using MC: Eurshould be used rather than E50
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
10/13
G1 Chile May 15-18, 2006: Structural elements and excavations 10
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Material behaviour: Stress paths
K
K=1v0
passivePoint B K
Kactive
h
III III
Point APoint A
Point B
Construction phases: I 1st excavation
II Pre-stressing anchor
III Final excavation
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Dewatering
Wet excavation
Impermeable (concrete) excavation floor
Dry excavation Undisturbed water table outside excavation
Drawdown outside excavation
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
11/13
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
12/13
G1 Chile May 15-18, 2006: Structural elements and excavations 12
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Dewatering: dry excavation
Undisturbed water table outside excavation
For every excavation phase do
Excavate soil
Set excavated area dry
Define area just below excavation floor as
interpolate between lines or clusters
Suitable for short- term excavations in lowpermeability soils
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Dewatering: dry excavation
Undisturbed water table outside excavation
dry
interpolate
GPL
-
7/22/2019 7 1605 1615 1715 Structural Elements Excavations
13/13
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Dewatering: dry excavation
Drawdown outside excavation
For every excavation phase do
Excavate soil
Define boundary conditions (heads)
Perform groundwater flow analysis.
Suitable for long-term excavations or excavations in
high permeability soils
Simplified alternative:
Draw GPL according to expected groundwater level and
generate pore pressures based on GPL.
PLAXIS FINITE ELEMENT CODE FOR SOIL AND ROCK ANALYSES
Dewatering: dry excavationDrawdown outside excavation
Groundwater flow calculation gives steady-state solution,
so for time is infinite!