6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting the work of many colleagues: IFJ-PAN (Poland) WUT(Poland),BINP(Russia), Linde/Cofely and several DESY groups Full cryogenic operation of AMTF – the first year

Transcript of 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop...

Page 1: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

6th International Workshop on Cryogenic

Operations

Bernd Petersen DESY MKS

presenting the work of many colleagues:

IFJ-PAN (Poland)

WUT(Poland),BINP(Russia),

Linde/Cofely and several DESY groups

Full cryogenic operation of AMTF

– the first year

Page 2: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

2Outline

AMTF - purpose & objectives (TDR) AMTF – layout AMTF- main cryogenic components Refrigerator availability Main cryo operation problems General safety requirements Cryogenic safety Safety of work organisation Some preliminary test results for XFEL cavities & modules (Preliminary) conclusions

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 3: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

3

AMTF: purpose & objectives (TDR)

- Complete cold performance test of all XFEL cryomodules before tunnel installation (RF, vacuum,cryo-losses)

103 cryomodules, rate: 1/week

- Cold RF test of all XFEL superconducting cavities before cryomodule assembly

824 cavities, rate 6/week

- Cold test of all superconducting magnet packages before cryomodule assembly

103 magnets, 1/week

- ( Assembly and tests of RF Waveguides (WP1) at Waveguide Assembly and Test Facility WATF)

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 4: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

4

Three test benches (XATB1, XATB2 and XATB3) for testing assembled modules and for high power tests of assembled cavities

Two test cryostats (XATC1 and XATC2) for RF performance tests of the cavities (One magnet test stand XMTS (located in the Magnet Test Hall Building 55) for testing

magnets)

AMTF layout (TDR)

84m x 48m

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 5: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

AMTF Hall - Cavity 5

Vertical Cryostat Radiation protection shielding Cavity preparation area

Cavity storage area Cavity incoming check area Clean room

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 6: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

AMTF Hall - Cryomodule 6

Unloading of the cryomodule after transport

Cryomodule preparation area Cryomodule test stand

Cryomodule test stand – module inside

Cryomodule test stand – front view

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 7: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

7XMTS: Test stand for sc XFEL Quadrupoles

Formal part of AMTF but installed and in operation since July 2008

Status November 2014:

96 (of 103) Quadrupols tested

For the development and series tests of superconducting magnet packages & current leads (in MTH-bldg 55)

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 8: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

8Cryogenic operation of AMTF

AMTF is supplied by the FLASH-Helium-Refrigerator (former refrigerator 42 of the HERA plant)

For the operation of the AMTF 3 KW at 40/80K, 0.5 KW at 4.5K and a peak liquifaction rate of 33 g/s

have to be delivered. The peak liquifaction is buffered by means of a 1oooo ltr liquid helium

storage dewar (XAST.)

Capacity limit:

return gas peak

screw compressor capacity during cool down/warm-up

2 dynamic procedures in parallel

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 9: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

9AMTF – cryogenics contributions

Red = WUT

Wroclaw University of Technology-> Kriosystem

Blue = DESY MKS

Acting for XFEL company

(no in-kind !) -> DEMACO

Green= BINP

Budker Institute Novosibirsk

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 10: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

10 AMTF components (utilities etc./DESY in-kind)

Pump station – completed in September 2010 Compressor station – completed in August 2010 Control building – completed in October 2010 Test Hall – erected in May 2010 Piping bridge – completed in October 2010

0 10m

Control building

Test hallCompressor station

Pump station

Piping bridge

Water towers

HERA Kälteanlage Halle

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 11: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

11Transfer line XATL1

The ~170m long DN400 transfer line XATL1 supplies the test stands with cryogenic power from HERA refrigerator. WUT/Poland in-kind.

Spec DESY: Short specification in August 2008 Full specification in August 2009 Commissioning August 2012

– in continuous operation since December 2012

DESY (in-kind):

Valve box for XATL1 at refrigerator

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 12: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

12Helium compressors (DESY in-kind)

2 sets of compressors for 2K operation at AMTF ( 2 x 20 g/s helium at 20 mbar)

1 set = 13 x parallel (WS 2001 RUVAC roots blower + SOGEVAC SV750B )

– simple, (robust), modular, redundant

SOGEVAC:

4 unscheduled repairs,

complete replacement of bearings & packing rings (all SOGEVAC)

RUVAC: 4 repairs,

complete exchange of bearings ongoing (all RUVAC)

No impact for AMTF operation

Very reliable service & support from manufacturer

In average: about 5000 h operation (status November 2014)

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Manifacturer: Oerlikon Leybold

SOGEVAC

RUVAC

Page 13: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

13 AMTF Vertical Cryostats

SPEC DESY

April 2009

Design & Construction

WUT&Kriosystem

Poland in-kind

Delivery & installation:

July 2012 – April 2013

Cavity Frame Design:

DESY FLA

6 inserts for AMTF

Concrete cylinder 140mm thick

Vacuum vessel

Thermal shield

LHe vessel

Stainless steel ring 30mm thickConcrete floor

Soil

Warm magneticshields

PVC pipe DN200

Support

Concrete

~

A-A

The lowestradiation shield

Cold magneticshield (MHF-sl)

Cold magneticshield (MKS1)

Space for heaters

Vacuum lid Vacuum flange

max.Ø

3xM20

Ø

Ø

Ø

min

.

Water drain pipe DN100(PVC or stainless steel)

~

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 14: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

14AMTF: 3 cryomodule test stands & cryostat adapters

Spec DESY (February 2010)

Design, Construction, Installation: BINP in-kindFirst test stand delivered & installed May 2013 (cold commissioning July 2013)

Cold commissioning of 3rd test stand December 2013

2 cryostat adapters for the test of single dressed cavities at AMTF

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 15: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

15XAST,XAVB, XAVB

L Helium Dewar XAST Valve Box XAVBSub Cooler Box XASB

DESY is acting for the XFEL company

Manufacturer: DEMACO NL

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Wessington Cryogenics Ltd UK

Page 16: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Cool down and Warm up16

XATC1, XATC2Pump and purge manualCool-down to 4K, liquid helium transferand warm-up process automatized by use of SNL scriptsPump-down to 2K manual

XATB1, XATB2, XATB3•Pump and purge manual•Complete cool-down and warm-up process performed manually by cryo-operators

Cool-down to

100K

Liquid helium

transfer to the cryostat

Pump-down to 2K

Warm-up to 300K

Liquid helium

transfer from the cryostat

Pressure rise to 1 Bar

Pump and purge

Measurement at 2K

Cool-down to

70K

Cool-down to 4K, helium liquefaction

Pump-down to 2K

Warm-up to 300K

Liquid helium

evaporation

Pressure rise to 1

Bar

Pump and purge

Measurement at 2K

Cryogenics operation sequence for vertical cryostat

Cryogenics operation sequence for cryomodule test stand

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 17: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Vertical Cryostats Operation Cycles17

Example: July 2014 -> September 2014

About 180 cycles since start of AMTF operation in 2013

Courtesy of

J.Zajac Linde/Cofely

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 18: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

XFEL Cryomodule tests operation Cycles18

About 20 cycles since September 2013 (now 13th XFEL cryomodule under test)

Courtesy of

J.Zajac Linde/Cofely

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 19: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Refrigerator Avialability 201319

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940414243444546474849505152

[ A

vail

ab

ilit

y p

er

we

ek

in %

]

[ Week ]

CRYOGENIC PLANT OPERATION 2013

Availability 2013 = 98,80%

Mai

nten

ance

Mai

nten

ance

Mai

nten

ance

Cool

ing

wat

er fa

ilur

e -c

ryop

lant

shut

dow

n

Volt

age

drop

-cr

yopl

ant

shut

dow

n

CBX

Mai

nten

ance

Courtesy of

J.Zajac Linde/Cofely

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 20: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Refrigerator Avialability 201420

0

10

20

30

40

50

60

70

80

90

100

1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940414243444546474849505152

[ A

vail

ab

ilit

y p

er

we

ek

in %

]

[ Week ]

CRYOGENIC PLANT OPERATION 2014

Availability 2014 = 98,4%

02.11.2014

IOC

M

aint

enan

ce

12K2

Fre

quen

cy c

onve

rter

fai

lure

-cr

yopl

ant

shut

dow

n52

CVC3

10 V

alve

posi

tion

er

mal

func

tion

IOC

Mai

nten

ance

IOC

M

aint

enan

ce

CBX

Mai

nten

ance

Courtesy of

J.Zajac Linde/Cofely

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 21: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Main Cryo Operation Problems in AMTF21

Mixing of serial tests with installation work and commissioning

Problems with warm 2K helium compressors (see transparency) Mixing of warm&cold gas for controlled cool-down/warm upLHe level measurements affected by electrical heaters 2K supply JT-valve in module test stand 3 (XATB3) out of shape Misalignment of process tube flanges (feed-caps) -> adapters‚Digital‘ operation of valve positioners -> change type of positioners Thermal contact of electrical heaters -> use of ‚CMTB-type‘ heaters Liquid level measurements -> increase current Mix-up of thermometers (calibration) -> try to sort, some re-

calibration

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

-> Several problems with well known and ‚mature‘ components !

Page 22: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Cryogenic safety22

no general risk of oxygen deficiency within the AMTF hall (about 50 000 m3 volume) oxygen deficiency monitors in each module test stand radiation protection cave design of helium safety valves and venting systems according to our cryomodule ‚crash-tests‘ on CMTB or – on default- according to ‚Lehmann-Zahn‘ values 5K and 40/80K helium release systems separated from 2K release systems (20 bar vs. 4 bar) all safety valves vent into helium volumes – venting to atmosphere outside the hall

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Oxygen monitor

Page 23: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

23AMTF: general design & safety requirements

EU/German law ‚Betriebssicherheitsverordnung‘ DESY safety rules Rules&procedures for buildings & utilities General safety & radiation safety rules Pressure vessels: PED (AD2000,EU harmonized code)

This means in advance of technical commissioning: Third party interlock approvals PVI(=appoval before operation) by third party

(the complete procedure took several months for AMTF) … (list is not complete)

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 24: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

AMTF safety at work - organisation 24

Safety officers for different working areas Electronic access control for AMTF (‚DACHS‘) Safety instructions checked by electronic access control (general safety, cryogenic safety, radiation safety)

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

‚DACHS‘

electronic access control

Page 25: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

25

Analysis of vertical acceptance tests includes Series Cavities + “ILC HiGrade”-Cavities NO infrastructure commissioning tests

So far delivered: 488 cavities (status November 2014) Total RF tested: 450 cavities

Vertical acceptance tests

Average:> 9 tests per weeksince Oct 2013 (full operation of AMTF)

Manufacturer 1

Manufacturer 2

Status of plot: July 2014

Courtesy of

J.Swierblewski IFJ-PAN details see LINAC 2014

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 26: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Yield of usable and maximum gradient of 339 cavities “as received”

Yield of gradients: “As received” 26

Average maximum gradient:

(30.4 ± 7.6) MV/mM1: (28.4 ± 7.1) MV/mM2: (32.4 ± 7.6) MV/m

Average usable gradient:

(26.6 ± 7.6) MV/mM1: (24.8 ± 7.0) MV/mM2: (28.6 ± 7.9) MV/m

given errors are standard deviation

M1

M2

M1

M2

Courtesy of

J.Swierblewski IFJ-PAN details see LINAC 2014

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 27: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

Summary of preliminary module results 27

  average max. gradient

module[MV/m]

average max. gradient

vertical[MV/m]

Average operational

gradientmodule[MV/m]

Average usable gradient

vertical[MV/m]

XM-2 27.2 28.1 24.5 26.5

XM-1 28.2 30.8 25.1 29.4

XM1 30.3 32.5 27.6 29

XM2 27.7 32.7 25.5 28.6

XM3 30.4 32.0 28.8 29.3

XM4 28.6 33.3 23.8 30.5

XM5 27.8 28.9 24.9 26.9

All results above XFEL specs. 23.6 MV/m

Status November 2014: XM13 is under test, 18 modules at DESY

Courtesy of

J.Swierblewski IFJ-PAN details see LINAC 2014

6th International Workshop on Cryogenics OperationsBernd Petersen DESY

Page 28: 6th International Workshop on Cryogenics Operations Bernd Petersen DESY 6th International Workshop on Cryogenic Operations Bernd Petersen DESY MKS presenting.

XFEL WP10 Accelerator Module Test Facility

28 Some (preliminary) conclusions

Deliveries & installation of XATCs,XATB,XAVB,XATL

were ‚just-in-time‘ for start-up of cavity production Deliveries & installation of XATBs

were ‚just-in-time‘ for start-up of cryomodule production No dedicated de-bugging of cryo-supply (and other systems) XATCs design capacities demonstrated Complexity of XATBs commissioning underestimated General effort for installation & commissioning underestimated To be demonstrated: 1 cryomodule test/week So far: in budget and almost ‚in time‘ (not ‚on schedule‘)

Thank you for your attention !

6th International Workshop on Cryogenics OperationsBernd Petersen DESY