6th DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

38
6th DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

description

6th DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala. Priority Items. 1. Public Works (B&R). 2. Public Works (B&R). 3. Uttar Haryana Bijli Vitran Nigam . 4. Public Works (B&R). 5. Public Works (B&R). 6. Public Works (B&R). 7. Revenue . 8. Irrigation Deptt. . 9. H.S.A.M.B. . - PowerPoint PPT Presentation

Transcript of 6th DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Page 1: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

6th DIVISIONAL

DEVELOPMENT REVIEW SESSION

District Ambala

Page 2: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Priority Items

Page 3: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

1. Public Works (B&R)Agenda Items Departmental Comments DC RemarksConstruction of H.L. Bridge over Sadhaura nadi on Shahbad from Barara - Kala Amb to Village Sahila.

Earlier for this purpose an estimate amounting to Rs.450 lacs was prepared by the PWD B&R department but the amount was not sanctioned by the govt and in the meantime the temporary arrangement has been made by the Panchayat Department from NREGS with an expenditure of Rs.35 lacs.

Department submitted the report that DDRS approval for the project was not received but in the meantime arrangement has been made by the Panchayat department from NREGS.Work has been completed and CC Road work is under progress for which an amount of Rs.15. lacs are to be obtained from NREGS to complete the CC Road work.

Page 4: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

2. Public Works (B&R).Agenda Items Departmental Comments DC RemarksConstruction of H.L. Bridge over Markanda Nadi from village Haryouli to Tandwal.Brief: Construction of H.L. Bridge over Markanda Nadi from village Haryouli to TandwalDC reports that- Bridge over Markanda Nadi from Village Haryouli to Tandwal is required.The approximate cost of this bridge will be Rs.1000.00 lacs.

Construction of H.L. Bridge over Markanda Nadi from village Haryouli to Tandwal.Brief: Construction of H.L. Bridge over Markanda Nadi from village Haryouli to TandwalDC reports that- Bridge over Markanda Nadi from Village Haryouli to Tandwal is required.The approximate cost of this bridge will be Rs.1000.00 lacs.

Department submitted the report that DDRS approval for the project is required for further action in this matter.

Page 5: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

3. Uttar Haryana Bijli Vitran Nigam Agenda Items Departmental Comments DC RemarksSet up 66 KV Sub Station at Hissar Road for the upcoming industrial growth.

1. As per report received from Executive Engineer, Op.Div., Ambala City, new colonies are coming up. Presently this area is being fed from 66KV Sub station at Layalpur Basti , Sonda, and Chaurmastpur. -all far away from this area,therefore resulting in frequent tripping/breakdown. Due to this very reason Nigam is neither able to cater quality supply to the area nor able to meet out the future demand of the area.2. In view of the above it is proposed that a 66KV sub station be created at Hissar Road/village Balana with a installed capacity of one No. 10/12.5 MVA, 66/11 KV transformer so as to meet out the future load growth as well as to cater better quality of supply to the area. The required 66KV sub line will be tapped from nearby Tepla-sonda Line which is at a distance of approximately 7.0Km from proposed site. The approximate cost of the project is Rs.400.00 lacs subject to the availability of land free of cost.

Deptt. Submitted the report that this project is not feasible due to non availability of required land. However, the existing 66 KV sub station at saddopur, sonda and Layalpur Basti are being augmented to meet out the demand of industrial as well as other load growth.

Page 6: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

4. Public Works (B&R)

Agenda Items Departmental Comments

DC Remarks

Construction of Mini Sectt. (IIIrd Phase) at Ambala is urgently required.

. Construction of Mini Sectt. (IIIrd Phase) at Ambala is urgently required.

Department Submitted the report that DDRS approval for the project is yet to be received by the govt.

Page 7: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

5. Public Works (B&R)

Agenda Items Departmental Comments DC RemarksAdditional bridge on Tangri River.

For the Construction of Additional bridge on Tangri River,an estimate for Rs.750 lacs was prepared and the work was started on 01.11.2007 and completed on 30.09.2008. Total expenditure incurred was Rs.750 lacs

Work completed.

Page 8: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

6. Public Works (B&R).Agenda Items Departmental

CommentsDC Remarks

Beautification of Flyovers.

Commissioner PWD B&R has informed that Deputy Commissioner may submit a specific proposal in this regard which would be taken up with NHAI

SDO © submitted a proposal that shops/rehris along the boundary of Railway Station may be shifted in the open space beneath the fly over. It may help in free flow of public transport/general traffic. Efforts are being made to shift the rehries/shops along the boundary of railway station and re-located at an open space. For this purpose sites are being inspected. In regard to the beautification of Fly over near Central Jail in Ambala NHAI reported that the project of 6 laning of NH is under consideration. In regard to above it is proposed that plantation will definitely help in beautification of the flyover near central jail in Ambala city.

Page 9: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

7. Revenue Agenda Items Departmental

CommentsDC Remarks

Conversion of Leasehold land tenure into freehold in Ambala Sadar

A five member committee under the Chairmanship of FC & PS to Govt. Haryana Revenue Department was constituted by the Govt. on 23.11.2006 .Report awaited.

Matter is under consideration with the Government

Page 10: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

8. Irrigation Deptt.

Agenda Items Departmental Comments DC RemarksNaggal Lift Irrigation Scheme. (Kanwala Distributory )

KANWALA DISTRIBUTARY To operationalize 1st stage i.e. kanwala distributory system of NLIS, its rehabilitation is required. The capacity of kanwala distibutory is also to be increased to supply 30 Cs. Canal Water to HUDA for drinking purposes. Earlier the rehabilitation could not be done due to the reason that 20 Cs. Supply to MES Ambala Cantt is being given regularly.Due to inadequate storage capacity of tanks of these departments, the closure could not be arranged earlier.

Deptt submitted the report that approval of NABARD authority is awaited. The rehabilitation of naggal lift irrigartion scheme will be taken up after the approval of project by NABARD.Share money is also awaited from HUDA.

Page 11: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

9. H.S.A.M.B. Agenda Items Departmental Comments DC RemarksProposal for shifting of Anaj/Chara Manadi from inner area to outside in A/Cantt.

CA HSAMB informed that Section 6 notification has been issued regarding shifting of Anaj Mandi Sabji Mandi/Chara Mandi from inner area to outside from A/Cantt. The matter is under litigation as the Hon’ble Punjab & Haryana High court has passed stay orders on this land.

shifting of Anaj/Chara Manadi from inner area to outside in A/Cantt. is under process

Page 12: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

10. H.S.A.M.B. Agenda Items Departmental Comments DC RemarksShifting of Sabji Mandi from inner Areas to outside in Ambala City.

CA HSAMB informs that 25A-3K-13M land has been acquired on G.T. Road for the establishment of New Sabji Mandi. Market committee has made the payment of 3.27 cr. through LAC Ambala towards cost of the land. The HSAMB has granted administrative approval amounting Rs. 5.89 cr. for the development of the Mandi. The Work is under progress and Likely to be Completed by 31-05-2010

Shifting of Sabji Mandi from inner Areas to outside in Ambala City is under process

Page 13: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Regular Agenda Items

Page 14: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

(A) Implementation of Development Activities

• 12th Finance Commission Grants

• 2nd State Finance Commission Grants

• LADT

Page 15: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Year Works /projects

Estimated Cost

Amount Sanctioned/ Released

Expenditure/Financial progress

Physical progress Remarks

< 50% > 50 %

2008-2009(Rural)

2009-2010(Rural)

2009-2010(B & R)

951

860

1

370.00

176.57

815-88

370.00

176.57

815-88

370.00

68.40

-

-

40%

Yes

100%

-

-

Completed

210 comle.650 in prog.

Work in progress

(A) Implementation of Development Activities

i) 12th Finance Commission Grants

Page 16: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Year Works /projects

Estimated Cost

Amount Sanctioned/ Released

Expenditure/Financial progress

Physical progress

Remarks

< 50% > 50 %

2007-2008

2008-2009

603

-

228.00

-

228.00

-

228.00

-

-

-

100%

-

Completed

No funds received during 2008-2009 and 2009-2010

(A) Implementation of Development Activities

ii) 2nd Finance Commission Grants

Page 17: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Year Works /projects

Estimated Cost

Amount Sanctioned/ Released

Expenditure/Financial progress

Physical progress

Remarks

< 50% > 50 %

2005-2006(Rural)

2008-2009(CC streets)

2008-2009(Roads)

2009-2010(Roads)

46

72

26

30

532.00

720.00

430.00

631.00

532.00

720.00

430.00

631.00

519.11

715.78

430.00

542.84

-

-

-

-

100%

100%

100%

85%

No funds received during 2008-2009 and 2009-2010

No funds received during 2008-2009 and 2009-2010

Completed

24 Completed6 in Progress

(A) Implementation of Development Activities

iii) LADT

Page 18: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

(B) Rural Development Programmes Programme Funds

AvailableExp. Upto 31-10-09

%age Physical Achievement  

NREGA 1000.484 666.387 66.6% Total 537 works undertaken out of which 172 works completed. Employment provided to 6256 Household. Total 29620 Household registered in this scheme.

Swaran Jayanti Gram Swarojgar Yojna(SGSY)

93.38 57.30 61%Job provided to 165 Swarojgaaaaris

Indira Awas Yojna(IAY)

208.901 166.60 99.9% Total Houses :812 Complete: 0In Progress:812

MPLAD (2008-09)

196.30 143.35 73.3% Complete:73 In Total works:109 Prog.: 36Works not started: 0(The funds of 2009-10 has not been received yet)

Haryali 5.50 0 0 Funds released to PIA/ Watershed committee/ Panchayats. Case for 2nd installment sent to Govt..

Total Sanitation Campaign(TSC)

533.18 493.04 92.5% Total toilets for BPL constructed : 19010School toilets: 284Aanganwadi toilets: 570Women sanitation complex: 65

H.R.D.F05-0606-0707-0808-0909-10

 414.42406.88387.96922.87 48.75

 412.15395.72384.75515.16 12.15

 99%97%99%55%24%

Total comp. In Prog not started214 212 0 2 (site dispute)150 150 0 0 99 99 0 0 325 43 282 0(funds recd.in02/09) 45 2 43

Women Chopal.-Phase I (08-09)Phase II (09-10)

222.00 108.00

213.00 38.60

96% 36%

74 66 8 36 7 29

Page 19: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

(C) Beautification & Improvements in Urban Surroundings

Page 20: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

H.S.A.M.B(Ambala) Construction of Link Roads

Total No. of roads Length in (K.M.) Esti.cost No. of roads compl.

In Progress Not started Physical in Prog.

Exp.as on 31.10.09

(in K.M.)

Phase-I 13.23 60 6 0 0 13.23 61.66

Phase-II 19.51 78.32 10 0 0 19.51 76.4

Phase III & IV 8.67 43.18 4 0 0 8.67 38.03

Phase-V 32.49 198.77 11 4 0 22.43 178.9

Phase-VI 19.44 181.37 9 1 0 15.37 108.59

Phase-VII 52.05 507.07 0 0 0 0 0

(D) Infrastructure Development project

Page 21: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

IRRIGATION DEPARTMENTState Plan/Flood Works

S.N Year Total No. of Works

Works compl.

In Prog

Works not started

Total funds available

Exp. Upoto 31.10.09

% of exp.

Remarks

1. 06-07 9 9 0 0 389.15 90.74 23% Less exp. Due to drop of scheme

 

2. 07-08 13 5 3 4 675.64 161.86

24% Work not started due to land acquisition under process.

 

3. 08-09 8 4 3 1 4433.54

2636.74

60% Work not started due to land acquisition under process.

 

(D) Infrastructure Development project

Page 22: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Under Head AIBP.

S.N Year Total No. of Works

Works compl

In Progress

Works not started

Total funds available

Exp. Upto 31.10.09

% of exp.

Remarks

1. 06-07 3 2 0 1 160.50 135.00

84 Work not

started due

to drop

of scheme from AIBP

(D) Infrastructure Development project

Page 23: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

P.W.D.(Water Supply & Sanitation)Rural Water SupplyS.No. Name of Head Total

Funds available

Exp. Upto 31.10.09

% age of exp.

Total Works

Works compl.

In Progress

1. Agumentation State Plan

618.18 648.78 105% 65 63 0

2 Addl.Central Assistance

350.28 431.89 124% 32 32 0

3 ARWSP 1591.45 1573.02 99% 158 151 7

4 NABARD 538.66 536.59 100% 17 17 0

5 Harijan Basti 95.38 95.38 100% 20 20 0 

Rural IGDWS              

6 Infrastucture Development

249.30 539.76 216% 36 31 5

7 Pvt.Sc Connection

1309.60 964.69 74% 35422 30200 5222

(D) Infrastructure Development project

Page 24: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Rural Water Supply

Urban IGDWS              

8 Pvt.Sc Connection Ambala City

155.01 105.03 68% 8409 4156 4253

Urban Water Supply

             

9 Ambala City 913.40 871.43 96% 5 3 2 

10 Ambala Sadar 326.15 23.59 7% 6 4 2 

Urban ACA              

11 Ambala Sadar 2224.93 2491.44 112% 1 0 1 

S.No. Name of Head Total Funds available

Exp. Upto 31.10.09

% age of exp.

Total Works

Works compl.

In Progress

(D) Infrastructure Development project

Page 25: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Urban Sewerage              

12 Ambala City 1988.77 1570.76 79% 4 0 4 

13 Ambala Cantt 170.42 60.34 36% 3 0 3 

Drainage               

14 Ambala City 278.81 212.44 76% 6 4 2 

  Grand Total 10810.34 10125.14 94% 44184 34681 9501

Rural Water SupplyS.No. Name of Head Total

Funds available

Exp. Upto 31.10.09

% age of exp.

Total Works

Works compl.

In Progress

(D) Infrastructure Development project

Page 26: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

(E) Gaps in existing infrastructure   Transformers

(nos.)11KV lins (in Kms.)

L/T lines (in Kms)

Connection Category-wise(Numbers)    

Domst Comm L.T. Indust

T/Wel PWW

Existing 8318 

2334 3890 145981 31274 3009 13852 612

Total requirement

8561 2357 3929 146481 31674 3049 14252 637

Gap 243 23 39 500 400 40 400 25

Funds Required(Rs. In lac)

195.00 46.00 68.00 10.00 15.00 80.00 500.00 38.00

Page 27: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

(F) CM ANNOUNCEMENTSDepartment Dropped Commissioned In

ProgressNot

FeasiblePending Total

District Administration 0 6 0 0 1 7

Education 1 16 1 13 0 31

Animal Husbandry 0 13 0 5 0 18

Forest 0 1 0 0 0 1

Health 0 1 2 2 0 5

Public Health 0 0 1 0 0 1

HUDA 0 0 1 1 2 4

Industries 0 1 1 0 0 2

Irrigation 2 4 2 0 0 8

Urban Local Bodies 0 0 1 0 0 1

Development Deptt. 0 6 2 0 0 8

Marketing Board 0 18 1 3 1 23

PWD B&R 0 4 5 6 0 15

Sports 0 8 0 4 0 12

UHBVN 1 3 1 0 0 5

Social Welfare 0 1 0 0 0 1

Roadways 0 1 0 0 1 2

Total 4 83 18 34 5 144

Page 28: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

C.M. Announcements Pending with H.Q.

Sr. No.

Department Officer at District Level

Name of Work Remarks

1 Treasury & Accounts

Treasury Officer Opening of Sub. Treasury at Shahzadpur

Proposal submitted to the Director, Treasury & Accounts, Haryana, Chandigarh.

2 HUDA Estate Officer HUDA Const. of Parsu Ram Park in Sector-8, Ambala City

Layout Plan of Sector-23 submitted to Admn. HUDA PKL.

3 HUDA Estate Officer HUDA Const. of Parsu Ram Bhawan in Ambala City

Submitted to C.A. HUDA

4 HSAMB Xen, HSAMB Const. of Kisan Rest House at Shahzadpur Anaj Mandi

Approval awaited from H.Q.

5 Transport G.M. Roadways Const. of Bus Stand in Vill. Mullana

No. Objection awaited from Executive Engineer NH-73, PKL.

Page 29: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

C.M. Announcements Dropped

Sr. No

Department Officer at District Level

Name of Work Remarks

1 Tech. Edu. Dir. Tech. Edu. Opening of Technical Institution

Does not Fulfill the Norms

2 Irrigation SE Irrigation Const. of Canal from Tajewala to Mohra via Nahoni

Dropped in the meeting under Chairmanship of PSCM

3 Irrigation SE Irrigation Const. of Canal from Hathni Kund for Naraingarh Area

The Clearance of this project is being pursued in CWC.

4 UHBVN SE, UHBVN Const. of 66 KV Power Sub Station in Vill. Ugala & Dheen

In Vill. Ugala Work in Progress & Sub. Satation at Vill. Dheen is not technically justified

Page 30: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

C.M. Announcements Works in Progress

Sr. No.

Department

Officer at District Level

Name of Work Estimated Cost (Rs. In Lakh)

Expenditure (Rs. In Lakh)

Status

1 Industrial Training

Principal ITI

Const. of ITI for Naraingarh

997.95 Approval received, funds awaited

2 Health CMO Const. of Primary Health Centre in Vill. Boh-Babyal

207.22 46.03 45% work completed

3 Health CMO Establishment of Primary Helath Centre in Vill. Kesri

207.27 101.33 40% work completed and likely to be completed by 17.12.2009

4 P.W.D. (Public Health)

Xen, PH Providing Sewerage System in Ambala City

4937.47 1153.52 100% sewer has been laid Const. of STP in progress.

5 HUDA Estate Officer

Const. of Rajeev Gandhi Sports Stadium in HUDA, Sector-10

102.50 47.20 30% work completed

6 Industries G.M. DIC Setup SEX in Ambala City 195000.00 Action is being taken by M/s. DLF Pvt. Ltd. for purchasing the land.

7 Irrigation SE, Irrigation

Const. of Mansoorpur lift Irrigation Scheme

860.64 211.97 40% work completed

8 Irrigation SE, Irrigation

Drainage of Water for village Barara

10.46 In Progress

9 H.R.D.F. Xen, PR Development works in Fifteen Villages

Likely to be comp. by 31-03-2010

Page 31: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

C.M. Announcements Works in ProgressSr. No.

Department Officer at District Level

Name of Work Estimated Cost (Rs. In Lakh)

Expenditure (Rs. In Lakh)

Status

10 H.R.D.F. Xen, PR

Shahzadpur & Shahzadpur Majra to be declared as Model Village

10% Completed Likely to be completed by 31-03-2010

11 Urban Local Bodies

Secy. M.C., N/Garh

Repair of Main Road of Market

64.64 In Progress

12 H.S.A.M.B. Xen, HSAMB

Opening of Collection Centre in Karasan Anaj Mandi

25.97 2.26 50% work Completed progress slow due to standing trees

13 PWD B&R XEN, B&R

Link road from Binjalpur to Zafferpur

30.00 20.00 80% work completed likely to be completed by 31-12-2009

14 PWD B&R XEN, B&R

Const. of Bridge over Shahzadpur River & Khanpur Brahaman river

226.09 174.00 Bridge Completed. Approaches 90% completed.

15 PWD B&R XEN, B&R

Link Road from Paplotha to Mullana upto Markanda River

69.00 52.20 80% work completed likely to be completed by 31-12-2009

16 PWD B&R XEN, B&R

Const. of New Road from Rajouli to Sarakpur

45.00 36.00 80% work completed likely to be completed by 31-12-2009

17 PWD B&R XEN, B&R

Link Road from Zaffapur to Jagdholi Road

56.50 45.20 80% work completed likely to be completed by 31-12-2009

18 HVPN SE, HBVN

Const. of 66 KV sub station in village Ugala and Dheen

In Vill. Ugala Work in Progress & Sub. Satation at Vill. Dheen is not technically justified

Page 32: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

C.M. Announcements (Not Feasible)Sr. No.

Department Officer at District Level

Name of Work Status

1 Education (School) DEO Up-gradation of School in Vill. Batrohan from Middle to High

Does not fulfill the norms

2 Education (School) DEO Up-gradation of School in Vill. Barola from Middle to High

Does not fulfill the norms

3 Education (School) DEO Up-gradation of School in Vill. Chaurmastpur from High to Senior Secondary

Does not fulfill the norms

4 Education (School) DEO Up-gradation of School in Vill. Tharwa from High to Senior Secondary

Does not fulfill the norms

5 Education (School) DEO Up-gradation of School in Vill. Baknour from High to Senior Secondary

Does not fulfill the norms

6 Education (Higher) DHE, Chd. Const. of Govt. College for Girls Does not fulfill the norms

7 Education (Higher) DHE, Chd. Opening Govt. Girls College in Shahzadpur Does not fulfill the norms

8 Education (Primary) DEPO Up-gradation of School in Vill. Jodhpur from Primary to Middle

Does not fulfill the norms

9 Education (Primary) DEPO Up-gradation of School in Vill. Khojkipur from Primary to Middle

Does not fulfill the norms

10 Education (Primary) DEPO Up-gradation of School in Vill. Neharsi from Primary to Middle

Does not fulfill the norms

11 Education (Primary) DEPO Up-gradation of School in Vill. Ghasitpur from Primary to Middle

Does not fulfill the norms

12 Education (Primary) DEPO Up-gradation of School in Vill. Malwa from Primary to Middle

Does not fulfill the norms

Page 33: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

C.M. Announcements Not FeasibleSr. No.

Department

Officer at District Level

Name of Work Status

13 Education (Primary)

DEPO Up-gradation of School in Vill. Jandheri from Primary to Middle

Does not fulfill the norms

14 Animal Husbandry

DD , ICDP Repair of Vet. Hosptial in Vill. Khudda Khurd

No. Govt. Institution exists in the Village

15 Animal Husbandry

DD , ICDP Shifting of animal hospital to main bazaar to anaj mandi

Not Feasible as approved by Hon’ble CM

16 Animal Husbandry

DD , ICDP Opening of Vety. Dispensary in Vill. Binjalpur

Live stock and human population is not as per norm

17 Animal Husbandry

DD , ICDP Opening of Vety. Dispensary in Vill. Nagla Jattan

Live stock and human population is not as per norm

18 Animal Husbandry

DD , ICDP Opening of Vety. Dispensary in Vill. Rajokheri

Live stock and human population is not as per norm

19 Health CMO Up-gradation of PHC to CHC in Barara Village

Population less than the National Helath Policy Norms

20 Health CMO Establishment of Health Dispensary in Vill. Gokulgarh

Population less than the National Helath Policy Norms

21 Town & Country Planning

Estate Officer Const. of Stadium in New HUDA Sector, Naraingarh

Due to Non availability of land

22 H.S.A.M.B. Xen, HSAMB Const. of Road Ugala , Buhawa Road to Deep Singh Dera

Due to Less consolidation path (Path is only 3 Karam)

23 H.S.A.M.B. Xen, HSAMB Const. of Road Dheen Saran road to Ram Nagar

Due to Less consolidation path (Path is only 2 Karam)

24 H.S.A.M.B. Xen, HSAMB Const. of Road Dadupur to Tandwali Rajokheri Road

Due to Less consolidation path (Path is only 3 Karam)

25 P.W.D. (B&R)

XEN, B&R Link Road from Adhoya to Barara Basti Due to Less consolidation path

Page 34: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

C.M. Announcements (Not Feasible)

Sr. No.

Department Officer at District Level

Name of Work Status

26 P.W.D. (B&R)

XEN, B&R

Const. of PWD Rest House at Dosarka

Due to stay on land acquisition by Punjab & Haryana High Court

27 P.W.D. (B&R)

XEN, B&R

Const. of Road from Chahl Majra to Tandwal, Rajokheri Road

Due to Less consolidation path

28 P.W.D. (B&R)

XEN, B&R

Const. of New Rod from Duliana to Tangali

Due to Less consolidation path

29 P.W.D. (B&R)

XEN, B&R

Const. of Link Road Gola to Dera Saini Majra

Due to Less consolidation path

30 P.W.D. (B&R)

XEN, B&R

Const. of Link Road from Tammanuli to Saha

Due to Less consolidation path

31 Sports DSO Const. of Mini Stadium at Vill. Sardahri

Due to Non availability of land with Gram Panchayat

32 Spots DSO Const. of Mini Stadium at Vill. Barara

Due to Non availability of land

33 Spots DSO Const. of Mini Stadium at Vill. Samlehri

Due to Non availability of land

34 Spots DSO Const. of Stadium for Naraingarh Due to Non availability of land

Page 35: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

General Issues

Page 36: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

General Issues

1. Irrigation Construction of Siphon on SYL (Irrigation) to prevent flooding in the Naggal areas) and Electrification of all gates from existing manual system to mechanical system on SYL cost. (Appx. Cost 4.25 crore).

2. B&R Construction of parallel flyover on NH 65 at the existing location i.e. from Aggarsen Chowk to Anaj Mandi. (Appx. Cost 4.0 Crore)

3. Urban Dev. Remodelling and reconstruction of Mahavir Park.( 2.0 Crore)

4. B&R Construction of Byepass road from Ghunghat Palace to connecting N.H.I connectingAmritsar and further NH 22 connecting Chandigarh.

5. Relocation of Mini Secretariat (project being discussed with defence authorities for exchange of land).

Page 37: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

6. B&R Construction of 40 new houses in old officer colony, Ambala City. Estimated cost is 7.30 crores.

7. B&R Construction of Mini Secretariat at Barara. Proposal already sent to Government.

8. Transport Shifting of Bus Stand from existing location to new location outside the city.

9 B&R Relocation of Motor Market from the existing location opposite Manji Sahib Gurudwara.

10. B&R Construction of building for sub Tehsil/Sub Treasury at Shazadpur.

11. B&R Construction of houses for Tehsildar and Naib Tehsildar at Naraingarh. Estimated cost is 1.44 crores.

General Issues

Page 38: 6th  DIVISIONAL DEVELOPMENT REVIEW SESSION District Ambala

Thank you…