6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach...

11
6SigmaDC Conference & User Training, 15 th – 17 th November 20 Hassan Moezzi A New Approach Welcome to the Model Data Centre

Transcript of 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach...

Page 1: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Hassan Moezzi

A New Approach

Welcome to the Model Data Centre

Page 2: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Operational Intent

Mid life Expected end of life

Year 1

Time

Operational intent

Usable Capacity of room

Total available KW

Capacity=W/m2 x area

Page 3: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

The Reality…

Mid life Expected end of life

Year 1

Time

Typical Operation

Operational intent

Lost Lifespan

Stranded Capacity

Usable Capacity of room

Total available KW

Hot Spots create a mid-life crisis? Premature end-of-life for the data center.

Hot Spots

Page 4: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Why is there stranded capacity?

• IT operation decisions have engineering impact on:• Efficiency (increased Opex through energy costs)• Resilience (increased risk of thermal downtime)• Longevity (increase in Capex caused by stranded capacity)

• Causes:• IT Deployment decisions do not take into account the engineering

impact of operational decisions• IT Deployment decisions do not consider air flow/cooling management

Page 5: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Lack of Airflow Management

• Did you know that all mission critical facilities lose more than 30% of their data center capacity because of hotspots?• Why?• IT Equipment is air cooled• There are no standards for cooling

design of IT Equipment.• IT equipment designs change over time.• IT equipment deployment changes over

time.• Data Center cooling infrastructure is

fixed over its lifetime.• The owner/operator has the

responsibility to deliver sufficient airflow and cooling to every piece of IT equipment at all times.

Servers

Switch

Storage

Page 6: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Capacity planning is impossible without airflow management

Same equipment, one works... one fails.

Servers

Switch

Storage

Page 7: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

The Physics of Airflow and Cooling

Equipment Manufacturer No Man’s Land Facilities Manager

There is a lack of effective communication between the Equipment Suppliers and the Building Services Industry

Page 8: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Current Process

InfrastructureIT

Equipment Cabinets

Page 9: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

What you’ll see today

InfrastructureIT

Equipment Cabinets The Virtual Facility

The Virtual Facility is a full 3-dimensional mathematical representation of the physical data center at any point in time.

Page 10: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Many teams... One goal

Engineering based decisions Business / Operational based decisions

Page 11: 6SigmaDC Conference & User Training, 15 th – 17 th November 2011 Hassan Moezzi A New Approach Welcome to the Model Data Centre.

6SigmaDC Conference & User Training, 15th – 17th November 2011

Closing Remarks

Mid life Expected end of life

Year 1

Time

Typical Operation

Operational intent

Reclaimed Capacity

Operating with a Virtual Facility

Reclaimed Lifespan

Capacity of room

Total available

KW

“Data centers seldom meet the operational and capacity requirements of their initial design” - Gartner