N~Duke -- 6~Power- A Duke Energy Company Duke Power Company A Duke Energy Company Oconee Nuclear Site' P.O. Box 1439 Seneca, SC 29679 (864) 885-3107 OFFICE (864) 885-3564 FAX W. R. McCollum, Jr. Vice President December 18, 1997 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Subject: Oconee Nuclear Station Docket Nos. 50-269, -270, -287 Individual Plant Examination of External (Generic Letter 88-20, Supplement 4) Events In response to Generic Letter 88-20, Supplement 4, Duke Energy Corporation (Duke) submitted the Individual Plant Examination of External Events (IPEEE) for severe accident vulnerabilities at the Oconee Nuclear Station in a letter dated December 28, 1995. The Oconee IPEEE program was conducted in accordance with the approach and methodology described in the Duke letter dated December 18, 1991, with one exception. The relay chatter analysis, being done in conjunction with the USI A-46 relay review, was not completed as part of the IPEEE submittal dated December 28, 1995. Duke indicated in the December 28, 1995 letter that the relay chatter analysis would be submitted following the completion of the USI A-46 relay review. In a letter dated October 3, 1995, Duke updated the NRC Staff on the progress of the resolution to USI A-46 and revised the submittal date for the USI A-46 report to December 31, 1996. A partial submittal of the USI A-46 report was provided to the NRC in a letter dated December 30, 1996. The partial submittal covered the emergency power equipment which is located at the Keowee Hydro Units and in the Oconee switchyard. In a letter dated March 31, 1997, Duke informed the NRC tha the submittal of the remaining portion of the USI A-46 report and would be submitted by December 15, 1997. In a letter dated December 15, 1997, .Dike submitted the remaining portion of the USI A-46 rep~ort.. 9801020094 971218 PDR ADOCK 05000269 P PDR t".~ a 2 F F A

Transcript of 6~Power-N~Duke -- A Oconee Nuclear Site' A Duke Energy ... · 4.0 Seismic PRA Analysis 4.1 Seismic...

  • N~Duke--6~Power-A Duke Energy Company

    Duke Power CompanyA Duke Energy Company

    Oconee Nuclear Site'P.O. Box 1439Seneca, SC 29679

    (864) 885-3107 OFFICE(864) 885-3564 FAXW. R. McCollum, Jr.

    Vice President

    December 18, 1997

    U. S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555

    Subject: Oconee Nuclear StationDocket Nos. 50-269, -270, -287Individual Plant Examination of External(Generic Letter 88-20, Supplement 4)

    Events

    In response to Generic Letter 88-20, Supplement 4, DukeEnergy Corporation (Duke) submitted the Individual PlantExamination of External Events (IPEEE) for severe accidentvulnerabilities at the Oconee Nuclear Station in a letterdated December 28, 1995. The Oconee IPEEE program wasconducted in accordance with the approach and methodologydescribed in the Duke letter dated December 18, 1991, withone exception. The relay chatter analysis, being done inconjunction with the USI A-46 relay review, was notcompleted as part of the IPEEE submittal dated December 28,1995. Duke indicated in the December 28, 1995 letter thatthe relay chatter analysis would be submitted following thecompletion of the USI A-46 relay review.

    In a letter dated October 3, 1995, Duke updated the NRCStaff on the progress of the resolution to USI A-46 andrevised the submittal date for the USI A-46 report toDecember 31, 1996. A partial submittal of the USI A-46report was provided to the NRC in a letter dated December30, 1996. The partial submittal covered the emergency powerequipment which is located at the Keowee Hydro Units and inthe Oconee switchyard.

    In a letter dated March 31, 1997, Duke informed the NRC thathe submittal of the remaining portion of the USI A-46report and would be submitted by December 15, 1997. In aletter dated December 15, 1997, .Dike submitted the remainingportion of the USI A-46 rep~ort..

    9801020094 971218PDR ADOCK 05000269P PDR

    t".~

    a 2 F F A

  • 4 -

    In accordance with Duke's commitment, please find attachedthe IPEEE addendum which contains the relay chatteranalysis.

    Please address any questions to Michael Bailey at (864) 885-4390.

    Very truly yours,

    W. R. McCollum Jr.Site Vice PresidentOconee Nuclear Station

    Attachment

    cc: L. A. Reyes, Regional AdministratorRegion II

    M. A. Scott, Senior Resident InspectorOconee Nuclear Site

    D. E. LaBarge, Project ManagerNRR

  • POR ADOCK 05000269p n

  • TABLE OF CONTENTS

    Section Page

    1. INTRODUCTION AND BACKGROUND 1

    2. UPDATE OF FRAGILITIES 1

    3. RELAY CHATTER ANALYSIS 23.1 RELAY CHATTER SCOPE 23.2 FRAGILITY COMPUTATIONS 3

    4. SEISMIC PRA ANALYSIS 34.1 SEISMIC PRA MODEL REVISIONS 34.2 CONTAINMENT PERFORMANCE ISSUES 4

    5. RESULTS AND CONCLUSIONS 45.1 RESULTS 45.2 SENSITIVITY STUDIES 45.3 CONCLUSIONS 4

    6. PLANT IMPROVEMENTS 5

    7. REFERENCES 6

    Table 2-1 Component Fragilities Used In The Seismic Analysis 7

    Table 2-2 Additional Seismic Plant Model Basic Event Data 9

    Table 3-1 Relay Outliers from IPEEE Relay Evaluation 12

    Table 5-1 Oconee Seismic Dominant Cutsets 17

    Table 5-2 Sensitivity Study Results 35

    Table 6-1 Enhancements Resulting From The IPEEE Program 36

    APPENDIX A OCONEE SEISMIC FAULT TREE

  • OCONEE SUPPLEMENTAL IPEEE SUBMITTAL REPORT

    1.0 Introduction and Background

    On December 21, 1995, Duke Power submitted its Oconee IPEEE report (Ref. 7.1) in response toGeneric Letter 88-20, Supplement 4 (Ref. 7.2). Section 3.0 (Seismic Analysis) noted that a "fullscope" relay chatter review, as defined in NUREG-1407 (Ref. 7.3), was being conducted inaccordance with the procedures outlined in the GIP (Ref. 7.4) in conjunction with the A-46 review.At the time of the report submittal, the review was in progress and the results of the relay reviewwere to be submitted as an addendum to the December 1995 IPEEE report. The purpose of thissupplemental report, therefore, is to present the results of the relay review as it affects thepreviously submitted seismic analysis as well as other enhancements to the seismic analysis.

    The enhancements to the previously submitted seismic analysis are described in Section 2.0, andthe relay review results are described in Section 3.0. The effect on the overall seismic PRA modeland risk results is described in Sections 4.0 and 5.0. An updated list of planned plant enhancementsis discussed in Section 6.0.

    2.0 Update of Fragilities

    In order to develop the original surrogate for screened out components used in the initial IPEEEsubmittal, the existing equipment anchorage evaluations were reviewed to determine what minimaladditional margin could be easily identified in the calculations. The original calculations wereoften bounding-type analyses, including criteria from both the SQUG and IPEEE programs. By re-reviewing the anchorage evaluations using IPEEE criteria only, certain conservatisms were quicklyidentified. Although all of the components had at least some additional margin, many of thecomponents had significantly more margin. However, for the original IPEEE submittal, only theadditional margin that could be quickly identified was included in the results. This acceleratedeffort resulted in conservative estimates for the seismic fragilities for surrogate elementsrepresenting screened out components.

    In order to minimize the dominance of the Auxiliary Building and SSF components surrogateelement in the risk results, the Auxiliary Building and SSF components anchorages were re-reviewed after the IPEEE submittal to determine if additional conservatisms could be removedfrom their capacity evaluations.

    For the post-submittal review, comprehensive reviews of the Unit 3 Auxiliary Building anchorageassessments were undertaken to determine more exact anchorage capacity levels. The Unit I and 2anchorage results were also given a brief review to assure that the results of the comprehensivereview of Unit 3 would be representative of the anchorage capacities on those units. The SSFresults were reviewed and updated as well.

    Additional anchorage reviews were conducted for the Reactor Building, Turbine Building, Yard &Switchyard, and Keowee.

    For all the areas, the original calculations reviewed the anchorage of components against a 0.1 8gpga NUREG/CR-0098 spectral shape (Ref. 7.5) for IPEEE. In order to determine additional seismic

    I

  • margin for IPEEE, all components were re-reviewed to determine if the anchorage had adequatecapacity for a 0.38g pga NUREG/CR-0098 spectral shape seismic demand screening level. Thislevel is equivalent to the seismic experience database screening level used for the componentassessments, except for the anchorage evaluations. Using this screening level, factors of safetycompared to the original 0.1 8g pga NUREG/CR-0098 screening level were obtained.

    After the factor of safety compared to 0.1 8g pga NUREG/CR-0098 was determined, the factor wasconverted to Uniform Hazard Spectra (UHS)-based as discussed in Section 3.1.4 of the originalsubmittal. This information was used to update the surrogate fragilities, representing screened outcomponents, as well as individual component fragilities for those components which do not screen.

    Table 2-1 contains the final listing of seismic fragilities included in the ONS seismic PRA model.Table 2-2 shows the various random, maintenance, and human error basic events also used therein.

    3.0 Relay Chatter Analysis

    3.1 Relay Chatter Scope

    The scope of the IPEEE relay chatter review for Oconee is consistent with the "full scope"classification as defined in Table 3.1 of NUREG-1407. Oconee is also a USI A-46 plant. Thefull scope evaluation requires a review of systems within the scope of IPEEE, includingthose that are also within the scope of USI A-46. Relay chatter reviews were conducted usingappropriate seismic margin procedures (EPRI NP-6041 - Ref. 7.6), USI A-46 proceduresoutlined in the GIP, and fragility procedures outlined in TR-103959 (Ref. 7.7)..

    Relays in this context include such components as electric relays, contacts, and switches thatare prone to chatter. A total of 6147 relays were reviewed for the entire plant.

    Within the scope of USI A-46, four functions were considered for achieving and maintaininga safe shutdown condition following a design basis earthquake. These functions are:reactivity control, reactor coolant pressure control, reactor coolant inventory control, anddecay heat removal. Systems best suited to perform these safe shutdown functions wereidentified. In addition, systems necessary to satisfy safe shutdown and containment integrityfunctional requirements, as modeled in the ONS PRA, were added. A subset of these plantsystems and equipment which are required to function during and immediately following anearthquake were identified. Relays for this subset of systems and equipment were consideredessential relays if the equipment associated with these functions rely on the proper operationof the relays.

    The list of essential relays was further reduced to include only those relays which result in anunacceptable seal-in or lockout of specific circuits necessary to maintain safe shutdown. Theother essential relays were not considered risk significant since they return to their desiredoperating position following the postulated 30 second earthquake event. This remaininggroup of essential relays includes relays for Keowee Hydro Station, Main Feeder Bus,Underground / Overhead Power Paths, and Oconee Nuclear Station.

    2

  • 3.2 Fragility Computations

    Seismic capacity versus demand screening was performed on the remaining subset ofessential relays. This screening was accomplished by comparing the in-cabinet demand(IPEEE in-structure floor spectra times GIP in-cabinet amplification factors) to the seismiccapacity information in the GERS. The screening level was set to match the AuxiliaryBuilding electrical cabinet structural surrogate fragility in the Oconee Seismic PRA model.

    Detailed fragilities for relays which were not screened out above were calculated using themethodology described in Sections 3 and 10 of EPRI-TR-103959. These fragilities werecompared to the Auxiliary Building electrical cabinets structural surrogate fragility. Relayswith fragility values less than this surrogate fragility are being considered for either furtheranalysis or replacement with a relay having a seismic capacity greater than or equal to theAuxiliary Building surrogate value.

    This process resulted in confirming the adequacy of all relays except 8 relays in the Keoweeoverhead power path and the relays shown in Table 3-1. The overhead power path relays areonly slightly below the Auxiliary Building surrogate capacity and are explicitly included inthe seismic PRA model. The remaining 142 relays (Table 3-1) with fragilities less than theAuxiliary Building surrogate are being considered for further analysis or replacement.

    During the course of relay chatter analysis for control room control board relays, a questionarose on the secondary affect of control board structural response on the relays containedtherein. It was concluded that this is an area of uncertainty and further analysis is planned toresolve this question.

    4.0 Seismic PRA Analysis

    4.1 Seismic PRA Model Revisions

    The IPEEE seismic PRA model was reviewed and revised as appropriate to incorporate thefindings outlined in Sections 2.0 and 3.0 above. Several structures and componentsdetermined to be seismically rugged were screened out of the model since their failureprobabilities were very small. Some of these structures and components were retained,however, to maintain certain parts of the fault tree logic.

    Surrogate values corresponding to the Auxiliary Building and Standby Shutdown Facilitywere updated and surrogate values corresponding to the Turbine Building and KeoweeHydro Station were added to represent the screened out non-relay components containedtherein.

    The Auxiliary Building surrogate value also represents screened out relay components in allareas (Oconee and Keowee), except the emergency power overhead feed. There are twoavailable power paths to feed emergency power from Keowee Hydro Station, an overheadfeed and a underground feed. Based upon the relay chatter assessments, the overhead pathrelays have a relay chatter fragility (slightly) lower than the Auxiliary Building surrogate.Accordingly, relay chatter is modeled for the overhead path only.

    The complete fault tree isdepicted in Appendix A.

  • 4.2 Containment Performance Issues

    Recall Section 3.1.6 of the original submittal addressed containment performance issues. Apartial review was submitted pending the results of the relay review. As a result of the relayassessments, it was determined that relay chatter events do not introduce any unique impactto containment performance and, thus, do not impact the current Level 2 and Level 3analyses.

    5.0 Results and Conclusions

    5.1 Results

    The seismically-induced core melt frequency was calculated as described in Section 3.1.5 ofthe original submittal. The CMF is 3.47E-05 / yr. The SEISM output is shown in Table 5-1.This table gives the percent contribution of each cut set to the total seismically-induced coredamage frequency and shows how the failure of each cut set is distributed among theacceleration intervals. A flooding event (attributed to the seismically-induced failure of theJocassee Dam), resulting in floods higher than the 5 ft. SSF flood barriers, makes up the mostdominant cut set. Sequences involving a total loss of power (including flooding events)coupled with the SSF response comprise the next several dominant cutsets. In particular,successive failures of off-site power, Keowee, and Lee Steam Station are combined with theSSF surrogate.

    5.2 Sensitivity Studies

    Sensitivity studies were conducted to determine how various factors, components, andfragilities affect the seismic CMF. Specifically, the following studies were performed:

    " Auxiliary Building surrogate median acceleration value increased from 0.48g to 0.60g" Varied probability of achieving critical flood height following a Jocassee Dam failure* Overhead path relays are screened out" Jocassee Dam median acceleration value increased from 0.49g to 0.60g* Increase Keowee 600V ac MCCs median acceleration value from 0.41g to 0.60g* Increase Keowee battery median acceleration value from 0.36g to 0.60g" Increase Keowee control boards' median acceleration value from 0.43g to 0.60g" SSF surrogate median acceleration value increased from 0.60g to 0.80g

    The results of these cases are presented in Table 5-2.

    5.3 Conclusions

    It can be concluded from Table 5-1 that no one failure truly dominates the seismic CMF. Therelay chatter analysis identified the need to enhance the seismic adequacy of a few relays.The current plan is to replace these relays with seismically adequate relays. Also, thesecondary effect of the control board response on protective relays within the boards is anarea of some uncertainty. Additional structural analysis of the control boards for IPEEEseismic demand is planned to better understand any potential impact on control boardessential relays.

    4

  • 6.0 Plant Improvements

    Several enhancements to plant hardware and procedural guidelines were recommended as a resultof both reviews. Table 3.3 from the original submittal has been updated and included in thissubmittal as Table 6-1 to include all potential non-relay plant enhancements. Table 3-1 in thissubmittal lists all potential relay enhancements. All enhancements are currently being reviewed andsome have been implemented.

    5

  • 7.0 References

    7.1 Duke Power Company, Oconee Nuclear Station IPEEE Submittal Report, December 21,1995

    7.2 USNRC, Generic Letter 88-20, Supplement 4, "Individual Plant Examination of ExternalEvents (IPEEE) for Severe Accident Vulnerabilities - 1OCFR50-54(f)," June 28, 1991

    7.3 USNRC, NUREG-1407, "Procedural and Submittal Guidance for the Individual PlantExamination of External Events (IPEEE) for Severe Accident Vulnerabilities," June 1991

    7.4 SQUG, "Generic Implementation Procedure (GIP) for Seismic Verification of NuclearPlant Equipment," Revision 2, Corrected 2/14/92

    7.5 USNRC, NUREG/CR-0098, "Development of Criteria for Seismic Review of SelectedNuclear Power Plants," 1978

    7.6 EPRI, NP-6041, Rev. 0 and Rev. 1, "A Methodology of Assessment of Nuclear PowerPlant Seismic Margin," October .1988 and August 1991

    7.7 EPRI, TR-103959, "Methodology for Developing Seismic Fragilities,"

    6

  • TABLE 2-1

    COMPONENT FRAGILITIES USED IN THE OCONEE SEISMIC ANALYSIS

    Basic Event MedianName Description Fragility, A(g) O3r I ou

    C000CT3SIS Seismically-Induced Failure Of Startup Transformer CT3 0.58 0.26 0.21COOOCT4SIS Seismically-Induced Failure Of Transformer CT4 0.88 0.26 0.21COOOCT5SIS Seismically-Induced Failure Of Transformer CT5 0.49 0.26 0.21C000ICSSIS Seismically-Induced Failure of the Integrated Control

    System Cabinets 0.35 0.24 0.18C003B1TSIS Seismically-Induced Failure of 4 kV Switchgear BIT,

    3B2T, 3BIT & 3B2T 0.55 0.24 0.18COOBWSTSIS Seismically-Induced Failure Of The BWST 0.71 0.25 0.31COOEWSTSIS Seismically-Induced Failure Of The EWST 1.38 0.35 0.52C0230KVSIS Seismically-Induced Failure of Keowee Overhead Path 0.72 0.26 0.38C03ATC4SIS Seismic Failure of Area Termination Cabinet 3AT4

    (Fails 3MS-94) 0.46 0.24 0.18CABMFRMSIS Seismically-Induced Failure Of Aux. Building Moment 1.29 0.25 0.28

    FramesCAUXSRGSIS Auxiliary Building Components Surrogate 0.48 0.24 0.18CBURPIPSIS Seismically-Induced Failure Of Buried Piping 1.40 0.20 0.57CCSTSUPSIS Seismically-Induced Failure Of Component Cooling

    Surge Tank Supports 0.24 0.24 0.18CESFTCBSIS Seismic Failure of ESFAS Termination Cabinets 0.35 0.24 0.18CHOTPMPSIS Seismic Failure of the Hotwell Pumps 0.46 0.24 0.18CHTOVERSIS Surrogate For Relay Chatter Failing Overhead Power 0.56 0.21 0.36

    PathCINTAKESIS Seismically-Induced Failure Of Intake Canal East Dike 0.58 0.32 0.34CJOCDAMSIS Seismically-Induced Failure Of Jocassee Dam Floods 0.49 0.40 0.32

    SiteCK600MCSIS Seismic Failure of Keowee 600V ac MCCs IXA and 0.41 0.24 0.18

    2XACKEOBATSIS Seismically-Induced Failure of Keowee Batteries 0.36 0.24 0.18CKEOSRGSIS Keowee Components Surrogate 0.60 0.24 0.18CKEOWCBSIS Seismic Failure of Keowee Control Boards 0.43 0.24 0.18CKEOWEESIS Seismically-Induced Failure Of Keowee Dam 0.58 0.32 0.34CLEEFEDSIS Seismically-Induced Failure Of 100 kV Lee Feeder 0.30 0.25 0.50CLETDWNSIS Seismically-Induced Failure Of The Letdown Coolers 1.10 0.24 0.18CMSNWLLSIS Seismically-Induced Failure of Masonry Block Walls 1.34 0.17 0.52COFSITESIS Seismically-Induced Failure Of Offsite Power Line 0.30 0.25 0.50

    InsulatorsCONDCLRSIS Seismic Failure of Condensate Coolers 0.29 0.24 0.18CONDENSSIS Seismically-Induced Failure Of The Condenser / Hotwell 0.46 0.25 0.31CPIPSUPSIS Seismically-Induced Failure Of Plant Piping Supports 1.77 0.46 0.43

    7

  • TABLE 2-1 (cont.)

    COMPONENT FRAGILITIES USED IN THE OCONEE SEISMIC ANALYSIS

    Basic Event MedianName Description Fragility, A(g) fir Pu

    CPOLDTKSIS Seismic Failure of Polishing Demineralizer Tanks 0.38 0.24 0.18CRCSPIPSIS Seismically-Induced Failure Of A Large RCS Pipe 1.27 0.34 0.43CRVINTRSIS Seismically-Induced Failure Of The Reactor Vessel 0.95 0.31 0.37

    InternalsCRVSKRTSIS Seismically-Induced Failure Of The Reactor Vessel Skirt 1.30 0.24 0.29CSSFSRGSIS SSF Components Surrogate 0.60 0.24 0.18CSSFTRNSIS Seismically-Induced Failure Of SSF 600/208 V ac

    Transformers 0.73 0.18 0.44CTURSRGSIS Turbine Building Components Surrogate 0.60 0.24 0.18CVDC3DPSIS Seismic Failure of 125/250 V dc Distribution Center 0.53 0.24 0.18

    3DP I

    8A2

  • I 1 .1, , I|

    TABLE 2-2

    ADDITIONAL SEISMIC PLANT MODEL BASIC EVENT DATA

    Basic Event [ 1Name Factor Units Rate I Description Probability

    CCCOPN1DHE 0.1 Operators Fail To Manually Open Valves 3CC-7 and 3CC-8 After Seismic Event 1.00E-0 1CEQLET1DEX 0.5 The Letdown Line Breaks In The Auxiliary Building 5.OOE-01CEQLET2DEX 0.25 An Unisolable Break Of The Letdown Line Occurs Inside the RB 2.50E-0ICEQLET3DEX 0.25 An Isolable Break Of The Letdown Line Occurs Inside The RB 2.50E-0ICEQLETDDHE 0.006 Operators Fail To Isolate Letdown Line 6.00E-03CEQOVERRHE 1 Operators Fail To Recover Chattered Overhead Path Relays 1.00E+00CEQUIPMRHE 0.1 Operator Fails to Restart Equipment 1.OOE-0 ICFLOODXDEX 0.4 Flood Level Exceeds 5 ft. SSF Flood Barrier 4.00E-01CHP0005AVC 1 N 2.20E-03 Air-Operated Valve 3HP-5 Fails To Close 2.20E-03CHPHPMUDHE 2.OOE-03 Operators Fail to Swap HPI Suction to the BWST Before LDST Depletion 2.OOE-03CMTCPOSDEX 0.5 Positive Moderator Temperature Coefficient 5.OOE-0 ICNDCLRIDEX 0.1 Condensate Cooler Failure Results in LPSW Flooding 1.00E-01CNDCLR2DEX 0.2 Condensate Cooler Failure Results in Feedwater Flooding 2.OOE-01CRCRANDDEX 2.OOE-02 Screening Value For SSF RCM Pump Random Events 2.OOE-02CSFRANDDEX 4.OOE-02 Screening Value for SSF Random Events 4.OOE-02CTTRIPODEX 1.00E-03 Turbine Fails to Trip 1.00E-03FEFMDPADEX 3.OOE-03 Motor-Driven EFW Pump 3A Random Events Screening Value 3.OOE-03FEFMDPATRM 5.OOE-03 Motor-Driven EFW Pump 3A Train Is In Maintenance 5.OOE-03FEFMDPBDEX 3.OOE-03 Motor-Driven EFW Pump 3B Random Events Screening Value 3.OOE-03FEFMDPBTRM 5.OOE-03 Motor-Driven EFW Pump 3B Train Is In Maintenance 5.00E-03FEFSWAPDHE 0.05 Operators Fail To Align The TD EFW Pump To The Hotwell Following A 5.OOE-02

    LoadshedFEFTDFPTRM 5.OOE-03 Turbine-Driven EFW Pump Is In Maintenance 5.OOE-03FETRANDDEX 4.OOE-011 TDEFWP Random Events Screening Value 4.OOE-0 IHHPHPRODHE 2.20E-03 Operators Fail to Initiate High Pressure Recirculation 2.20E-03KKIBOTHHYM 5.23E-03 Both Keowee Units Unavailable Due To Common Maintenance 5.23E-03KK2UNITHYM 0.0381 The Overhead Unit Is Unavailable Due To Maintenance 3.80E-02

    9

  • TABLE 2-2 (cont.)

    ADDITIONAL SEISMIC PLANT MODEL BASIC EVENT DATA

    Basic EventName Factor Units Rate Description Probability

    LLPLPRODHE 1.00E-03 Operators Fail to Initiate Low Pressure Recirculation 1.00E-03LLPVATHDHE 1.00E-03 Operators Fail To Throttle LPI Flow To Prevent Pump Runout Given Large 1.00E-03

    LOCANACSFDGDGM 4.28E-02 SSF Diesel Generator Is In Maintenance 4.28E-02NACSFDGDGR 24 H 4.63E-03 SSF Diesel Generator Fails To Run 1.11 E-01NACSFDGDGS I N 3.78E-03 SSF Diesel Generator Fails To Start 3.78E-03NACSFDGLHE 3.00E-03 SSF Diesel Generator Is Left Unavailable After Test Or Maintenance 3.00E-03NSFORCMDHE 1.00E-01 Operators Fail To Align The SSF RCM System For Operation I.OOE-0INSF3PUIDPM 7.79E-03 SSF Unit 3 RCM Pump Train Is In Maintenance 7.79E-03NSFCONICMR 24 H 1.50E-04 Train I Refrigerant Compressor Fails To Run 3.60E-03NSFCON2CMR 24 H 1.50E-04 Train 2 Refrigerant Compressor Fails To Run 3.60E-03NSFCON2CMS I N 2.90E-02 Train 2 Refrigerant Compressor Fails To Start 2.90E-02NSFPU02APM I N 4.17E-03 SSF ASW Pump Train Is In Maintenance 4.17E-03NSFTIMEDHE 6.00E-03 Operators Fail To Deploy To The Standby Shutdown Facility In Time 6.00E-03PACLOADDHE 6.00E-03 Failure to Recover 600 V Load Centers 3X I, 3X2, 3X3 and 3X4 After a Loadshed 6.00F-03PACXCT3THM I N 9.13E-04 Transformer CT3 Unavailable Due To Test Or Maintenance 9.131E-04PACXCT4THM I N 9.13E-04 Transformer CT4 Unavailable Due To Test Or Maintenance 9.13E-04PACXCT5THM I N 9.13E-04 Transformer CT5 Unavailable Due To Test Or Maintenance 9.13 E-04RRC0004DEX 2.00E-01 PORV Block Valve Is Closed During Power Operation 2.00E-01RRC0004DHE 3.00E-03 N Operators Fail To Close The PORV*Block Valve 3.00E-03RRC661PRVC I N 7.50E-03 PORV Main Valve Fails To Close On Demand 7.50E-03TLOMFATDEX 6.00E-02 Loss Of Main Feedwater Following A Turbine Trip 6.00E-02TRCSRVODEX 9.00E-01 RCS Safety Relief Valve Does Not Stick Open After Relieving Liquid 9.00E-01TRCSRVLDEX 1.00E-01 Either Primary Safety Relief Valve Fails To Close After Liquid Relief 1.00E-01TTRHPITDHE I 1.00E-02 Operators Fail To Throttle HPI Following A Transient 1.00E-02WCWLAK IDEX 4.71E-0l Lake Keowee Level Is At Or Below Elevation 798.33' 4.711E-01

    10

  • ,A -,- I

    TABLE 2-2 (cont.)

    ADDITIONAL SEISMIC PLANT MODEL BASIC EVENT DATA

    Basic Event IIName J Factor jUnitsj Rate Description Probability

    WHSEWSTDHE 5.OOE-02 Operators Fail to Refill the Elevated Water Storage Tank (With Fire Hose) 5.OOE-02WHSPUIADEX 3.OOE-03 HPSW Pump Train I A Random Events Screening Value 3.OOE-03WHSPUIATRM 1.00E-02 HPSW Pump Train A Is In Test Or Maintenance 1.00E-02WHSPU1BDEX 3.00E-03 HPSW Pump Train I B Random Events Screening Value 3.OOE-03WHSPU I BTRM 1 .OOE-02 _HPSW Pump Train B Is In Test Or Maintenance 1.00E-02

    11

  • TABLE 3-1

    RELAY OUTLIERS FROM LPEEE RELAY EVALUATION

    Typical Relay Manufacturer & Total Relays ForID Name Model Number Bldg. Comments All Units

    CT4 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -87T/CT4 (X) RLY (X PHASE) HU AB REPLACEMENT I

    CT4 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -87T/CT4 (Y) RLY (Y PHASE) HU AB REPLACEMENT I

    CT4 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -87T/CT4 (Z) RLY (Z PHASE) HU AB REPLACEMENT I

    IN-SITU MODALXFMR CT4 WESTINGHOUSE TESTING - POSSIBLE

    51TN/CT4 NEUTRAL OC RLY CO-7 AB REPLACEMENT I

    IN-SITU MODALCT4 XFMR GE TESTING - POSSIBLE

    86/CT4 LOCKOUT RLY HEA61B238 AB REPLACEMENT 1FURTHER REVIEW -

    GEN SUPPLY WESTINGHOUSE POSSIBLE41-52/U I BREAKER DB-50 KEO REPLACEMENT 2

    GEN FIELD FURTHER REVIEW -FLASHING WESTINGHOUSE POSSIBLE

    31/U1 BREAKER DB-25 KEO REPLACEMENT 2FURTHER REVIEW -

    GEN FIELD WESTINGHOUSE POSSIBLE41/UI BREAKER DBF-16 KEO REPLACEMENT 2

    REG CONTROL WESTINGHOUSE LOW RUGGEDNESS -SV-2/JUI AUX RLY SV KEO REPLACEMENT 2

    TURB GUIDE BRNG FURTHER REVIEW -OIL LEVEL SWITCH MAGNETROL POSSIBLE

    I GBOLS63TB (1GBOLT0002) TF21-SP KEO REPLACEMENT 2FURTHER REVIEW

    LEVEL SWITCH JO-BELL POSSIBLEIHPOLS63BLH (IHPOLS0001) CB KEO REPLACEMENT 2

    FURTHER REVIEW -LEVEL SWITCH JO-BELL POSSIBLE

    IHPOLS63BLL (1HPOLS0002) CB KEO REPLACEMENT 2GOVERNOR SPEED FURTHER REVIEW -SWITCH TRW POSSIBLE

    14GOV/I TRANSMITTER SST-2400 KEO REPLACEMENT 2GEN I C02 FURTHER REVIEW-THERMOSTATS (12 FENWAL POSSIBLE

    ICOPS063FT I TOTAL) 27121 KEO REPLACEMENT 2FURTHER REVIEW -

    GEN 1 C02 KIDDE POSSIBLE20F1 RELEASE VALVE 890149 KEO REPLACEMENT 2

    FURTHER REVIEW -GEN I C02 KIDDE POSSIBLE

    20F2 RELEASE VALVE 890149 IKEO REPLACEMENT 2

    12

  • TABLE 3-1

    RELAY OUTLIERS FROM IPEEE RELAY EVALUATION

    Typical Relay Manufacturer & Total Relays ForID Name Model Number Bldg. Comments All Units

    GEN C02 CYL FURTHER REVIEW -RELEASE VALVE KIDDE POSSIBLE

    20PI (MAIN BANK) 890149 KEO REPLACEMENT 2GEN C02 CYL FURTHER REVIEW -RELEASE VALVE KIDDE POSSIBLE

    20P2 (MAIN BANK) 890149 KEO REPLACEMENT 2CT5 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -

    87T/CT5 (X) RLY (X PHASE) HU AB REPLACEMENT 1CT5 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -

    87T/CT5 (Y) RLY (Y PHASE) HU AB REPLACEMENT ICT5 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -

    87T/CT5 (Z) RLY (Z PHASE) HU AB REPLACEMENT I

    IN-SITU MODALCT5 XFMR WESTINGHOUSE TESTING - POSSIBLE

    51TN/CT5 NEUTRAL OC RLY. CO-7 AB REPLACEMENT I

    IN-SITU MODAL51TN/CT5 CT5 XFMR 4 KV WESTINGHOUSE TESTING - POSSIBLE(4KV) NEUTRAL OC RLY CO-7 AB REPLACEMENT I

    IN-SITU MODALCT5 XFMR GE TESTING - POSSIBLE

    86T/CT5 LOCKOUT RLY HEA61B238 AB REPLACEMENT I

    U3 NORM BKR N13 FURTHER REVIEW -50BN13 INSTANTANEOUS GE POSSIBLE(3BIT-05) OC RLY CHC11A21A BH REPLACEMENT I87B13 (X) U3 MFB 1 DIFF RLY WESTINGHOUSE PENDING SQURTS(3BIT-02) (X PHASE) CA-16 BH TESTING I87B13 (Y) U3 MFB 1 DIFF RLY WESTINGHOUSE PENDING SQURTS(3B 1T-02) (Y PHASE) CA-16 BH TESTING I87B13 (Z) U3 MFB 1 DIFF RLY WESTINGHOUSE PENDING SQURTS(3BIT-02) (Z PHASE) CA-16 BH TESTING I

    U3 NORM BKR N23 FURTHER REVIEW -50BN23 INSTANTANEOUS GE POSSIBLE(3B2T-01) OC RLY CHCI IA21A BH REPLACEMENT I87B23 (X) U3 MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(3B2T-03) (X PHASE) CA-16 BH TESTING I87B23 (Y) U3 MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(3B2T-03) (Y PHASE) CA-16 BH TESTING 187B23 (Z) U3 MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(3B2T-03) (Z PHASE) CA-16 BH TESTING 1

    CT2 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -87T/CT3 (X) RLY (X PHASE) HU-I AB REPLACEMENT 3

    CT2 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -87T/CT3 (Y) RLY (Y PHASE) HU-1 AB REPLACEMENT 3

    13

  • TABLE 3-1

    RELAY OUTLIERS FROM IPEEE RELAY EVALUATION

    Typical Relay Manufacturer & Total Relays ForID Name Model Number Bldg. Comments All Units

    CT2 XFMR DIFF WESTINGHOUSE LOW RUGGEDNESS -87T/CT3 (Z) RLY (Z PHASE) HU-I AB REPLACEMENT 3

    XFMR CT3 230 IN-SITU MODAL51TN/CT3 KV/NEUTRAL OC WESTINGHOUSE TESTING - POSSIBLE(230KV) RLY CO-7 AB REPLACEMENT 3

    XFMR CT3 4.16 IN-SITU MODAL51TN/CT3 KV/NEUTRAL OC WESTINGHOUSE TESTING - POSSIBLE(4160V) RLY CO-7 AB REPLACEMENT 3

    XFMR CT3 6.9 IN-SITU MODAL51TN/CT3 KV/NEUTRAL OC WESTINGHOUSE TESTING - POSSIBLE(6900V) RLY CO-7 AB REPLACEMENT 3

    IN-SITU MODALPCB 28 AUX BKR STRUTHERS-DUNN TESTING - POSSIBLE

    62B1/PCB-28 FAIL RLY 219BBXP AB REPLACEMENT 3

    IN-SITU MODALPCB 30 AUX BKR STRUTHERS-DUNN TESTING - POSSIBLE

    62B1/PCB-30 FAIL RLY 219BBXP AB REPLACEMENT 3

    IN-SITU MODAL

    CT3 XFMR ELECTRO-SWITCH TESTING - POSSIBLE86/CT3 LOCKOUT RLY LOR (SERIES 24) AB REPLACEMENT 3

    CT3 XFMR 230KV IN-SITU MODALSUPPLY BUS DIFF GE TESTING - POSSIBLE

    87TB/CT3 (X) RLY (X PHASE) PVD21D/NON-OP AB REPLACEMENT 3

    CT3 XFMR 230KV IN-SITU MODALSUPPLY BUS DIFF GE TESTING - POSSIBLE

    87TB/CT3 (Y) RLY (Y PHASE) PVD21D/NON-OP AB REPLACEMENT 3

    CT3 XFMR 230KV IN-SITU MODALSUPPLY BUS DIFF GE TESTING - POSSIBLE

    87TB/CT3 (Z) RLY (Z PHASE) PVD21D/NON-OP AB REPLACEMENT 3PHASE A STUP BUS WESTINGHOUSE PENDING SQURTS

    27EA/U3 UV RLY CV-7 (1875524) AB TESTING 3PHASE B STUP BUS WESTINGHOUSE PENDING SQURTS

    27EB/U3 UV RLY CV-7 AB TESTING 3PHASE C STUP BUS WESTINGHOUSE PENDING SQURTS

    27EC/U3 UV RLY CV-7 AB TESTING 3

    U3 STUP BUS DIFF GE LOW RUGGEDNESS -87BU3 (X) RLY (X PHASE) PVDIICI1A TB REPLACEMENT 3

    14

  • TABLE 3-1

    RELAY OUTLIERS FROM IPEEE RELAY EVALUATION

    Typical Relay Manufacturer & Total Relays For

    ID Name Model Number Bldg. Comments All Units

    U3 STUP BUS DIFF GE LOW RUGGEDNESS -

    87BU3 (Y) RLY (Y PHASE) PVD1ICI1A TB REPLACEMENT 3

    U3 STUP BUS DIFF GE LOW RUGGEDNESS -87BU3 (Z) RLY (Z PHASE) PVDI IC IA TB REPLACEMENT 3

    FURTHER REVIEW -

    U2 STUP BKR El WESTINGHOUSE POSSIBLE

    RXEI (BIT-12) BLOCKING RLY AR BH REPLACEMENT 0

    FURTHER REVIEW -

    U2 STUP BKR E2 WESTINGHOUSE POSSIBLERXE2 (BIT-12) BLOCKING RLY AR BH REPLACEMENT 0

    Ul NORM BKR NIl FURTHER REVIEW -50BNI I INSTANTANEOUS GE POSSIBLE(BIT-03) OC RLY CHCIIA21A BH REPLACEMENT I

    U2 NORM BKR N12 FURTHER REVIEW -50BN12 INSTANTANEOUS GE POSSIBLE

    (BIT-11) OC RLY CHCIlA21A BH REPLACEMENT 1

    87B II(X) U! MFB 1 DIFF RLY WESTINGHOUSE PENDING SQURTS(B I T-02) (X PHASE) CA-16 BH TESTING 187B1 I(Y) UI MFB 1 DIFF RLY WESTINGHOUSE PENDING SQURTS

    (B IT-02) (Y PHASE) CA-16 BH TESTING I87B1 I(Z) UI MFB I DIFF RLY WESTINGHOUSE PENDING SQURTS

    (BIT-02) (Z PHASE) CA-16 BH TESTING I

    87B12 (X) U2 MFB I DIFF RLY WESTINGHOUSE PENDING SQURTS(BIT-12) (X PHASE) CA-16 BH TESTING I

    87B12 (Y) U2 MFB I DIFF RLY WESTINGHOUSE PENDING SQURTS(BIT-12) (Y PHASE) CA-16 BH TESTING I

    87B12 (Z) U2 MFB 1 DIFF RLY WESTINGHOUSE PENDING SQURTS(B1T-12) (Z PHASE) CA-16 BH TESTING I

    87SB1 (X) STBY BUS I DIFF WESTINGHOUSE PENDING SQURTS(BIT-07) RLY (X PHASE) CA-16 BH TESTING 1

    87SB1 (Y) STBY BUS 1 DIFF WESTINGHOUSE PENDING SQURTS

    (BIT-07) RLY (Y PHASE) CA-16 BH TESTING I87SB1 (Z) STBY BUS 1 DIFF WESTINGHOUSE PENDING SQURTS

    (BIT-07) RLY (Z PHASE) CA-16 BH TESTING I

    U I NORM BKR N21 FURTHER REVIEW -50BN21 INSTANTANEOUS GE POSSIBLE(B2T-11) OC RLY CHCI1A21A BH REPLACEMENT I

    U2 NORM BKR N22 FURTHER REVIEW -

    50BN22 INSTANTANEOUS GE POSSIBLE(B2T-03) OC RLY CHCIIA21A BH REPLACEMENT I

    87B21(X) UI MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(B2T-12) J(X PHASE) CA-16 BH TESTING I

    15

  • TABLE 3-1

    RELAY OUTLIERS FROM IPEEE RELAY EVALUATION

    Typical Relay Manufacturer & Total Relays ForID Name Model Number Bldg. Comments All Units87B21(Y) U1 MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(B2T-12) (Y PHASE) CA-16 BH TESTING I87B21(Z) UI MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(B2T-12) (Z PHASE) CA-16 BH TESTING I87B22 (X) U2 MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(B2T-02) (X PHASE) CA- 16 BH TESTING I87B22 (Y) U2 MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(B2T-02) (Y PHASE) CA-16 BH TESTING 187B22 (Z) U2 MFB 2 DIFF RLY WESTINGHOUSE PENDING SQURTS(B2T-02) (Z PHASE) CA-16 BH TESTING I87SB2 (X) STBY BUS 2 DIFF WESTINGHOUSE PENDING SQURTS(B2T-07) RLY (X PHASE) CA- 16 BH TESTING 187SB2 (Y) STBY BUS 2 DIFF WESTINGHOUSE PENDING SQURTS(B2T-07) RLY (Y PHASE) CA-16 BH TESTING I

    87SB2 (Z) STBY BUS 2 DIFF WESTINGHOUSE PENDING SQURTS(B2T-07) RLY (Z PHASE) CA-16 BH TESTING I

    XFMR 1E DIFF WESTINGHOUSE LOW RUGGEDNESS -87T-X/IE (PHASE X) HU KEO REPLACEMENT 2

    XFMR IE DIFF WESTINGHOUSE LOW RUGGEDNESS -87T-Y/IE (PHASE Y) HU KEO REPLACEMENT 2

    XFMR IE DIFF WESTINGHOUSE LOW RUGGEDNESS -87T-Z/IE (PHASE Z) HU KEO REPLACEMENT 2

    FURTHER REVIEW -GEN LOSS OF WESTINGHOUSE POSSIBLE

    40G-1UI FIELD RLY KLF-I KEO REPLACEMENT 2GEN VOLTAGE GE LOW RUGGEDNESS -

    60-1 BALANCE RLY 12CFVB1 IA3A KEO REPLACEMENT 2WESTINGHOUSE LOW RUGGEDNESS -

    87G-1 GEN DIFF RLY SC KEO REPLACEMENT 2GEN GROUNDFAULT FURTHER REVIEW -OVERVOLTAGE WESTINGHOUSE POSSIBLE

    59GN-1 RLY CV-8 KEO REPLACEMENT 2XFMR CX DIFF WESTINGHOUSE LOW RUGGEDNESS -

    87T-X/CX (PHASE X) HU KEO REPLACEMENT 1XFMR CX DIFF WESTINGHOUSE LOW RUGGEDNESS -

    87T-Y/CX (PHASE Y) HU KEO REPLACEMENT IXFMR CX DIFF WESTINGHOUSE LOW RUGGEDNESS -

    87T-Z/CX (PHASE Z) HU KEO REPLACEMENT IFURTHER REVIEW -

    AIR CIRCUIT WESTINGHOUSE POSSIBLEACB-3 BREAKER 3 150CA1500 KEO REPLACEMENT 2

    FURTHER REVIEW -AIR CIRCUIT WESTINGHOUSE POSSIBLE

    ACB-7 BREAKER 7 DB-50 KEO REPLACEMENT 2

    TOTAL = 142

    16

  • . It

    TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency Contribution to Acceleration Interval IContrib. 0.2 10.23 0.28 J 0.36 10.46 0.56 1 0.66 0.77 1 0.87 1 0.97 Accident Sequences_ _ _

    2.41 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CFLOODXDEX CJOCDAMSIS1.18 0.00 0.00 0.00 3.99 19.62 21.93 21.47 13.81 14.41 4.77 CKEOBATSIS CLEEFEDSIS COFSITESIS CSSFSRGSIS1.17 0.00 0.00 0.00 3.30 17.92 21.89 22.35 14.51 15.05 4.98 CAUXSRGSIS CSSFSRGSIS1.09 0.00 0.00 0.00 5.98 19.98 20.67 20.46 13.54 14.49 4.89 CJOCDAMSIS CSSFSRGSIS1.09 0.00 0.00 0.00 2.82 17.37 21.80 22.49 14.79 15.56 5.17 CK600MCSIS CLEEFEDSIS COFSITESIS CSSFSRGSIS1.05 0.00 0.00 0.00 2.45 16.41 21.62 22.87 15.21 16.08 5.35 CKEOWCBSIS CLEEFEDSIS COFSITESIS CSSFSRGSIS0.96 0.00 0.00 0.00 1.86 13.73 20.44 23.60 16.48 17.78 6.10 C003BITSIS CSSFSRGSIS0.95 0.00 0.00 0.00 1.46 13.63 20.92 23.86 16.47 17.72 5.93 COOOCT5SIS CKEOBATSIS COFSITESIS CSSFSRGSIS0.90 0.00 0.00 0.00 8.12 22.58 20.14 18.67 12.33 13.62 4.54 CKEOBATSIS CLEEFEDSIS COFSITESIS CSSFTRNSIS0.89 0.00 0.00 0.00 1.01 11.82 20.37 24.49 17.27 18.73 6.30 COOOCT5SIS CK600MCSIS COFSITESIS CSSFSRGSIS0.88 0.00 0.00 0.00 6.80 20.87 20.35 19.67 13.11 14.40 4.80 CAUXSRGSIS CSSFTRNSIS0.87 0.00 0.00 0.00 0.87 11.08 20.04 24.71 17.63 19.20 6.47 COOOCT5SIS CKEOWCBSIS COFSITESIS CSSFSRGSIS0.85 0.00 0.00 0.00 11.89 22.46 18.55 17.38 11.80 13.38 4.54 CJOCDAMSIS CSSFTRNSIS0.81 0.00 0.00 0.00 5.86 20.37 20.40 19.93 13.45 14.98 5.01 CK600MCSIS CLEEFEDSIS COFSITESIS CSSFTRNSIS0.80 0.00 0.00 0.00 1.25 10.94 18.67 23.86 17.84 20.13 7.32 CSSFSRGSIS CTURSRGSIS0.78 0.00 0.00 0.00 5.12 19.38 20.37 20.40 13.93 15.58 5.23 CKEOWCBSIS CLEEFEDSIS COFSITESIS CSSFTRNSIS0.77 0.00 0.00 0.00 1.22 11.64 19.30 23.80 17.50 19.73 6.83 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS CSSFSRGSIS0,73 0.00 0.00 0.00 0.72 9.55 18.42 24.38 18.50 21.11 7.32 COOOCT3SIS CKEOBATSIS CLEEFEDSIS CSSFSRGSIS0.73 0.00 0.00 0.00 0.84 10.03 18.68 24.28 18.24 20.73 7.21 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS CSSFSRGSIS0.71 0.00 0.00 0.00 0.72 9.38 18.33 24.43 18.56 21.20 7.39 CEQOVERRHE CHTOVERSIS CKEOWCBSIS CLEEFEDSIS CSSFSRGSIS0.70 0.00 0.00 0.00 3.94 16.43 19.51 21.33 15.29 17.47 6.04 C003BITSIS CSSFTRNSIS0.70 0.00 0.00 0.00 2.08 12.95 18.78 22.67 16.96 19.61 6.95 CKEOWEESIS CLEEFEDSIS COFSITESIS CSSFSRGSIS0.70 0.00 0.00 0.00 0.49 8.19 17.72 24.71 19.17 22.04 7.67 COOOCT3SIS CK600MCSIS CLEEFEDSIS CSSFSRGSIS0.69 0.00 0.00 0.00 3.10 16.39 20.08 21.68 15.36 17.49 5.90 COOOCT5SIS CKEOBATSIS COFSITESIS CSSFTRNSIS0.68 0.00 0.00 0.00 0.42 7.63 17.35 24.81 19.46 22.48 7.85 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS CSSFSRGSIS0.68 0.00 0.00 0.00 0.62 8.17 17.07 24.24 19.22 22.41 8.27 CKEOSRGSIS CLEEFEDSIS COFSITESIS CSSFSRGSIS0.67 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NACSFDGDGR0.66 0.00 0.00 0.00 0.41 7.56 17.20 24.72 19.50 22.66 7.94 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS CSSFSRGSIS0.64 0.00 0.00 0.00 2.17 14.35 19.74 22.47 16.27 18.68 6.32 COOOCT5SIS CK600MCSIS COFSITESIS CSSFTRNSIS0.64 0.00 0.00 0.00 0.24 6.11 16.17 24.93 20.30 23.87 8.37 COOOCT3SIS COOOCT5SIS CKEOBATSIS CSSFSRGSIS0.64 0.00 0.00 0.00 0.28 6.44 16.45 24.92 20.09 23.54 8.28 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS CSSFSRGSIS0.62 0.00 0.00 0.00 0.24 5.99 16.07 24.96 20.35 23.95 8.45 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWCBSIS CSSFSRGSIS0.62 0.00 0.00 0.00 1.87 13.50 19.49 22.74 16.66 19.21 6.52 COOOCT5SIS CKEOWCBSIS COFSITESIS CSSFTRNSIS0.62 0.00 0.00 0.00 0.16 5.18 5.40 25.03 20.83 24.69 8.70 COOOCT3SIS C000CT5SIS CK600MCSIS CSSFSRGSIS

    17

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency Contribution to Acceleration Interval __ -- ----Contrib. 0.2 10.23 0.28 0.361 0.46 0.56 0.661 0.77 0.87 0.97 Accident Sequences

    0.61 0.00 0.00 0.00 0.14 4.81 15.02 25.02 21.06 25.09 8.86 COOOCT3SIS COO0CT5SIS CKEOWCBSIS CSSFSRGSIS0.60 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NSFORCMDHE0.60 0.00 0.00 0.00 0.20 5.16 14.82 24.52 20.86 25.07 9.36 COOOCT5SIS CKEOSRGSIS COFSITESIS CSSFSRGSIS0.59 0.00 0.00 0.00 0.72 8.50 16.93 23.81 19.10 22.78 8.17 CO0OCT5SIS CKEOWEESIS COFSITESIS CSSFSRGSIS0.58 0.00 0.00 0.00 2.68 13.26 18.06 21.85 16.78 20.04 7.34 CSSFTRNSIS CTURSRGSIS0.56 0.00 0.00 0.00 2.60 14.09 18.65 21.77 16.43 19.61 6.84 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS CSSFTRNSIS0.53 0.00 0.00 0.00 1.56 11.70 18.00 22.55 17.57 21.22 7.41 COOOCT3SIS CKEOBATSIS CLEEFEDSIS CSSFTRNSIS0.52 0.00 0.00 0.00 1.81 12.25 18.20 22.40 17.27 20.79 7.28 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS CSSFTRNSIS0.51 0.00 0.00 0.00 4.40 15.46 17.89 20.45 15.70 19.23 6.86 CKEOWEESIS CLEEFEDSIS COFSITESIS CSSFTRNSIS0.51 0.00 0.00 0.00 0.92 9.42 17.07 23.11 18.56 22.59 8.32 C0230KVSIS CKEOBATSIS CLEEFEDSIS CSSFSRGSIS0.51 0.00 0.00 0.00 1.56 11.49 17.91 22.61 17.63 21.32 7.48 CEQOVERRHE CHTOVERSIS CKEOWCBSIS CLEEFEDSIS CSSFTRNSIS0.51 0.00 0.00 0.00 0.16 4.26 13.20 23.62 21.40 26.96 10.41 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS CSSFSRGSIS0.50 0.00 0.00 0.00 1.07 10.08 17.42 23.00 18.31 22.30 7.82 COOOCT3SIS CK600MCSIS CLEEFEDSIS CSSFTRNSIS0.50 0.00 0.00 0.00 0.09 3.39 12.23 23.49 21.97 28.00 10.83 COOOCT3SIS CKEOSRGSIS CLEEFEDSIS CSSFSRGSIS0.49 0.00 0.00 0.00 0.59 7.10 15.26 23.22 19.84 24.80 9.19 CEQOVERRHE CHTOVERSIS CKEOWEESIS CLEEFEDSIS CSSFSRGSIS0.49 0.00 0.00 0.00 0.63 8.06 16.40 23.41 19.21 23.57 8.72 C0230KVSIS CK600MCSIS CLEEFEDSIS CSSFSRGSIS0.49 0.00 0.00 0.00 0.92 9.42 17.09 23.14 18.63 22.79 8.01 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS CSSFTRNSIS0.48 0.00 0.00 0.00 1.34 10.04 16.75 22.52 18.32 22.62 8.41 CKEOSRGSIS CLEEFEDSIS COFSITESIS CSSFTRNSIS0.48 0.00 0.00 0.00 0.34 5.72 14.30 23.34 20.59 26.04 9.67 COOOCT3SIS CKEOWEESIS CLEEFEDSIS CSSFSRGSIS0.48 0.00 0.00 0.00 0.54 7.51 16.04 23.48 19.49 24.03 8.91 C0230KVSIS CKEOWCBSIS CLEEFEDSIS CSSFSRGSIS0.47 0.00 0.00 0.00 0.91 9.33 16.95 23.06 18.67 22.98 8.10 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS CSSFTRNSIS0.46 0.00 3.05 5.13 26.71 29.71 15.01 9.58 4.91 4.56 1.34 CKEOBATSIS CLEEFEDSIS COFSITESIS NACSFDGDGR0.46 0.00 0.00 0.00 0.05 2.61 11.10 23.14 22.49 29.21 11.41 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOSRGSIS CSSFSRGSIS0.45 0.00 0.00 0.00 0.03 2.06 10.21 22.85 22.93 30.13 11.79 COOOCT3SIS COOOCT5SIS CKEOSRGSIS- CSSFSRGSIS

    0.45 0.00, 0.00 0.00 0.53 7.58 16.02 23.38 19.55 24.34 8.60 COOOCT3SIS COOOCT5SIS CKEOBATSIS CSSFTRNSIS0.45 0.00 0.00 0.00 0.62 7.98 16.28 23.35 19.32 23.96 8.49 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS CSSFTRNSIS0.45 0.00 0.00 0.00 0.31 6.00 14.92 23.54 20.29 25.45 9.49 COOOCT5SIS C0230KVSIS CKEOBATSIS CSSFSRGSIS0.44 0.00 0.00 0.00 0.19 4.44 13.11 23.23 21.30 27.44 10.29 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS CSSFSRGSIS0.44 0.00 0.00 0.00 0.53 7.44 15.92 23.42 19.60 24.42 8.68 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWCBSIS CSSFTRNSIS0.43 0.00 0.00 0.00 0.00 17.06 19.53 21.50 15.93 19.12 6.86 CAUXSRGSIS CRVINTRSIS0.43 0.00 0.00 0.00 0.36 6.45 15.31 23.55 20.12 25.25 8.96 COOOCT3SIS COOOCT5SIS CK600MCSIS CSSFTRNSIS0.43 0.00 0.00 0.00 0.21 5.08 14.19 23.60 20.79 26.29 9.84 C000CT5SIS C0230KVSIS CK600MCSIS CSSFSRGSIS0.43 0.00 0.00 0.00 0.11 3.54 12.15 23.11 21.87 28.51 10.71 COOOCT3SIS C000CT5SIS CKEOWEESIS CSSFSRGSIS0.43 0.00 0.00 009 20.88115.3318.506.63 CKEOBATSIS CLEEFEDSIS COFSITESIS CRVINTRSIS

    18

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency' Contribution to Acceleration Interval -__Contrib. 1 0.2 10.23 1 0.28 1 0.36 10.461 0.56 0.66 0.77 0.87 0.97 Accident Sequences

    0.43 0.00 0.00 0.00 0.18 4.72 13.82 23.58 21.00 26.68 10.02 CO0OCT5SIS C0230KVSIS CKEOWCBSIS CSSFSRGSIS0.43 0.00 0.00 0.00 0.31 6.00 14.94 23.57 20.37 25.68 9.14 CO0OCT3SIS C000CT5SIS CKEOWCBSIS CSSFTRNSIS _ _ _0.42 0.00 0.00 0.00 1.56 10.42 16.56 22.06 18.17 22.94 8.28 COOOCT5SIS CKEOWEESIS COFSITESIS CSSFTRNSIS0.42 0.00 0.00 0.00 0.45 6.42 14.71 23.05 20.12 25.61 9.63 C000CT5SIS CKEOSRGSIS COFSITESIS CSSFTRNSIS0.42 0.00 3.05 5.13 26.71 29.71 15.01 9.58 4.91 4.56 1.34 CKEOBATSIS CLEEFEDS1S COFSITESIS NSFORCMDHE0.42 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS NACSFDGDGR0.41 0.00 0.00 0.00 0.00 16.42 19.30 21.48 16.12 19.61 7.06 CK600MCSIS CLEEFEDSIS COFSITESIS CRVINTRSIS0.39 0.00 0.00 0.00 0.00 19.58 18.98 20.26 15.30 18.95 6.93 CJOCDAMSIS CRVINTRSIS0.39 0.00 0.00 0.00 0.00 15.41 19.02 21.70 16.47 20.13 7.27 CKEOWCBSIS CLEEFEDSIS COFSITESIS CRVINTRSIS0.37 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS NSFORCMDHE0.37 0.00 1.51 3.23 22.02 30.63 17.37 11.69 6.13 5.73 1.70 CK600MCSIS CLEEFEDSIS COFSITESIS NACSFDGDGR0.37 0.00 0.00 0.00 1.99 11.49 16.61 21.30 17.57 22.63 8.40 C0230KVSIS CKEOBATSIS CLEEFEDSIS CSSFTRNSIS0.37 0.00 0.00 0.00 0.00 12.68 17.68 22.03 17.55 21.91 8.15 C003BITSIS CRVINTRSIS0.36 0.00 0.00 0.00 0.00 12.56 18.06 22.21 17.50 21.77 7.90 COOOCT5SIS CKEOBATSIS COFSITESIS CRVINTRSIS0.36 0.00 0.00 0.00 0.36 5.30 13.12 22.23 20.67 27.58 10.72 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS CSSFTRNSIS0.35 0.00 0.00 0.00 1.28 8.74 15.00 21.60 18.95 25.07 9.36 CEQOVERRHE CHTOVERSIS CKEOWEESIS CLEEFEDSIS CSSFTRNSIS0.35 0.00 0.00 0.00 0.12 3.30 11.18 21.96 21.74 29.56 12.15 C0230KVSIS CKEOSRGSIS CLEEFEDSIS CSSFSRGSIS0.35 0.00 0.00 0.00 1.37 9.90 16.07 21.72 18.30 23.77 8.86 C0230KVSIS CK600MCSIS CLEEFEDSIS CSSFTRNSIS0.35 0.00 0.00 0.00 0.21 4.24 12.20 22.17 21.28 28.72 11.19 COOOCT3SIS CKEOSRGSIS CLEEFEDSIS CSSFTRNSIS0.34 0.00 0.00 0.00 0.00 10.78 17.40 22.57 18.17 22.78 8.31 COOOCT5SIS CK600MCSIS COFSITESIS CRVINTRSIS0.34 0.00 0.00 0.00 0.75 7.08 14.14 21.85 19.79 26.49 9.91 COOOCT3SIS CKEOWEESIS CLEEFEDSIS CSSFTRNSIS0.34 0.00 0.00 0.00 1.18 9.25 15.76 21.84 18.61 24.29 9.08 C0230KVSIS CKEOWCBSIS CLEEFEDSIS CSSFTRNSIS0.34 0.00 0.00 0.00 0.43 5.58 13.12 21.91 20.46 27.60 10.89 C0230KVSIS CKEOWEESIS CLEEFEDSIS CSSFSRGSIS0.34 0.00 0.00 0.00 0.00 10.06 17.05 22.67 18.46 23.26 8.50 COOOCT5SIS CKEOWCBSIS COFSITFSIS CRVINTRSIS0.33 0.00 0.00 2.69 20.40 30.90 18.40 12.69 6.73 6.32 1.88 CKEOWCBSIS CLEEFEDSIS COFSITESIS NACSFDGDGR0.33 0.00 1.51 3.23 22.02 30.63 17.37 11.69 6.13 5.73 1.70 CK600MCSIS CLEEFEDSIS COFSITESIS NSFORCMDHE0.32 0.00 0.00 0.00 0.04 2.00 9.29 21.27 22.58 31.66 13.17 COOOCT5SIS C0230KVSIS CKEOSRGSIS CSSFSRGSIS0.32 0.00 0.00 0.00 0.12 3.26 11.08 21.88 21.83 30.02 11.81 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOSRGSIS CSSFTRNSIS0.32 0.00 0.00 0.00 0.68 7.43 14.75 22.04 19.49 25.89 9.72 COOOCT5SIS C0230KVSIS CKEOBATSIS CSSFTRNSIS0.32 0.00 0.00 0.00 0.07 2.58 10.21 21.63 22.28 31.00 12.22 COOOCT3SIS COOOCT5SIS CKEOSRGSIS CSSFTRNSIS0.31 0.00 0.00 0.00 0.00 9.89 15.82 21.81 18.62 24.29 9.58 CRVINTRSIS CTURSRGSIS0.31 0.00 0.00 0.00 0.42 5.52 13.02 21.84 20.56 28.04 10.60 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS CSSFTRNSIS0.31 0.00 0.00 0.00 0.14 3.44 11.09 21.60 21.63 30.08 12.01 COOOCT5SIS C0230KVSIS CKEOWEESIS CSSFSRGSIS0.31 0.00 0.00 0.00 0.46 6.32 14.07 22.17 20.04 26.83 10.12 COOOCT5SIS C0230KVSIS CK600MCSIS CSSFTRNSIS

    19

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency Contribution to Acceleration Interval 1 -c cet Se qunContrib. 0.2 0.23 0.28 0.36 0.46 0.56 0.66 0.77 0.87 0.97 Accident Se_ ences

    0.30 0.00 0.00 0.00 0.24 4.41 12.10 21.79 21.17 29.22 11.06 C000CT3SIS COOOCT5SIS CKEOWEESIS CSSFTRNSIS0.30 0.00 0.00 2.69 20.40 30.90 18.40 12.69 6.73 6.32 1.88 CKEOWCBSIS CLEEFEDSIS COFSITESIS NSFORCMDHE0.30 0.00 0.00 0.00 0.00 10.57 16.42 21.84 18.33 23.89 8.97 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS CRVINTRSIS0.30 0.00 0.00 0.00 0.39 5.87 13.73 22.17 20.27 27.27 10.31 CO00CT5SIS C0230KVSIS CKEOWCBSIS CSSFTRNSIS0.29 0.00 0.00 0.00 0.00 28.50 20.68 18.56 12.59 14.57 5.10 CMTCPOSDEX CRVINTRSIS0.29 0.00 0.00 0.00 0.00 8.57 15.48 22.09 19.14 25.24 9.49 C000CT3SIS CKEOBATSIS CLEEFEDSIS CRV1NTRSIS0.29 0.00 0.00 0.00 0.00 9.02 15.74 22.07 18.92 24.87 9.38 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS CRVINTRSIS0.28 0.00 0.00 0.00 0.00 8.40 15.38 22.12 19.19 25.33 9.58 CEQOVERRHE CHTOVERSIS CKEOWCBSIS CLEEFEDSIS CRVINTRSIS0.28 0.00 0.00 0.00 0.00 7.28 14.77 22.22 19.68 26.17 9.88 COOOCT3SIS CK600MCSIS CLEEFEDSIS CRVINTRSIS0.27 0.00 0.00 0.00 0.00 26.03 20.13 18.63 13.17 16.08 5.97 CMSNWLLSIS0.27 0.00 0.00 0.00 0.00 6.77 14.41 22.23 19.91 26.60 10.07 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS CRVINTRSIS0.27 0.00 0.00 0.00 0.00 11.86 16.11 20.98 17.91 23.95 9.20 CKEOWEESIS CLEEFEDSIS COFSITESIS CRVINTRSIS0.27 0.00 0.00 0.00 0.00 7.25 14.19 21.74 19.67 26.53 10.61 CKEOSRGSIS CLEEFEDSIS COFSITESIS CRVINTRSIS0.27 0.00 0.00 0.00 17.57 29.29 19.70 14.84 8.26 7.92 2.42 C003BITSIS NACSFDGDGR0.26 0.00 0.00 0.00 0.00 6.70 14.28 22.14 19.93 26.78 10.17 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS CRVINTRSIS0.26 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NACSFDGDGM0.26 0.00 0.00 1.10 14.09 29.80 20.67 15.38 8.46 8.09 2.41 COOOCT5SIS CKEOBATSIS COFSITESIS NACSFDGDGR0.26 0.00 0.00 0.00 0.00 5.36 13.31 22.13 20.58 27.98 10.64 COOOCT3SIS COOOCT5SIS CKEOBATSIS CRVINTRSIS0.25 0.00 0.00 0.00 0.00 5.67 13.57 22.17 20.40 27.64 10.54 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS CRVINTRSIS0.25 0.00 0.00 0.00 0.00 5.26 13.22 22.14 20.61 28.05 10.73 COOOCT5SIS CEQOVERRHE CI-TOVERSIS CKEOWCBSIS CRVINTRSIS0.25 0.00 0.00 0.00 0.00 4.53 12.61 22.10 20.99 28.78 11.00 COOOCT3SIS COOOCT5SIS CK600MCSIS CRVINTRSIS0.25 0.00 0.00 0.00 0.26 4.11 11.12 20.69 21.02 30.27 12.53 C0230KVSIS CKEOSRGSIS CLEEFEDS1S CSSFTRNSIS0.24 0.00 0.00 0.00 0.00 4.19 12.26 22.04 21.17 29.16 11.17 COOOCT3SIS COOOCT5SIS CKEOWCBSIS CRVINTRSIS0.24 0.00 0.00 0.00 0.00 4.49 12.09 21.57 20.94 29.11 11.79 COOOCT5SIS CKEOSRGSIS COFSITESIS CRVINTRSIS0.24 0.00 0.00 0.00 17.57 29.29 19.70 14.84 8.26 7.92 2.42 C003BITSIS NSFORCMDHE0.24 0.00 0.00 0.00 0.95 6.90 12.94 20.46 19.61 28.01 11.13 C0230KVSIS CKEOWEESIS CLEEFEDSIS CSSFTRNSIS0.24 0.00 0.00 0.00 0.00 7.55 14.08 21.36 19.56 26.97 10.49 C000CT5SIS CKEOWEESIS COFSITESIS CRVINTRSIS0.23 0.00 0.00 1.10 14.09 29.80 20.67 15.38 8.46 8.09 2.41 COOOCT5SIS CKEOBATSIS COFSITESIS NSFORCMDHIE0.23 0.00 0.00 0.00 0.00 14.94 18.17 21.22 16.65 21.07 7.95 CAUXSRGSIS CRCSPIPSIS0.23 0.00 0.00 0.00 0.08 2.50 9.27 20.10 21.91 32.52 13.62 COOOCT5SIS C0230KVSIS CKEOSRGSIS CSSFTRNSIS0.23 0.00 0.00 0.00 0.00 9.86 14.64 20.58 18.63 26.00 10.29 COOBWSTSIS CRVINTRSIS0.23 0.00 0.00 0.00 0.00 16.60 18.46 20.68 16.07 20.47 7.72 CKEOBATSIS CLEEFEDSIS COFSITESIS CRCSPIPSIS0.22 0.00 0.00 0.00 0.00 16.98 18.08 20.44 16.08 20.62 7.79 CONDENSSIS CRCSPIPSIS0.22 0.00 0.00 0.63 10.61 28.06 21.85 17.14 9.63 9.29 2.78 C000CT5SIS CK600MCSIS COFSITESIS NACSFDGDGR

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent I Frequency Contribution to Acceleration IntervalContrib.•1 0.2 1 0.23 0.28 0.36 10.46 1 0.561 0.66 1 0.77 1 0.87 1 0.97 1--t Accident Sequences

    0.22 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS CSFRANDDEX TRCSRVODEX0.22 0.00 0.00 0.00 0.31 4.28 11.03 20.33 20.90 30.77 12.38 CO00CT5SIS C0230KVSIS CKEOWEESIS CSSFTRNSIS0.21 0.00 0.00 0.00 0.00 14.35 17.92 21.16 16.81 21.58 8.17 CK600MCSIS CLEEFEDSIS COFSITESIS CRCSPIPSIS0.21 0.00 0.00 0.50 9.42 27.14 22.18 17.84 10.14 9.82 2.95 COOOCT5SIS CKEOWCBSIS COFSITESIS NACSFDGDGR0.21 0.00 0.00 0.00 0.00 18.86 18.90 20.36 15.46 19.26 7.17 CBURPIPSIS CHOTPMPSIS TRCSRVODEX0.21 0.00 0.00 0.00 0.00 13.44 17.61 21.33 17.13 22.09 8.39 CKEOWCBSIS CLEEFEDSIS COFSITESIS CRCSPIPSIS0.21 0.00 2.55 3.50 18.53 26.05 17.07 13.44 8.01 8.24 2.60 CKEOWEESIS CLEEFEDSIS COFSITESIS NACSFDGDGR0.21 0.00 0.00 0.00 0.00 3.66 10.64 20.54 21.24 30.95 12.96 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS CRVINTRSIS0.21 0.00 0.00 0.00 0.00 17.20 17.71 20.06 16.03 20.95 8.05 CJOCDAMSIS CRCSPIPSIS0.20 0.00 0.00 0.00 0.00 2.90 9.80 20.30 21.67 31.94 13.39 COOOCT3SIS CKEOSRGSIS CLEEFEDSIS CRVINTRSIS0.20 0.00 0.00 0.00 0.00 8.39 14.23 20.79 19.06 26.82 10.71 C0230KVSIS CKEOBATSIS CLEEFEDSIS CRVINTRSIS0.20 0.00 0.00 0.63 10.61 28.06 21.85 17.14 9.63 9.29 2.78 COOOCT5SIS CK600MCSIS COFSITESIS NSFORCMDHE0.20 0.00 0.00 0.00 0.00 1.40 6.83 17.95 22.23 35.81 15.79 C000CT4SIS CEQOVERRHE CHTOVERSIS CLEEFEDSIS CSSFSRGSIS0.20 0.00 0.00 0.00 0.00 1.09 6.22 17.54 22.44 36.56 16.14 COOOCT3SIS COOOCT4SIS CLEEFEDSIS CSSFSRGSIS0.20 0.00 0.00 0.00 0.00 6.22 12.53 20.56 20.06 28.98 11.65 CEQOVERRHE CHTOVERSIS CKEOWEESIS CLEEFEDSIS CRVINTRSIS0.20 0.00 13.86 9.73 27.01 22.95 11.10 7.15 3.71 3.47 1.02 CONDENSSIS CSFRANDDEX TRCSRVODEX0.20 0.00 0.00 0.00 0.00 16.06 18.76 21.15 16.23 20.26 7.54 C0001CSSIS C03ATC4SIS CBURPIPSIS TRCSRVODEX0.20 0.00 0.00 0.00 13.24 26.24 20.24 16.87 10.06 10.08 3.27 CTURSRGSIS NACSFDGDGR0.20 0.00 0.00 0.00 0.00 19.84 18.37 19.75 15.29 19.45 7.30 CBURPIPSIS CONDENSSIS TRCSRVODEX0.20 0.00 0.00 1.07 12.58 27.25 20.42 16.43 9.63 9.64 2.97 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS NACSFDGDGR0.20 0.00 0.00 0.00 0.00 7.12 13.56 20.88 19.56 27.75 11.14 C0230KVSIS CK600MCSIS CLEEFEDSIS CRVINTRSIS0.19 0.00 0.00 0.00 0.00 4.96 11.63 20.48 20.63 30.16 12.14 C000CT3SIS CKEOWEESIS CLEEFEDSIS CRVINTRSIS0.19 0.00 0.00 0.00 0.00 10.97 16.25 21.48 18.11 23.85 9.34 C003BITSIS CRCSPIPSIS0.19 0.00 0.00 0.00 0.00 15.01 18.54 21.40 16.57 20.75 7.73 C03ATC4SIS CBURPIPSIS CPOLDTKSIS TRCSRVODEX0.19 0.00 0.00 0.00 0.00 6.61 13.22 20.87 19.78 28.19 11.34 CO230KVSIS CKEOWCBSIS CLEEFEDSIS CRVINTRSIS0.19 0.00 0.00 0.00 0.00 10.87 16.60 21.67 18.07 23.72 9.06 COOOCT5SIS CKEOBATSIS COFSITESIS CRCSPIPSIS0.19 0.00 0.00 0.00 0.00 2.21 8.83 19.85 22.02 33.07 14.01 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOSRGSIS CRVINTRSIS0.19 0.00 0.00 0.00 0.00 0.64 5.03 16.53 22.68 38.09 17.02 COOOCT3SIS COOOCT4SIS COOOCT5SIS CSSFSRGSIS0.19 0.00 0.00 0.00 0.00 0.82 5.54 16.96 22.55 37.43 16.70 COOOCT4SIS COOOCT5SIS CEQOVERRHE CHTOVERSIS CSSFSRGSIS0.19 0.00 0.00 0.50 9.42 27.14 22.18 17.84 10.14 9.82 2.95 COOOCT5SIS CKEOWCBSIS COFSITESIS NSFORCMDHE0.19 0.00 0.00 0.00 0.00 1.74 8.08 19.50 22.34 33.94 14.40 COOOCT3SIS COOOCT5SIS CKEOSRGSIS CRVINTRSIS0.19 0.00 2.55 3.50 18.53 26.05 17.07 13.44 8.01 8.24 2.60 CKEOWEESIS CLEEFEDSIS COFSITESIS NSFORCMDHE0.18 0.00 0.00 0.00 0.00 9.29 15.93 21.92 18.68 24.71 9.48 COOOCT5SIS CK600MCSIS COFSITESIS CRCSPIPSIS0.18 0.00 0.00 0.00 0.00 5.22 12.17 20.72 20.38 29.56 11.95 COOOCT5SIS C0230KVSIS CKEOBATSIS CRVINTRSIS

    21

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Fre~uency Contribution to Acceleration Interval ____-C-ontrib_ 0. 23 0.28 0.3610.46 0.56 0.66 10.77 10. 0.97 kAccident Sequences

    0.18 0.00 0.00 0.00 0.00 20.09 17.98 19.38 15.24 19.75 7.54 CBURPIPSIS CJOCDAMSIS TRCSRVODEX0.18 0.00 0.00 0.00 0.00 3.82 10.56 20.19 21.14 31.48 12.81 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS CRVINTRSIS0.18 0.00 0.00 0.00 0.00 8.65 15.58 21.97 18.94 25.18 9.68 COOOCT5SIS CKEOWCBSIS COFSITESIS CRCSPIPSIS0.18 0.00 3.05 5.13 26.71 29.71 15,01 9.58 4.91 4.56 1.34 CKEOBATSIS CLEEFEDSIS COFSITESIS NACSFDGDGM0.18 0.00 0.00 0.00 13.24 26.24 20.24 16.87 10.06 10.08 3.27 CTURSRGSIS NSFORCMDHE0.18 0.00 0.00 0.00 0.00 3.02 9.73 19.95 21.56 32.50 13.24 COOOCT3SIS COOOCT5SIS CKEOWEESIS CRVINTRSIS0.18 0.00 0.00 1.07 12.58 27.25 20.42 16.43 9.63 9.64 2.97 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS NSFORCMDHE0.18 0.00 0.00 0.00 0.00 4.40 11.51 20.65 20.76 30.36 12.33 COOOCT5SIS C0230KVSIS CK600MCSIS CRVINTRSIS0.17 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NSFCON2CMS0.17 0.00 0.00 0.00 0.00 13.98 17.12 20.95 17.13 22.22 8.59 CBURPIPSIS CVDC3DPSIS TRCSRVODEX0.17 0.00 0.00 0.00 0.00 4.07 11.18 20.58 20,92 30.74 12.52 COOOCT5SIS C0230KVSIS CKEOWCBSIS CRVINTRSIS0.17 0.00 0.00 0.00 0.00 14.01 16.42 20.22 17.08 23.15 9.12 CINTAKESIS CRCSPIPSIS0.17 0.00 0.00 0.61 9.37 25.38 21.35 18.11 10.84 10.95 3.39 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS NACSFDGDGR0.17 0.00 0.00 0.00 8.28 24.91 21.71 18.74 11.33 11.49 3.55 COOOCT3SIS CKEOBATSIS CLEEFEDSIS NACSFDGDGR0.17 0.00 0.00 0.00 0.00 10.51 16.69 22.05 18.24 23.54 8.96 C03ATC4SIS CAUXSRGSIS CBURPIPSIS TRCSRVODEX0.17 0.00 0.00 0.00 0.00 8.47 14.40 21.05 19.03 26.19 10.86 CRCSPIPSIS CTURSRGSIS0.16 0.00 0.00 0.48 8.28 24.43 21.57 18.76 11.36 11.53 3.58 CEQOVERRHE CHTOVERSIS CKEOWCBSIS CLEEFEDSIS NACSFDGDGR0.16 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS NACSFDGDGM0.16 0.00 0.00 0.00 0.00 9.08 14.98 21.14 18.78 25.83 10.20 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS CRCSPIPSIS0.16 0.00 0.00 0.61 9.37 25.38 21.35 18.11 10.84 10.95 3.39 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS NSFORCMDHE0.16 0.00 0.00 0.00 0.00 7.32 14.04 21.26 19.50 27.14 10.73 COOOCT3SIS CKEOBATSIS CLEEFEDSIS CRCSPIPSIS0.15 0.001 0.00 0.00 0.00 7.72 14.30 21.27 19.31 26.78 10.62 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS CRCSPIPSIS0.15 0.00 0.00 0.00 8.28 24.91 21.71 18.74 11.33 11.49 3.55 COOOCT3SIS CKEOBATSIS CLEEFEDSIS NSFORCMDHE0.15 0.00 0.00 0.00 6.01 22.62 22.13 20.13 12.44 12.72 3.95 COOOCT3SIS CK600MCSIS CLEEFEDSIS NACSFDGDGR0.15 0.00 0.00 0.00 0.00 7.18 13.95 21.28 19.54 27.23 10.82 CEQOVERRIIE CHTOVERSIS CKEOWCBSIS CLEEFEDSIS CRCSPIPSIS0.15 0.00 0.00 0.00 0.00 6.20 13.35 21.32 19.97 28.03 11.13 COOOCT3SIS CK600MCSIS CLEEFEDSIS CRCSPIPSIS0.15 0.00 0.00 0.00 7.46 22.38 21.15 19.59 12.38 12.83 4.22 CKEOSRGSIS CLEEFEDSIS COFSITESIS NACSFDGDGR0.15 0.00 0.00 0.48 8.28 24.43 21.57 18.76 11.36 11.53 3.58 CEQOVERRHE CHTOVERSIS CKEOWCBSIS CLEEFEDSIS NSFORCMDI-IE0.15 0.00 0.00 0.00 0.00 5.75 13.01 21.29 20.18 28.45 11.33 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS CRCSPIPSIS0.15 0.00 0.00 0.00 0.00 2.79 8.87 18.80 21.24 33.40 14.89 C0230KVSIS CKEOSRGSIS CLEEFEDSIS CRVINTRSIS0.15 0.00 0.00 0.00 0.00 6.16 12.81 20.81 19.93 28.36 11.93 CKEOSRGSIS CLEEFEDSIS COFSITESIS CRCSPIPSIS0.15 0.00 0.00 0.00 0.00 1.04 5.57 16.07 21.75 37.82 17.75 COOOCT4SIS C0230KVSIS CLEEFEDSIS CSSFSRGSIS0.15 0.00 0.00 0.00 0.00 7.57 14.64 21.88 19.47 26.13 10.32 C003BITSIS C03ATC4SIS CBURPIPSIS TRCSRVODEX0.14 0.00 13.86 9.73 27.01 22.95 11.10 7.15 3.71 3.47 1.02 CONDENSSIS NSFCON2CMS TRCSRVODEX I I _I

    q

    ")9

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Fre luency Contribution to Acceleration Interval _Co-ntrib. 0.2 [10.23 0.28 1 0.36 0.46 10.56 0.66 0.77 0.87 0.97' Accident Sequences

    0.14 0.00 0.00 0.00 5.26 21.58 22.16 20.67 12.93 13.27 4.13 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS NACSFDGDGR0.14 0.00 0.00 0.00 0.00 10.20 14.71 20.33 18.37 25.92 10.47 CKEOWEESIS CLEEFEDSIS COFSITESIS CRCSPIPSIS0.14 0.00 0.00 0.00 0.00 5.69 12.88 21.18 20.19 28.63 11.43 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS CRCSPIPSIS0.14 0.00 1.51 3.23 22.02 30.63 17.37 11.69 6.13 5.73 1.70 CK600MCSIS CLEEFEDSIS COFSITESIS NACSFDGDGM0.14 0.00 0.00 0.00 0.00 1.74 6.80 16.93 21.53 36.70 16.30 C000CT4SIS CEQOVERRHE CHTOVERSIS CLEEFEDSIS CSSFTRNSIS0.14 0.00 0.00 0.00 0.00 1.36 6.20 16.55 21.73 37.48 16.67 COOOCT3SIS COOOCT4SIS CLEEFEDSIS CSSFTRNSIS0.14 0.00 0.00 0.18 5.20 21.40 22.02 20.64 12.98 13.40 4.18 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS NACSFDGDGR0.14 0.00 0.00 0.00 0.00 4.54 11.95 21.09 20.75 29.77 11.91 COOOCT3SIS COOOCT5SIS CKEOBATSIS CRCSPIPSIS0.14 0.00 0.00 0.00 0.00 4.80 10.58 19.06 20.31 31.69 13.56 C0230KVSIS CKEOWEESIS CLEEFEDSIS CRVINTRSIS0.14 0.00 0.00 0.00 0.00 0.61 4.49 15.09 21.91 39.26 18.65 COOOCT4SIS COOOCT5SIS C0230KVSIS CSSFSRGSIS0.14 0.00 0.00 0.00 0.00 4.80 12.20 21.15 20.60 29.44 11.81 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS CRCSPIPSIS0.14 0.00 0.00 0.00 0.00 1.67 7.28 17.98 21.80 35.33 15.94 COOOCT5SIS C0230KVSIS CKEOSRGSIS CRVINTRSIS0.14 0.00 0.00 0.00 6.01 22.62 22.13 20.13 12.44 12.72 3.95 COOOCT3SIS CK600MCSIS CLEEFEDSIS NSFORCMDHE0.14 0.00 0.00 0.00 0.00 4.44 11.86 21.09 20.77 29.83 12.00 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWCBSIS CRCSPIPSIS0.14 0.00 0.00 0.00 0.00 3.82 11.29 20.99 21.11 30.53 12.27 COOOCT3SIS COOOCT5SIS CK600MCSIS CRCSPIPSIS0.13 0.00 0.00 0.00 0.00 1.03 5.52 16.00 21.83 38.37 17.25 COOOCT4SIS COOOCT5SIS CEQOVERRHE CHTOVERSIS CSSFTRNSIS0.13 0.00 0.00 0.00 0.00 0.80 5.01 15.59 21.96 39.05 17.58 COOOCT3SIS COOOCT4SIS COOOCT5SIS CSSFTRNSIS0.13 0.00 0.00 0.00 7.46 22.38 21.15 19.59 12.38 12.83 4.22 CKEOSRGSIS CLEEFEDSIS COFSITESIS NSFORCMDHE0.13 0.00 0.00 0.00 0.00 3.53 10.96 20.91 21.26 30.89 12.45 COOOCT3SIS COOOCT5SIS CKEOWCBSIS CRCSPIPSIS0.13 0.00 0.00 0.00 0.00 3.78 10.80 20.45 21.02 30.83 13.13 COOOCT5SIS CKEOSRGSIS COFSITESIS CRCSPIPSIS0.13 0.00 0.00 0.65 8.51 22.75 20.48 18.79 12.02 12.73 4.07 COOOCT5SIS CKEOWEESIS COFSITESIS NACSFDGDGR0.13 0.00 0.00 0.00 5.26 21.58 22.16 20.67 12.93 13.27 4.13 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS NSFORCMDHE0.13 0.00 0.00 2.69 20.40 30.90 18.40 12.69 6.73 6.32 1.88 CKEOWCBSIS CLEEFEDSIS COFSITESIS NACSFDGDGM0.13 0.00 0.00 0.00 0.00 2.91 8.80 18.48 21.13 33.97 14.71 COOOCT5SIS C0230KVSIS CKEOWEESIS CRVINT-RSIS0.13 0.00 0.00 0.10 3.71 19.12 22.08 21.82 14.01 14.59 4.57 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS NACSFDGDGR0.13 0.00 0.00 0.00 0.00 6.41 12.70 20.45 19.82 28.84 11.79 COOOCT5SIS CKEOWEESIS COFSITESIS CRCSPIPSIS0.13 0.00 0.00 0.00 0.00 5.77 12.79 21.15 20.17 28.29 11.84 C03ATC4SIS CBURPIPSIS CTURSRGSIS TRCSRVODEX0.13 0.00 0.00 0.00 3.22 18.42 22.05 22.18 14.39 15.04 4.70 COOOCT3SIS COOOCT5SIS - CKEOBATSIS NACSFDGDGR0.13 0.00 0.00 0.18 5.20 21.40 22.02 20.64 12.98 13.40 4.18 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS NSFORCMDHE0.12 0.00 0.00 0.08 3.23 18.12 21.97 22.26 14.46 15.13 4.76 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWCBSIS NACSFDGDGR0.12 0.00 0.00 0.00 0.00 8.42 13.27 19.79 18.96 27.92 11.63 C00BWSTSIS CRCSPIPSIS0.12 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS CRCRANDDEX,0.12 0.00 0.00 0.65 8.51 22.75 20.48 18.79 12.02 12.73 4.07 COOOCT5SIS CKEOWEESIS COFSITESIS NSFORCMDHE0.12 0.00 0.00 0.00 10.56 24.37 19.95 17.63 11.28 12.20 4.01 IC0230KVSIS CKEOBATSIS CLEEFEDSIS NACSFDGDGR

    23

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency Contribution to Acceleration Interval 1 1[ [ [ [ [ [ [-Contrib.[ 0.2 0.23 0.28 0.36 0.46 10.56 10.66 0.77 10.87 0.97] - ----- r- Accident Seque-nces-0.12 0.00 0.00 0.00 2.27 16.23 21.81 23.12 15.33 16.16 5.07 COOOCT3SIS COOOCT5SIS CK600MCSIS NACSFDGDGR.0.11 0.00 0.00 0.10 3.71 19.12 22.08 21.82- 14.01 14.59 4.57 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS NSFORCMDHE0.11 0.00 0.00 0.00 2.84 16.20 21.01 22.68 15.37 16.43 5.46 COOOCT5SIS CKEOSRGSIS COFSITESIS NACSFDGDGR0.11 0.00 0.00 0.00 3.22 18.42 22.05 22.18 14.39 15.04 4.70 COOOCT3SIS COOOCT5SIS CKEOBATSIS NSFORCMDHE0.11 0.00 0.00 0.00 0.00 3.06 9.46 19.36 21.19 32.58 14.34 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS CRCSPIPSIS0.11 0.00 0.00 0.00 1.96 15.31 21.59 23.47 15.75 16.67 5.25 C000CT3SIS C000CT5SIS CKEOWCBSIS NACSFDGDGR0.11 0.00 0.00 0.00 0.00 2.42 8.68 19.07 21.54 33.51 14.78 C000CT3SIS CKEOSRGSIS CLEEFEDSIS CRCSPIPSIS0.11 0.00 0.00 0.08 3.23 18.12 21.97 22.26 14.46 15.13 4.76 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWCBSIS NSFORCMDHE0.11 0.00 0.00 0.00 0.00 7.13 12.85 19.92 19.33 28.71 12.06 C0230KVSIS CKEOBATSIS CLEEFEDSIS CRCSPIPSIS0.11 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS NSFCON2CMS'0.11 0.00 0.00 0.00 0.00 5.25 11.23 19.55 20.19 30.78 13.01 CEQOVERRHE CHTOVERSIS CKEOWEESIS CLEEFEDSIS CRCSPIPSIS0.11 0.00 0.00 0.00 10.56 24.37 19.95 17.63 11.28 12.20 4.01 C0230KVSIS CKEOBATSIS CLEEFEDSIS NSFORCMDHE0.11 0.00 0.00 0.00 0.00 4.17 10.38 19.39 20.67 31.89 13.50 COOOCT3SIS CKEOWEESIS CLEEFEDSIS CRCSPIPSIS0.11 0.00 0.00 0.00 0.00 6.03 12.20 19.93 19.77 29.59 12.49 C0230KVSIS CK600MCSIS CLEEFEDSIS CRCSPIPSIS0.11 0.00 0.00 0.00 7.71 22.26 20.45 19.05 12.46 13.59 4.48 C0230KVSIS CK600MCSIS CLEEFEDSIS NACSFDGDGR0.11 0.00 0.00 0.00 2.27 16.23 21.81 23.12 15.33 16.16 5.07 OOOCT3SIS COOOCT5SIS CK600MCSIS NSFORCMDHE0.11 0.00 0.00 0.00 0.00 1.84 7.79 18.58 21.82 34.57 15.41 C000CT5SIS CEQOVERRHE CHTOVERSIS CKEOSRGSIS CRCSPIPSIS0.11 0.00 0.00 0.00 0.00 1.44 7.11 18.20 22.07 35.38 15.79 COOOCT3SIS COOOCT5SIS CKEOSRGSIS CRCSPIPSIS0.10 0.00 0.00 0.00 0.00 5.59 11.87 19.89 19.95 30.00 12.70 C0230KVSIS CKEOWCBSIS CLEEFEDSIS CRCSPIPSIS0.10 0.00 0.00 0.62 7.36 20.16 19.60 19.45 13.24 14.71 4.86 CEQOVERRHE CHTOVERSIS CKEOWEES1S CLEEFEDSIS NACSFDGDGR0.10 0.00 0.00 0.00 17.57 29.29 19.70 14.84 8.26 7.92 2.42 C003BITSIS NACSFDGDGM0.10 0.00 0.00 0.00 0.00 8.06 13.27 19.95 19.08 28.00 11.64 COOEWSTSIS CONDENSSIS CSSFTRNSIS0.10 0.00 0.00 0.00 2.84 16.20 21.01 22.68 15.37 16.43 5.46 COOOCT5SIS CKEOSRGSIS COFSITESIS NSFORCMDHE0.10 0.00 0.00 0.00 0.00 1.30 5.54 15.14 21.03 38.70 18.30 COOOCT4SIS C0230KVSIS CLEEFEDSIS CSSFTRNSIS0.10 0.00 0.00 0.00 1.96 15.31 21.59 23.47 15.75 16.67 5.25 COOOCT3SIS COOOCT5SIS CKEOWCBSIS NSFORCMDHE0.10 0.00 0.00 0.00 6.76 21.27 20.52 19.59 12.96 14.20 4.69 C0230KVSIS CKEOWCBSIS CLEEFEDSIS NACSFDGDGR0.10 0.00 0.00 0.00 0.00 25.51 19.84 18.82 13.47 16.37 5.99 C000ICSSIS CBURPIPSIS FETRANDDEX TRCSRVODEX0.10 0.00 0.00 1.10 14.09 29.80 20.67 15.38 8.46 8.09 2.41 COOOCT5SIS CKEOBATSIS COFSITESIS NACSFDGDGM0.10 0.00 0.00 0.00 0.00 3.19 9.38 19.03 21.08 33.14 14.18 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS CRCSPIPSIS0.10 0.00 0.00 0.00 0.00 4.39 10.88 19.65 20.46 31.31 13.31 COOOCT5SIS C0230KVSIS CKEOBATSIS CRCSPIPSIS0.10 0.00 0.00 0.00 0.00 2.52 8.61 18.74 21.43 34.09 14.61 COOOCT3SIS COOOCT5SIS CKEOWEESIS CRCSPIPSIS0.10 0.00 0.00 0.00 0.00 0.76 4.46 14.21 21.17 40.17 19.22 COOOCT4SIS COOOCT5SIS C0230KVSIS CSSFTRNSIS0.10 0.00 0.00 0.00 0.00 24.05 19.77 19.20 13.87 16.91 6.20 CBURPIPSIS CPOLDTKSIS FETRANDDEX TRCSRVODEX0.10 0.00 0.00 0.00 0.00 3.69 10.26 19.53 20.78 32.06 13.69 COOOCT5SIS C0230KVSIS CK600MCSIS CRCSPIPSIS

    24

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Freqey Contribution to Acceleration IntervalContrib. 0.2 0.23] 0.28 0.36 0.46 0 10.97] Accident Sequences

    0.10 0.00 0.00 0.00 7.71 22.26 20.45 19.05 12.46 13.59 4.48 C0230KVSIS CK600MCSIS CLEEFEDSIS NSFORCMDHE0.10 0.00 0.00 0.00 0.00 3.41 9.95 19.43 20.91 32.42 13.88 COO0CT5SIS C0230KVSIS CKEOWCBSIS CRCSPIPSIS0.09 0.00 0.00 0.62 7.36 20.16 19.60 19.45 13.24 14.71 4.86 CEQOVERRHE CHTOVERSIS CKEOWEESIS CLEEFEDSIS NSFORCMDHE0.09 0.00 0.00 0.00 4.61 17.52 19.80 21.08 14.82 16.66 5.51 COOOCT3SIS CKEOWEESIS CLEEFEDSIS NACSFDGDGR0.09 0.00 0.00 0.00 2.39 13.95 19.56 22.83 16.48 18.45 6.35 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS NACSFDGDGR0.09 0.00 0.00 0.00 6.76 21.27 20.52 19.59 12.96 14.20 4.69 C0230KVSIS CKEOWCBSIS CLEEFEDSIS NSFORCMDHE0.09 0.00 0.00 0.00 4.15 18.23 20.50 21.10 14.49 16.16 5.37 COOOCT5SIS C0230KVSIS CKEOBATS1S NACSFDGDGR0.09 0.00 0.00 0.00 0.00 0.89 4.75 14.46 21.10 39.76 19.04 COOOCT3SIS C000CT4SIS CLEEFEDSIS CRVINTRSIS0.09 0.00 0.00 0.00 0.00 1.14 5.24 14.85 20.99 39.09 18.69 COOOCT4SIS CEQOVERRHIE CHTOVERSIS CLEEFEDSIS CRVINTRSIS0.09 0.00 0.00 0.00 1.43 11.58 18.88 23.64 17.62 19.97 6.88 COOOCT3SIS CKEOSRGSIS CLEEFEDSIS NACSFDGDGR0.09 0.00 0.00 0.63 10.61 28.06121.85 17.14 9.63 9.29 2.78 COOOCT5SIS CK600MCSIS COFSITESIS NACSFDGDGM0.08 0.00 0.00 0.00 4.61 17.52 19.80 21.08 14.82 16.66 5.51 C000CT3SIS CKEOWEESIS CLEEFEDSIS NSFORCMDHE0.08 0.00 0.00 0.00 0.00 0.52 3.81 13.51 21.16 41.09 19.91 C000CT3SIS COOOCT4S1S C000CT5SIS CRVINTRSIS0.08 0.00 0.00 0.00 2.39 13.95 19.56 22.83 16.48 18.45 6.35 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS NSFORCMDHE0.08 0.00 0.00 0.00 0.00 0.67 4.21 13.91 21.10 40.51 19.60 COOOCT4SIS C000CT5SIS CEQOVERRHE CHTOVERSIS CRVINTRSIS0.08 0.00 0.00 0.00 0.00 6.41 11.61 19.02 19.52 30.29 13.14 COOEWSTSIS CINTAKESIS CSSFTRNSIS0.08 0.00 0.00 0.00 2.93 16.09 20.30 22.03 15.46 17.38 5.80 COOOCT5SIS C0230KVSIS CK600MCSIS NACSFDGDGR0.08 0.00 0.00 0.50 9.42 27.14 22.18 17.84 10.14 9.82 2.95 COOOCT5SIS CKEOWCBSIS COFSITESIS NACSFDGDGM0.08 0.00 0.00 0.00 0.00 2.32 7.82 17.59 21.03 34.89 16.35 C0230KVSIS CKEOSRGSIS CLEEFEDSIS CRCSPIPSIS0.08 0.00 0.00 0.09 2.77 14.44 19.27 22.28 16.28 18.64 6.23 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS NACSFDGDGR0.08 0.00 0.00 0.00 0.00 17.53 18.53 20.60 15.90 19.96 7.48 CAUXSRGSIS CBURPIPSIS FETRANDDEX TRCSRVODEX0.08 0.00 2.55 3.50 18.53 26.05 17.07 13.44 8.01 8.24 2.60 CKEOWEESIS CLEEFEDSIS COFSITESIS NACSFDGDGM0.08 0.00 0.00 0.00 4.15 18.23 20.50 21.10 14.49 16.16 5.37 COOOCT5SIS C0230KVSIS CKEOBATSIS NSFORCMDHE0.08 0.00 0.00 0.00 2.54 15.18 20.10 22.37 15.88 17.93 6.00 COOOCT5SIS C0230KVSIS CKEOWCBSIS NACSFDGDGR0.08 0.00 0.00 0.00 0.00 0.00 0.00 23.06 23.53 37.02 16.40 CABMFRMSIS0.08 0.00 0.00 0.00 1.43 11.58 18.88 23.64 17.62 19.97 6.88 COOOCT3SIS CKEOSRGSIS CLEEFEDSIS NSFORCMDHE0.08 0.00 0.00 0.00 0.83 9.25 17.80 24.20 18.75 21.6417.53 COOOCT5SIS CEQOVERRHE CITOVERSIS CKEOSRGSIS NACSFDGDGR0.08 0.00 0.00 0.00 13.24 26.24 20.24 16.87 10.06 10.08 3.27 CTURSRGSIS NACSFDGDGM0.08 0.00 0.00 0.00 0.00 4.02 9.40 17.96 20.26 33.35 15.01 C0230KVSIS CKEOWEESIS CLEEFEDSIS CRCSPIPSIS0.08 0.00 0.00 0.00 1.66 12.02 18.67 23.16 17.47 20.24 6.78 C000CT3SIS COOOCT5SIS CKEOWEESIS NACSFDGDGR0.08 0.00 0.00 0.00 0.00 1.38 6.38 16.72 21.44 36.68 17.40 COOOCT5SIS C0230KVSIS CKEOSRGSIS CRCSPIPSIS0.08 0.00 0.00 1.07 12.58 27.25 20.42 16.43 9.63 9.64 2.97 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS NACSFDGDGM0.08 0.00 0.00 0.00 0.00 0.00 0.00 21.47 23.57 37.93 17.03 CAUXSRGSIS CRVSKRTSIS0.07 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS CRCRANDDEX

    25

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency Contribution to Acceleration Interval [ _ I -I-Co-ntrib. j 0.2 10.23 10.28 1 0.36 10.461 0.56 0.66 0.77 1 0.87 0.97 Accident Sequences . ........ . ... .

    0.07 0.00 0.00 0.00 0.49 7.52 16.84 24.57 19.65 22.94 8.00 C000CT3SIS CO0OCT5SIS CKEOSRGSIS NACSFDGDGR _0.07 0.00 0.00 0.43 8.86 27.50 22.81 18.05 10.01 9.49 2.84 C03ATC4SIS CAUXSRGSIS CSFRANDDEX TRCSRVODEX0.07 0.00 0.00 0.45 9.01 27.50 22.72 17.99 10.00 9.49 2.85 CAUXSRGSIS CHOTPMPSIS CSFRANDDEX TRCSRVODEX0.07 0.00 0.00 0.00 2.93 16.09 20.30 22.03 15.46 17.38 5.80 COOOCT5SIS C0230KVSIS CK600MCSIS NSFORCMDHE0.07 0.00 0.00 0.09 2.77 14.44 19.27 22.28 16.28 18.64 6.23 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS NSFORCMDHE0.07 0.00 0.00 0.00 0.00 0.00 0.00 21.56 23.45 37.95 17.04 CKEOBATSIS CLEEFEDSIS COFSITESIS CRVSKRTSIS0.07 0.00 0.00 0.00 0.00 0.00 0.00 21.26 23.42 38.16 17.17 CONDENSSIS CRVSKRTSIS0.07 0.00 0.00 0.00 0.00 0.00 0.00 21.08 23.44 38.24 17.24 CK600MCSIS CLEEFEDSIS COFSITESIS CRVSKRTSIS0.07 0.00 0.00 0.00 0.00 0.00 0.00 20.83 23.42 38.39 17.36 CKEOWCBSIS CLEEFEDSIS COFSITESIS CRVSKRTSIS0.07 0.00 0.00 0.00 2.54 15.18 20.10 22.37 15.88 17.93 6.00 COOOCT5SIS C0230KVSIS CKEOWCBSIS NSFORCMDHE0.07 0.00 0.00 0.00 0.00 0.00 0.00 19.70 23.25 38.92 18.13 C003BITSIS CRVSKRTSIS0.07 0.00 0.00 0.00 0.00 2.42 7.76 17.28 20.91 35.48 16.16 COOOCT5SIS C0230KVSIS CKEOWEESIS CRCSPIPSIS0.07 0.00 0.00 0.00 17.57 29.29 19.70 14.84 8.26 7.92 2.42 C003BITSIS NSFCON2CMS0.07 0.00 0.00 0.00 0.83 9.25 17.80 24.20 18.75 21.64 7.53 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOSRGSIS NSFORCMDHE0.07 0.00 0.00 0.00 0.00 0.00 0.00 20.00 23.35 38.95 17.70 COOOCT5SIS CKEOBATSIS COFSITESIS CRVSKRTSIS0.07 0.00 0.00 0.00 0.00 0.00 0.00 19.55 23.32 39.22 17.90 C000CT5SIS CK600MCSIS COFSITESIS CRVSKRTSIS0.07 0.00 0.00 0.00 0.00 0.00 0.00 19.31 23.30 39.37 18.02 COOOCT5SIS CKEOWCBSIS COFSITESIS CRVSKRTSIS0.07 0.00 0.00 0.00 1.66 12.02 18.67 23.16 17.47 20.24 6.78 COOOCT3SIS COOOCT5SIS CKEOWEESIS NSFORCMDHE0.07 0.00 0.00 0.00 0.00 13.01 16.75 21.06 17.48 22.83 8.87 C003BITSIS CBURPIPSIS FETRANDDEX TRCSRVODEX0.07 0.00 0.00 0.00 0.49 7.52 16.84 24.57 19.65 22.94 8.00 COOOCT3SIS COOOCT5SIS CKEOSRGSIS NSFORCMDHE0.07 0.00 0.00 0.00 0.00 0.00 0.00 20.72 23.18 38.49 17.62 CJOCDAMSIS CRVSKRTSIS0.07 0.00 0.00 0.61 9.37 25,38 21.35 18.11 10.84 10.95 3.39 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS NACSFDGDGM0.07 0.00 0.00 0.00 5.89 17.19 18.25 19.89 14.80 17.74 6.24 C0230KVSIS CKEOWEESIS CLEEFEDSIS NACSFDGDGR0.07 0.00 0.00 0.00 0.00 0.00 0.00 17.95 22.71 39.73 19.61 CRVSKRTSIS CTURSRGSIS0.06 0.00 0.00 0.00 8.28 24.91 21.71 18.74 11.33 11.49 3.55 COOOCT3SIS CKEOBATSIS CLEEFEDSIS NACSFDGDGM0.06 0.00 0.00 0.00 0.00 0.00 0.00 6.14 12.40 30.00 51.46 C00BWSTSIS CCSTSUPSIS CLETDWNSIS CSSFTRNSIS0.06 0.00 0.00 0.00 0.00 0.84 4.22 13.13 20.28 40.77 20.75 COOOCT4SIS C0230KVSIS CLEEFEDSIS CRVINTRSIS0.06 0.00 0.00 0.48 8.28 24.43 21.57 18.76 11.36 11.53 3.58 CEQOVERRHE CHTOVERSIS CKEOWCBS1S CLEEFEDSIS NACSFDGDGM0.06 0.00 0.00 0.00 0.00 0.00 0.00 17.78 22.83 40.38 19.00 COOOCT3SIS CKEOBATSIS CLEEFEDSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 18.39 22.86 39.97 18.78 CEQOVERRHE CHTOVERSIS CKEOBATSIS CLEEFEDSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 17.37 22.78 40.64 19.21 COOOCT3SIS CK600MCSIS CLEEFEDSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 17.15 22.75 40.77 19.32 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 17.96 22.82 40.23 18.98 CEQOVERRHE CHTOVERSIS CK600MCSIS CLEEFEDSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.49 3.37 12.23 20.27 42.00 21.64 C000CT4SIS C000CT5SIS C0230KVSIS CRVINTRSIS

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent] Frequency Contribution to Acceleration Interval -. . . .... . . . . . .Contrib. 0.2 0.23 10.28 0.36 10.46 10.56 0.66 10.77 10.87 10.97 Accident Sequences0.06 0.00 0.00 0.00 0.00 0.00 0.00 16.72 22.42 40.55 20.31 CKEOSRGSIS CLEEFEDSIS COFSITESIS CRVSKRTSIS0.06 0.00 0.00 0.00 1.83 11.42 17.48 22.41 17.67 21.36 7.82 Co23o•VSIS CKEOSRGSIS CLEEFEDSIS NACSFDGDGR--0.06 0.00 0.00 0.00 0.00 0.00 0.00 17.74 22.79 40.37 19.10 CEQOVERRHE CHTOVERSIS CKEOWCBSIS CLEEFEDSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 5.34 11.80 30.00 52.86 COOBWSTSIS CLETDWNSIS CONDENSSIS CSSFTRNSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 19.32 22.85 39.36 18.47 CINTAKESIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 16.44 22.63 41.27 19.66 CO00CT3SIS COOOCT5SIS CKEOBATSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 5.58 10.78 18.46 19.63 31.46 14.09 CO0EWSTSIS CONDENSSIS CRVINTRSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 17.00 22.68 40.88 19.44 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 16.05 22.58 41.51 19.86 COOOCT3SIS COOOCT5SIS CK600MCSIS CRVSKRTSIS0.06 0.00 0.00 0.00 5.89 17.19 18.25 19.89 14.80 17.74 6.24 C0230KVSIS CKEOWEESIS CLEEFEDSIS NSFORCMDHE0.06 0.00 0.00 0.00 0.00 0.00 0.00 15.84 22.54 41.64 19.97 COOOCT3SIS COOOCT5SIS CKEOWCBSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 16.60 22.63 41.12 19.64 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 15.44 22.20 41.39 20.98 COOOCT5SIS CKEOSRGSIS COFSITESIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 0.00 0.00 16.39 22.60 41.25 19.76 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWCBSIS CRVSKRTSIS0.06 0.00 0.00 0.00 0.00 4.93 10.24 18.25 19.84 32.16 14.57 CBURPIPSIS CHOTPMPSIS CRVINTRSIS0.06 0.00 0.00 0.00 6.01 22.62 22.13 20.13 12.44 12.72 3.95 COOOCT3SIS CK600MCSIS CLEEFEDSIS NACSFDGDGM0.06 0.00 0.00 0.00 0.00 10.12 14.95 20.80 18.49 25.25 10.40 CBURPIPSIS CTURSRGSIS FETRANDDEX TRCSRVODEX0.06 0.00 0.00 0.00 0.00 4.06 9.84 18.34 20.17 32.76 14.83 COOOICSSIS C03ATC4SIS CBURPIPSIS CRVINTRSIS0.06 0.00 0.00 0.00 7.46 22.38 21.15 19.59 12.38 12.83 4.22 CKEOSRGSIS CLEEFEDSIS COFSITESIS NACSFDGDGM0.06 0.00 0.00 0.00 0.00 3.74 9.59 18.30 20.30 33.07 14.99 C03ATC4SIS CBURPIPSIS CPOLDTKSIS CRVINTRSIS0.06 0.00 0.00 0.00 5.40 22.78 23.02 20.61 12.30 12.12 3.76 C003BITSIS C03ATC4SIS CSFRANDDEX TRCSRVODEX0.06 0.00 0.00 0.97 11.18 25.92 20.64 17.22 10.31 10.48 3.28 CHOTPMPSIS CINTAKESIS CSFRANDDEX TRCSRVODEX0.06 0.00 0.00 0.00 5.50 22.80 22.94 20.56 12.29 12.13 3.78 C003BITSIS CHOTPMPSIS CSFRANDDEX TRCSRVODEX0.06 0.00 0.00 0.00 5.26 21.58 22.16 20.67 12.93 13.27 4.13 COOOCT3SIS CKEOWCBSIS CLEEFEDSIS NACSFDGDGM0.06 0.00 0.00 0.00 0.00 5.20 9.98 17.74 19.67 32.55 14.87 CBURPIPSIS CONDENSSIS CRVINTRSIS0.06 0.00 0.00 0.00 5.53 22.69 22.89 20.59 12.33 12.18 3.80 CAUXSRGSIS CSFRANDDEX CVDC3DPSIS TRCSRVODEX0.06 0.00 0.00 0.00 0.00 0.00 0.00 17.78 22.49 40.34 19.40 CKEOWEESIS CLEEFEDSIS COFSITESIS CRVSKRTSIS0.05 0.00 0.00 0.00 0.00 25.00 20.90 19.58 13.45 15.60 5.47 CEQUIPMRHE CESFTCBSIS CRVINTRSIS0.05 0.00 0.00 0.00 1.83 11.42 17.48 22.41 17.67 21.36 7.82 C0230KVSIS CKEOSRGSIS CLEEFEDSIS NSFORCMDHE0.05 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS CSFRANDDEX FETRANDDEX TRCSRVODEX0.05 0.00 0.00 0.18 5.20 21.40 22.02 20.64 12.98 13.40 4.18 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOBATSIS NACSFDGDGM0.05 0.00 0.00 0.00 2.13 11.84 17.27 21.93 17.50 21.63 7.70 COOOCT5SIS C0230KVSIS CKEOWEESIS NACSFDGDGR0.05 0100 0.00 0.00 0.00 0.00 0.00 16.43 22.29 41.22 20.06 COOOCT5SIS CKEOWEESIS COFSITESIS CRVSKRTSIS0.05 0.00 0.00 0.00 0.00 28.06 19.77 18.11 12.83 15.54 5.68 CBURPIPSIS CNDCLR2DEX CONDCLRSIS TRCSRVODEX

    27

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Feuency Contribution to Acceleration Interval _ _Co0trib. 0.2 0.23 1 0.28 10.36 10.4610.5610.66[ 0.77 0.87 10.97 Accident Sequences

    0.05 0.00 0.00 0.00 0.00 0.00 0.00 4.66 11.05 29.71 54.58 C00BWSTSIS CINTAKESIS CLETDWNSIS CSSFTRNSIS0.05 0.00 0.00 0.00 0.00 0.00 0.00 13.61 21.52 42.54 22.33 COOOCT3SIS CKEOSRGSIS CLEEFEDSIS CRVSKRTSIS0.05 0.00 0.00 0.00 0.00 3.38 8.57 17.34 20.31 34.27 16.12 CBURPIPSIS CRVINTRSIS CVDC3DPSIS0.05 0.00 0.00 0.00 0.62 7.40 15.55 23.22 19.65 24.48 9.07 COOOCT5SIS C0230KVSIS CKEOSRGSIS NACSFDGDGR0.05 0.00 0.00 0.00 0.00 0.00 0.00 14.10 21.59 42.19 22.12 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS CRVSKRTSIS0.05 0.00 0.00 0.00 13.24 26.24 20.24 16.87 10.06 10.08 3.27 CTURSRGSIS NSFCON2CMS0.05 0.00 0.00 0.00 0.00 0.00 0.00 12.51 21.23 43.27 22.99 COOOCT3SIS COOOCT5SIS CKEOSRGSIS CRVSKRTSIS0.05 0.00 0.00 0.65 8.51 22.75 20.48 18.79 12.02 12.73 4.07 COOOCT5SIS CKEOWEESIS COFSITESIS NACSFDGDGM0.05 0.00 0.00 0.00 0.00 0.00 0.00 12.97 21.32 42.94 22.78 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOSRGSIS CRVSKRTSIS0.05 0.00 0.00 0.00 0.00 0.00 0.00 16.41 22.00 41.18 20.41 C00BWSTSIS CRVSKRTSIS0.05 0.00 0.00 0.10 3.71 19.12 22.08 21.82 14.01 14.59 4.57 COOOCT5SIS CEQOVERRHE CHTOVERSIS CK600MCSIS NACSFDGDGM0.05 0.00 0.00 0.00 0.00 0.73 4.12 13.28 20.52 40.80 20.55 COOOCT3SIS COOOCT4SIS CLEEFEDSIS CRCSPIPSIS0.05 0.00 0.00 0.00 0.00 0.93 4.54 13.67 20.45 40.19 20.21 COOOCT4SIS CEQOVERRHE CHTOVERSIS CLEEFEDSIS CRCSPIPSIS0.05 0.00 0.00 0.00 3.22 18.42 22.05 22.18 14.39 15.04 4.70 COOOCT3SIS COOOCT5SIS CKEOBATSIS NACSFDGDGM0.05 0.00 0.00 0.00 17.57 29.29 19.70 14.84 8.26 7.92 2.42 C003BITSIS CRCRANDDEX0.05 0.00 0.00 0.00 0.00 4.37 9.29 17.34 19.79 33.54 15.66 COOEWSTSIS CINTAKESIS CRVINTRSIS0.05 0.00 0.00 0.00 2.13 11.84 17.27 21.93 17.50 21.63 7.70 COOOCT5SIS C0230KVSIS CKEOWEESIS NSFORCMDUIE0.05 0.00 0.00 0.00 0.00 0.00 0.00 14.51 21.65 42.45 21.40 COOOCT3SIS CKEOWEESIS CLEEFEDSIS CRVSKRTSIS0.05 0.00 0.00 0.00 0.00 0.00 0.00 15.02 21.71 42.08 21.18 CEQOVERRHE CHTOVERSIS CKEOWEESIS CLEEFEDSIS CRVSKRTSIS0.05 0.00 0.00 0.08 3.23 18.12 21.97 22.26 14.46 15.13 4.76 COOOCT5SIS CEQOVERRHE CHTOVERSIS. CKEOWCBSIS NACSFDGDGM0.05 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NSF3PUIDPM0.05 0.00 0.00 0.00 0.62 7.40 15.55 23.22 19.65 24.48 9.07 COOOCT5SIS C0230KVSIS CKEOSRGSIS NSFORCMDHE0.05 0.00 0.00 0.00 0.00 0.42 3.29 12.37 20.50 42.01 21.41 COOOCT3SIS COOOCT4SIS COOOCT5SIS CRCSPIPSIS0.05 0.00 0.00 0.00 0.00 0.54 3.64 12.75 20.48 41.48 21.11 COOOCT4SIS COOOCT5SIS CEQOVERRHE CHTOVERSIS CRCSPIPSIS0.05 0.00 0.00 0.00 0.00 0.00 0.00 13.36 21.38 43.22 22.05 COOOCT3SIS COOOCT5SIS CKEOWEESIS CRVSKRTSIS0.05 0.00 0.00 0.00 10.58 22.48 19.19 17.94 12.00 13.35 4.45 CONDENSSIS CSSFTRNSIS WHSEWSTDHE0.05 0.00 0.00 0.00 0.00 0.00 0.00 13.84 21.46 42.87 21.83 C000CT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS CRVSKRTSIS0.05 0.00 0.00 0.00 10.56 24.37 19.95 17.63 11.28 12.20 4.01 C0230KVSIS CKEOBATSIS CLEEFEDSIS NACSFDGDGM0.05 0.00 0.00 0.00 0.00 0.00 0.00 16.12 21.89 41.32 20.67 C0230KVSIS CKEOBATSIS CLEEFEDSIS CRVSKRTSIS0.05 0.00 0.00 0.00 2.27 16.23 21.81 23.12 15.33 16.16 5.07 C000CT3SIS COOOCT5SIS CK600MCSIS NACSFDGDGM0.05 0.00 0.00 0.00 0.00 0.00 0.00 15.73 21.84 41.55 20.87 C0230KVSIS CK600MCSIS CLEEFEDSIS CRVSKRTSIS0.04 0.00 0.00 0.00 0.00 0.00 0.00 15.53 21.80 41.68 20.99 C0230KVSIS CKEOWCBSIS CLEEFEDSIS CRVSKRTSIS0.04 0.00 0.00 0.00 3.80 19.07 22.10 21.89 13.99 14.41 4.74 C03ATC4SIS CSFRANDDEX CTURSRGSIS TRCSRVODEX0.04 0.00 0.00 0.00 3.88 19.09122.03,21.84 13.98 14.43 4.76 CHOTPMPSIS CSFRANDDEX CTURSRGSIS TRCSRVODEX

    "IQ

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Centf Frequency Contribution to Acceleration Interval _ ... ........Contrib. I0.2 0.23 10.28 1 0.36 10.46 0.56 10.66 0.77 0.87 0.97 Accident Sequences

    0.04 0.00 0.00 0.00 0.00 0.00 0.00 14.86 21.66 42.14 21.33 COOOCT5SIS C0230KVSIS CKEOBATSIS CRVSKRTSIS0.04 0.00 0.00 0.00 2.84 16.20 21.01 22.68 15.37 16.43 5.46 CO0OCT5SIS CKEOSRGSIS COFSITESIS NACSFDGDGM0.04 0.00 0.00 0.00 3.23 17.99 22.11 22.50 14.49 14.88 4.81 C003B1TSIS CSFRANDDEX CVDC3DPSIS TRCSRVODEX0.04 0.00 0.00 0.00 0.00 0.00 0.00 14.50 21.60 42.36 21.54 COOOCT5SIS C0230KVSIS CK600MCSIS CRVSKRTSIS0.04 0.00 0.00 0.00 1.96 15.31 21.59 23.47 15.75 16.67 5.25 CO0OCT3SIS C000CT5SIS CKEOWCBSIS NACSFDGDGM0.04 0.00 0.00 0.00 0.00 0.00 0.00 14.31 21.56 42.48 21.65 C000CT5SIS C0230KVSIS CKEOWCBSIS CRVSKRTSIS0.04 0.00 0.00 0.00 6.90 21.53 20.95 19.86 12.81 13.54 4.41 CINTAKESIS CSFRANDDEX CVDC3DPSIS TRCSRVODEX0.04 0.00 0.00 0.00 7.71 22.26 20.45 19.05 12.46 13.59 4.48 C0230KVSIS CK600MCSIS CLEEFEDSIS NACSFDGDGM0.04 0.00 0.00 0.97 11.18 25.92 20.64 17.22 10.31 10.48 3.28 CHOTPMPSIS CINTAKESIS NSFCON2CMS TRCSRVODEX0.04 0.00 0.00 0.62 7.36 20.16 19.60 19.45 13.24 14.71 4.86 CEQOVERRHE CHTOVERSIS CKEOWEESIS CLEEFEDSIS NACSFDGDGM0.04 0.00 0.00 0.00 0.00 0.00 0.00 12.24 20.48 43.19 24.10 CO230KVSIS CKEOSRGSIS CLEEFEDSIS CRVSKRTSIS0.04 0.00 0.00 0.00 6.76 21.27 20.52 19.59 12.96 14.20 4.69 C0230KVSIS CKEOWCBSIS CLEEFEDSIS NACSFDGDGM0.04 0.00 0.00 0.00 0.00 0.00 0.00 11.23 20.17 43.85 24.76 COOOCT5SIS C0230KVSIS CKEOSRGSIS CRVSKRTSIS0.04 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NSFTIMEDHE0.04 0.00 0.00 0.00 4.61 17.52 19.80 21.08 14.82 16.66 5.51 COOOCT3SIS CKEOWEESIS CLEEFEDSIS NACSFDGDGM0.04 0.00 0.00 0.00 13.24 26.24 20.24 16.87 10.06 10.08 3.27 CRCRANDDEX CTURSRGSIS0.04 0.00 0.00 0.00 0.00 0.68 3.64 12.02 19.65 41.69 22.32 COOOCT4SIS C0230KVSIS CLEEFEDSIS CRCSPIPSIS0.04 0.00 0.00 0.00 0.00 7.43 10.96 17.42 18.66 31.02 14.51 CBURPIPSIS CRCSPIPSIS0.04 0.00 0.00 0.00 2.21 14.66 20.67 23.27 16.05 17.24 5.91 CSFRANDDEX CTURSRGSIS CVDC3DPSIS TRCSRVODEX0.04 0.00 0.00 0.00 2.39 13.95 19.56 22.83 16.48 18.45 6.35 CEQOVERRHE CHTOVERSIS CKEOSRGSIS CLEEFEDSIS NACSFDGDGM0.04 0.00 0.00 0.00 0.00 0.00 0.00 13.07 20.64 43.17 23.13 C0230KVSIS CKEOWEESIS CLEEFEDSIS CRVSKRTSIS0.03 0.00 0.00 0.00 17.57 29.29 19.70 14.84 8.26 7.92 2.42 C003BITSIS CSFRANDDEX FETRANDDEX TRCSRVODEX0.03 0.00 0.00 0.00 0.00 0.40 2.90 11.16 19.57 42.79 23.18 COOOCT4SIS COOOCT5SIS C0230KVSIS CRCSPIPSIS0.03 0.00 0.00 0.00 0.00 0.00 0.00 12.01 20.34 43.87 23.78 COOOCT5SIS C0230KVSIS CKEOWEESIS CRVSKRTSIS0.03 0.00 0.00 0.00 4.15 18.23 20.50 21.10 14.49 16.16 5.37 COOOCT5SIS C0230KVSIS CKEOBATSIS NACSFDGDGM0.03 0.00 0.00 0.00 8.41 19.60 18.42 18.76 13.47 15.84 5.51 CINTAKESIS CSSFTRNSIS WHSEWSTDHE0.03 0.00 0.00 0.00 1.43 11.58 18.88 23.64 17.62 19.97 6.88 COOOCT3SIS CKEOSRGSIS CLEEFEDSIS NACSFDGDGM0.03 0.00 1.47 2.93 19.55 28.59 17.66 12.97 7.33 7.26 2.24 C0001CSSIS CINTAKESIS CSFRANDDEX FETRANDDEX TRCSRVODEX0.03 0.00 0.00 0.00 0.00 7.94 11.91 18.16 18.59 29.80 13.59 C0001CSSIS COOEWSTSIS CBURPIPSIS TRCSRVODEX0.03 0.00 0.00 0.00 5.14 19.09 20.45 20.67 14.03 15.49 5.13 C00BWSTSIS CHOTPMPSIS CSFRANDDEX TRCSRVODEX0.03 0.00 0.00 0.00 0.00 7.35 11.65 18.19 18.79 30.22 13.80 COOEWSTSIS CBURPIPSIS CPOLDTKSIS TRCSRVODEX0.03 0.00 0.00 0.00 2.93 16.09 20.30 22.03 15.46 17.38 5.80 COOOCT5SIS C0230KVSIS CK600MCSIS NACSFDGDGM0.03 0.00 0.00 0.09 2.77 14.44 19.27 22.28 16.28 18.64 6.23 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOWEESIS NACSFDGDGM0.03 00.00 0.00 0.00 0.00 5.49 12.14 20.83 20.56 29.42 11.56 COOCT4SIS CEQOVERRHE CHTOVERSIS CLEEFEDSIS NACSFDGDGR

    29

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency Contribution to Acceleration Interval J ___- , [Contrib. 0.2 10.23 10.28j 0.361 0.46 0.56 0.66 0.77 10.87 0.97 T --- 1 Accident Sequences

    0.03 0.00 0.00 0.00 2.54 15.18 20.10 22.37 15.88 17.93 6.00 C000CT5SIS C0230KVSIS CKEOWCBSIS NACSFDGDGM0.03 0.00 0.00 0.00 6.90 21.53 20.95 19.86 12.81 13.54 4.41 CINTAKESIS CVDC3DPSIS NSFCON2CMS TRCSRVODEX0.03 0.00 1.01 2.27 17.40 28.45 18.57 13.98 7.96 7.92 2.44 CINTAKESIS CPOLDTKSIS CSFRANDDEX FETRANDDEX TRCSRVODEX0.03 0.00 0.00 0.00 0.00 4.37 11.25 20.70 21.10 30.55 12.02 C000CT3SIS COO0CT4SIS CLEEFEDSIS NACSFDGDGR0.03 0.00 0.00 0.00 0.83 9.25 17.80 24.20 18.75 21.64 7.53 COOOCT5SIS CEQOVERRHE CHTOVERSIS CKEOSRGSIS NACSFDGDGM0.03 0.00 13.86 9.73 27.01 22.95 11.10 7.15 3.71 3.47 1.02 CONDENSSIS NSFTIMEDHE TRCSRVODEX0.03 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS NSF3PUIDPM0.03 0.00 0.00 0.00 1.66 12.02 18.67 23.16 17.47 20.24 6.78 COOOCT3SIS COOOCT5SIS CKEOWEESIS NACSFDGDGM0.03 0.00 0.00 0.00 0.00 4.89 9.96 17.80 19.64 32.53 15.19 COOEWSTSIS CAUXSRGSIS CBURPIPSIS TRCSRVODEX0.03 0.00 0.00 0.00 0.49 7.52 16.84 24.57 19.65 22.94 8.00 COOOCT3SIS COOOCT5SIS CKEOSRGSIS NACSFDGDGM0.03 0.00 0.00 0.00 0.00 22.29 19.79 19.67 14.30 17.51 6.45 CEQUIPMRHE CESFTCBSIS CRCSPIPSIS0.03 0.00 0.00 0.00 0.00 3.36 10.20 20.37 21.58 31.83 12.66 COOOCT4SIS COOOCT5SIS CEQOVERRHE CHTOVERSIS NACSFDGDGR0.03 0.00 13.86 9.73 27.01 22.95 11.10 7.15 3.71 3.47 1.02 CONDENSSIS NSFORCMDHE WHSEWSTDHE0.03 0.00 0.00 0.00 0.00 5.49 12.14 20.83 20.56 29.42 11.56 COOOCT4SIS CEQOVERRHE CHTOVERSIS CLEEFEDSIS NSFORCMDHE0.03 0.00 0.00 0.00 0.00 2.65 9.38 20.10 21.98 32.81 13.07 COOOCT3SIS COOOCT4SIS COOOCT5SIS NACSFDGDGR0.03 0.00 0.00 0.00 0.00 4.37 11.25 20.70 21.10 30.55 12.02 COOOCT3SIS COOOCT4SIS CLEEFEDSIS NSFORCMDHE0.03 0.00 0.00 0.00 0.00 3.37 8.36 16.91 20.06 34.57 16.74 C003BITSIS COOEWSTSIS CBURPIPSIS TRCSRVODEX0.03 0.00 0.00 0.00 0.00 0.00 0.00 8.40 18.17 45.91 27.52 COOOCT3SIS COOOCT4SIS CLEEFEDSIS CRVSKRTSIS0.03 0.00 0.00 0.00 13.24 26.24 20.24 16.87 10.06 10.08 3.27 CSFRANDDEX CTURSRGSIS FETRANDDEX TRCSRVODEX0.03 0.00 0.00 0.00 0.00 0.00 0.00 8.73 18.28 45.66 27.33 COOOCT4SIS CEQOVERRHE CHTOVERSIS CLEEFEDSIS CRVSKRTSIS0.03 0.00 0.00 0.00 0.00 7.32 11.80 18.51 18.98 30.01 13.37 C0001CSSIS CBURPIPSIS CRVINTRSIS FETRANDDEX0.03 0.00 0.00 0.00 0.00 0.00 0.00 7.67 17.80 46.38 28.14 COOOCT3SIS COOOCT4SIS COOOCT5SIS CRVSKRTSIS0.03 0.00 0.00 0.00 0.00 0.00 20.98 24.47 19.48 25,26 9.80 CAUXSRGSIS CEQLET2DEX CPIPSUPSIS0.03 0.00 0.00 0.00 0.00 0.00 20.98 24.47 19.48 25.26 9.80 CAUXSRGSIS CEQLET3DEX CPIPSUPSIS0.03 0.00 0.00 0.00 5.89 17.19 18.25 19.89 14.80 17.74 6.24 C0230KVSIS CKEOWEESIS CLEEFEDSIS NACSFDGDGM0.03 0.00 0.00 0.00 0.00 3.36 10.20 20.37 21.58 31.83 12.66 COOOCT4SIS COOOCT5SIS CEQOVERRHE CHTOVERSIS NSFORCMDHE0.03 0.00 0.00 0.00 0.00 6.77 11.54 18.53 19.18 30.41 13.57 CBURPIPSIS CPOLDTKSIS CRVINTRSIS FETRANDDEX0.03 0.00 0.00 0.00 0.00 0.00 0.00 7.98 17.92 46.14 27.96 COOOCT4SIS COOOCT5SIS CEQOVERRHE CHTOVERSIS CRVSKRTSIS0.02 0.00 0.00 0.00 0.00 2.65 9.38 20.10 21.98 32.81 13.07 COOOCT3SIS COOOCT4SIS COOOCT5SIS NSFORCMDHE0.02 0.00 0.00 0.00 0.00 20.73 19.33 20.03 14.86 18.31 6.74 COOEWSTSIS CONDENSSIS NSFORCMDHIE0.02 0.00 0.00 0.00 0.00 0.00 21.40 24.15 19.29 25.32 9.84 CEQLET2DEX CONDENSSIS CPIPSUPSIS0.02 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS CSFRANDDEX TRCSRVLDEX0.02 0.00 0.00 2.50 20.86 31.71 18.42 12.40 6.43 5.93 1.75 CAUXSRGSIS CNDCLR2DEX CONDCLRSIS CSFRANDDEX TRCSRVODEX0.02 0.00 1.47 2.93 19.55 28.59 17.66 12.97 7.33 7.26 2.24 C0001CSSIS CINTAKESIS FETRANDDEX NSFCON2CMS TRCSRVODEX

  • TABLE 5-1Oconee Seismic Dominant Cutsets

    Per Cent Frequency Contribution to Acceleration IntervalContrib. 0.2 0.23 10.2810.36 10.4610.56[10.660.77 10.87 0.97 _ _ __Accdn eune ___Conrib Accident Sequences

    0.02 0.00 0.00 0.00 0.00 2.48 7.05 15.77 20.05 36.12 18.53 COOEWSTSIS CBURPIPSIS CTURSRGSIS TRCSRVODEX0.02 0.00 0.00 0.00 1.83 11.42 17.48 22.41 17.67 21.36 7.82 C0230KVSIS CKEOSRGSIS CLEEFEDSIS NACSFDGDGM0.02 0.00 0.00 0.00 5.14 19.09 20.45 20.67 14.03 15.49 5.13 C00BWSTSIS CHOTPMPSIS NSFCON2CMS TRCSRVODEX0.02 0.00 0.00 0.00 0.00 18.85 18.90 20.36 15.46 19.26 7.17 CBURPIPSIS CHOTPMPSIS TRCSRVLDEX0.02 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NACSFDGDGS0.02 0.00 0.00 0.00 0.00 0.00 17.90 23.62 20.22 27.27 10.98 C003B1TSIS CEQLET2DEX CPIPSUPSIS0.02 0.00 0.00 0.00 0.00 0.00 17.90 23.62 20.22 27.27 10.98 C003BITSIS CEQLET3DEX CPIPSUPSIS0.02 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NSFPU02APM TRCSRVODEX0.02 0.00 0.00 4.89 24.59 30.18 16.66 11.10 5.74 5.29 1.56 CAUXSRGSIS NSFTIMEDHE0.02 0.00 0.00 0.00 0.00 0.00 21.00 23.75 19.27 25.78 10.20 CEQLET2DEX CJOCDAMSIS CPIPSUPSIS0.02 0.00 0.00 0.00 0.00 0.00 21.00 23.75 19.27 25.78 10.20 CEQLET3DEX CJOCDAMSIS CPIPSUPSIS0.02 0.00 13.86 9.73 27.01 22.95 11.10 7.15 3.71 3.47 1.02 CONDENSSIS CSFRANDDEX TRCSRVLDEX0.02 0.00 0.00 0.00 0.00 16.06 18.76 21.15 16.23 20.26 7.54 COOOICSSIS C03ATC4SIS CBURPIPSIS TRCSRVLDEX0.02 0.00 0.00 0.00 0.00 19.84 18.37 19.75 15.29 19.45 7.30 CBURPIPSIS CONDENSSIS TRCSRVLDEX0.02 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NSFCONICMR0.02 0.00 21.45 11.47 25.73 19.45 9.10 5.87 3.10 2.95 0.89 CJOCDAMSIS NSFCON2CMR0.02 0.00 1.01 2.27 17.40 28.45 18.57 13.98 7.96 7.92 2.44 CINTAKESIS CPOLDTKSIS FETRANDDEX NSFCON2CMS TRCSRVODEX0.02 0.00 0.00 0.00 0.00 15.01 18.54 21.40 16.57 20.75 7.73 C03ATC4SIS CBURPIPSIS CPOLDTKSIS TRCSRVLDEX0.02 0.00 0.00 0.00 0.00 19.32 19.37 20.63 15.34 18.64 6.70 CONDENSSIS CRVINTRSIS WHSEWSTDHE0.02 0.00 0.00 0.00 0.00 4.23 10.23 19.26 20.77 32.09 13.42 COOOCT4SIS C0230KVSIS CLEEFEDSIS NACSFDGDGR0.02 0.00 13.86 9.73 27.01 22.95 11.10 7.15 3.71 3.47 1.02 CONDENSSIS NSFPU02APM TRCSRVODEX0.02 0.00 0.00 0.00 2.13 11.84 17.27 21.93 17.50 21.63 7.70 COOOCT5SIS C0230KVSIS CKEOWEESIS NACSFDGDGM0.02 0.00 0.00 0.00 0.00 20.09 17.98 19.38 15.24 19.75 7.54 CBURPIPSIS CJOCDAMSIS TRCSRVLDEX0.02 0.00 0.00 0.00 0.62 7.40 15.55 23.22 19.65 24.48 9.07 COOOCT5SIS C0230KVSIS CKEOSRGSIS NACSFDGDGM0.02 0.00 0.00 0.00 0.00 0.00 15.40 22.49 20.63 29.08 12.40 CEQLET2DEX CPIPSUPSIS CTURSRGSIS0.02 0.00 0.00 0.00 0.00 0.00 15.40 22.49 20.63 29.08 12.40 CEQLET3DEX CPIPSUPSIS CTURSRGSIS0.02 0.00 0.00 0.00 0.00 2.56 8.48 18.61 21.54 34.30 14.52 COOOCT4SIS COOOCT5SIS C0230KVSIS NACSFDGDGR0.02 0.00 3.39 4.95 23.82 27.52 15.40 10.93 6.11 6.03 1.86 CINTAKESIS CNDCLR2DEX CONDCLRSIS CSFRANDDEX TRCSRVODEX0.02 0.00 0.00 0.00 0.00 0.00 18.72 23.02 19.74 27.40 11.11 CEQLET2DEX CINTAKESIS CPIPSUPSIS0.02 0.00 0.00 0.00 0.00 13.98 17.12 20.95 17.13 22.22 8.59 CBURPIPSIS CVDC3DPSIS TRCSRVLDEX0.02 0.00 0.00 0.00 0.00 0.00 0.00 7.47 17.09 46.08 29.36 COOOCT4SIS C0230KVSIS CLEEFEDSIS CRVSKRTSIS0.02 0.00 0.00 0.00 0.00 4.23 10.23 19.26 20.77 32.09