6MW+ wind turbine, · Wind Energy Haahr Management Representative DMV Wind Energy DANAK Sway Heave...

7

Transcript of 6MW+ wind turbine, · Wind Energy Haahr Management Representative DMV Wind Energy DANAK Sway Heave...

  • • 2

    •  Hybrid construction: concrete caisson, steel shaft

    •  6MW+ wind turbine, 40-55m waterdepth

    •  Self buoyant

    •  Compact design

    •  Cost effective

    •  No piling, no noise

    •  Proven technologies

    •  Integrated design, constructability and offshore operability

    Gravity Based Foundation, innovative design

    BAM and Van Oord GBF - presentation GBF solution CONFIDENTIAL

  • • 3

    GBF design, working as a team for three years

    BAM and Van Oord GBF - presentation GBF solution CONFIDENTIAL

  • • 4

    Proving the design, achieving a credible solution

    BAM and Van Oord GBF - presentation GBF solution CONFIDENTIAL

  • • 5

    Yard for mass fabrication, reducing cost of energy

    BAM and Van Oord GBF - presentation GBF solution CONFIDENTIAL

  • • 6

    Marine operations: proven technology and experience

    BAM and Van Oord GBF - presentation GBF solution CONFIDENTIAL

  • Reliable, Robust, Ready