6623 14 ........ . ... . . . . . . .... . . . . . . . . . .... . . . h l . ECN
2 P.0.1 of - ENGINEERING CHANGE NOTICE
3. Originator's Name, Organization, MSIN, and Telephone No.
T. Nuxall, CVDF, R3-86, 3 72-3 739 6. Project Title~o.lWorkOrderNo.
SNFIW-441
Cold Vacuum Drying Spent Nuclear Fuel ,
9. Document Numbers Changed by this ECN (includes sheet no. and rev.)
Scc block 13a
2. ECN Category (mark one)
Supplemental I1 Direct Revision 1x1 Change ECN I1 Temporary [I Standby 11 Supersedure 11 CancellVoid I1
4. USQ Required? 5 . Date
[] Yes [XI No 912100
7. Bldg./Syr.lFae. No. 8. Approval Designator
CVDF Q 142-K
11. Related PONo. 10. Related ECN No(s).
NIA NIA 12a. Modification Work
I] Yes (fill out Blk.
12b. Work Packago NO.
NIA
12c. Modification Work Complete 1Zd. Restored to Original Condi- tion (Temp. or Standby ECN only)
NIA NIA
1x1 No (NABlks. IZb, 12c. 1Zd)
3NF-3876, Rev. 2, SNF-3877, Rev. 2, SNF-3878, Rev 1, SNF-3879, Rev. 3, SNF-3880, Rev. 1, SNF-3881, lev. 2, SNF-3882, Rev. 2, SNF-3883, Rev 3, SNF-3884, Rev. 2, -M Rev. 5LIF-yr(,9, 1, SNF-4418, R+J. Rev. , ~
L, SNF-3933, Rev. 1, SNF-3936, Rev. 2, SNF-5964, Rev. 0, SNF-5970, Rev. 1 rryoo
I Design AuthorityiCog. Engineer
Signature Br Date Design AulhoritylCog. Engineer
Signature & Date
Jpdated document numbers and deleted revision numbers
JSQ Approval: CX B . l from AP-NS-4-001-15
48. Justification (mark one)
:riteria Change[] ~ e s i g n ~mprovement[~] ~nvirunmenta~[] Facility Deactivation[]
is-Found[] Facilitate Const[] Const. Error/Omission[] Design Enor/Omission[] 4b. Justification Details
Sditorial changes for configuration control.
The design verification method for SSISC components is by independent review in accordance with EN-6- 127-01. Documentation of this review is accomplished by the independent review approval signature
A-7WC-0131
ENGINEERING CHANGE NOTICE 1. ECN (use no. from pg. I )
1662314 18. Schedule Impact (days) 6. Design
Verification Required
2 N" %I@
NA
Improvement 11 [I Delay
17. Cost Impact NA
ENGINEERING CONSTRUCTION
[I $ [I $
Additional
Savings [I $
Savings [I $ Additional
[I [I
component Index
ASME Coded it-
Human Fsotor Corniderstion
[I [I
[I [I [I [I
1nrpcction P h
liiv~nlury Adwhnolt Rcwurst [I [I
:nnronmentd KPpm
:"mrame",d Pernit
!O. other Affected Documents: (NOTE: Documents listed below will not be revised by this ECN.) Signatures below
indicate that the signing organization has been notified of other affected documents listed below Document NumberiRevision Document NumbdRevision
NA
Document Number Revision
!I. Approvals Date
h i g n Aulhority C. Miska 9-z-0 Signature
Design Agent
PE
YA
safety
Design
Cnviron.
Other
ADDITIONAL
DEPARTMENT OF ENERGY
Signature or a Control Number that tracks the Approval Signature
A-7900-013-3 (05196) GEF096
DISTRIBUTION SHEET
D. Whitehurst
G . Singh
CVD Library
R. Ramsgate
Page 1 of 1 To Distribution Project Titlework Order
7
x 3 - 7 8 X
x 3 - 7 8 X
x 3 - 7 8 X
x 3 - 7 8 X
Name
P. Beaudet
P. Morrell (AVS)
C. Miska
Attach" EDT/ECN 1 Onlv I Only 1 Text 1 Attach. 1 I MSlN With All Text Only Appendix
5 8 - 0 7 X
G1-50 X
x 3 - 7 8 X
SNF Project Files
SNF Satelite Library
C. Van Katwijk
1 J. Brehm I x3-79 I x I I I I
R 3 - 1 1 X
X3-25 X
R 3 - 4 7 X
J L . Price 1 R3-26 I x 1 I I I I S N F StartuD 1 B2-64 I x I I I I
ID. Whitworth I R 3 - 1 1 I x I I I I I T. Nuxall I x 3 - 7 8 I x I I I I
I
A-6000.1 35 (10197)
SNF-3933 Revision 2
Nupro Process VentlMCO Check / Relief Valve- Prevent Back Flow From Process Vent Into MCO
Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management
Protect Hanford Manaaemenl Contractor for the U i Department of Energy under Contract DE-AC06-96RL13200
P.O. Box 1000 Fluor Hanford Richland, Washington
Approved for public release: further dissemination unlimited
.--
SNF-3933 Revision 2
ECN 662314
Nupro Process Vent/MCO Check / Relief Valve- Prevent Back Flow From Process Vent Into MCO
Project No: W-441
C Miska
Document Type: RPT
FH
Date Published September 2000
Prepared for the US. Department of Energy Assistant Secretary for Environmental Management Project Hanford Management Contractor for the U S Department of Energy under Contract DE-AC06-96RL13200
P.O. Box 1000 Richland, Washington
Fluor H anford
Division: SNF
I I Release Stamp
Approved for public release: further dissemination unl imited
SNF-3933 Revision 2
TRADEMARK DISCLAIMER Reference nere n lo an, spec f c COmmerC a P I O O ~ C I pfocess
~ .- . .. .. . - - . . . . . .-
or sewice by trade name, irademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors.
This report has been reproduced from the best available copy.
Total Pages: 1 . 1
TRADEMARKS
rn NUPRO is a Registered Trademark of Nuclear Products Co., Cleveland Ohio
RECORD OF REVISION 1 Page -
(2) Title
Nupro Process Vent/MCO Check/Relief Valve-Prevent Back Flow From Process Vent Into MCO
Change Control Record
(1) Document Number
SNF-3933
(3) Revision
0
1
Authorized for Release
(5) Cog. Engr. I (6) Cog. Mgr. Date (4) Description of Change - Replace, Add, and Delete Pages
I I
, ,
A-7320-005 (1 0/97)
Commercial Grade Item Upgrade Dedication Form I I FCNNo. NA CCil No. CGI-SNF-D-07-P4-040 1 Page I o f13
SNF-19.13. Rev 2
I IIIC I 'KEVENI HACK FI.OW FROM PROCESS \ 'EN1 INTO MC'O
Yl'PHO I'KOC'ESS \'EI\T .%IC0 C'IIECK / KF.LIEI; VAl~ \ '# : -
. - . . . -. . . . .. .. . ..
Afg. ParVModel No.: plA Supplier's PIN: $A
%d Use Description: plA
'rocurement andlor Model 40.: SS-RL4M8F8
!quipment No.: VPS - ZKV-* 1 12 SNF-5303
Specification No.:
IW-441-P4)
Equipment Supplier (if different from manufacturer): TBD Equip. Supplier's Part No.: NA
Manufacturer: Nupro Valve Mfg. Company
Past P.O. No.: NA
~~~~~ .~ ...
3 . Recommended Procurement Strategy (coordinate with project CGI interface Engineer or BTR):
NA .- ~ _ _ _ Section 2c CGI Determination
1. Question #1: Is the Item subject to design or specification requirements that are unique to nuclear facilities or activities?
[ ] YES (the Item is not commercial grade)
.. ~~ [ X ] NO . .. (continue) - .. 2. Question #2: Is the Item used in applications other than nuclear facilities or activities?
[ ] NO (the item is not commercial grade)
[ X I YES(continue) .. ~
Commercial Grade Item Upgrade Dedication Form ECNNo. NA CGI No CGI-SNF-D-07-P4-040 Title NUPRO PROCESS VENTiMCO CHECK I RELIEF VALVE - PREVENT BACK FLOW FROM PROCESS VENT INTO MCO
I. Question #3: Is the Item ordered from manufacturerlsupplier on the basis or specifications set forth in the Published product information (e.g., manufacturers catalog)?
[ ] NO (the Item is not commercial grade)
I .X~ l .YES (continue) . ~~~ ~~ ~~~~~ ~~~~~~~~ ~~ ~ .~ ~~~ . ~ . .
X I All three criteria have been satisfied. The Item meets the definition of commercial grade. .. .. ~
Section 2d Reason for Dedication The above described Item is being Dedicated for USI? in the application cited for the fdlowing reason(s):
X 1 Item is being purchased from a non ESL manufacturer supplier as commercial grade to be used in a Safety Class
5Nl-1933 RLY 2
P a g L 2 o t I 3
] Item is being purchased from a non ELS manufacturer supplier as commercial grade to be used in a Safety Significant application.
] Item was purchased from a non ESL manufacturer supplier as commercial grade to be used in a Safety Class ~ ~~ ~~ ~
] Item was purchased from anon ESL manufacturer supplier as commercial grade to be used in a Safety Significant ~~ ~ ~~ application. ~~~ . .~~ ~
Other ('like-for-like', similar, substitution, replacement evaluation) 1 Section 3 Failure Effects Evaluation
4. ParVComponent Safety Function: I. Check va lve closure prevents a i r b a c k leakage from the process vent to the M C O to
prevent h y d r o g e n explosion.
C o n f i n e m e n t - P reven ts air l eakage into the M C O during v a c u u m opera t i on or a f t e r rupture ?.
~~~~~~~~ ~~ .~ .. .~ . ~ ~ . . ~ ~ ~~ ~~ ~~~~ ~~~ ~~~~~~~~~
~ ~ . . disc . . .. burst. ~.
3, Check valve T e n s ~~ ~ . w h e n . r-ired to prov ide overpressure relief p a t h .
1. M a i n t a i n cr i t ica l function before and a f te r Seismic event . 3. ParVComponent Functional Mode:
Safety Function #I:
[ X ] Active - Mechanical or Electrical change of state is required to occur for the component to perform its safety
[ ] Passive - Change of state is not required for the component to perform its safety function
[ ] Active - Mechanical or Electrical change of state is required to occur for the component to perform its safety
[ X ] Passive - Change of state is not required for the component to perform its safety function
function
Safety Function #2:
function.
Safety Function #3:
[ X ] Active - Mechanical or Electrical change of state is required to occur for the component to perform its safety
[ ] Passive - Change of state is not required for the component to perform its safety function Safety Function #4:
[ ] Active -Mechanical or Electrical change of state is required to occur for the component to perform its safety
[ X ] Passive - Change of state is not required for the component to perform its safety function
function.
function.
09/02/00
Commercial Grade Item Upgrade Dedication Form
C. Host Component Safety Function (if applicable): NA
SNF-3933. Kcv. 2
D. Failure Mechanisms(s) and the effects on component or system safety function (see worksheet 1): 1. Seizure - failure of the check valve to close as required, resulting in air leakage into the MCO.
2. Fracture of the valve body or piping attachment, resulting in air leakage into the MCO.
3. Seizure -- failure of the checkhelief valve to open as required, resulting in functional impairment of the pressure safety element, VPS-PSE-l*33.
Section 4 Environmental & Natural Phenomena Hazard Design Environmental Qualification Required: If yes: Environmental Qualification Requirements
Yes[ 1 Limiting Environmental Conditions: No [ X I Required Safety Functions:
Environmental Condition B Qualification Period:
Natural Phenomena Hazard (NPH) Design Required: If yes: NPH Design Requirements Yes [ X I Performance Category: PC-3
No [ 1 NPH Design Req'ts.: Seismic Condition A
HNF-PRO-97 SNF-5303
Required Safety Functions: Check Valve Closure t o Provide Isolation Between the Process Vent and the MCO; Confinement; open when required to provide overpressure telief path.
Section 5 Component Functional Classification [ X ] Safety Class (SC) [ ]General Service [ ] Safety Significant (SS)
If partlcomponent classification is different from host componentlsystem, document basis.
ECNNu. NA CCil No. CGI-SNF-D-07-P4-040
Section 6 [reserved] Section 7 [reserved]
Sect on 8 References (for Functional Classification)
Pagc 3 nf I3
National Codes/Standards: ASME B31.3
Safety Analysis Report (SAR): HNF-SD-SNF-SAR-002
Drawings: H-1-82161; HNF-SD-SNF- SEL-002, + ECN 652269: CVDF-SSD-003
Vendor ManualslManufacturerlSupplier Information: Nupro Company - "HL4" Series Low Pressure Proportional Relief Valves.
Other: f lA
09/02/00
Commercial Grade Item Upgrade Dedication Form
Verification Document: Vendor Specifications,
HNF-SD-SNF-SEL-002, ECN 652269
SNF3933, RCY 2
safety function@))
Confinement
CCNNo. NA CCil No. CGI-SNF-D-07-P4-040
Internal Pressure
Cracking Pressure Setting
P a g c 4 o r l 3
Release Pressure
Seat Leakage, Reverse Flow After Cracking
No leakage at test pressure of 165 psig. Note 3. 150 psig and full vacuum
Nominal 30 psig (not t o exceed 31 psig). Lockwire t o be in place t o maintain pressure relief setting after test.
Reseal must occur > 20 psig
Pressure test t o design pressure I150 psig) (bubble
Environmental
Seismic .~ . Condition A ~~~~~~
Flow Rate
1 ,T
1 .T
1 ,T
1 .T
1 .T
Note 2 ~ 1 .T Nominal 10 std cft/min at 30
I psig.
X
X
Commercial Grade Item Upgrade Dedication Form
1. Notes and Legend: 1 Acceptance Method:
SNF-3933. IKcv 2
1. The check / relief valve bonnet seal, stem seal, and bonded poppet seal (VITON) is not subject to degradation at ambient conditions of 40°F and 60% RH or 11 5'F and 22% RH and is suitable for Environmental Condition B application.
2. Maintain critical function before and after Seismic event. SNF- 5303, Appendix L, page L-18 provides a seismic testing plan for this safety class, Seismic Condition A component at a Seismic Spectra SNF-4896. Equipment that has been shaker-table tested should not be installed in a plant (Ref. IEEE Standard 344-1984, Section 71. Consequently, the seismic test constitutes a destructive test. The industry sampling practice for destructive test is t o test only one item.
Pressure test at 110% of design accident condition pressure of 150 psig.
3.
CCNNu. NA CGl No CGI-SNF-D-07-P4-040
1. Special Test and Inspection 1,IN for Inspection 1 ,T for Test
2. Commercial Grade Survey 3. Source Verification 4. Vendoriltem Wistory
rags 5 ,>f 13
4. Material verification acceptance method may be by either I
I inspection or test. I
Rev. 2: Updated reference documentation. .. .. .. ~.~ ~~
10 Initial Reviews and Approvals
09102100
Commercial Grade Item Uograde Dedication Form 1 SNF-3933. Rev. 2
LCNNo. NA [GI No. CGI-SNF-D-07-P4-040 rltie PREVENT BACK FLOW FROM PROCESS VENT INTO MCO
NUPRO PROCESS VENTIMCO CHECK I RELIEF VALVE - Page 6 or 13
WORKSHEET 1 DETERMINATION OF FAILURE MECHANlSMSlMODES .-.-.._li_~-~.-.-.-.... ""I_____._ I_______
SECTION 1 Typical Failure Definition
.. .. .. .... .. .. .. .. Mechanisms Fracture
~ . . . .. . . . . . .. ... .... .. ....... .. .. .. ... . .. .. ...
Corrosion
Erosion
Open Circuit
Short Circuit
Blockage
Seizure
Unacceptable Vibration
Loss of Properties
Excess Strain
Mechanical Creep
Ductile Fracture
~~ .................................... .................................................... ~ . . ~ . . Separation of a solid accompanied by little or no macroscopic plastic deformation.
The gradual deterioration of a material due to chemical or electrochemical reactions, such as oxidation, between the material and its environment. Destruction of materials by the abrasive action of moving fluids, usually accelerated by the presence of solid particles carried with the fluid. An electrical circuit that is unintentionally broken so that there is no complete path for current flow.
An abnormal connection by which an electrical current is connected to ground, or to some conducting body, resulting in excessive current flow. Clogging of a filtering medium resulting in the inability to perform its purification function or blockage of flow. Binding of a normally moving item through excessive pressure, temperature, friction, jamming.
Mechanical oscillations produced are beyond the defined permissible limits due to unbalancing, poor support, or rotation at critical speeds. A loss of mechanical and physical properties of a material due to exposure to high temperatures, radiation exposure. Under the action of excessive external forces the material of the part has been deformed or distorted.
From prolonged exposure to high temperature and stress, the object will show a slow change in its physical (shape and dimension) and mechanical characteristics. Fracture characterized by tearing of metal accompanied by appreciable gross plastic
Applicable to Component ....................... under ~~ ...................... Evaluation ~ .~ .................
Yes [ ] Mode.
Yes [ ] Mode.
Yes [ ] Mode.
Yes [ ] Mode.
No [XI ; If Yes, indicate failure
No [XI; If Yes, indicate failure
No [X 1; If Yes, indicate failure
No [X 1; If Yes, indicate failure
Yes [ ] Mode.
No [XI; If Yes, indicate failure
Yes [ ] Mode.
No [XI; If Yes, indicate failure
Yes [ ] Mode.
Yes [ ] Mode.
Yes [ ] Mode.
Yes [ ] Mode.
Yes [ ] Mode.
No [XI; If Yes, indicate failure
No [XI; If Yes, indicate failure
No [XI; If Yes, indicate failure
No [XI; If Yes, indicate failure
No [XI; If Yes, indicate failure
Yes [ ] Mode.
No [X 1; If Yes, indicate failure
deformation - Section 2 Additional Failure Modes Applicable to the Component Under Evaluation
- 1. Failure of check valve to seat and prevent reverse flowlfailure of check valve to open and
provide flow path for pressure safety element VPS -PSE- I *33.
2. Process connectionlbodv break.
09/02/00
Commercial Grade Item Upgrade Dedication Form 6CNNo. NA ('GI Nu CGI-SNF-D-07-P4-040 I ,tie NUPRO PROCESS VENTlMCO CHECK / RELIEF VALVE - PREVENT BACK FLOW FROM PROCESS VENT INTO MCO
SNF-3933. Kcv. 2
Ihgc 7 , , I I3
CHECKLIST I ACCEPTANCE METHOD I
SPECIAL TESTiINSPECTION VERIFICATION
SECTION 1
Item Description: Nupro Process VentlMCO Check I Relief Valve
System #: 07
Manufacturer (Addredphone):
Nupro Valve Mfg. Company
P.O. #
SECTION 2 CRITICAL CHARAC?
Equip #: VPS-CKV-* 1 1 2
Procurement and/or Model #: SS-RL4M8F8
Supplier (AddresdPhone):
,RISTlCS TO BE VERIFIED BY METHOD 1.
I I I I
I 1 I I 1 1 I I I 1
~
T", port-
I I I I I I
I I
I I I I I
I
I I I I I I
1 1 -
1. Nameplate - Manufacturer
2. Component Number-Procurement and/or Model Number
3. Process Connection
4. "A" Dimension
5. Material, Body (Verification may be by either inspection or test)
6. Material, Process Connection (Verification may be by either inspection or
7. Confinement
8. Internal Pressure
9. Cracking Pressure Setting
IO. Reseal Pressure
11. Seat Leakage, Reverse Flow After Cracking
12. Seismic Condition A
13. Flow Rate
SECTION 3 VERIFY BY INSPECTION P
* See Attachment G of Desk Instruction for Sampling Size - - Characteristic: Nameplate - Manufacturer
Sample Sire*: All Items
Acceptance Criteria: NUPRO Company
Receipt Inspection Plan / Report #.
References (see Section 7):
Commercial Grade Item Upgrade Dedication Form
l it le NUPRO PROCESS VENT/MCO CHECK / RELIEF VALVE - PREVENT BACK FLOW FROM PROCESS VENT INTO MCO
SNI'-3933. Rev. 2
Characteristic: Component Number-Procurement and/or Model Number
Sample Size*: All Items
Acceptance Criteria: SS-RL4M8F8 , (Per SNF-5303. Section H, Design Data Sheet)
Receipt Inspection Plan I Report #:
References (see Section 7): Nupro Company - "HL4" Series Low pressure Proportional Relief Valves.
Characteristic: Process Connection, Inlet / Outlet
Sample Size*: All Items
Acceptance Criteria: 1/2" Male NPT X 1/2" FNPT
Receipt Inspection I'lan / Report #:
References (see Section 7):
IiCNNo. NA CGI Nu. CCI-SNF-D-07-P4-040
Characteristic: Material, Body
Sample Size*: Normal Sample Size
Acceptance Crileria: Stainless Steel
Receipt Inspection Plan / Report #:
l'age X 01 13
References (see Section 7): ~ -
Characteristic: Material, Process Connection
Sample Size*: Normal Sample Size
Acceptance Criteria: Stainless Steel
Receipt Inspection Plan I Report #:
References (see Section 7):
Characteristic: "A" Dimension
Samplc Size*: Normal Sample Size
Acceptance Criteria: Nominal 5.43 inch
Receipt Inspection Plan I Report #:
References (see Section 7):
~ ~ -
Commercial Grade Item Upgrade Dedication Form FCNNo. S A C'GI N". C G I - S N F - D - ~ ~ - P ~ - ~ ~ ~
SECTION 4 VERIFY BY SPECIAL TEST
* See Attachment G of Desk Instruction for Sampling Sire
[ ]Purchaser
[ ] Supplier/Manufacturer** Testllnspection Location:
[ ]Other I Characteristic for Test: Confinement
Acceptance Criteria: No Leakage at Test Pressure of 165 psig
Sample Size*: Normal Sampling Size
Actual Test Value:
Test Plan and Report #: References (see Section 7):
Characteristic for Test: Internal Pressure
Acceptance Criteria: 150 psig and full vacuum
Sample Size*: Normal Sampling Size
Actual Test Value:
Test Plan and Report #: ~ _ _ ~ References (see Section 7):-
Characteristic for Test: Cracking Pressure Setting
Acceptance Criteria: Nominal 30 psig (must not exceed 31 psig). Lockwire t o be in place t o maintain pressure relief setting after test.
Sample Sire*: Normal Sampling Size
Actual Test Value:
Test Plan and Report #: References (see Section 7):- - Characteristic for Test: Real Pressure
Acceptance Criteria: Reseal must occur > 20 psig.
Sample Size*: Normal Sampling Size
Actual Test Value:
Test Plan and Report #: ~ References (see Section 7):
Characteristic for Test: Seat Leakage, Reverse Flow After Cracking
Acceptance Criteria: Pressure test t o design pressure 1150 psigl (bubble tight standards< 10-3 ml Hekec.1
Sample Size*: Normal Sampling Size
Actual Test Value:
Test Plan and Report #: References (see Section 7):-
Commercial Grade Item Upgrade Dedication Form llCN No. NA C(il No. CCI-SNF-D-07-P4-040 'TXIC: NUPRO PROCESS VENTlMCO CHECK / RELIEF VALVE - PREVENT BACK FLOW FROM PROCESS VENT INTO MCO
Acccptance Criteria: Maintain Critical Function Before and After Seismic Event
Sample Size*: Destructively Test Only One Item
Actual Test Value:
SNF-3933. Rev. 2
I'agc lOoI13
Characteristic for Test: Flow Rate
Acccptance Criteria: Nominal 10 std cft/min at 30 psig.
Sample Size*: Normal Sampling Size
Actual rest Value:
Test Plan and Report #: References (see Section 7): -.
Commercial Grade Item Upgrade Dedication Form
I I.< SL11'1W I'KOCXSS \ ' F M W ' O C'HFC'K RELIEF \ 'Al . \ 'E PREVEST BACK FLOW FKORl I'KOCEW \'ENT I N T O R1( 0 . .. . . . . . -. . . . . . . - . . ~.
I
I ' l h l l l L ~
SNI:-3[933. Rev. 2
I Design Authority 0 1
CCNNo. NA Ctil No. CGI-SNF-D-07-P4-040
I [ ] Drawings: I I
I ' ~ ~ ~ ~ 13 ,,i 13
I [ ] Manuals (specify type & number): I I I f 1 Design Calculations I 1 I [ 1 installation Instructions 1 I I [ 1 Operation ~nstructions I I 1 [ ] Calibration Instructions I I 1 [ 1 Manufacturer's Recommended Spare Parts List I I
[ ] Other.
Procurement Documents
I [ 1 Certificate ofConformance/Compliance I I I 1 Seismic Qualification Certificate I I
[ ] Environmental Qualificalion Certificate
[ ] Test Report (s):
[ ] Inspection Keport (s):
I [ ] CMTKs for ASME Pressure Ketainiiig Malcrials 1 I 1 1 Valve Seat Leakage Keport I I
09/02/00