7/27/2019 660 MW Schedule
1/7
Activity
Description
#1
Mont hs-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Months1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sheet 1 of 7
Ind-Barath 660MW Power Plant Project Schedule
0Pubilic System
Validate contract
Preliminary design
Detailed investigation
Pile foundation construction
Main plant excavation
Pour the first side of concrete
The main plant on the basis of zero meter
Begin lifting main plant steel structure
Install dust removing system
Center control building preparation
Chimney top sealing
Install turbine pedestal
Chemical water workshop preparation
Main plant close
Air cooler island foundation preparation
Chemical qualified demineralized water
oiler installation startsBoiler drum lifting in position
ST bedplate in positionAuxiliary power receivingFinish boiler water pressure test
--- limestone
(Design, Civil work, Supply, Installation & Commisioning)
-
7/27/2019 660 MW Schedule
2/7
Activity
Description
Mont hs
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Months
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sheet 2 of 7
0
Pubilic System
--- limestone
Turbine coveringBoiler acid cleaning starts
Boiler ignition pipe blowingInitial synchronization
Whole set test run endPAC end
Design
Preliminary detailed investigationPreliminary designConstruction general drawing
Boiler drawingPreliminary design review
Construction drawing of five open one flat Construction drawing of plant underground equipment Technology construction drawing Electric heat control drawing Drawing design of pile foundation project
--- progress
Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)
-
7/27/2019 660 MW Schedule
3/7
Activity
Description
Mont hs
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Months
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sheet 3 of 7
0
Equipment Purchasing
ain equipment bid invitingoiler equipment purchasingTG equipment purchasing
The first batch purchasingP heater
LP heatereaeratoran
Electrical equipmentable bracket/cable
P pipe & valves,pipe fittings
/L P pipe & valves,pipe fittingsESPCondensate pumpElectrically driven feed pumpOther pressure vesselsCirculating water pumpBoiler elevator
Thermal control equipmenthemical water equipment
Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)
-
7/27/2019 660 MW Schedule
4/7
Activity
DescriptionMont hs
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Months
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sheet 4 of 7
0
Transportation
Boiler steel structureurbine foundation embedded part
an & pumpSP
Deaerator & Coal MillsContinuous Blowdown & Intermittent Blowdown SystemAUX of Turbine
urbine properenerator proper
Drumoiler proper
pipe & thermal controlAir cooler island equipment
Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)
-
7/27/2019 660 MW Schedule
5/7
Activity
Description
#1
#2
Mont hs
-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Months
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sheet 5 of 7
0
4-8
4-8
5-7
8-15
9
4-7
6-10
4-7
9-11
7-16
8-13
8-14
8-11
7-10
11-15
6-11
15
15
8-14
11-19
Engineering Progress Schedule
--- progress
Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)
-
7/27/2019 660 MW Schedule
6/7
Activity
Descript on
#1
#2
Mont hs
-1 1 2 3 4 5 6 7 8 9 10 11 1 2 13 1 4 15 16 17 1 8 19 20 21 22 2 3 24 25 2 6 27 2 8 29 30 3 1 32 33 34 3 5 36 37 3 8 39 40 41 4 2 43
Months
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sheet 6 of 7
0
6-11
14-20
14-22
10-18
15
15-20
15-20
16-20
17-22
15-21
15-21
15-21
17-21
16
18-20
19-21
11-18
14-19
16-20
19-20
15-21
Engineering Progress Schedule
Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)
-
7/27/2019 660 MW Schedule
7/7
D ip
#1
#2
Mont hs
-1 1 2 3 4 5 6 7 8 9 10 11 1 2 13 1 4 15 16 17 1 8 19 20 21 22 2 3 24 25 2 6 27 2 8 29 30 3 1 32 33 34 3 5 36 37 3 8 39 40 41 4 2 43
Months
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Sheet 7 of 7
0
20
20-22
20-22
20-22
21-22
21-22
21-22
22
21
21
21
21
22
22
24
The first four months is equipment bid inviting and design stage
and the 22nd month is test run period.
In china, generating power within 24 months for this project is feasible.But the foundation construction depends on the geological condition,if you want to generate power within this period,
the erection works must keep up with the whole progress.
Engineering Progress Schedule
Ind-Barath 660MW Power Plant Project Schedule(Design, Civil work, Supply, Installation & Commisioning)