Quality MeetingDate :Place :
Purpose Bracket Compressor Mounting
Model640A
Part JK246260-6610JK246260-6591JK246260-5222
Content : 1. Master Schedule
2. Child Part / Material Availability3. Supply Chain
4. Line Preparation
13. Delivery System
9. Part Quality Status
10. Past Problem
15. Production Capacity
7. SOP Preparation
8. Quality Document Preparation
14. Lot Control & ID Information
5. Flow Process & Quality System
6. Man Power Preparation
11. Internal Audit Result
12. Packaging Standard & Storage
JK246260-6610 JK246260-6591
JK246260-5222
1.Master Schedule
Conclusion : Current condition progress to HVPT phase
2.Child Part /Material Availability
3.Supply Chain
Conclusion : Need to discuss about supply mechanism for HVPT & Mass pro
Raw Material Receiving Inspection (Ingot)
Incoming Check
Stock Inner Part : 500 pcs
Mechanism supply : current supply by DNIA
4
21
5
3
4.Line Preparation
4.1 Line Condition
Conclusion : Line Casting & Finishing all readyLine Machining ready (need discuss about 100% check thread & jig)
4.Line Preparation
4.1 Line Condition
Line Machining BCM 6611 Line Machining BCM 6592Line Casting BCM Denso
Line Deburing Cutting Line Deburing Sender belt Line Deburing mini belt
4.2. Tool & Equipment Preparation
Conclusion : Tool & Equipment Preparation all ready in Nusa Metal
Dies Ready at Nusametal
BCM 6592 BCM 6610 BCM 5222
Jig Machining Ready at Nusametal
JK246260-5222JK246260-6592
JK246260-6610
Conclusion : QA system refer to QAPC & Insp. standard
5.Flow Process & Quality System
Incoming Material Melting
Assembling Machining
Gravity Die Casting
Washing
Finishing
Final CheckDelivery
AppearanceCompositionImpurities
CompositionImpuritiesGas ContentFluidity
AppearanceJob SetupQ-TimePatrol
Appearance
AppearanceJob SetupQ-TimePatrol
AppearanceChild Part Check
Appearance Appearance
Note :Allowed to use molten only after Quality Approval
Note :Initial 100% check by Quality
Conclusion : BCM 5222 on progress, Quality document need approval
6.Man Power Preparation 7.SOP Preparation
8.Quality Document Preparation
MP
Casting
MP
Finishing
MP
Machining SectionPart Name
BCM 6611 BCM 6592 BCM 5222
Casting
IK Proses O O ∆
Inspection Standard O O ∆
Cheak sheat job set up & patrol O O ∆
Q-Time O O ∆
IK 100% O O ∆
Finishing
IK Proses O O ∆
Inspection Standard O O ∆
IK 100% O O ∆
Machining
IK Proses O O ∆
Inspection Standard O O ∆
Cheak sheat job set up & patrol O O ∆
Q-Time O O ∆
IK 100% O O ∆
Final Inspection
Location sheat O O ∆
IK 100% O O ∆
Pre Delivery Inspection
IK PDI O O ∆
Check sheat O O ∆
DocumentPart Name
BCM 6611 BCM 6592 BCM 5222
PIS O O O
QAPC O O O
PFMEA O O O
QAN O O O
MSA ∆ ∆ ∆
ISIR O O ∆
Mill Sheat O O O
Cp-Cpk O O ∆
Packaging Std. ∆ ∆ ∆
Lab scope ∆ ∆ ∆
Lot Control O O OWI Final inspection O O ∆
ESC schedule ∆ ∆ ∆
Incoming insp. Ingot O O O
Incoming insp. Inner part O O N/A
MP Quality
Inspection
9.Part Quality Status
Conclusion : BCM 5222 need discussion with DNIA regarding N1 data
9.1. Measuring n=1 result 9.2. Capability (Cp&Cpk) result
Conclusion : Need discuss with DNIA about Cycle time problem
10.Kakotora (Past problem) 11. Internal Audit Result
Capacity problem : CT Check thread 100% = 155 sec
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
TOOLINGREADINESS
QUALITYREADINESS
PROCESSREADINESS
INTERNAL AUDIT BCM DENSO
ITEM CHECK STD
Note :Internal audit result for LVPT phase
Conclusion : Need approval packaging standard with DNIANeed discuss with DNIA about delivery mechanism
12.Packaging Standard & Storage 13. Delivery System
14. Lot Control & ID part Information
Packaging standard Concept ready. - Nusametal Applies to method, directdelivery and milk run delivery system.
15. Production Capacity
Conclusion : Current Cycle Time not yet achieved, NM will improve to achieve capacity
0
200000
400000
600000
800000
1000000
1200000
1400000
1600000
1800000
Sep'15 Okt'15 Nov'15
Tim
e
Month
Data Capacity Machining Bracket Compressor Mounting
Dandori
BCM 6111
BCM 6592
BCM 5222
Total Shift 1 / Month
Total Shift 2 / Month
Total Shift 3 / Month
Time Working Time / monthAcc. Time /Month
Total Hour /Month 1568700 1568700
Total Shift 1 / Month 478800 478800
Total Shift 2 / Month 579600 1058400
Total Shift 3 / Month 510300 1568700
Target
C/T pcs /Month Safety ( 10% )Time / Month
BCM 5222 105 5,500 6600 658350
BCM 6592 105 2,224 2668.8 266213
BCM 6111 120 4,000 4800 547200
Dandori 43200 43200
Total Time 1514963
16. Image
BCM 6592
BCM 6611
BCM 5222
Thank You