PROJECT JOB NO. 6 20.04.2015 RAYRE JFAGA CWINK 5 10.03.2015 RAYRE JFAGA CWINK 61033923 4 12.02.2015 RAYRE JFAGA CWINK 3 30.01.2015 ABATS NHOWA CWINK VER. DATE MADE BY CHECKED APPROVED TYPE FOUNDATION DISCIPLINE SEQUENCE SHEET NO. VER. ISSUE DATE DRAWING TITLE SIZE DESCRIPTION STATUS 61033923 NBW 519 WTG SS SK 001 5 20/04/2015 WTG GENERAL ARRANGEMENT. PRE INSTALLED SCOUR FOR MTO A1 UPDATE BASED ON CLIENTS COMMENTS 61033923 NBW 519 WTG SS SK 002 2 30/01/2015 WTG TRANSITION PIECE TP/MP INTERFACE FLANGE A1 ISSUED FOR INFORMATION Updated drawings highlighted with grey WTG FOUNDATIONS DISCIPLINE : SS - SECONDARY STEEL SKETCHES BELWIND II OFFSHORE WIND FARM - WTG PROJECT ID NOTES 61033923-NBW-519-WTG-SK-DL.xlsx Rambøll Job No.:61033923 Page 1 of 1

description

WTG-SK-DL

Transcript of 61033923-NBW-519-WTG-SK-DL

Page 1: 61033923-NBW-519-WTG-SK-DL

PROJECT JOB NO. 6 20.04.2015 RAYRE JFAGA CWINK

5 10.03.2015 RAYRE JFAGA CWINK

61033923 4 12.02.2015 RAYRE JFAGA CWINK

3 30.01.2015 ABATS NHOWA CWINK

VER. DATE MADE BY CHECKED APPROVED

TYPE FOUNDATION DISCIPLINE SEQUENCE SHEET NO. VER. ISSUE DATE DRAWING TITLE SIZE DESCRIPTION STATUS

61033923 NBW 519 WTG SS SK 001 5 20/04/2015 WTG GENERAL ARRANGEMENT. PRE INSTALLED SCOUR FOR MTO A1 UPDATE BASED ON CLIENTS COMMENTS

61033923 NBW 519 WTG SS SK 002 2 30/01/2015 WTG TRANSITION PIECE TP/MP INTERFACE FLANGE A1 ISSUED FOR INFORMATION

Updated drawings highlighted with grey

WTG FOUNDATIONS DISCIPLINE : SS - SECONDARY STEEL SKETCHES

BELWIND II OFFSHORE WIND FARM - WTG

PROJECT ID NOTES

61033923-NBW-519-WTG-SK-DL.xlsx Rambøll Job No.:61033923 Page 1 of 1