© 2014 HDR, all rights reserved. Stakeholder Meeting December 16 th , 2014 1:30 pm to 2:30 pm Interstate 229 Major Investment Study Exit 3 – Minnesota Avenue Benson Road 60 th Street N.

Transcript of 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road...

Page 1: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

© 2014 HDR, all rights reserved.

Stakeholder MeetingDecember 16th, 20141:30 pm to 2:30 pm

Interstate 229 Major Investment StudyExit 3 – Minnesota

Avenue

Benson Road

60th Street N.

Benson Road

60th Street N.

Page 2: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

Study Area Map

I-229 Corridor Study

Additional StudiesExit 3 – Minnesota AveExit 6 – 10th StreetExit 9 – Benson Road

Solberg Avenue Overpassto60th Street N. Overpass

Page 3: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

Study Advisory PartnersSouth Dakota Department of Transportation (SDDOT)

South Dakota Highway Patrol

City of Sioux Falls

Sioux Falls Metropolitan Planning Organization (MPO)

Federal Highway Administration (FHWA)

Page 4: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

Exit 3 (Minnesota Avenue) Crossroad

Study Goals• Reduce traffic congestion • Evaluate interchange options• Integrate plans for the 49th Street

Extension with the interchange options developed

• Improve pedestrian and bike access to the Big Sioux River Pathway

• Improve safety for corridor users• Improve vehicle safety to Yankton Trail

Park

Page 5: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

Minnesota Avenue Corridor Overview

Intersection projected to be over capacity by 2035.

43 Crashes in 4 year period (rear end and

angle crashes).

Stop-controlled approach projected to be over capacity by 2018.

Page 6: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

Minnesota Avenue Corridor Overview

Park Entrance difficult to enter/exit during peak hours (mostly related to

soccer season).

6 Crashes in 4 year period (rear end crashes

near gore area).

Stop-controlled approach projected to be over capacity by 2018.

Intersection projected to be at capacity by 2035.

Page 7: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

Minnesota Avenue Corridor Overview

57 Crashes in 4 year period (rear end and

angle crashes).

Traffic backs up north from I-229; numerous driveways increase

potential for conflict.

Intersection projected to be over capacity by 2035.

Stop-controlled approach is over capacity.

Page 8: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

Preliminary local street extensions, interchange concepts, and traffic impact analyses in the vicinity of I-229 & Minnesota Avenue were identified in the following studies:

41st Street Corridor Study

Sioux Falls Major Street and Access Management Plan

2000 and 2010 Decennial Interstate Corridor Studies

49th Street Extension Study

Traffic Impact Studies – Costco, Scheels, and Walmart

Relevant Previous Studies

Page 9: 60 Street N. Benson Road MIS Stakeholder Meetings_Mi… · Benson Road 60th Street N. Benson Road 60th Street N. Thanks for Attending!!!!! PROJECT CONTACTS: Jason Kjenstad – HDR

© 2014 HDR, all rights reserved.

Interstate 229 Major Investment StudyExit 3 – Minnesota

Avenue

Benson Road

60th Street N.

Benson Road

60th Street N.

Thanks for Attending!!!!!

PROJECT CONTACTS:Jason Kjenstad – HDR Engineering, Inc.605-977-7740 or [email protected]

Ross Harris– HR Green, Inc.515-657-5263 or [email protected]

Shannon Ausen – City of Sioux Falls605-367-8607 or [email protected]

Steve Gramm – SDDOT Project Development605-773-6641 or [email protected]