60 ft road BASKETBALLCOURT -...

1
Gate 60 ft road DRIVE WAY DRIVE WAY DRIVE WAY DRIVE WAY DRIVE WAY DG DRIVE WAY BLOCK 05-A BLOCK 06-A BLOCK 04-A BLOCK 03-B TYPE - c green TYPE - c EXISTING ROAD LVL. ± 0-00 20 1 30 71 103 110 121 BLOCK 06-A BLOCK 04-A TYPE - c TYPE - A lawn lawn TYPE - c TYPE - B 11 M. WIDE ROAD 20 30 5500 wd. driveway 5500 wd. driveway 5500 wd. driveway 5500 wd. driveway lawn lawn PF PF PF TA TA TA TA TA TA TA TA TA MH MH MH TC TC TC B-1 B-2 B-3 B-4 B-7 B-6 B-5 U.G. TANK-17.5x10m 5500 wd. driveway RMU-6 GAS BANK-01 9x10 green RAMP DRIVE WAY DRIVE WAY DRIVE WAY DG 5500 wd. driveway 5500 wd. driveway RMU-5 RMU-4 9x10 5500 wd. driveway 5500 wd. driveway DRIVE WAY DRIVE WAY bed minton court bed minton court BASKETBALL COURT criket pitch criket pitch B-13 B-14 sit out mound walkway 1.5m wd. walkway 1.5m wd. walkway 1.5m wd. pl. pl. pl. pl. paved mound pl. pl. pl. pl. pl. 3.5 mtr. pathway with grass pavers bed minton court bed minton court BASKETBALL COURT criket pitch criket pitch pargola lawn DRIVE WAY 5.5 m wide B-8 B-9 B-10 B-11 B-12 B-15 B-16 detail "A" ELE. 01 SEC. 02 ELE/SEC.03 SEC. 04 SEC. 05 SEC. 06 SEC. 07 RMU-1 RMU-2 RMU-3 RMU-7 RMU-8 RMU-8 Lvl. +99.30 Lvl. +100.30 Lvl. +100.30 Lvl. +99.30 Lvl. +99.225 Lvl. +99.15 Lvl. +99.65 Lvl. +98.80 Lvl. +98.80 Lvl. +98.80 Lvl. +98.80 Lvl. +99.25 Lvl. +99.25 Lvl. +99.25 Lvl. +99.65 Lvl. +99.65 Lvl. +98.80 Lvl. +98.60 Lvl. +98.60 Lvl. +98.30 Lvl. +98.40 Lvl. +98.40 Lvl. +98.40 Lvl. +98.40 Lvl. +98.40 Lvl. +98.50 Lvl. +98.50 Lvl. +98.60 Lvl. +98.70 Lvl. +98.80 Lvl. +98.95 Lvl. +98.75 Lvl. +98.55 Lvl. +98.85 Lvl. +99.15 Lvl. +99.15 Lvl. +98.85 Lvl. +98.85 Lvl. +98.65 Lvl. +98.95 Lvl. +98.95 Lvl. +98.65 Lvl. +98.65 Lvl. +98.85 Lvl. +98.55 Lvl. +98.55 Lvl. +98.60 Lvl. +98.60 Lvl. +98.90 Lvl. +98.90 Lvl. +98.85 Lvl. +98.85 Lvl. +99.15 Lvl. +99.15 Lvl. +99.20 Lvl. +98.60 Lvl. +98.75 TYPE E BLOCK-D BLOCK-D BLOCK-D BLOCK-D STP GAS BANK DRAINAGE SUMP (3.0x1.5x2.0 M. DEEP) WITH 3 NOS. SUBMERSIBLE PUMPS (2 WORKING + 1 STANDBY) @ 10 LPS ,14 MTR. HEAD EACH PUMP ROOM U.G. TANK TOTAL CAP:- 125 KL WATER DEPTH 3.0 M FIRE TANK 200 KL U.G. TANK & PUMP HOUSE FIRE CAP. = 200 KL DOMESTIC:- 136 KL TOTAL CAP = 336 KL S1 S3A S2 S4 S5 S6 S7 S8 S10 S9 S11 S12 S13 S14 S15 S16 S17 S3 S7A S7B G.L = +98.85 I.L = +98.05 DEPTH = 0.80 M. I.L = +97.80 G.L = +98.85 I.L = +98.05 DEPTH = 0.80 M. I.L = +97.80 I.L = +97.80 G.L = +98.65 I.L = +97.85 DEPTH = 0.80 M. I.L = +97.60 I.L = +97.60 I.L = +97.60 G.L = +98.65 I.L = +97.85 DEPTH = 0.80 M. G.L = +98.60 I.L = +97.80 DEPTH = 0.80 M. I.L = +97.55 I.L = +97.55 I.L = +97.55 G.L = +98.60 I.L = +97.80 DEPTH = 0.80 M. G.L = +98.60 I.L = +98.05 DEPTH = 0.80 M. I.L = +97.80 I.L = +97.80 I.L = +97.80 G.L = +98.60 I.L = +98.05 DEPTH = 0.80 M. LIG & EWS G.L = ± 0.00 I.L = -0.80 DEPTH = 0.80 M. I.L = -0.97 I.L = -0.92 I.L = -1.00 ARCHITECT Date Description Rev DRG. TITLE: Drawn by KEY IN: PLOTTED ON: SCALE: DATE.: Design By : ISSUED FOR: 140 BUILDING TYPE 0 10 10 20 30 40 50 60 70 80 90 100 0 OWNERS NAME Ashiana Housing Ltd. Unit no.4 & 5,Plot No.D-2,3rd Floor, Southern park, saket District Centre, Saket New Delhi - 110017 Phone no. 011- 42 65 42 65 PROJECT : SHEET. NO.: 1 : 550 DWK-00 / ES - 01 August 2016 130 140 150 10 20 30 40 50 60 70 80 90 100 0 0 10 20 30 40 50 60 70 80 90 100 110 120 130 0 Amit kamboj D G.F.C. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 SERVICE CONSULTANT: EXTERANL SEWERAGE SYSTEM ASHIANA HOUSING 'DWARKA' AT JODHPUR Nitesh Kumar Ckd By Anand Havelia 3. LEGEND : S. No. SYMBOL 1. 4. 2. D E S C R I P T I O N 5. 6. MANHOLE M.H. SEWER LINE ETHIQUE D 507/508, KAILASH ESPLANADE, L.B.S MARG, OPP SHREYAS CINEMA, GHATKOPAR (WEST), MUMBAI - 400086. TEL NO : 25004553/25005978 E mail :ethique@hotmail com MAULI SHREE APARTMENT PLOT NO 4/3-E' PHULE BAUG' LOKMANYA NAGAR, SADASHIVE PETH, PUNE - 20 TEL:-(020) 2433 3803 E mail :[email protected] BY ARCHITECT SANJEEV MEHTA Tel : (0120) 6943500 ( 24 Lines ) Noida Office : B - 67, Sector - 67, Noida - 201 301 e mail : [email protected], website : www.cespl.in Consummate Engineering Services (P) Ltd. Lko. Office : R 006, Rohtas Plumeria, Gomti Nagar, Lucknow R0 29-10-2016 ISSUED AS G.F.C. LAYOUT PLAN ,1 7+( $5($6 68%-(&7 72 68%6,'(1&( 25 ),//(' 83 62,/ '8( 72 (;&(6 EXCAVATION AT SITE FOR CONSTRUCTION OF BASEMENTS) THE SEWER LINES & MANHOLE SHOULD BE LAID ON SUITABLE SUPPORT OR CONCRETE CRADLE SUPPORTED ON PILES OR SUITABLE FOUNDATION AS PER STRUCTURAL DESIGN. 12. IN CASE WHERE SEWERS ARE LAID IN HIGH SUBSOIL CONDITIONS MANHOLES SHOULD BE CONSTRUCTED IN R.C.C. GARDE M-25. 13. THE WIDTH OF TRENCH FOR SEWER AND DRAINAGE SHOULD BE D+ 400MM. (D= O.D. OF PIPE). SHORING / TIMBERING SHOULD BE ADEQUATE TO PREVENT CAVING-IN OF THE TRENCH WALLS OF SUBSIDENCE OF AREAS ADJACENT TO THE TRENCH. AN ENGINEER-IN-CHARGE IN CONSULTATION WITH A STRUCTURAL ENGINEER SHOULD PROVIDE ADEQUATE ARRANGEMENT TO PREVENT CAVING-IN. 14. 15. d) ABOVE 2250 M.M. DEPTH 1500 M.M. DIA. c) 1650 TO 2250 M.M. DEPTH 1200 M.M. DIA. 600 X 600 M.M. a) UPTO 900 M.M. DEPTH b) 900 TO 1650 M.M. DEPTH 900 M.M. DIA. THE SIZE OF MANHOLE SHALL BE AS UNDER ( INNER SIZES ) NOTES : SEWERAGE SYSTEM 1. THE LEVELS OF SEWER LINES HAS BEEN WORKED OUT ON THE BASIS OF CERTAIN GROUND LEVEL AND FOR CERTAIN PIPE LENGTHS BETWEEN TWO MANHOLES. THE INVERT LEVELS HAS TO BE STRICTLY FOLLOWED. HOWEVER, THE SLOPE OF LINE MAY BE SLIGHTLY CHANGED. 2. FOR ANY DESCRIPENCY / OMMISSION THE MATTER SHOULD REFER TO THE CONSULTANTS BEFORE EXECUTION. 3. MANHOLE SHALL BE PROVIDED AT FOLLOWING PLACES :- AT NOT MORE THAN 45 METER INTERVAL IN STRAIGHT LENGTH. AT EVERY JUNCTION AND POSITION WHERE THERE IS CHANGE OF SIZE, GRADIENT AND ALIGNMENT. AT THE START OF EACH SEWER LINE. THE STRUCTURAL DESIGN OF MANHOLES / PIPE BEDDING HAS TO BE DONE FOR LOCAL FIELD CONDITIONS SUCH AS FILLED UP SOIL / BLACK COTTON SOIL / HIGH SUB SOIL CONDITIONS. WHERE THE DIAMETER OF PIPE IS INCREASED THE CROWN OF THE PIPE SHALL BE FIXED AT THE SAME LEVEL AND NECESSARY SLOPE SHALL BE GIVEN IN THE INVERT OF THE MANHOLE CHAMBER. 6. 5. THIS DRAWING SHALL BE READ ALONG WITH THE GROUND FLOOR PLAN OF RESPECTIVE BUILDING FOR EXACT LOCATION OF APPURTENANCES / MAN HOLES ETC. 7. SEWER LINE UNDER THE ROAD SHALL BE ENCASED WITH 150 TH, PCC 1:2:4 ALLROUND. 8. MANHOLE COVER SHOULD BE FINISHED WITH FINISHED FORMATION LEVEL AS PER LANDSCAPE DRAWING. 9. 10. MATERIAL OF PIPE :- 11. THIS DRAWING SHALL BE COORDINATED WITH OTHER DRAWING I.E. ARCHITECTURE, STRUCTURAL, ELECTRICAL, LANDSCAPE & OTHER RELEVANT DRAWING. 4. c) b) a) RCC (NP 3) PIPE FORMATION LEVEL INVERT LEVEL I.L. F.L. CONNECTION LEVEL C.L. 7. 8. GROUND FLOOR PLAN MANHOLE SIZE = 600x600 PIPE DIA =150Ø SLOPE 1 IN 100 DETAILS OF SEWER LINES Manhole No. Length Dia. Slope MH Top Level Invert Level Depth MH Top Level Invert Level Depth Upper End Lower End From To (m) (mm) 1 in (m) (m) (m) (m) (m) (m) S1 S2 74 200 160 99.30 98.10 1.20 99.20 97.64 1.56 S2 S4 46 200 160 99.20 97.64 1.56 98.90 97.35 1.55 S3A S3 56 200 200 98.90 97.70 1.20 98.90 97.42 1.48 S3 S4 45 200 200 98.90 97.42 1.48 98.90 97.20 1.71 S4 S5 42 200 250 98.90 97.20 1.71 98.80 97.03 1.77 S5 S6 52 200 250 98.80 97.03 1.77 98.60 96.82 1.78 S6 S7 35 200 250 98.60 96.82 1.78 98.50 96.68 1.82 S7A S7B 38 200 160 98.50 97.30 1.20 98.50 97.06 1.44 S7B S7 37 200 160 98.50 97.06 1.44 98.50 96.83 1.67 S7 S8 50 200 250 98.50 96.68 1.82 98.40 96.48 1.92 S8 S16 20 200 250 98.40 96.48 1.92 98.40 96.40 2.00 S9 S10 50 200 160 98.80 97.60 1.20 98.65 97.29 1.36 S10 S11 55 200 200 98.65 97.29 1.36 98.50 97.01 1.49 S11 S12 42 200 200 98.50 97.01 1.49 98.30 96.80 1.50 S12 S13 48 200 200 98.30 96.80 1.50 98.30 96.56 1.74 S13 S14 44 200 250 98.30 96.56 1.74 98.40 96.39 2.01 S14 S15 42 200 250 98.40 96.39 2.01 98.40 96.22 2.18 S15 S16 28 200 250 98.40 96.22 2.18 98.40 96.11 2.29 S16 S17 18 250 250 98.40 96.11 2.29 98.40 96.03 2.37 S17 STP 5 250 250 98.40 96.03 2.37 98.40 96.01 2.39

Transcript of 60 ft road BASKETBALLCOURT -...

Page 1: 60 ft road BASKETBALLCOURT - Rajasthanrera.rajasthan.gov.in/Content/ProjectCommanarea/Drawings/149183a9-e98c... · 6282.9446 gate 107096.3503 60 ft road drive way drive way drive

6282.9446

Gate

107096.3503

6

0

f

t

r

o

a

d

DRIVE WAY

DRIVE WAY

DRIVE WAY

DRIVE WAY

DRI

VE

WA

Y

DGGreen

DRIVE WAY

BLO

CK

05-A

BLO

CK

06-A

BLOC

K04

-A

BLOC

K03

-B

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

BED

ROO

M

TOILE

T

TOILE

T

BED

ROO

M

VE

RA

ND

AH

BED

RO

OM

TOIL

ET

TOILE

TBE

D R

OO

M

V

E

R

A

N

D

A

H

BED

ROO

M

K

I

T

C

H

E

N

L

I

V

I

N

G

U

P

D

N

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

BED

ROO

M

TOILE

T

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

V

E

R

A

N

D

A

H

K

I

T

C

H

E

N

L

I

V

I

N

G

V

E

R

A

N

D

A

H

L

I

V

I

N

G

V

E

R

A

N

D

A

H

K

I

T

C

H

E

N

L

I

V

I

N

G

TOILE

T

U

P

D

N

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

T

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

C

H

EN

DIN

NIN

G

LIV

IN

G

LIF

T

V

E

R

A

N

D

A

H

U

P

D

N

L

I

F

T

TOILE

TV

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

UTILI

TY

TOILE

T

D

I

N

N

I

N

G

L

I

V

I

N

G

U

P

D

N

U

P

L

I

F

T

TOILE

TV

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

TOILE

T

TOILE

T

BED

ROO

M

D

I

N

N

I

N

G

3

.

4

1

5

X

1

.

9

4

TOILE

T

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

TOILE

T

BED

ROO

M

BED

ROO

MK

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

U

P

D

N

V

E

R

A

N

D

A

H

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

BED

ROO

M

TOILE

T

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

L

I

F

T

TYPE

- c

U

P

DN

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTILI

TY

BED

RO

OM

TOIL

ET

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

CH

EN

DIN

NIN

G

LIV

IN

G

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

TD

IN

NIN

G

LIV

IN

G

LIF

T

VE

RA

ND

AH

BED

RO

OM

BED

RO

OM

KIT

CH

EN

gree

n

TOILE

T

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITYTO

ILET

BED

RO

OM

BED

RO

OM

KIT

C

H

EN

DIN

NIN

G

LIV

IN

G

U

P

D

N

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

T

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

C

H

EN

DIN

NIN

G

LIV

IN

G

LIF

T

TYPE

- c

U

P

DN

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTILI

TY

BED

RO

OM

TOIL

ET

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

CH

EN

DIN

NIN

G

LIV

IN

G

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

T

TOIL

ETBE

D R

OO

MBE

D R

OO

M

KIT

CH

EN

DIN

NIN

G

LIV

IN

G

LIF

T

TOILE

T

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITYTO

ILET

BED

RO

OM

BED

RO

OM

KIT

CH

EN

DIN

NIN

G

LIV

IN

G

U

P

DN

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOIL

ET

TOIL

ETBE

D R

OO

MBE

D R

OO

M

KIT

CH

EN

D

IN

N

IN

G

LIV

IN

G

LIF

T

T

O

I

L

E

T

green

green

paving

pavingSEC

URITY CA

BIN

high tension line

EXISTING

ROA

D LV

L. ± 0-00

mound

20

1

30

71

103

110

121

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

BED

ROO

M

TOILE

T

TOILE

T

BED

ROO

M

VE

RA

ND

AH

BED

RO

OM

TOIL

ET

TOILE

TBE

D R

OO

M

V

E

R

A

N

D

A

H

BED

ROO

M

K

I

T

C

H

E

N

L

I

V

I

N

G

U

P

D

N

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

BED

ROO

M

TOILE

T

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

V

E

R

A

N

D

A

H

K

I

T

C

H

E

N

L

I

V

I

N

G

V

E

R

A

N

D

A

H

L

I

V

I

N

G

V

E

R

A

N

D

A

H

K

I

T

C

H

E

N

L

I

V

I

N

G

TOILE

T

BLO

CK

06-A

BLOC

K04

-A

U

P

D

N

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

T

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

C

H

EN

DIN

NIN

G

LIV

IN

G

LIF

T

V

E

R

A

N

D

A

H

U

P

D

N

L

I

F

T

TOILE

TV

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

UTILI

TY

TOILE

T

D

I

N

N

I

N

G

L

I

V

I

N

G

U

P

D

N

U

P

L

I

F

T

TOILE

TV

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

TOILE

T

TOILE

T

BED

ROO

M

D

I

N

N

I

N

G

3

.

4

1

5

X

1

.

9

4

TOILE

T

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

TOILE

T

BED

ROO

M

BED

ROO

MK

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

U

P

D

N

V

E

R

A

N

D

A

H

1.05

M W

IDE

PASS

AGE

UTILI

TY

BED

ROO

M

TOILE

T

TOILE

T

BED

ROO

M

BED

ROO

M

K

I

T

C

H

E

N

D

I

N

N

I

N

G

L

I

V

I

N

G

L

I

F

T

TYPE

- c

TYPE

- A

U

P

DN

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTILI

TY

BED

RO

OM

TOIL

ET

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

CH

EN

DIN

NIN

G

LIV

IN

G

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

TD

IN

NIN

G

LIV

IN

G

LIF

T

VE

RA

ND

AH

BED

RO

OM

BED

RO

OM

KIT

CH

EN

lawn

lawn

TOILE

T

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITYTO

ILET

BED

RO

OM

BED

RO

OM

KIT

C

H

EN

DIN

NIN

G

LIV

IN

G

U

P

D

N

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

T

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

C

H

EN

DIN

NIN

G

LIV

IN

G

LIF

T

TYPE

- c

TYPE

- B

U

P

DN

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTILI

TY

BED

RO

OM

TOIL

ET

TOILE

TBE

D R

OO

MBE

D R

OO

MK

IT

CH

EN

DIN

NIN

G

LIV

IN

G

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOILE

T

TOIL

ETBE

D R

OO

MBE

D R

OO

M

KIT

CH

EN

DIN

NIN

G

LIV

IN

G

LIF

T

TOILE

T

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITYTO

ILET

BED

RO

OM

BED

RO

OM

KIT

CH

EN

DIN

NIN

G

LIV

IN

G

U

P

DN

VE

RA

ND

AH

VE

RA

ND

AH

1.05

M W

IDE

PASS

AG

E

UTIL

ITY

BED

RO

OM

TOIL

ET

TOIL

ETBE

D R

OO

MBE

D R

OO

M

KIT

CH

EN

D

IN

N

IN

G

LIV

IN

G

LIF

T

T

O

I

L

E

T

green

paving

pavingSEC

URITY CA

BIN

11 M. W

IDE RO

AD

mound

20

30

5500 wd. driveway

5500 wd. driveway

5500

wd.

driv

eway

5500

wd.

driv

eway

lawn

lawn

CR

CR

CR

CR

CR

CR PR PR

PR PR

CRCR

CR

CR

PF

PF

PF

PA

PAPA

PA

PA

PA

CL

CLCL

CL

CL

CL

PA

PAPA

PA

PA

PA

PA

PA

PA

TA

TA

TATATA

TA

TA TA

TACS

CS

CS

CS

CS

PA

PA

TG

TG

TG

CL CL

CL

CL

PA

PA PA

PA

MH MHMH

TG

TG

TG

TG TG

CS

CS

CS

CS

CS

TP

TP

TP

TP

TPTC

TC

TC

PA

PA

CLERODENDRUM INERME @ .30 MTR. C/C BOTH WAYS

CLE

RO

DEN

DRUM

IN

ERM

E @

.30 M

TR. C/C

BO

TH W

AYS

CLER

ODE

NDRU

M I

NERM

E @

.30

MTR

. C/C

BOTH

WAY

S

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

AL

ALAL

ALALALALALALAL

ALAL

AL

AL

AL

AL

AL

AL

FB

FB

FB

FB

FB

FB

FB

QD

QD QD

QDQD

QD

QD

QD QD

QD

QD QD

QD

CL

CL

CL

CL

CS

CS

VINI

CA R

OSI

A @

.60

MTR

.

C/C

BOTH

WAY

S

CLER

ODE

NDRU

M I

NERM

E

@ .3

0 M

TR. C

/C B

OTH

WAY

S

JATR

OPH

A SP

P.

@ .4

5 M

TR. C

/C B

OTH

WAY

S

JATR

OPH

A S

PP.@

.45 M

TR. C

/C B

OTH

WAYS

NERIUM OLEANDER RED @

.60 MTR. C/C BOTH WAYS

HIBISCUS ROSASINENSIS @.45 MTR. C/C BOTH WAYS

JACOBINIA RASIKFOLIA @.45 MTR. C/C BOTH WAYS

EUPHORBIA MILLI @ .45 MTR. C/C BOTH WAYS

PENN

ISETU

M SE

TAC

EUM

@

.45

MTR

. C/C

BOTH

WAY

S

NERIUM OLEANDER DWARF @

.45 MTR. C/C BOTH WAYS

CLER

OD

END

RUM

INER

ME

@ .3

0 M

TR. C

/C B

OTH

WAYS

CLERO

DEN

DRU

M IN

ERME

@ .3

0 M

TR. C/C

BO

TH W

AYS

PENN

ISETUM SETA

CEUM

@.4

5 M

TR. C

/C B

OTH

WAYSB-1

B-2

B-3

B-4

B-7

B-6

B-5

U.G. TANK-17.5x10m

225

3700

1200

2410

1200

2180

1200

10922

3

4

0

6

9

9

0

11000

2400

11000

3

3

8

5

9

9

0

2

2

5

1

5

0

0

3

1

8

0

2700

7

4

73

0

0

JAALI AS PERLOCALLYAVAILABLE

COMPOUNDWALL

4125

939

2409

1119

786

2400

2400

1500

2500

1888

959

1500

Green

Green

Green

TEXTUREDPANEL18 MM BEADRAISED IN PLASTER

50 MMCONITNUOUS BEADRAISED IN PLASTER

5500 wd. driveway

RMU-6

GAS BANK-01

9x10

gree

n

A

T

M

1

5

0

0

X

1

8

0

0

525

525

1

5

0

0

1800

ATM

M

A

C

H

IN

E

265

2

6

5

RAM

P

DRIVE WAY

DRIVE WAY

DRI

VE W

AY

DGGreen

5500 wd. driveway

225

3700

1200

2410

1200

2180

1200

10922

3

4

0

6

9

9

0

11000

2400

11000

3

3

8

5

9

9

0

2

2

5

1

5

0

0

3

1

8

0

7

4

73

0

0

JAALI AS PERLOCALLYAVAILABLE

COMPOUNDWALL

4125

939

2409

1119

786

2400

2400

1500

2500

1888

959

1500

Green

Green

Green

TEXTUREDPANEL18 MM BEADRAISED IN PLASTER

50 MMCONITNUOUS BEADRAISED IN PLASTER

5500 wd. driveway

RMU-5 RMU-4

9x10

5500 wd. driveway

JAALI AS PERLOCALLYAVAILABLE

5500 wd. driveway

4500

DRIVE WAY

DRI

VE

WA

Y

bed minton court

bed minton court

BASK

ETBA

LLCO

URT

crike

t pitc

h

crike

t pitc

h T

O

IL

E

T

2

1

0

0

X

1

6

6

0

S

T

O

R

E

2

1

0

0

X

1

6

6

0

T

O

I

L

E

T

2

1

0

0

X

1

6

6

0

S

T

O

R

E

2

1

0

0

X

1

6

6

0

TOILET

2100X 1660

STORE

2100X 1660

TOILET

2100X 1660

STORE

2100X 1660

TOILET

2100X 1660

STO

R

E

2100X 1660

TOILET

2100X 1

660

STORE

2100X 1660

B-13

B-14

sit out

mound

walkway 1.5m wd.

walkway 1.5m wd.

walkway 1.5m wd.

pl.

pl.

pl. pl.

paved

mound

pl.

pl.

pl.

pl.

pl.

3.5 mtr. pathway with grass pavers

bed minton court

bed minton court

BASK

ETBA

LLCO

URT

crike

t pitc

h

crike

t pitc

h

pargola

lawn

DRI

VE W

AY

5.5

m w

ide

IWC

IWC

TOILET

2100X 1660

STORE

2100X 1660

TOILET

2100X 1660

STORE

2100X 1660

TOILET

2100X 1660

STORE

2100X 1660

TOILET

2100X 1660

STORE

2100X 1660

B-8

B-9

B-10B-11

B-12

B-15B-16

detail "A"

ELE. 01

SEC. 02

ELE/SEC.03

SEC. 04

SEC

. 05

SEC

. 06

SEC. 07

RMU-1 RMU-2 RMU-3

RMU-7

RMU-8

RMU-8

Lvl. +99.30

Lvl. +100.30Lvl. +100.30

Lvl. +

99.3

0

Lvl. +

99.2

25

Lvl. +

99.1

5

Lvl. +

99.6

5

Lvl. +98.80Lv

l. +9

8.80

Lvl.

+98.

80Lv

l. +9

8.80

Lvl.

+99.

25Lv

l. +9

9.25

Lvl.

+99.

25

Lvl. +

99.6

5

Lvl. +

99.6

5

Lvl. +98.80

Lvl. +98.60

Lvl. +98.60

Lvl.

+98.

30

Lvl. +98.40

Lvl. +98.40

Lvl. +98.40

Lvl. +98.40

Lvl. +98.40

Lvl. +98.50

Lvl. +98.50

Lvl. +98.60

Lvl. +98.70

Lvl. +98.80

Lvl. +98.95

Lvl. +98.75

Lvl. +98.55

Lvl. +98.85Lvl. +99.15

Lvl. +99.15Lvl. +98.85Lvl. +98.85

Lvl. +98.65

Lvl. +98.95 Lvl. +98.95Lvl. +98.65

Lvl. +98.65

Lvl.

+98.

85

Lvl. +98.55

Lvl. +98.55

Lvl. +98.60

Lvl. +98.60

Lvl. +98.90Lvl. +98.90

Lvl. +98.85

Lvl. +98.85

Lvl. +99.15

Lvl. +99.15

Lvl. +99.20

Lvl. +98.60

Lvl. +98.75TYPE E

BLOCK-D BLOCK-D

BLOCK-D

BLOCK-D

STP

GAS BANK

DRAINAGE SUMP (3.0x1.5x2.0 M. DEEP)

WITH 3 NOS. SUBMERSIBLE PUMPS

(2 WORKING + 1 STANDBY)

@ 10 LPS ,14 MTR. HEAD EACH

PANEL

PV

P1

PVP 1P1

DE AV

J

P

U

M

P

R

O

O

M

U

.G

. T

A

N

K

T

O

T

A

L

C

A

P

:-

1

2

5

K

L

W

A

T

E

R

D

E

P

T

H

3

.0

M

F

I

R

E

T

A

N

K2

0

0

K

L

U.G. TANK & PUMP HOUSE

FIRE CAP. = 200 KL

DOMESTIC:- 136 KL

TOTAL CAP = 336 KL

S1S3A

S2

S4

S5

S6

S7

S8

S10

S9

S11

S12

S13

S14

S15

S16

S17

S3S7A

S7B

PQ

P Q

PQ

P Q

P Q

PQ

P Q

PQ

P Q

G.L = +98.85I.L = +98.05DEPTH = 0.80 M.

I.L = +97.80

G.L = +98.85I.L = +98.05DEPTH = 0.80 M.

I.L = +97.80I.L = +97.80

G.L = +98.65I.L = +97.85DEPTH = 0.80 M.

I.L = +97.60

I.L = +97.60I.L = +97.60

G.L = +98.65I.L = +97.85DEPTH = 0.80 M.

G.L = +98.60I.L = +97.80DEPTH = 0.80 M.

I.L = +97.55

I.L = +97.55

I.L = +97.55

G.L = +98.60I.L = +97.80DEPTH = 0.80 M.

G.L = +98.60I.L = +98.05DEPTH = 0.80 M.

I.L = +97.80

I.L = +97.80I.L = +97.80

G.L = +98.60I.L = +98.05DEPTH = 0.80 M.

LIG & EWS G.L = ± 0.00I.L = -0.80DEPTH = 0.80 M.

I.L =

-0.97

I.L = -0.92

I.L = -1.00

ARCHITECT

Date DescriptionRev

DRG. TITLE:

Drawn by

KEY IN:PLOTTED ON:

SCALE:DATE.:

Design By :

ISSUED FOR:

140

BUILDING TYPE

0 10

10

20

3040

50

60

70

80

90

100

0

OWNERS NAME

Ashiana Housing Ltd.Unit no.4 & 5,Plot No.D-2,3rd Floor,Southern park, saket District Centre,Saket New Delhi - 110017Phone no. 011- 42 65 42 65

PROJECT :

SHEET. NO.:

1 : 550

DWK-00 / ES - 01

August 2016

130 140 150

10

20

30

40

50

60

70

80

90

100

0

0 10 20 30 40 50 60 70 80 90 100 110 120 130

0

Amit kamboj

D

G.F.C.

0 10 20 30 40 50 60 70 80 90 100 110 120 130

SERVICE CONSULTANT:

EXTERANL SEWERAGE

SYSTEM

ASHIANA HOUSING 'DWARKA'AT JODHPUR

Nitesh KumarCkd By

Anand Havelia

3.

LEGEND :

S. No. SYMBOL

1.

4.

2.

D E S C R I P T I O N

5.

6.

MANHOLE M.H.

SEWER LINE

ETHIQUED 507/508, KAILASH ESPLANADE,L.B.S MARG, OPP SHREYAS CINEMA,GHATKOPAR (WEST),MUMBAI - 400086.TEL NO : 25004553/25005978E mail :ethique@hotmail com

MAULI SHREE APARTMENTPLOT NO 4/3-E' PHULE BAUG'LOKMANYA NAGAR,SADASHIVE PETH, PUNE - 20TEL:-(020) 2433 3803E mail :[email protected]

BY

ARCHITECT SANJEEV MEHTA

Tel : (0120) 6943500 ( 24 Lines )Noida Office : B - 67, Sector - 67, Noida - 201 301

e mail : [email protected], website : www.cespl.in

Consummate Engineering Services (P) Ltd.

Lko. Office : R 006, Rohtas Plumeria, Gomti Nagar, Lucknow

R0 29-10-2016 ISSUED AS G.F.C.

LAYOUT PLAN

IN THE AREAS SUBJECT TO SUBSIDENCE OR FILLED UP SOIL (DUE TO EXCESEXCAVATION AT SITE FOR CONSTRUCTION OF BASEMENTS) THE SEWER LINES& MANHOLE SHOULD BE LAID ON SUITABLE SUPPORT OR CONCRETE CRADLESUPPORTED ON PILES OR SUITABLE FOUNDATION AS PER STRUCTURALDESIGN.

12.

IN CASE WHERE SEWERS ARE LAID IN HIGH SUBSOIL CONDITIONS MANHOLESSHOULD BE CONSTRUCTED IN R.C.C. GARDE M-25.

13.

THE WIDTH OF TRENCH FOR SEWER AND DRAINAGE SHOULD BE D+ 400MM.(D= O.D. OF PIPE).

SHORING / TIMBERING SHOULD BE ADEQUATE TO PREVENT CAVING-IN OF THETRENCH WALLS OF SUBSIDENCE OF AREAS ADJACENT TO THE TRENCH. ANENGINEER-IN-CHARGE IN CONSULTATION WITH A STRUCTURAL ENGINEERSHOULD PROVIDE ADEQUATE ARRANGEMENT TO PREVENT CAVING-IN.

14.

15.

d) ABOVE 2250 M.M. DEPTH 1500 M.M. DIA.

c) 1650 TO 2250 M.M. DEPTH 1200 M.M. DIA.

600 X 600 M.M.a) UPTO 900 M.M. DEPTH

b) 900 TO 1650 M.M. DEPTH 900 M.M. DIA.

THE SIZE OF MANHOLE SHALL BE AS UNDER ( INNER SIZES )

NOTES : SEWERAGE SYSTEM1.

THE LEVELS OF SEWER LINES HAS BEEN WORKED OUT ON THE BASIS OFCERTAIN GROUND LEVEL AND FOR CERTAIN PIPE LENGTHS BETWEEN TWOMANHOLES. THE INVERT LEVELS HAS TO BE STRICTLY FOLLOWED. HOWEVER,THE SLOPE OF LINE MAY BE SLIGHTLY CHANGED.

2.

FOR ANY DESCRIPENCY / OMMISSION THE MATTER SHOULD REFER TO THECONSULTANTS BEFORE EXECUTION.

3.

MANHOLE SHALL BE PROVIDED AT FOLLOWING PLACES :-

AT NOT MORE THAN 45 METER INTERVAL IN STRAIGHT LENGTH.

AT EVERY JUNCTION AND POSITION WHERE THERE IS CHANGE OF SIZE,GRADIENT AND ALIGNMENT.

AT THE START OF EACH SEWER LINE.

THE STRUCTURAL DESIGN OF MANHOLES / PIPE BEDDING HAS TO BE DONEFOR LOCAL FIELD CONDITIONS SUCH AS FILLED UP SOIL / BLACK COTTONSOIL / HIGH SUB SOIL CONDITIONS.

WHERE THE DIAMETER OF PIPE IS INCREASED THE CROWN OF THE PIPESHALL BE FIXED AT THE SAME LEVEL AND NECESSARY SLOPE SHALL BEGIVEN IN THE INVERT OF THE MANHOLE CHAMBER.

6.

5.

THIS DRAWING SHALL BE READ ALONG WITH THE GROUND FLOOR PLAN OFRESPECTIVE BUILDING FOR EXACT LOCATION OF APPURTENANCES / MANHOLES ETC.

7.

SEWER LINE UNDER THE ROAD SHALL BE ENCASED WITH 150 TH, PCC 1:2:4ALLROUND.

8.

MANHOLE COVER SHOULD BE FINISHED WITH FINISHED FORMATION LEVELAS PER LANDSCAPE DRAWING.

9.

10.

MATERIAL OF PIPE :-11.

THIS DRAWING SHALL BE COORDINATED WITH OTHER DRAWING I.E.ARCHITECTURE, STRUCTURAL, ELECTRICAL, LANDSCAPE & OTHERRELEVANT DRAWING.

4.

c)

b)

a)

RCC (NP 3) PIPE

FORMATION LEVEL

INVERT LEVELI.L.

F.L.

CONNECTION LEVELC.L.

7.

8.

GROUND FLOOR PLANMANHOLE SIZE = 600x600PIPE DIA =150ØSLOPE 1 IN 100

DETAILS OF SEWER LINES

Manhole No.

Length

Dia.Slope

MH Top

Level

Invert

Level

Depth

MH Top

Level

Invert

Level

Depth

Upper EndLower End

From To(m) (mm)

1 in(m) (m) (m) (m) (m) (m)

S1 S2 74 200 160 99.30 98.10 1.20 99.20 97.64 1.56

S2 S4 46 200 160 99.20 97.64 1.56 98.90 97.35 1.55

S3A S3 56 200 200 98.90 97.70 1.20 98.90 97.42 1.48

S3 S4 45 200 200 98.90 97.42 1.48 98.90 97.20 1.71

S4 S5 42 200 250 98.90 97.20 1.71 98.80 97.03 1.77

S5 S6 52 200 250 98.80 97.03 1.77 98.60 96.82 1.78

S6 S7 35 200 250 98.60 96.82 1.78 98.50 96.68 1.82

S7A S7B 38 200 160 98.50 97.30 1.20 98.50 97.06 1.44

S7B S7 37 200 160 98.50 97.06 1.44 98.50 96.83 1.67

S7 S8 50 200 250 98.50 96.68 1.82 98.40 96.48 1.92

S8 S16 20 200 250 98.40 96.48 1.92 98.40 96.40 2.00

S9 S10 50 200 160 98.80 97.60 1.20 98.65 97.29 1.36

S10 S11 55 200 200 98.65 97.29 1.36 98.50 97.01 1.49

S11 S12 42 200 200 98.50 97.01 1.49 98.30 96.80 1.50

S12 S13 48 200 200 98.30 96.80 1.50 98.30 96.56 1.74

S13 S14 44 200 250 98.30 96.56 1.74 98.40 96.39 2.01

S14 S15 42 200 250 98.40 96.39 2.01 98.40 96.22 2.18

S15 S16 28 200 250 98.40 96.22 2.18 98.40 96.11 2.29

S16 S17 18 250 250 98.40 96.11 2.29 98.40 96.03 2.37

S17 STP 5 250 250 98.40 96.03 2.37 98.40 96.01 2.39

AutoCAD SHX Text
+150MM Lvl.
AutoCAD SHX Text
±00MM Lvl.
AutoCAD SHX Text
+150MM Lvl.
AutoCAD SHX Text
N
AutoCAD SHX Text
W
AutoCAD SHX Text
E
AutoCAD SHX Text
S