IN SPEC T ION A N D T EST PL A NFO R
H V S Y N C H R O N O U S G E N E R A T O R
STANDARD SPE CIFICATION NO.
6-81-1035 Rev. 2
Page 1 o f 6
t R i . 0 )4fiaT u r zfr- - 9 r
INSPECTION AND TEST PLAN
FOR
HV SYNCHRONOUS GENERATOR
2 29.06 .12 Revised and Re- issued P R J D AK C DM
1 24.12.07 Revised and Re- issued SA C R M MVKK VC
0 31.03.03 I ssued for implementation R G AK C AK B G R R
Rev.N o.
Date PurposePrepared
byChecked
by
Standards CommitteeConvenor
Standards BureauChairman
Approved by
Format No. 8-00-0001-F7 Rev. 0 Copyright EIL — All r ights reserved
7/28/2019 6-81-1035 Rev 2
http://slidepdf.com/reader/full/6-81-1035-rev-2 2/6
MPT/MT : Magnetic Particle Testing
MRT Mechanical Run Test
MTCMOC
NPSH
NDT
NEMA
PO
PESO
PQR
PR
PM IPV C
QCRT
T CTPI or TPIA
UT
UL
VDR
WP S
WP Q
XLPE
: Material Test Certificate
: Material of Construction
Net Positive Suction Head
Non Destructive Testing
National Electrical Manufacturers Association
: Purchase Order
Petroleum Explosive Safety Organization
: Procedure Qualification Record
: Purchase Requisition
: Positive Material Identification
Poly Vinyl Chloride
Quality Control
Radiography Testing
Test Certificate
Third Party Inspection Agency
: Ultrasonic Testing
Under writer Laboratories
: Vendor Data Requirement
Welding Procedure Specification
: Welders Performance Qualification
: Cross Linked Poly Ethylene
SiIIWIZIEtek ENGINEERSz iaalitg'SINDIA LMTE D
IN SPEC T ION A N D T EST PL A NF O R
H V S Y N C H R O N O U S G E N E R A T O R
S T A N D A RD S P E C I F I C A T IO N N O .
6-81-1035 Rev. 2
Page 2 of 6
Abbreviations
AS
BASEEFA
BIS
CCE or CCOE
CELL
CIMFR
CEDFT
DTDPT
ERTL
FCRIFM
FLP
HICIT PIP
IC
IG CIE C
JE C
LP T
Alloy Steel
British Approval Service for Electrical Equipment in Flammable
Atmospheres
Bureau of Indian Standards
Chief Controller of Explosives
Certification Engineers International Limited
Central Institute of Mining & Fuel Research
Carbon Equivalent
Dry Film Thickness
Destructive Testing
Dye Penetrate Testing
Electronics Regional Test Laboratory
Fluid Control Research InstituteFactory Mutual
: Flame Proof
Hydrogen Induced Cracking
Inspection and Test Plan
Ingress Protection
: Inspection Certification
Inter Granular Corrosion
: International Electro technical Commission
Japanese Electro technical Committee
: Liquid Penetrate Testing
Inspection Standards Committee
Convenor : Mr. A.K. Chaudhary
Members:
Mr. S.C. Gupta Mr. RK Singh Mr. MP Jain (Projects)
Mr. G. Suresh Mr. Rajeev Kumar Mr. G. Poornachandra Rao
Format No. 8 -00-0001-F7 Rev . 0
Copyright EIL — Al l rights reserved
7/28/2019 6-81-1035 Rev 2
http://slidepdf.com/reader/full/6-81-1035-rev-2 3/6
at E N G IN E E RSg wagsINDIA LI MI TE D
INSPECTION AND TEST PLANFO R
HV SYNCHRONOUS GENERATOR
STANDARD SPECIFICATION NO.
6-81-1035 Rev. 2
Page 3 of 6
1.0 SCOPE
This Inspection and Test Plan covers the minimum testing & inspection requirements of HV Synchronous Generators.
2.0 REFERENCE DOCUMENTS
PO/PR & Standards referred there in /Job specifications / Approved documents.
3.0 INSPECTION AND TEST REQUIREMENTS
S L
NO.STAGE/ ACTIVITY CHARACTERISTICS
QUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
SU B
SUPPLIERSUPPLIER EIL/TPIA
1.0 Procedures -- -- -- -- -- --
2.0 Material Inspection
2. 1
Raw Material:
Body(casting or
fabrication),Rotor shaft, Core
laminations, Copper,
Insulation material,
Bearings, Space heater,
CT?PT, Lighting Arrestor,
Power supply, RTD, BTD,
Instrument, cable boxes,
Cable glands, etc.
Visual, Mechanical & Chemical properties,
Surface finish, Dimensions as per Supplier's
standard.
Shaf t — MPT & UT
As per
Supplier's
standard
Material Test
Certificates /
Test records
H H/R
R
(For major
items only)
2 .2
AVR, Forced Lubrication
System for sleeve bearings
(if applicable), Forced
Ventilation system, Heat
Exchanger.
Visual/Dimension/Pressure test/Material test
certificate. Functional Tests, Lubrication system
check and performance check for guaranteed
performance of motors and fans
100%
Manufacturer's
test
Certificates/
test records
H H/R R
Copyright EIL — Al l rights reservedormat No. 8 -00-0001-F7 Rev . 0
7/28/2019 6-81-1035 Rev 2
http://slidepdf.com/reader/full/6-81-1035-rev-2 4/6
E N O N E E R Sillataieuw I N D I A L I M I T E D" '"w"" '
I N S P E C T IO N A N D T E S T P L A N
F O R
HV SYNCHRONOUS GENERATOR
S T A N D A R D S P E C I F IC A T I O N N O .
6 - 8 1 -1 0 3 5 R e v . 2
Page 4 of 6
S LNO.
STAGE/ ACTIVITY CHARACTERISTICSQUANTUM
OF CHECKRECORD
SCOPE OF INSPECTION
S U BSUPPLIER EUL/TPIA
SUPPLIER
3.0 Inprocess Inspection
3. 1
In Process Checks for main
stator, main rotor, exciter
stator and exciter rotor.
i Resistance, HV Test, IR Test., Inter turn
insulation, Dynamic Balancing of Rotor Assembly,
Radial air gap measurement100% Test Records - H -
4.0 Final Inspection
4 .1 Generator (Routine Tests)
General visual check, dimensional check,
nameplate details including punching of
statutory references and markings
Check calibration status of all testing
equipment.
Mounting, Shaft centre height.
Paint shade
Terminal box location and internal clearances
Winding Resistance measurement
1R before & after HV Test for main stator, main
rotor, exciter stator, exciter rotor & space
Polarization Index Test
IR on RTDs & Snace heaters
ecords
100% Inspection test
records
- H II/W
HV Test on main stator, main rotor, exciter
stator exciter rotor and space heater.
No load Characteristics (OCC)
Short Circuit characteristics
Regulation test
Phase sequence test
Copyright EIL — Al l rights reservedormat No. 8 -00-0001-F7 Rev . 0
7/28/2019 6-81-1035 Rev 2
http://slidepdf.com/reader/full/6-81-1035-rev-2 5/6
l a 11 5 1 z eh e l A E N G I N E E R S7 t i i5 tenli f INDIA L IMITED
IA Gov( oe Ind* us-Mono)
IN SPEC T ION A N D T EST PL A NFO R
H V S Y N C H R O N O U S G E N E R A T O R
STANDARD SPECIFICATION NO.
6-81-1035 Rev. 2
Page 5 of 6
SL
NO.STAGE/ ACTIVITY CHARACTERISTICS
QUANT
OF CHECK
UMRECORD
SCOPE OF INSPECTION
S U B
SUPPLIERSUPPLIER EIL/TPIA
Pressure Test on coolers of closed circuit
cooling system [wherever applicable]
Measurement of bearing current/shaft voltage
(above 1000 KW)
Vibration Measurement [under no-load-halflcey]
Measurement of Shaft Vibrations
Functional Tests on AVR
Checks on line & Neutral cubicles
Checks on Excitation Panels
100% Inspection test
records
- H H/W
4.2 Generator (Type Tests)
Temperature Rise test
Over speed Test
Determination of Efficiency
Waveform & Harmonic analysis, transient
voltage dip, rise and recovery time.
Three phase short circuit withstand test and
measurement of reactance and time constants
(above 1000KW)
Measurement of Leakage Reactance and Potier
Reactance.
One sample
from each
type/rating
Inspection test
recordsH H/W
4 .3Submission of Documents/
Certificates
Test certificate from recognized testing
laboratory for area classification.
BIS certificate for FLP motors and accessories
as applicable.
CCOE/PESO approved certificates for motorsand accessories as applicable
1 Machine/
Type/rating
Supplier's Test
Records /
.. .
Certificates
trom statutory
berliec
- H R
Tests for degree of protection of enclosure
Terminal Box fault level test certificate
5. 0 Painting
5.1 Painting of Motor framesPre treatment, primer and final paint,
shade, thickness100% Test records - H --
Copyright EIL — All rights reservedormat No. 8-00-0001-F7 Rev. 0
7/28/2019 6-81-1035 Rev 2
http://slidepdf.com/reader/full/6-81-1035-rev-2 6/6
l a mz e t i b ENONEERSflowegver INDIA LIMITED
=am) IA GoN ot Ind. UndaMirgl
IN SPEC T ION A N D T EST PL A NF O R
H V S Y N C H R O N O U S G E N E R A T O R
S T A N D A RD S P E C I F I C A T IO N N O .
6-81-1035 Rev. 2
Page 6 of 6
SL
NO.STAGE/ ACTIVITY CHARACTERISTICS
NUTUM
OF
A
CHECKRECORD
SCOPE OF INSPECTION
S U B
SUPPLIERSUPPLIER EIL/TPIA
6.0 Documentation and IC
6. 1 Documentation and ICReview of Internal Test Records
IC issuance100%
Supplier's Test
Records /
Inspection
Certificate (IC)
- H H
•
Legends: H- Hold (Do not proceed without approval), Random -10% , R-Review, RW-Random witness, W- Witness (Give due notice, work may proceed
aeschedueddae
NOTES (As applicable):Wherever W/R or fl/W is indicated, Inspection Engineer shall decide the option to be exercised for the particular stage and supplier
In case of conflict between purchase specification, contract documents and ITP, more stringent conditions shall be applicable.
This document describes generally the requirements pertaining to all types of the item. Requirements specific to PO and the item are only applicable.
Acceptance Norms for all the activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents
Format No. 8 -00-0001-FT Rev . 0