LSI-VC-5 Minutes v1.0 Page 1 MINUTES OF THE 5 th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL CONSTELLATION (LSI-VC) 21-23 February 2018 Tokyo, Japan Key Outcomes 1. Progressed the CEOS Analysis-Ready Data for Land (CARD4L) assessment process, and agreed actions to establish a SAR subgroup to finalise the backscatter Product Family Specification (PFS) and investigate new SAR PFS. Agreed to engage WGCV in the assessment process. 2. Agreed that annual updates of the CARD4L PFS are not necessary, however the documents will be updated as needed; stability of the PFS is preferred. 3. The European ARD stocktake was well received, and actions were agreed to broaden this assessment. 4. Actions agreed to proceed with a CEOS ARD Strategy and Notes to appeal to data users, providers, and hosts. 5. The carbon requirements task will be discontinued in favour of focusing on progressing CEOS tools and information systems in support of gap analyses. 6. Identified a way forward for the Moderate Resolution Interoperability (MRI) initiative, and identified three specific tasks to take forward and include in the 2018-2020 CEOS Work Plan. 7. Actions agreed regarding GFOI and GEOGLAM input on the utility of CARD4L products, as a pathfinder for further feedback gathering.

Transcript of 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL...

Page 1: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page1

MINUTESOFTHE

5thMEETINGOFTHECEOS

LANDSURFACEIMAGINGVIRTUALCONSTELLATION(LSI-VC)

21-23February2018Tokyo,Japan

KeyOutcomes

1. ProgressedtheCEOSAnalysis-ReadyDataforLand(CARD4L)assessmentprocess,andagreedactionstoestablishaSARsubgrouptofinalisethebackscatterProductFamilySpecification(PFS)andinvestigatenewSARPFS.AgreedtoengageWGCVintheassessmentprocess.

2. AgreedthatannualupdatesoftheCARD4LPFSarenotnecessary,howeverthedocumentswillbeupdatedasneeded;stabilityofthePFSispreferred.

3. TheEuropeanARDstocktakewaswellreceived,andactionswereagreedtobroadenthisassessment.

4. ActionsagreedtoproceedwithaCEOSARDStrategyandNotestoappealtodatausers,providers,andhosts.

5. ThecarbonrequirementstaskwillbediscontinuedinfavouroffocusingonprogressingCEOStoolsandinformationsystemsinsupportofgapanalyses.

6. IdentifiedawayforwardfortheModerateResolutionInteroperability(MRI)initiative,andidentifiedthreespecifictaskstotakeforwardandincludeinthe2018-2020CEOSWorkPlan.

7. ActionsagreedregardingGFOIandGEOGLAMinputontheutilityofCARD4Lproducts,asapathfinderforfurtherfeedbackgathering.

Page 2: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page2

WednesdayFebruary21st

Session1:Opening

Welcome

TakeoTadonowelcomedeveryonetoJapanandtheRESTECoffice.

JennLaceywelcomedeveryonetothemeeting,andnotedthatthisisagoodtimetotakestockoftheworkwe’vedone,andwherewe’regoingnext.JennwelcomedSusanneMecklenburgtoherfirstLSI-VCmeetingasaLead.SusannethankedJennandreportedthatsheislookingforwardtoherfirstmeetingasaLead.AndreiaSiqueiraspokeonbehalfofAdamLewis/GA,notingthatsheislookingforwardtothemeeting.JonathonRossisheretorepresenttheSITViceChairTeam,whichhasidentifiedLSI-VCsupportasoneofitspriorities.

Atourdetablefollowed.ArecordofthemeetingattendanceisattachedinAppendixA.

LSI-VCCEOSWorkPlanTasks/DeliverablesandLSI-VCImplementationPlan

JennreviewedtheLSI-VCMissionStatement:

TheLandSurfaceImagingVirtualConstellationexiststomaximizethevaluederivedfromCEOSAgencylandsurfaceimagingassetsandactivitiesbyprovidinganoverarchingcoordinationrole;

andnotedthatwearenowatthe3-yearhorizonoftheoriginalLSI-VCToR(2015).Jennreviewedeachoftheworkareas:

SpaceSegment

Jennsuggestedthatwemightneedtorevisitthefirstpointunder‘aggregatingandanalysingmultiplesetsofdata’.DaveJarrettnotedthatthiswillbecomeveryimportantforpostLandsat9studies.AkeRosenqvistnotedthepotentialofsystematicacquisitionplansforSARmissionsfromagenciesincludingCONAE,CSA,andUKSA–thiscouldbeaveryhelpfulcontribution.JonathonnotedthatnewmissionsfromCopernicusandJAXAwouldbenefitfromsuchgap/capabilityanalysiswork.DavenotedtheonlinesurveyforCopernicusrequirementsassessment.

Susanneaskedwhatharmonizingacquisitionplansmeansinpractice.Jennnotedthatthisisopenfordebate,butthisismostlyapplicabletoSARgiventhecurrentstateofmediumresolutionopticalacquisitions.Withthatsaiditwouldstillbeusefultoassesswhatmightbeneededinthefuture–forcommunicationtoagenciesasinputsfortheiracquisitionplanningprocesses.WehadsuccessinthepastwithSentinel-2(BiancawasabletoaddnewS-2acquisitionsinresponsetodiscussionswithinLSI-VC).

BrianKilloughnotedthat‘harmonizing’isatroublesomeword,andhesuggestschangingitto‘optimization’.HeaddedthattherehasbeengoodprogressonoptimizingradaracquisitionsinSDCG/GFOIinsupportofspecificgoals.Akenotedthatsomemissionsdon’thavedefinedacquisitionplans,andsotheopportunityexistsforacquisitionoptimization.BriannotedtheexampleofRadarsat-2,whichhasacquisitionsplannedinresponsetodemand.

JennpresentedtheLSI-VCImplementationPlanandnotedhowitrelatestotheCEOSWorkPlan.

Page 3: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page3

GroundSegmentandInformationSystems

JennisunclearaboutthebreakdownofresponsibilitiesforthisitemacrossWGISS,CEOSSEO,LSI-VC,etc.,andwouldwelcomeadiscussiononthis.

ProductsandServices

Therehasbeengoodprogresshere,andwewilldiscussimplementationlatertodayandtomorrow.

CEOSWorkPlanUpdates

JennreviewedtheupdatestotheCEOSWorkPlanforLSI-VC.Itemswereclosed,modified,andcreatedbasedonprogresstodate.TheclosingofCARB-13wasnotedinparticular.TherehasbeennoengagementfromtheCEOScarboncommunity,sothisactionwillnotbecarriedforward.Thelackofengagementraisesquestionsaroundthebenefitsofthetask.

JennwouldliketoidentifyresponsiblepartiesforalloftheLSI-VCtasks/deliverablesintheCEOSWorkPlan.ShesuggeststargetinganupdateoftheLSI-VCImplementationPlanforSeptember.

StevenHosfordreviewedtheCEOSWorkPlanpurposeandprocess.ThescheduleforupdatingtheWorkPlanwaspresentedanditwasnotedthatCEOSentitymeetingschedulesarenotalwayscompatiblewithusingtheCEOSWorkPlanasatoolformanagingtheworkoftheentities.StevenindicatedthattheSITChairwaskeentoencourageamorerigoroususeoftheCEOSWorkPlantomanageCEOS’activities.ConcerningthequestionofwhetherCARD4LdeliverablesshouldbenamedFDA-XXactionsorLSI-XXactions,Stevensuggestedthatitwasnotcriticallyimportant,howeveritwouldbebettertohaveacoherentapproachwithrespecttoalloftheCEOSentitiescontributingtoFDA.

CEOSOverview

StevenHosfordreviewedCEOS’organisationalstructure,governingdocuments,etc.Henotedtheprioritiesofthe2018CEOSChair(EC):aCO2andGHGemissionmonitoringsystem,andon"Data"includingcontinuationofCEOS’workonFDA.

LSI-VCisauniqueVCduetothebreadthofitsactivities–coveringmanyobservingtechnologies,resolutions,parametersofinterest,andimplementationapproaches.Thisbreadthhascausedsignificantorganisationalchallenges,butLSI-VC'srecentfocusonasubsetofthisscopehasenabledprogressonspecifictasks(e.g.,CARD4L,MRI,DataCubesupport).

Session2:AgencyReports

USGS

− JennnotedUSGS’fundamentalgoalofensuringthepublicavailabilityofaprimarydatarecordaboutthecurrentstateandhistoricalconditionoftheEarth.

− Landsat7hasperformeditslastmanoeuvregivenitscurrentfuellevel.ItisyettobeseenifRestore-LtakesplaceandwhetheritstargetremainsLandsat7.

− Landsat9(launchinglate2020)willhaveajointMissionOperationCentrewithLandsat8,giventhemissions’similarity.

− EverythingremainsonthetableforLandsat10andtheSustainableLandImaging(SLI)process.

Page 4: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page4

− ARDwillbethestandardforLandsatdatainthefuture.− Fundingremainsaproblem;workingtogetheriskeyintimesofbudgetconstraints.JonathonaskedhowitwasagreedthatARDwouldbethestandardLandsatproductinfuture.JennnotedthatthemaindriverswerefromtheLandsatScienceTeamandusercommunitydemand.JennconfirmedthatLevel1productswillcontinuetobeavailable.BriannotedthatthisARDisbasicallythecurrentSRproduct,butwithimprovedatmosphericcorrections,etc.JonathonnotedthatUSGSisstilldoingworkaroundprojections–recallingSteveLabahn’semailseekingfeedbackfromLSI-VC.

GeoscienceAustralia

AndreiapresentedanupdateonbehalfofGA:

− CoordinatingapapertobepresentedattheIGARSSconferenceinJuly.Thepaper(ObservationsandRecommendationsfortheCalibrationofLandsat8OLI&Sentinel-2MSIforImprovedDataInteroperability)isledbyDennisHelderandotherauthorsincludingGeoscienceAustralia(AdamLewis).

− GA’ssurfacereflectancevalidationprogramatacontinentalscale:themainobjectiveistovalidateARDproducts(startingwithsurfacereflectance)basedoninsitufielddata.ThisisacollaborationbetweenGA,CSIRO,andAusCoverpartner-nodes.DataisbeingacquiredacrossdifferentsitestoestablishquantitativeaccuracyresultsonDigitalEarthAustralia’ssurfacereflectanceproducts.Theresults,tools,anddatawillbeopenaccessandsharedwiththecommunity.Thisprogramisusingamuchmorecomprehensivesetofsitescomparedtopastefforts.TheprojectagreementbetweenGAandCSIROwassignedinearlyFebruary.

− GAhasinitiatedanabstractfortheJournalofRemoteSensing’sSpecialIssueontheScienceofLandsatARD(ledbyAdamLewis).AndreiaaskedallLSI-VCmemberstoconsidercontributingtothepaper.

LSI-VC-5-01AlltogetincontactwithAdamLewis/AndreiatobeinvolvedintheARDpapersforIGARSSortheJournalofRemoteSensing.

Mid-March

− The2ndannualOpenDataCubeConferencewasheldinCanberralastweek.Therewere45participantsfrommanycountriesandorganisations.ThemainmessagewasthattheODCcommunityseesthemselvesasusersofanalysis-readydataproducts.Oneofthecommunity’sobjectivesfor2018isacomprehensivestocktakeofARDstatusandoutlook,tosupportuserexpectations.

StephenWardnotedthattheODCcommunitywishestocommunicatetoCEOS,viaLSI-VC,thatARDisvitaltotheprogressoftheinitiative.

JAXA

TakeoTadonocoveredJAXA’scurrentmissionportfolioanddatadistributionstatus:

− GCOM-CwaslaunchedinDecember2017.− JAXAarehopingtoworkwiththeNASAGEDIteaminthefuturetoresurrecttheMulti-footprint

Page 5: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page5

ObservationLidarandImager(MOLI)mission.− JAXAismovingtoamoreopenmodelforALOSdata:

− Tadono-sanattributedthereleaseofAVNIR-2datatotheLSI-VCanditsfollowupafterLSI-VC-3.HesharedanoverviewoftheAVNIR-2productsandnotedthatthedatadistributionwebsiteisunderdevelopment.ReleaseisexpectedinJFY18.

− ALOS-3(optical)andALOS-4(L-bandSAR)areunderdevelopment,andareplannedtolaunchin2020.Tadono-sansharedsomedetailsofthemissions.

TheLSI-VCLeadscongratulatedJAXAandtheLSI-VCregardingtheAVNIR-2dataavailability.

AkeRosenqvistnotedthatALOS-1PALSARScanSARshouldalsoappearintheabovetable.

ItwasnotedthatdistributionofScanSARdataisdependentonprocessingandfindingthebudgetnecessarytodothis.StephenWardsuggestedexploringsolutionstogetaroundtheJAXAprocessingbottleneckandbudgetrestrictions.Others(e.g.,thecommercialsector,Google,Amazon,theCopernicusAustraliaHub,AlaskaSatelliteFacility,etc.)mightbewillingtotakeonthisprocessing.

LSI-VC-5-02Shin-ichiSobue,StephenWard,JonathonRoss,andBrianKilloughtoexplorealternativeoptionsforALOSandALOS-2dataprocessing.

LSI-VC-6

ToshioOkumura(JAXA/RESTEC)gaveanoverviewofALOS-2PALSAR-2ARD,whichisprovidedbyJAXAthroughtheJJ-FASTsystem.TheJJ-FASTproductisanARDdataset(compatiblewiththeCARD4LPFS),anddiffersfromthestandardJAXAALOSdataset.ThedataareScanSAR,dualpolarization,1degreetiles,ortho-rectifiedandslopecorrected,gamma-0.Therearefourfilesforeachdataproduct:backscattercoefficientsforeachpolarization(HHandHV),thelocalincidenceangle,processingmaskinformation,andacataloguefile(metadata).JAXAistriallingJJ-FASTdatadistributiontoVietnamandIndonesiafortheirDataCubeprojects.

BriancommendedJAXAontheJJ-FASTproduct,notingthatitishighqualityandveryusefulfortheDataCubeandotherapplications.HeencouragedJAXAtocontinuewiththiseffortandwelcomedanexpandedscopeofdataavailability.

Page 6: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page6

OthertypesofSARARDisatopicofdiscussionandwillbecoveredlaterinthemeeting.AkesuggeststhattherecouldbemanyCARD4LSARproducts(e.g.,InSAR,polarimetric).Akealsonotedthatthealreadyavailableannual25mglobalFBmosaics,aswellasthenewScanSARmosaicsfromJAXAarecompliantwiththecurrentCARD4LbackscatterPFS.

ESA

SusannepresentedthefollowingSentinelmissiondataupdates:

− Acquisitionplansareupdatedonafrequent(6-12month)basis.Thenextroundofupdatesisongoingnow.

− Sentinel-2:CoverageofEuropeisavailablenow.It’sexpectedthatbymid-2018,theLevel-2Aproductwillbeavailablewithglobalcoverage.

BrianaskedwhetherthereisanyindicationfromESA’spartnersthattheywillmirrorthisglobaldata.HenotedthatcloudprovidersofferthemostpowerforexpandingandpopulatingDataCubes.SusanneconfirmedthattheUKandCNESarealreadymirroringthedata,andtheglobalproductionwilluseSen2Cor.

− Sentinel-3:routineoperationsareongoing.AllLevel-1and-2landandmarinecoredataproductshavebeenreleased.Newproductdefinitionandimplementationisongoing,andsomefurtherfireproductswillbeavailableinQ1/Q22018.

ESAFDAActivities

− DIAS:contractshavebeensignedwith4providers(December2017).StartofoperationsareplannedforJune2018.

− AnumberofESAARDdataproductsareavailable/planned:

− Sen2Corv2.5wasrecentlyreleasedandincludesmultiplefixes.− AharmonizedSentinel-2/LandsatARDprototypeproductisintheworks,andESAisconsidering

systematicproductionofthisLevel-3product.ItisbeingdevelopedinparallelwithNASA’sHLS,andthereseemstobeanexchangeofinformationbetweenthetwogroups.

Page 7: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page7

− ESAisalsolookingatcombiningS-2andS-3data.SusanneexpectstohavethefirstresultsintimeforLSI-VC-6.

− Thereareanumberof‘quasi-compliant’SentinelCARD4Ldatasets–seethepresentationfordetails.

− FerranGasconwillserveasESA’sPOCfortheMRIInitiative(tobediscussedlaterinthemeeting).

EuropeanCommission

ZoltanSzantoireviewedtheCopernicusdatadownloadstatistics.HealsonotedthataglobalSentinel-2mosaicshouldbeavailablebyQ42018.TheproductisaseamlesssurfacereflectancemosaicbuiltusingESAdata.Usershavetheabilitytochoosehowtheaggregationisdone,andtheproductisgeneratedonrequest.Userscanalsochooseareasofinterestforthemosaic,andthiswillimpactprocessingtime.AkenotedthatitwouldbeveryhelpfultohaveaSentinel-1mosaiccapabilityalso.

EuropeanARDProgress

StevenHosfordpresentedaninitialstocktakeofARDactivitiesinEurope:

− CNES,DLR,ESA,UKSA,andVITOarethekeysurfacereflectanceARDproducersinEurope.− CNESareusingMAJAfortheiratmosphericcorrection.TheycurrentlyproduceSRdataoverFrance

andFrenchterritories,Spain,Italy,Belgium,Netherlands,Scotlandandmanyspotsitesacrosstheworld.TheyareextendingtheirgeographicalcoveragetoNorthAfricashortly.theia.cnes.fr

− DLRhaspartneredwithCNESandaredoingtheirownproductionofS-2L-2AdataoverGermanyusingMAJA.On-demandproductionusingSen2Corisalsopossibleonwww.code-de.org.

− DLRprovidedcommentsontheCARD4LPFSfromtheperspectiveofEnMAP.− SystematicS-2surfacereflectanceproductsfortheUKhavebeengenerateduptoJuly2017through

aprojectledbytheUKSatelliteApplicationsCatapult.Thishascomethroughaprototypedevelopmentproject,andmaybecontinuedforaccesstoUKgovernmentusers.

− VITOareprovidingderivedS-2productsforBelgiumviaTerrascope.ThereisaproposaltoexpandtheirgeographicalscopetoEuropeandAfrica.Waterproductsarealsoavailable.

Stevennotedageneralissuefordiscussion:theCARD4LregistrationaccuracyrequirementofhalfapixelseemstooambitiousforSentinel-2at10mresolution.

StephenWardthankedStevenforhiseffortonthisEuropeanstocktake.HenotedthattheOpenDataCubeteamhasanactiontodoaglobalstocktake,andthiswillserveasagreatbasis.

StevenHosfordpointedoutthatthereisnotalotofdiversityintheapproaches(mostlyMAJAorSen2Cor).JonathonwouldbeinterestedtoknowhowmanyoftheseactivitiesareultimatelyfundedbytheEC.

NASA

DaveJarrettreported:

− NISAR(launching2021)productspecificationsareyettobedecided,buttherewillbeapushforARDgenerationinlinewiththeCARD4LPFS.

− ASTER,MODIS,andVIIRSarealreadyproducingproductsthatarecompliantwiththeCARD4LPFS.

Page 8: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page8

− Web-EnabledLandsatData(WELD)andHLSareresearchproductsthatadvanceARDcapabilities.

CEOSSEO

BrianKilloughshowedtheCOVEcoverageanalysertool,andpresentedresultsontherelationshipbetweentemporalcoverageusingasinglemissionandcombinationsofdatasources.Histeamhasinvestigateddifferentcombinationsofmissions(includingopticalandSAR),andlookedatthenumberofpotentialacquisitionsperyearandtheoccurrenceofcoincidentcoverages.TherearethreetimesayearwhenLandsat8,Sentinel-2,andSentinel-1arecoincident.Thereisgreatpotentialhere,presentinglotsofcal-valandinteroperabilityopportunities.Theseresultsdemonstratethatbycombiningdatafrommultiplemissions,observationgapscanbereducedtoanaverageof2-3days.

Briannotedthattherearetwoapproachestointeroperability:mergingdatasources(e.g.,theHLSapproach)orcombiningtheendproductsofseparateanalyses.

ISRO

BimalBhattacharyapresentedanoverviewofISRO’sEOprogram.HealsocoveredsomeupcomingcollaborativemissionsincludingTRISHNA(withCNES)andNISAR(withNASA).

BimalnotedtheSACRS2schemeforatmosphericcorrectionofRS2-AWiFSdata.Thesoftwarepackage,SACRS2-AWiFS,isopenforallathttp://mosdac.gov.in/data/tools/SACRS2_Package.rar.

BimalreviewedtheagriculturalworkbeingundertakenatISRO.SARisakeydatasetduetocloudcover,andISROareexploringtheintegrationofGEOandLEOproductsforhighfrequencyagriculturalmonitoring.

ISROarelookingforassistancewithintegratingallthecomponentsnecessaryforanoperationalARDproductionpipeline,andwouldwelcomeLSI-VC’sassistance.BimalalsonotedthatAWiFSlackssomebands,whichmakesACmoredifficult.

LSI-VC-5-03BimaltoconnectwithISROcolleaguesdoingDataCubework. Mid-March

LSI-VC-5-04

GA(Jono/Andreia/Adam)toreachouttoISROregardingassistancewithanoperationalARDproductionpipeline.

DavetoconnectBimalandJeffMasekregardingtheAROP(AutomatedRegistrationandOrthorectificationPackage)usedfortheHLSproject.

August

Notingtheissueofmissingbands,JonosuggestedanLSI-VCIPtaskaroundwritingrecommendationsforagenciesforthemissiondesignphase–i.e.,howtodesignaninstrumenttomakeitconducivetoARDproduction.Knowinghowthespecificationofthemajorityofagencymissionsaredevelopedincorporatingmonths(ifnotyears)ofworkinteractingwithusersandtailoringtheinstrumentdesigntotheirneedsthroughMissionSpecificationteams,StevenandSusannewerenotconvincedoftheimpactofsuchareport.

Page 9: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page9

AkeRosenqvistnotedthereisnojointL-andS-BandacquisitionplanforNISAR.AkehasanactionfromSDCGtowritetoNASAandISROaskingthemtoconsideranacquisitionplanthatwouldfacilitatecoincidentacquisitionsandthereforeintercomparisonexercises.

Session3a:CEOSAnalysis-ReadyDataforLand(CARD4L)Overview

StatusReportonAnalysis-ReadyDataUsage

BrianreviewedthestatusofAnalysis-ReadyDatausage.HenotedthatGoogleiscurrentlythebestsourceforSentinel-1ARD,giventhattheyhavepre-processedGRDdatatoARD(gamma-0intensity).TheCEOSSEOhasrecentlydevelopedascript(withsupportfromGoogle)thatwillgenerateaDataCubedirectlyfromthesedataholdings.ThisiscurrentlythefastestmethodtoprepareS-1DataCubes–andisessentiallyfreeifyouhaveaGoogleresearchgrantwhichprovidesfreeaccesstoGoogleCloudstorageandcompute.

StephenrecalledtheODCactiontodoastocktakeofARDavailabilityandaccessoptions.

Dataprovenanceiskey,andthismeansthatagenciesarethepreferredsourceofdata,howeverreliabilityandaccessoptionsneedtobeimprovedtoenticeusers.

ZoltinotedGoogle’schoiceofprojection,whichisnotthebestformanyapplications;theirproductsarecertainlynotthebe-all,end-allforARD.

ESAWGCVSARSubgroupInteractionandSARARDStudy

SusannepresentedtheoutcomesfromtheSARARDsessionattheWGCVSARsubgroupmeeting:

StephennotedthathehasbeendiscussingSARARDwithJAXA,andisencouragingthemtotakealeadontheSARPFS,includinganynewonesthatmightemerge.

TheconstituencyoftheproposedSARARDteamneedstobecorrect.AgroupofSARpuristswilllikelynotbeeffective.Weneedagroupthatiswellawareoftheintendedusecase,thatis,usersthatarenotusuallyusingSARproducts(supplementaryusers,DataCubes,etc.).Weneedtobeclearthatwearenot

Page 10: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page10

proposingthatrawproductsbereplaced.ASARbackscatterintensityproductisveryusefulforbasicusecases.

LSI-VC-5-05

ESA(NunoMiranda)andJAXA(TakeoTadono,AkeRosenqvist)toestablishagrouptofurthertheSARARDwork,includingexpansiontootherPFS.NASAwillprovideadditionalsupport,andthegroupshouldinvolveotherSARagenciessuchasCSA,DLR,etc.ISROexpressedinterestinparticipating.

March

SusannealsopresentedtheoutcomesfromESA’sSARARDstudy:

CEOSAnalysis-ReadyDataforLand(CARD4L)FrameworkRecap

AndreiareviewedtheCARD4Lframeworkworktodate.

ThursdayFebruary22nd

Session3b:CARD4LImplementationPhase#1

ProductFamilySpecifications(PFS)

AndreiaSiqueira(GA)presentedthebackgroundofthedevelopmentoftheCARD4LPFS.20+peopleparticipatedineachofthePFSreviewteleconferences,andtherewasgoodengagementfromavarietyofcommunities.Anumberofdifferentchangeshavebeenappliedtoeachdocument.However,somechangeswerethesametoallthreedocuments,suchas:theinclusionofachapterforthedefinitionsandacronymsusedinthetext(e.g.,LST,SBT,ancillarydata);changedwordsundertheguidancesectiontosaythattheproductswillberesampledontoacommongeometricgrid(foragivenproduct)andwouldprovidebaselinedataforfurtherinteroperabilityboththroughtimeandwithotherdatasets.Twomajorsuggestionscameoutoftheteleconferences:splittingthelandsurfacetemperaturePFSintotwocomponents(surfacetemperature,brightnesstemperature)andthedevelopmentofmoreradarPFS(e.g.,interferometricSAR).Alldiscussions,feedback,dates,actions,etc.,arebeingcapturedinanExceltable.TheupdatedPFSdocumentsaswellastheExceltablearekeptintheGoogleDrive.

JonathonRoss(GA)askedwhetherweshouldbeprioritisingtheimplementationphasebeforelookingatmodifyingtheexistingPFS.HeaddedthatPFSinstabilitycouldhamperuptakebydataproviders.

Page 11: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page11

ReferringtotheplannedfurtherrevisionsofthePFS,StevenHosford(ESA/CNES)stressedthatweneedtobeawarethatnotallofCEOSis‘operational’,andweshouldbeconsiderateoftheamountofresourcesavailableforthiswork.

SusanneMecklenburg(ESA)askedwhetheranupdateofallPFSisnecessaryatthisstage,suggestingthatweinsteadfocusonSAR.AkeRosenqvist(JAXA)agreed,suggestingthatupdatesshouldonlytakeplaceasneeded;excessivechangeswillbeadragonresourcesandmakeimplementationmoredifficultfordataproviders.

ItwasagreedthattheplannedannualupdatesofthePFSareunnecessary,howeverweremainopentomakingminorincrementalchangeswhenevernecessary.PFSstabilityisthepriority.

WGCV’sroleintheCARD4Lassessmentprocesswasdiscussed.JonathonRoss(GA)suggested:callingthecurrentPFS‘pre-final’;askingLSI-VCagenciestodopracticeassessmentsforcandidateproducts,recordingtheirprocess;andthenusingtheseinputstoprepareafirstdraftoftheCARD4LAssessmentFramework.WGCVcanthenbeengagedfortheirfeedback.

ItwasagreedthatWGCVshouldbeengagedintheassessmentprocess.

StephenWardstressedtheimportanceofhavingaclearARDstrategytoinformdatausers,providers,andintermediaries(especiallythe‘BigData’hosts),tomakethemawareofwherewe’reat,wherewe’regoing,andpersuadingthemthattheyshouldbeusing/producing/hostingCARD4Lproducts.TheARDstrategyshouldcoverthesepoints,aswellasPRandoutreachtopics.

Summary

− NocomprehensiveupdatestothePFSonanannualbasis–wewantstabilityinthespecifications.− TheSurfaceReflectanceandSurfaceTemperaturePFSareconsideredbaselined;minorclarifications

arepossiblelaterthisyearafterthefirstagenciesgothroughtheassessmentprocess.− LookingforLSI-VCagenciestostartpilotingtheassessmentandproductionprocessoverthecoming

months(e.g.,JAXAonSAR,ESAonSurfaceReflectance,USGSonSurfaceTemperature).AimforresultsbythejointmeetinginSeptember.UsetheseexperiencestodraftanofficialassessmentprocesstosharewithWGCVforreview.

Itwasagreedthatasub-group,ledbyJAXA(TakeoTadono,AkeRosenqvist)andESA(NunoMiranda)shouldbeestablished(seeactionbelow)toseethatthisiscompleted.

TheSARBackscatterPFSwillbebaselinedbytheSARsub-groupbeforeSIT-33.Thesub-groupwillalsoexaminewhetherotherSARPFS(polarimetricandInSAR)shouldbeproposed.

LSI-VC-5-06

LSI-VCagencies(workingwithWGCV)tostartpilotingtheCARD4Lassessmentandproductionprocessoverthecomingmonths(JAXA(TakeoTadono,AkeRosenqvist)onSAR,ESA(FerranGascon)onSurfaceReflectance,USGS(SteveLabahn,GregStensaas)&ESA(S-3LSTteams,SusanneMecklenburg)onSurfaceTemperature).Theabovedelegationsarenotexclusive;otheragenciesarealsoencouragedtotest-runtheirproducts.

LSI-VC-6

LSI-VC-5-07AndreiaSiqueira,TakeoTadonoandAkeRosenqvisttoengageNunoMiranda,andworktogethertocompleteabaselineSARBackscatterCARD4LPFSforSIT-33.

SIT-33

Page 12: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page12

LSI-VC-5-08

ESA(SusanneMecklenburg,NunoMiranda)andJAXA(TakeoTadono,AkeRosenqvist)toleadaSARARDsubgrouptaskedwithdiscussingadditionalSARPFS(e.g.,polarimetry,InSAR)andmakerecommendationstoLSI-VC-6.

LSI-VC-6

AkenotedthestilloutstandingquestionofwheretodrawthelinewiththePFS–thereisabalancebetweengeneralandspecificutility.HehighlightedpriordiscussionsaroundwhethertheSARbackscatterPFSshouldbeagamma-0orsigma-0product,andheaskedwhethertheseshouldbetwoseparateCARD4Lproducts(astheyservedifferentpurposes)orshouldusersbeexpectedtoperformthetransformationbetweenthetwoproducts?ThiswillbediscussedfurtherbytheSARsub-group.

OpenDataCube,GFOI,andARDStocktake

StephenWardpresentedontherelationshipbetweenCARD4LandtheOpenDataCube(ODC)andGFOIcommunities:

− CARD4Lisperhapsthemostsignificantstandardisationactivityforspaceagencyprogrammestoremaincompetitive,meetuserexpectations,andaddressFDAchallengesandopportunities–includingODC.

− ODCwouldliketoconvey–throughLSI-VC,toSIT-33–arequestthatCEOSanditsagenciesrecognisetheimportanceofARDstandardsandproductionandtakemeasurestoresourceandexpeditetherelevantCEOSinitiatives.TherewillbeagendaitemsonARDandFDAatSIT-33–ledbyAlexHeld(CSIRO,SITViceChair).

− ODCplansacomprehensivestocktakeofARDstatus,availability,andoutlook.− TherewasaformalactionfromthefirstjointmeetingtohaveGEOGLAMandGFOIundertakeformal

feedbackandpilotworktoensureCARD4Lisfitforpurposeforthoseusercommunities.− SDCGplanstosubmitasurveytoGFOIcountriesnextmonthinColombia.SDCGwillrequestthat

LSI-VCreviewthesurvey.SDCGwillalsodistributePRmaterialstoinformashortpresentationtoGFOIcountriesonARD(andDataCube).Thesematerialscanbereusedforothercommunities(e.g.,GEOGLAM)

− AcoretaskisproposedforthenextversionoftheSDCG3-YearWorkPlan,whichimpliesclosecooperationwithLSI-VC.

LSI-VC-5-09

StephenWardwillworkwiththeODCPartnersForumtoorganiseforalettertobesenttoCEOS/LSI-VC/SITChairacknowledgingLSI-VC’seffortsonCARD4L,andencouragingexpansionoftheCARD4LinitiativeandamovetoproductionofCARD4LdatabyagenciessothatFDAplatformscanflourish.

March16

LSI-VC-5-10

LSI-VCSECtocoordinatethedraftingofacomprehensivestocktakeofARDstatus,outlook,andconnectiontoCARD4LPFS–buildingontheworkofStevenHosford/ESA.ThestocktakewillbeusedtoinformshortARDstrategynotesforinternalandexternaloutreachwithARDproviders,hosts,andusercommunities(ref:LSI-VC-5-17).

LSI-VC-6

Page 13: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page13

LSI-VC-5-11LSI-VCcontactstoreviewtheGFOI/SDCGdraftsurveyseekingfeedbackfromGFOIcountriesontheutilityofCARD4Lforforestmonitoringapplications.

Oncereceived

LSI-VC-5-12CEOSSEOtosetupwww.ceos.org/ard.LSI-VCSECtomigratetheexistingCARD4Lwebsitetothislocation. March16

LSI-VC-5-13

LSI-VCSECtoworkwiththeSITChairTeamtoensuretheSITTechnicalWorkshopagendaincludesanitemonCARD4LoutreachtocommunitiesbeyondGFOIandGEOGLAM(includingSDGsandotherGEOpriorities).

BeforeSITTechnicalWorkshop

CARD4LProductAssessmentFramework

JonathonRoss(GA)reviewedthedraftprocesspresentedbyAdamLewis(GA)lastyear:

It’sfeltthatthereisaroleforWGCVaroundconfirmingtheself-assessmentsdonebythedataproducers.Ifwewantarigorousprocessthatgivesusersconfidenceinthedata,WGCVshouldbeinvolvedintheCARD4L‘stamping’procedure.LSI-VCprovidesthestrategiclayer,aswellasaninitialcheck,howeverthetechnicalexpertiseoftheWGCVteamisrequiredtocompletelyverifytheself-assessments.

LSI-VC-5-14

AndreiatocontacttheWGCVChairandVice-ChairregardingWGCV’spotentialroleinCARD4Lproductassessments.Chair:[email protected]:[email protected]

BeforeSIT-33

SusanneMecklenburg(ESA)suggestedthatLSI-VCmightneedtoestablishaseparatemultilateral,operationalactivity(alongthelinesofACIX)tohandletheassessmentprocess.JennLacey(USGS)notedthatweshouldavoidduplicatinganyeffortsthatarealreadyongoing(e.g.,USGShasmanyrelated

Page 14: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page14

activities).Susannesuggestedleveragingothers’workasmuchaspossible,e.g.,workcompletedforQA4EO.

Aftersomediscussion,thefollowingwereagreedasthehigh-levelstepsforCARD4Lproductassessments:

1. LSI-VCisapproachedbyadataproviderthatwishesfortheirdatasettobeconsideredCARD4L.

2. LSI-VCSECtoconnectthedataproviderwithaPOCwithinLSI-VC(product-specific).

3. LSI-VCSECmonitorstheprocess,keepingaregistryofproposals(inconfidence)andcarriesoutageneralliaisonrole.

4. Thedataproviderself-assessestheirproductusingthetemplateagainstthePFS(whichwillbeaproductofLSI-VC’spilotassessments;ref:LSI-VC-5-07).

5. TheLSI-VCPOCreviewsthedataprovider’sself-assessment.

6. Providedallisinorder,WGCVwouldthenbeengagedforatechnicalreview(TBCwithWGCV).WGCVwilleitherapprovetheself-assessmentoraskforfurtherinformation/work.

7. OnceconfirmedasmeetingtherequirementsofCARD4L,thedatasetwillbeaddedtothewww.ceos.org/ardwebsitealongwithaccessinstructionsbytheLSI-VCSEC.

LSI-VC-5-15

JonathonRosstoupdatetheCARD4Lassessmentprocessdiagram,andtoproposeconsistentCEOSWP/LSI-VCIPtasks.Bothshouldbeconsistentwiththestepsagreedduringthemeeting.

March23

LSI-VC-5-16JennLaceytorenametheCEOSWorkPlantaskontheCARD4L‘ImplementationStrategy’to‘EngagementStrategy’.

BeforeNextLSI-VCTeleconference

LSI-VC-5-17

LSI-VCSECtodraft‘ARDstrategynotes’thatcoverhowtoapproachdataproviders,datahosts,anddatausers.TheseareseparatetotheEngagementStrategy,andareintendedtoinspireusersandconvincedataprovidersanddatahoststoadoptCARD4L.

LSI-VC-6

LSI-VC-5-18AndreiatoplantheoutreachandpromotionaspectsoftheCARD4LEngagementStrategy(coveringmeetings,conferences,etc.).

LSI-VC-6

RequirementsSessionIdeas

Ratherthanpursuingtheideaofbroadrequirementsandgapanalyses,Brianwouldliketofocusonimprovingandenhancingtoolsandresourcesthatwouldbevaluableforallpeopleundertakingtheirownanalyses(e.g.,COVE,MIM,etc.).BrianiscertainthatapolishedprocessfortheexistingCEOSWPactionVC-26doesnotexist.

Jonathonthinksthatweshouldatleaststillbelookingatgapanalysesforancillarydatarequirements,notingtheemergenceofmanysmall,independentsatellites.HesuggestedthatLSI-VCdoashortguideforthesenewdataprovidersonsourcesofinformationforatmosphericcorrection,geometry,etc.

Page 15: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page15

StephenWardsuggestedthatLSI-VCcouldhelpunlockthefullpoweroftheMIMdatabase.FeedbackonimprovementstotheMIMthatwouldbehelpfulforgapanalyseswouldbeveryuseful.LSI-VCcouldalsopossiblyserveasapilotuserofthenewAPI(indevelopment).

Alyssanotedthattherearereallytwodistinctgapanalyses–aroundbothacquisitionanduse.ThelatterisnowakeyfocusforGEOGLAM,andtheyarelookingattoolsandprocessesforidentifyingwhetherdataacquiredisactuallybeingused.

EngagingDataProviders

ThefollowingwereidentifiedasthecriterianecessaryfordataproviderstoengagewiththeCARD4Lconcept:

1. Theyknowwhattodo;2. Theyknowhowtodoit(i.e.,productgeneration);3. Theywanttodoit(akeypointishowtoconvincethem–providingexamplemetrics,etc.(e.g.,

viaUSGS/Landsat)iscrucial);4. Achievebuy-infromleadership(viaCEOSandGEOandtheirinitiatives).

StevenHosfordnotedthatearlydiscussionsbetweenESAandthecommercialsectorsuggestthatcommercialproviderswouldbeveryinterestedin‘stamping’theirproductsasCARD4L,asitwouldgivethemaleveloflegitimacy.

Briannotedthatitmightbedifficulttogetmetricsofdatausagefromcommercialproviders.

AkenotedtheneedforastrategytoengageotherCEOSagenciesthataren’tcloselyinvolvedwithLSI-VCatthisstage(e.g.,CNES,DLR,ASI,CONAE,China).WecannotsimplypresentatSIT-33andhopetogettraction.

LSI-VC-5-19JonathonRosstofollowupwithDaveHudsonregardingidentificationofaChineseLSI-VCcontact. March

ModerateResolutionInteroperability(MRI)

JennLaceyrecappedtheprogresstodateonMRI.TheobjectiveofthisinitiativewastoincreasethecomplementarityandcomparabilityamongtheincreasingnumberofmoderateresolutionEarthobservingsystems–helpinguserstakeadvantageofallavailablespaceassets.Sheaskedhowweshouldtakewhatwasdonelastyear,andcombinethiswitheverythingelsebeingdoneonFDAandCARD4L.ThefocusandgoalsforMRIarestillunclear,andwehopetomakesomeheadwayatLSI-VC-5.

DiscussiononProductInteroperabilityandtheDistinctionBetweenCARD4LandMRI

Twomainbarrierstointeroperabilitywereidentified:geometryandsensorcompatibility.TheformercanbeaddressedbyspecifyingcommonreferencesandDEMs,whilethelatterrequiressimilarityatthesensorlevel.

AkenotedthatGFOIdefinedatainteroperabilityasbeingtheabilitytoreplaceonesensorwithanother(asopposedtosensorcomplementaritywheresensors,suchase.g.C-andL-bandSAR,providecomplementaryinformation).

Page 16: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page16

ThereisstillnoclarityaroundthemeaningofMRIinthiscontext.However,itisagreedthatCARD4Ldoesn’tguaranteeinteroperability.

SusanneconfirmedthatFerranGasconwillleadtheMRIactivityaswellastheefforttocreateamergedLS-S2productwithinESA.

FDAContext

StevenHosfordpresentedanoverviewofCEOS’FDAworktodate.Henotedthatinpastyears,FDAhasoverseentasks(FDA-XX)thathavebeenassignedtotheCEOSentitieswhichcompletethework.ThisistocontinueforseveralFDAtasksassignedtoWGISS,forexample.ItisunclearwhethertheARDtaskstobeconductedunderFDAshouldbeassignedasFDAorLSItasks.TheLSI-VCLeadspreferthattheARDtasksbecomeLSItasks.

ThecurrentsetofFDAtasksforthe2018-2020CEOSWPdefinedbythevariousCEOSentitiesimplementingFDAandtheFDAad-hocteamwerepresented.ItwasfeltbyLSI-VC-5participantsthatsomeofthesetasksdidnotreflectthehigh-level,strategicfunctionexpectedoftheFDA-AHT.StevenagreedtopassthesecommentsontotheFDA-AHTco-Chairsanditeratewiththemonthetasksidentified.DespitethelackofreportingbytheFDA-AHT,overallprogresshasbeenmadeonseveralFDAsubjectsincludingthecriticalneedtobetterframeFDAtotakea"bigpicture"approach,ensuringthatabroadsetoftechnologysolutionsisincludedintheframework,makingitrelevantandapplicabletoallspaceagencies.

MRIWayForward

MichaelBergerpresentedontheoverallMRIobjectives,principlesandlong-termroadmap.HesuggestedthefollowingastheobjectivesoftheMRIinitiative:

− ProvidingclearrecommendationstospaceagenciesfortheimplementationoftheMRIframeworkunderconsiderationofwidestpossibleuseandthespecificmandateofspaceagencies;

− Providinggoodpracticesandguidanceforusercommunitiesinadaptingandusingmultiplesensorproductswithinsingledatastreams,includingrelatedsoftwaretoolsandreferencedatasets;

andpresentedthefollowingMRIimplementationroadmap:

Thefollowingweresuggestedasthespecifictasksfor2018:

− Furtheringtheframeworkunderconsiderationoftheagreedprinciplesandexpandingittoother

Page 17: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page17

sensorswithafocusonmoderateresolutionSAR.− Analysingvariouspast/ongoingimplementations(NASAHLS,ESAHLS,etc.)forMRIframework

compliance.− Initiatingdetailedassessmentsofvariousimplementationoptions(commongrid,spectraland

temporaladjustments).

LSI-VC-5-20JenntoensureMichaelBergeragreeswiththeMRItaskscurrentlyproposedfortheCEOSWP. NextLSI-VCCall

HarmonizedLandsatSentinel-2(HLS)

DavidJarrettbrieflypresentedonNASA’sHarmonizedLandsatSentinel-2products/project.

− ItwasnotedthattheHLSproductswouldthemselvesbeconsideredaCARD4Lproduct.− AdialoguehasbeenestablishedwithNASAHQaroundlong-termstewardshipofHLSprocessing,

whichwouldfacilitatethe‘spinning-up’ofHLSDataCubes.

LSI-VC-5-21BriantofollowupwithJeffMasekregardingthespecificsoftheHLSdatasetinterpolation. March

FridayFebruary23rd

Session5:RequirementsAssessment

GEOGLAMRequirementsOverview

AlyssaWhitcraft(GEOGLAM)presentedanoverviewoftheGEOGLAMrequirementsworktodate,itsevolution,andthetwo-dayoperationaluserrequirementsworkshopplannedforApril.Theworkshopwillnotonlylookatgapsinwhathasbeenacquired(increasinglyfew),butalsolookatgapsinuseruptake.Theworkshopwilllookathowusersareusingdata,andhowthiscanbemadeeasierandmoreimpactfulusingnewapproaches(e.g.,DataCube,CARD4L).

AlyssasupportedBrianKillough’ssuggestiontofocusonimprovingtheutilityofCEOSinformationtoolstomakegapanalysesmoresystematicandstraightforward.

BriannotedtheAfricanRegionalDataCube(ARDC)anditspotentialforGEOGLAM.TheARDCwillbeshowcasedattheGEOGLAMmeeting.

TheGEOGLAMcommunity’sfeedbackonCARD4Lwasdiscussed.Inacoupleofweeks,theGFOIcommunitywillbeaskedfortheirfeedbackonCARD4Lthroughasurvey.Alyssarequestedacopyofthesurvey;shewillreviewitandassesshowitmightbeincorporatedintoasurveygoingoutaheadoftheAprilGEOGLAMworkshop.

LSI-VC-5-22Stephen/BriantodiscusswithAlyssa:integrationoftheGFOICARD4LsurveyquestionsintotheGEOGLAMAprilworkshopsurvey.

March

Page 18: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page18

LSI-VC-5-23AlyssaandBriantoexplorepossibilitiesaroundtestingHLSdatawiththeGEOGLAMcommunity–asanewMRIcasestudy.

April

CarbonRequirements

LSI-VCreachedouttotheCEOScarboncommunitymultipletimes,withlittleresultandinfrequentinteractions.Itwasagreedthatthereisnotmuchwecandoinaone-wayfashion–LSI-VCneedsinputsandfeedbackfromthethematicside.BrianKillough(NASA,SEO)suggestedthat,atthispoint,weshouldholdoffonanyfurtheractionaroundcarbon.AlyssaWhitcraft(GEOGLAM)agreed,notingthatthereneedstobeastrongpullfromthethematicside/ademandforthisanalysistobedone.

Also,whilebroad,generalisedgapanalysesdonotlookfeasible,therearestilltasksthatLSI-VCcouldprogressinsupportofgapanalysisactivities.Specifically,LSI-VCandtheSEOcanworktogethertoimprovetheutilityofexistingCEOStools(COVE,MIM)toimprovetheirusefulnessforspecificgapanalysesthatmightariseinthefuture.

StephenWard(ESA,MIMDBTeam)notedthatthereisworkongoingwithintheMIMDBteamonimprovementstothedatabasethatwillaidgapanalyses,inparticularthedevelopmentofanAPI,migrationtomachine-readablefields,etc.ThisisjointlyfundedbytheCEOSSEOandESA.StephenwelcomedLSI-VCinputsondesiredfeaturesandotherimprovements,andhewillsharemoredetailswithLSI-VCmembers.

LSI-VC-5-24AlyssaandBriantodiscussimprovementstoCOVEthatwouldaidgapanalyses. April

LSI-VC-5-25

JenntodeletetheCEOSWorkPlantaskonrequirements,andworkwithBrian(COVE),Stephen(MIM),andAlyssa(GEOGLAM)towritenewtasksaroundgatheringCARD4LfeedbackviaGEOGLAMandGFOI,andupdatingCEOSinformationtoolstoimprovetheirvalueforgapanalyses.

March

LSI-VC-5-26CEOSMIMDatabaseTeamtosharetheplansfortheMIMAPIandotherdatabaseupdates. ASAP

Regardingthecarbongapanalysis,JennLacey(USGS)notedthepotentiallynewlinkagetoWGClimateviaJohnDwyer(USGS).JennalsosuggestedthatagapanalysisfocusedonCARD4Ldatasetscouldbeuseful.

Summary

TheoutcomesofSession5canbesummarisedasfollows:

− SeekfeedbackonCARD4LfromtheGFOIandGEOGLAMcommunities,includingviaaquestionnaire.− Suspendthecarbonrequirementsworkuntilasufficientdialogueisestablished.− Anotherthematicareaforgapanalyseswillnotbesought.

Page 19: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page19

Session6:UpcomingMeetings

LSI-VC-6/SDCG-14/GEOGLAMJointMeetings

Followingthelastjointmeeting,AlyssaWhitcraft(GEOGLAM)andBradDoorn(NASA)expressedconcernabouttheoverlapsbetweenmeetings(particularlyLSI-VCandGEOGLAM).ApossiblesolutionistomoveGEOGLAMearlierintheweek.StephenWardnotedthatwearestillworkingouthowtobeststructuretheweek.ARD,DataCubes,andinteroperabilityareallcommonconcernsforthethreegroups,andthesetopicsshouldbeaddressedtogether.ItwasagreedthatfeedbackonCARD4Lisaperfecttopicforajointsession.It’sfeltthatfourdaysshouldbesufficient,andtheaimwillbetominimiseoverlapandmaximisecommonsessions.

LSI-VC-7

DaveJarrett(NASA)hasofferedtoinvestigatethepossibilityofholdingLSI-VC-7(February/March2019)intheUnitedStates,perhapsinFloridaatKennedySpaceCenter.

Session7:Closing

ClosingRemarks

JennLacey(USGS)thankedeveryoneforattending,andthankedTakeoTadono(JAXA)inparticularforhostingthemeetingatJAXA/RESTEC.

SusanneMecklenburg(ESA)thankedeveryonefortheirinputstothemeeting.ShenotedthatitwasveryusefulingettinguptospeedontheworkofLSI-VC,sincetakingovertheESAco-Leadrole.ShewasespeciallyhappytoseesometangibleoutcomesandclearnextstepsonCARD4L.

JonathonRoss(GA)acknowledgedthesignificantprogressmadebytheteamsincetherebootoftheLSI-VCatthe2015CEOSPlenary.Hecommendedtheteam’sfocusandhighprofilework.

AndreiaSiqueira(GA)thankedeveryonefortheirsupportasanewcomertotheteam.Andreiahopestobeinvolvedgoingforward.

TakeoTadono(JAXA)thankedeveryoneforcoming,andhopesthateveryoneenjoyedtheirstayinJapan.JAXAwillremaincloselyengagedinLSI-VC,inparticularthroughtheirleadingroleintheSARCARD4Lwork.

ZoltanSzantoi(EC/JRC)notedthatJRCwillhostthenextLSI-VCmeetinginIspra,Italy.HelooksforwardtowelcomingeveryoneinSeptember.ThemeetingwillbejointwiththeSDCG-GFOIandGEOGLAMgroups.

BimalBhattacharya(ISRO)thankedLSI-VCforengagingISROinthemeeting.HestatedthatthereisplentyofworktodoaroundISRO’sdata,andhewilltakebackthelessonslearnedfromthisweekandpromoteprogressinIndia.Helooksforwardtoupdatingusinthenearfuture.

Page 20: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page20

APPENDIXA

Attendees

Organisation Name

EC/JRC ZoltanSzantoi

ESA MichaelBerger(remote)

ESA SusanneMecklenburg

ESA/CNES StevenHosford

ESA StephenWard

ESA MattSteventon

GA AndreiaSiqueira

GA JonathonRoss

GEOGLAM AlyssaWhitcraft(remote)

ISRO BimalBhattacharya

JAXA TakeoTadono

JAXA OsamuOchiai

JAXA AkeRosenqvist

JAXA/RESTEC ToshioOkumura

NASA DaveJarrett

NASA/SEO BrianKillough

USGS JennLacey

Page 21: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page21

APPENDIXB

ActionsRecord

No. Action DueDate

LSI-VC-5-01AlltogetincontactwithAdamLewis/AndreiatobeinvolvedintheARDpapersforIGARSSortheJournalofRemoteSensing.

Mid-March

LSI-VC-5-02Shin-ichiSobue,StephenWard,JonathonRoss,andBrianKilloughtoexplorealternativeoptionsforALOSandALOS-2dataprocessing.

LSI-VC-6

LSI-VC-5-03 BimaltoconnectwithISROcolleaguesdoingDataCubework. Mid-March

LSI-VC-5-04

GA(Jono/Andreia/Adam)toreachouttoISROregardingassistancewithanoperationalARDproductionpipeline.

DavetoconnectBimalandJeffMasekregardingtheAROP(AutomatedRegistrationandOrthorectificationPackage)usedfortheHLSproject.

August

LSI-VC-5-05

ESA(NunoMiranda)andJAXA(TakeoTadono,AkeRosenqvist)toestablishagrouptofurthertheSARARDwork,includingexpansiontootherPFS.NASAwillprovideadditionalsupport,andthegroupshouldinvolveotherSARagenciessuchasCSA,DLR,etc.ISROexpressedinterestinparticipating.

March

LSI-VC-5-06

LSI-VCagencies(workingwithWGCV)tostartpilotingtheCARD4Lassessmentandproductionprocessoverthecomingmonths(JAXA(TakeoTadono,AkeRosenqvist)onSAR,ESA(FerranGascon)onSurfaceReflectance,USGS(SteveLabahn,GregStensaas)&ESA(S-3LSTteams,SusanneMecklenburg)onSurfaceTemperature).Theabovedelegationsarenotexclusive;otheragenciesarealsoencouragedtotest-runtheirproducts.

LSI-VC-6

LSI-VC-5-07

AndreiaSiqueira,TakeoTadonoandAkeRosenqvisttoengageNunoMiranda,andworktogethertocompleteabaselineSARBackscatterCARD4LPFSforSIT-33.

SIT-33

Page 22: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page22

LSI-VC-5-08

ESA(SusanneMecklenburg,NunoMiranda)andJAXA(TakeoTadono,AkeRosenqvist)toleadaSARARDsubgrouptaskedwithdiscussingadditionalSARPFS(e.g.,polarimetry,InSAR)andmakerecommendationstoLSI-VC-6.

LSI-VC-6

LSI-VC-5-09

StephenWardwillworkwiththeODCPartnersForumtoorganiseforalettertobesenttoCEOS/LSI-VC/SITChairacknowledgingLSI-VC’seffortsonCARD4L,andencouragingexpansionoftheCARD4LinitiativeandamovetoproductionofCARD4LdatabyagenciessothatFDAplatformscanflourish.

March16

LSI-VC-5-10

LSI-VCSECtocoordinatethedraftingofacomprehensivestocktakeofARDstatus,outlook,andconnectiontoCARD4LPFS–buildingontheworkofStevenHosford/ESA.ThestocktakewillbeusedtoinformshortARDstrategynotesforinternalandexternaloutreachwithARDproviders,hosts,andusercommunities(ref:LSI-VC-5-17).

LSI-VC-6

LSI-VC-5-11LSI-VCcontactstoreviewtheGFOI/SDCGdraftsurveyseekingfeedbackfromGFOIcountriesontheutilityofCARD4Lforforestmonitoringapplications.

Oncereceived

LSI-VC-5-12 CEOSSEOtosetupwww.ceos.org/ard.LSI-VCSECtomigratetheexistingCARD4Lwebsitetothislocation. March16

LSI-VC-5-13

LSI-VCSECtoworkwiththeSITChairTeamtoensuretheSITTechnicalWorkshopagendaincludesanitemonCARD4LoutreachtocommunitiesbeyondGFOIandGEOGLAM(includingSDGsandotherGEOpriorities).

BeforeSITTechnicalWorkshop

LSI-VC-5-14

AndreiatocontacttheWGCVChairandVice-ChairregardingWGCV’spotentialroleinCARD4Lproductassessments.Chair:[email protected]:[email protected]

BeforeSIT-33

LSI-VC-5-15

JonathonRosstoupdatetheCARD4Lassessmentprocessdiagram,andtoproposeconsistentCEOSWP/LSI-VCIPtasks.Bothshouldbeconsistentwiththestepsagreedduringthemeeting.

March23

LSI-VC-5-16JennLaceytorenametheCEOSWorkPlantaskontheCARD4L‘ImplementationStrategy’to‘EngagementStrategy’.

BeforeNextLSI-VCTeleconference

Page 23: 5th MEETING OF THE CEOS LAND SURFACE IMAGING VIRTUAL …ceos.org/document_management/Virtual_Constellations/LSI/Meeting… · Jenn is unclear about the breakdown of responsibilities

LSI-VC-5Minutesv1.0

Page23

LSI-VC-5-17

LSI-VCSECtodraft‘ARDstrategynotes’thatcoverhowtoapproachdataproviders,datahosts,anddatausers.TheseareseparatetotheEngagementStrategy,andareintendedtoinspireusersandconvincedataprovidersanddatahoststoadoptCARD4L.

LSI-VC-6

LSI-VC-5-18AndreiatoplantheoutreachandpromotionaspectsoftheCARD4LEngagementStrategy(coveringmeetings,conferences,etc.).

LSI-VC-6

LSI-VC-5-19 JonathonRosstofollowupwithDaveHudsonregardingidentificationofaChineseLSI-VCcontact. March

LSI-VC-5-20 JenntoensureMichaelBergeragreeswiththeMRItaskscurrentlyproposedfortheCEOSWP. NextLSI-VCCall

LSI-VC-5-21 BriantofollowupwithJeffMasekregardingthespecificsoftheHLSdatasetinterpolation.

March

LSI-VC-5-22Stephen/BriantodiscusswithAlyssa:integrationoftheGFOICARD4LsurveyquestionsintotheGEOGLAMAprilworkshopsurvey.

March

LSI-VC-5-23AlyssaandBriantoexplorepossibilitiesaroundtestingHLSdatawiththeGEOGLAMcommunity–asanewMRIcasestudy.

April

LSI-VC-5-24 AlyssaandBriantodiscussimprovementstoCOVEthatwouldaidgapanalyses.

April

LSI-VC-5-25

JenntodeletetheCEOSWorkPlantaskonrequirements,andworkwithBrian(COVE),Stephen(MIM),andAlyssa(GEOGLAM)towritenewtasksaroundgatheringCARD4LfeedbackviaGEOGLAMandGFOI,andupdatingCEOSinformationtoolstoimprovetheirvalueforgapanalyses.

March

LSI-VC-5-26 CEOSMIMDatabaseTeamtosharetheplansfortheMIMAPIandotherdatabaseupdates.

ASAP