    ObjectivesObjectives

    To understand the importance of 5s to our Lean

    initiatives.To know what the 5Ss are and know the key

    benefits of each.

    Identify and overcome the barriers toproductivity

    To be able to participate in group and individual

    5s activities.

    Improve quality of work

    Practice efficiency at all times.

  • 7/25/2019 5S Training and Implementation

    3/66

    5S Introduction

    5S Steps

    ContentsContents

    5S and TPM implementation

    Syndicate exercise

  • 7/25/2019 5S Training and Implementation

    4/66

    IntroductionIntroduction

    TPM Pillars

    E

    Train

    Autono

    Focu

    Plann

    A

    Sa

    En

    TPM

    rlyEquipment

    anagement

    ing&Educatio

    n

    ousMainten

    ance

    sedImprovem

    ent

    edMaintenance

    ministration

    ety,Health,

    ironmental

    Quality

  • 7/25/2019 5S Training and Implementation

    5/66

    Clearing (Sort)

    Organising (Set)

    IntroductionIntroduction

    5S

    Cleaning (Shine)

    Standardising (Standardise)

    Discipline (Sustain)

  • 7/25/2019 5S Training and Implementation

    6/66

    5S is a system to reduce waste and optimize productivity through maintaining an orderly

    workplace and using visual cues to achieve more consistent operational results.

    Implementation of this method "cleans up" and organizes the workplace basically in its

    existing configuration, and it is typically the first lean method which organizations implement.

    The 5S pillars, Sort (Seiri), Set in Order (Seiton), Shine (Seiso), Standardize (Seiketsu), and

    Sustain (Shitsuke), provide a methodology for organizing, cleaning, developing, and sustaining

    a productive work environment. In the daily work of a company, routines that maintain

    IntroductionIntroduction

    organization an or er iness are essentia to a smoot an e icient ow o activities. T is ean

    method encourages workers to improve their working conditions and helps them to learn to

    reduce waste, unplanned downtime, and in-process inventory.

    A typical 5S implementation would result in significant reductions in the square footage of

    space needed for existing operations. It also would result in the organization of tools and

    materials into labeled and color coded storage locations, as well as "kits" that contain just what

    is needed to perform a task. 5S provides the foundation on which other lean methods, such as

    TPM, cellular manufacturing, just-in-time production, and six sigma can be introduced.

  • 7/25/2019 5S Training and Implementation

    7/66

    Sort. Sort, the first S, focuses on eliminating unnecessary items from the workplace

    that are not needed for current production operations.

    An effective visual method to identify these unneeded items is called "red tagging",

    which involves evaluating the necessity of each item in a work area and dealing

    with it appropriately. A red tag is placed on all items that are not important for

    operations or that are not in the proper location or quantity. Once the red tag items

    are identified, these items are then moved to a central holding area for subsequent

    dis osal rec clin or reassi nment. Or anizations often find that sortin enables

    The 5S Pillars

    them to reclaim valuable floor space and eliminate such things as broken tools,scrap, and excess raw material.

  • 7/25/2019 5S Training and Implementation

    8/66

    IntroductionIntroduction

    Our Environmental (Generally)

  • 7/25/2019 5S Training and Implementation

    9/66

    IntroductionIntroduction

    Just across the Road...

  • 7/25/2019 5S Training and Implementation

    10/66

    IntroductionIntroduction

    Our Environmental (Generally)

  • 7/25/2019 5S Training and Implementation

    11/66

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    12/66

    To do this you may need to develop a policy or fix

    some rules, i.e.

    Low priority items may be stored in a distant

    place.

    5S Steps5S Steps

    Clearing

    area.

    The team should agree the rules and must stick to

    them.

    A red tag is affixed to each item that is put into the

    Red Tag area.

  • 7/25/2019 5S Training and Implementation

    13/66

    Stratify Strategy for Clearing (Seiri)

    Separate necessary items

    from unnecessary items and

    discard unnecessary items.

    Categorise items according

    5S Steps5S Steps

    ,

    importance, storage space

    required or the place

    requiring the item, for

    Example, control the

    categorised items

    according to their type.

  • 7/25/2019 5S Training and Implementation

    14/66

    Red Tag is one of the implementation plans for Sort

    (seiri), part of the kaizen strategy of workplace

    improvement.

    A method of identifying potentially unneeded items

    Red Tagging

    n e wor area.

    Ensures that no needed items are accidentally

    disposed of.

    Allows us to evaluate the usefulness of an item bysegregating it when we are unsure of its use.

  • 7/25/2019 5S Training and Implementation

    15/66

  • 7/25/2019 5S Training and Implementation

    16/66

    Define the necessity of the item in order to perform

    the work required on a day to day basis.- If it isnt needed it should be disposed of.

    Determine the fre uenc with which the item is

    Red Tagging Aims

    needed.- If its needed infrequently it can be stored away

    from the work area.

    Decide the quantity of the item required to performthe regular work.

    - Excess items can be disposed or stored away.

  • 7/25/2019 5S Training and Implementation

    17/66

    Sample

  • 7/25/2019 5S Training and Implementation

    18/66

    Sample

  • 7/25/2019 5S Training and Implementation

    19/66

  • 7/25/2019 5S Training and Implementation

    20/66

    Example

  • 7/25/2019 5S Training and Implementation

    21/66

    Example

  • 7/25/2019 5S Training and Implementation

    22/66

  • 7/25/2019 5S Training and Implementation

    23/66

    5S Steps5S Steps

    After Clearing

  • 7/25/2019 5S Training and Implementation

    24/66

    BeforeBefore After After

  • 7/25/2019 5S Training and Implementation

    25/66

    a) Remove unnecessary items and dispose of them properly

    b) Make work easier by eliminating obstacles

    c) Reduce chance of being disturbed with unnecessary items

    Benefits of Seiri (, sort)

    d) Prevent accumulation of unnecessary items

    e) Evaluate necessary items with regard to dept/cost/other

    factors.

  • 7/25/2019 5S Training and Implementation

    26/66

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    27/66

    Workplace organisation

    to fix the layout of tools and equipment

    everything should be readily available when

    needed.

    5S Steps5S Steps

    Organising

    Everything needed should be Easy to see, Easy

    to retrieve, Easy to use, Easy to return.

    4E Philosophy

  • 7/25/2019 5S Training and Implementation

    28/66

    5S Steps5S Steps

    Useful check points for a organised workplace:

    1. Are tools divided into specialised use and regular

    use items?

    2. Is the number of tools required kept to a minimum?

    3. Are pallets, waste bins, hoses always placed in the

    Organising

    4. Is anything stored around safety or fire fightingequipment?

    5. Are positions of main corridors and aisles clearly

    marked?6. Can you immediately and safely find the items you

    need?

  • 7/25/2019 5S Training and Implementation

    29/66

    5S Steps5S Steps

    Organising (Examples)

    5S Steps5S Steps

    Visual indications to easily show

    visibility of tools and equipment

  • 7/25/2019 5S Training and Implementation

    30/66

  • 7/25/2019 5S Training and Implementation

    31/66

  • 7/25/2019 5S Training and Implementation

    32/66

  • 7/25/2019 5S Training and Implementation

    33/66

  • 7/25/2019 5S Training and Implementation

    34/66

    5S Steps5S Steps

    Organising (One more Example)

    Shadow boards for

    tools

  • 7/25/2019 5S Training and Implementation

    35/66

    5S Steps5S Steps

    Organising (5S Cabinet - Example)

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    36/66

    5S Steps5S Steps

    After Organising

  • 7/25/2019 5S Training and Implementation

    37/66

    1) Arrange all necessary items in order so they can be

    easily picked for use

    2) Prevent loss and waste of time

    Benefits ofBenefits of SeitonSeiton ((?? ))

    a e easy o n an p c up necessary ems

    4) Ensure first-come-first-serve basis

    5) Make work flow smooth and easy

    6) Can also be translated as "set in order"

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    38/66

    5S Steps5S Steps

    38

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    39/66

    Cleaning sounds simple enough, but it

    involves a host of activities:

    removing from the workplace everything

    that should not be there

    5S Steps5S Steps

    Cleaning

    ma n a n ng every ng a s ou e

    there) in the best possible condition by

    constant checking and constant care

    Ultimately then "cleaning is careful

    checking"

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    40/66

    Before After

    5S Steps5S Steps

    Cleaning

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    41/66

    5S Steps5S Steps

    Cleaning Before...

    Leaks all over the floor and no name

    indications of the equipment

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    42/66

    5S Steps5S StepsAfter...

    Pilot equipment

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    43/66

    Dividing zones/dividing roles

    Indicate the role each person is to play (area of

    responsibility)

    Responsibility maps and check lists are

    5S Steps5S Steps

    Cleaning How to do it ?

    43

    Implement cleaning by area/equipment

    Careful and systematic cleaning of particular

    areas and equipment will help spot potentialproblems

    Not simply wipe off dust - Cleaning is

    Inspection.

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    44/66

    Implementing improvements

    Speed up the cleaning process

    Make difficult/dirty places easier to reach and

    access. (DTAs)

    5S Steps5S Steps

    Cleaning How to do it ?

    .

    Defining rules for the team (Code of Conduct)

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    45/66

    Introduce a plant slogan

    Take 5 minutes for 5S

    5S Steps5S Steps

    Cleaning How to do it ?

    Take the time to make it shine!!

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    46/66

    pp

    After Demarcating

    Area of operation

  • 7/25/2019 5S Training and Implementation

    47/66

    Machine reliability

    - Easier to identify issues on clean machines,meaning they can be addressed sooner.

    - Cleaning is a form of inspection.

    Benefits of Shine

    Equipment / Tools- Clean equipment functions more effectively.

    - Easier to spot damage or wear on clean

    equipment and tools than on dirty ones.

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    48/66

    5S Steps5S Steps

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    49/66

    The state that exists when the first 3 S's are

    properly maintained.

    make sure that clearing, organising and

    cleaning are being maintained and incorporated

    into everyday activities.

    Standardising

    identify, eliminate or take preventive action to

    help prevent 3S conditions to deteriorate.

    A never-ending activity!

  • 7/25/2019 5S Training and Implementation

    50/66

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    51/66

    After StandardisingNote the exact numberof items piling up the

    standard

  • 7/25/2019 5S Training and Implementation

    52/66

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    53/66

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    54/66

    Defined as "making a habit of properly maintaining

    correct procedures".

    pp

    Discipline

    keep discipline?

  • 7/25/2019 5S Training and Implementation

    55/66

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    56/66

    1. The workplace would become dirty and chaotic

    again.

    2. Unneeded items would soon begin piling up.

    Discipline Lack of Discipline

    3. People would neglect to wear their PPE and

    eventually sustain an injury.

    4. Equipment malfunction and defective products

    5. Customers would become disgusted by our dirty

    and disorganised factory.

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    57/66

    1. Total team involvement and focus on the challenge is vital

    2. Develop complete visual control to make maintaining the standards as

    easy as possible Remember it's about working smarter notharder!

    3. Use Fixed position photographs of before, during and after to display

    your efforts.

    Discipline Important Hints

    4. Use specific audits to evaluate your 5S effectiveness

    5S Steps5S Steps

    B ildi th Di i li

  • 7/25/2019 5S Training and Implementation

    58/66

    Building the Discipline

    Provide activity boards

    for performance follow up

    5S Steps5S Steps

  • 7/25/2019 5S Training and Implementation

    59/66

    Discipline Activity Board (Example)

    Activity Board - 5S

    TEAM

    5S Progress

    5S

    VISION AUDIT SHEET

    AUDIT PLAN ACTION

    PLAN

    TAGS

    CONTROL

    ACTION

    PLAN

    ACTION

    PLAN

    ACTION

    PLAN

    ACTION

    PLAN

    TAGS

    CONTROL

    TAGS

    CONTROL

    TAGS

    CONTROL

    TAGS

    CONTROL

    5S

    MISSION

    OBJECTIVES

    LAY OUT

    IMPLEMENTATION

    PLAN

    5s Radar Chart OPL

    OPL

    OPL

    OPL

    OPL

    OPL

    OPL

    STANDARD

    BENEFITS

    OPL

    OPL

    BENEFITS BENEFITS BENEFITS BENEFITSTOTAL TAGS

    PROGRESS

  • 7/25/2019 5S Training and Implementation

    60/66

    Hints on 5S implementation

  • 7/25/2019 5S Training and Implementation

    61/66

    Select a Pilot area for 5s

    Document the current situation. Photograph Conduct a Risk Assessment

    5S Hints to start up

    Establish resources required Plan the approach and communicate

    Share equally the responsibilities

    Monitor via auditing Measure the benefits

    Hints on 5S implementation

  • 7/25/2019 5S Training and Implementation

    62/66

    5S Hints to start up

    ...

    Improve!!

    5S and TPM implementation

  • 7/25/2019 5S Training and Implementation

    63/66

    10

    12

    Continuous

    im rovements

    Waste & loss

    Programme

    Training Autonomous

    Maintenance

    Safety &

    p

    0

    2

    4

    6

    Time

    FactoryGoals Effective

    Maintenance

    Environment

    TPM in

    Administration

    5 S5 S

    5S and TPM implementation

  • 7/25/2019 5S Training and Implementation

    64/66

    S

    afetyandEn

    Contin

    uousImprov

    EffectiveMaintenance

    p

    vir

    on.

    e.

    A

    utonomousMain

    t.

    TPMinAd

    ministration

    Training

    5S implementation5S by Teams

  • 7/25/2019 5S Training and Implementation

    65/66

    5S by Teams Using the sophisticated equipment supplied and the

    materials (e.g.: radar, audit sheet, typical activity board,etc)

    available be inventive, imaginative, resourceful in

    demonstrating:

    Clearing, Organising, Cleaning,

    Standardising & Discipline(Seiri, Seiso, Seiton Seiketsu and Shitsuke)

    Where: YOUR Syndicate Room

    Important NoteImportant Note

    Remember that 5s needs to be applied during the 2 weeks

  • 7/25/2019 5S Training and Implementation

    66/66