58784587-ZTE
Transcript of 58784587-ZTE
Scope of Activities
Per Site 5950
Scope 2 - BTS Implementation Per Site 4760
Scope 3 – Minilink HOP(1+0) Per Hop 1440
Scope 4 – Minilink(1+1) Per Hop 2040
1440
Scope 6 - Expansion (4,4,4 to 6,6,6) Per Site 2464
960
4760
1200
600
Scope 10 - Antenna changeover Per Site 400
Scope11-1800 SITE (Co-located with 900) MBC Per Site 2816
Scope 12 -TRU ADDITION 200
Scope 13 – Micro cell Installation (2302 or 2308) 2112
3168
3872
2816
Per Hop 2816
Per Hop 3910
Per Site 2112
Unit of Measurement
Scope I - BTS and Minilink (1+0 ) outdoor and indoor
Scope 5 - Expansion for RBS 2202 (2,2,2 to 4,4,4)
Per Site (with cabinet expansion)
Scope 7 - Preventive site Maintenance of Bharti-All Circles
Per site (Not applicable for ASP who have separate site maintenance contract)
Scope 8 – Macro-cell change out (replacing 2202 with 2206)
Per Site (Including Transportation charges)
Scope 9 -GSM Antenna Height Reduction (With Antenna Mounts or without Antenna Mount )
Per Site (With Antenna Mounts)
Per Site (Without Antenna Mounts)
Per Site (Upto 3 TRU's)
Per Site (Excluding Transportation charges)
Scope 14 – Microcell Installation (2*2308 or 2*2302)
Per Site (Excluding Transportation charges)
Scope 15 – Microcell Installation (2*2308 or 2*2302) with Minilink
Per Site (Excluding Transportation charges)
Scope 16 – Microcell Installation (2308 or micro BTS) with Minilink
Per Site (Excluding Transportation charges)
Scope 17 - Microwave hop Installation (1.8 meter & 1.2 meter), one antenna each at both ends, 1+0 0r 1+1) on backbone site.
Scope 18 - Microwave hop Installation (1.8 meter & 1.2 meter), two antenna each at both ends, (1+1) on backbone site.
Scope 19 - Replacement of BTS 2202 with BTS 2206 - INDOOR
Per Site 2464
Scope 21 - Alignment of Existing Hop Per Hop 720
Per Site 480
Per Site 2816
Per Feeder Cable 320
800
1232
Per Pole 360
Scope 26 - Changing of ODU Per ODU 200
Per Hop 1000
Per Hop 2288
Scope 29 - Polarization Changes Per Site 200
Scope 30 – Repeater installation & de-installation
1440
640
Scope 31 – Swaping of 2302 with 2308/2309 Per Site 1440
Per Hop 2816
Scope 33 – Dismantle of BTS includingML Per Site 2464
Scope 34 – Dismantle of ML hop (0.6m) Per Hop 880
Scope 35 – Dismantle of ML hop (1.2m) Per Hop 1440
Per Site 4420
Per Site 3740
Per Site 7820
Scope 39 – Installation of BTS (2 RBS cabinets) Per Site 7140
Per Site 2816
Per Site 3520
Per Site 3520
Per Site 4080
Per Site 2112
Scope 20 - Expansion of BTS 2206 with BTS 2202 collocated
Scope 22 - Installation of ODU,IF CABLE,MMU, Wave guide Splitters and Base Plates (for 1+1 hops)
Scope 23 – Replacement of RBS 2202 with RBS 2206 along with 2 to 3 sector addition - 2 days
Scope 24 - Replacement of Feeder Cable with connectorization and Earthing
2 to 3 Feeder Cables
4 to 6 Feeder Cables
Scope 25 - Installation/Deinstallation of MW/GSM Pole
Scope 27 - Upgradation of MW from 1+0 to 1+1 Config.
Scope 28 - Changing of Antenna from 0.3/0.6 mtr. To 1.2 mtr
Per Site (Repeator Installation)
Per Site(Repeator De-Installation)
Scope 32 – High Capacity MW installation with ECI MUX or AXX or TRAFFIC NODE
Scope 36 – Installation of outdoor BTS & ML site (RBS 2106/2104/2954)
Scope 37 - Installation of outdoor BTS only (RBS 2106/2104/2954)
Scope 38 – Installation of BTS (2 RBS cabinets)& ML hop
Scope 40 – INSTALLATION OF RBS 2111 With SMPS & Battery BankScope 41 – INSTALLATION OF RBS 2111 with Mini Link, With SMPS & Battery Bank
Scope 42 – INSTALLATION OF RBS 2111(Two cabinets) With SMPS & Battery Bank
Scope 43 – INSTALLATION OF RBS 2* 2111 with Mini Link
Scope 44 :- EXPANSION of RBS 2111 (2,2,2 to 4,4,4)
Per Site 1440
Scope 46 – INSTALLATION OF AXX 9300) Per Site 2112
Per Site 1440
Per Site 4760
2464
2816
Per Site 4760
Per Site 5950
Per Site 14110
Scope 53 – Installation of OMS 16XX Nodes Per Site 3910
Per Site 10200
Per Site 11900
Scope 56 –Installation of 12xx nodes Per Site 3168
Per Site 8840
Per Site 14110
Per Site 10200
Per Site 3910
Per Site 11900
Scope 62 –Installation of MD202 Nodes Per Site 3168
Per Site 8840
9350
5100
Scope 45 – INSTALLATION OF AXX 9100 or 9200
Scope 47 – SWAP OUT OF MACRO BTS WITH 2308/2309(Micro)
Scope 48 – INSTALLATION OF BTS (With Antenna Mounts)
Scope 49 – EXPANSION FROM 2+2+2 TO 6+6+6 (Single cabinet & double cabinet)
Per Site (for Single Cabinet expansion)
Per Site (for Double Cabinet expansion)
Scope 50 – Implementation of Node B(Only) (WCDMA)
Scope 51 – Implementation of Node B with Mini Link (WCDMA)
Scope 52 – Installation, Commissioning, Integration and AT of OMS 16XX Nodes (includes test equipment for AT )
Scope 54 – Commissioning, Integration and AT of OMS 16XX Nodes (includes test equipment for AT )
Scope 55 – Installation, Commissioning, Integration and AT of OMS 12XX Nodes (includes test equipment for AT)
Scope 57 – Commissioning, Integration and AT of OMS 12XX Nodes (includes test equipment for AT)
Scope 58 – Installation, Commissioning, Integration and AT of MHL3000 (single row or dual row) Nodes(includes test equipment for AT)
Scope 59 – Commission, Integration & AT for MHL 3000 (single row or dual row) ; (includes test equipment for AT )
Scope 60 – Installation of MHL3000 Nodes (single row or dual row )
Scope 61 – Installation, Commissioning, Integration and AT of MD202 Nodes(includes test equipment for AT)
Scope 63 – Commissioning, Integration and AT of MD202 Nodes (includes test equipment for AT)
Scope 64 – Installation, Commissioning, Integration and AT of XMP1 Nodes or MHL
compact node (For Optical or Electrical testing) ; (includes test equipment for AT)
Per Site (For Optical & Electrical testing)
Per Site (For Electrical testing)
Per Site 2640
6800
2640
Per Site 2816
Per Site 1440
Scope 69 – Installation of 8xx nodes Per Site 1440
Scope 70 - 2 to 3 sector expansion Per Site 1000
Scope 71 - TMA or Filter Installation Per Site 600
200
300
Scope 73 – Supply of Manpower 0
Supervisor Per Month 8800
Supervisor Per Day 360
Technician/Installation Engineer Per Month 7200
Technician/Installation Engineer Per Day 280
Testing Engineer Per Day 440
Rigger Per Month 4800
Rigger Per Day 180
Per Day 200
Per Day 280
Per Site 5100
Per Site 3910
Per Site 1620
Per Site 1800
Per Site 1980
Scope 65 – Installation of XMP1 Nodes or MHL compact node
Scope 66 – Commissioning, Integration & AT of XMP1 or MHL compact node (For Optical or
Electrical testing);(includes test equipment for AT )
Per Site (For Optical & Electrical testing)
Per Site (For Electrical testing)
Scope 67 – Installation, Commissioning, Integration and AT of OMS 8XX Nodes (includes test equipment for AT)
Scope 68 – Commissioning, Integration and AT of OMS 8XX Nodes(includes test equipment for AT )
Scope 72 - Cut-out for cable inlets (Roxtec) 7/8” or 1-1/4” or 1-5/8”
Per cable inlet ( 7/8” )
Per cable inlet (1-1/4”or1-5/8”)
Rigger Daily Allowance (Only applicable If asked to work outside of base city for Night Accomodation other living expenses other than Metro cities defined
Rigger Daily Allowance (Only applicable If asked to work outside of base city for Night Accomodation other living expenses for Delhi and NCR region, Chennai, Kolkatta, Bangalore, Pune, Hyderabad & Mumbai
Scope 74 - Implementation of BTS & ML site (GSM/WCDMA)-3 Days-Without battery bank & smps installation
Scope 75 - Implementation of BTS (GSM/WCDMA) – 2 Days-Without battery bank & SMPS installation.
Scope 76 - REPLACEMENT OF BTS 2202 WITH BTS 2206 INDOOR- (1 Day)(Without battery bank and SMPS.)
Scope 77 - EXPANSION OF BTS 2206 WITH BTS 2202 COLLOCATED - (1.5 Day) Without battery bank and SMPS
Scope 78 - Replacement of BTS 2202 with BTS 2206 - indoor and third sector addition – 2 Days-(Without battery bank and SMPS)
Per Hop 1980
Per Site 1980
Per Hop 480
Per Hop 1000
Per Site 6970
Per Site 6290
Per Site 2288
Per Site 3060
Per Site 2992
Per Site 3696
Per Site 600
Per Site 1400
Per Site 1000
Per Site 3910
Per Site 3910
Per Site 5100
Per Site 4420
Per Site 3740
Per Site 7820
Scope79 - HIGH CAPACITY MW INSTALLATION WITH ECI MUX OR AXX OR TRAFFIC NODE – (2 Days)-Without battery bank and SMPS
Scope 80 - DISMANTLING OF BTS &ML – (1 Day)-Without battery bank and power plant
Scope 81 - Dismantle of ML hop (0.6m) – (0.5 Day)-Without battery bank and power plant
Scope 82 - Dismantle of ML hop (1.2m) – (0.5 Day)- Without battery bank and power plant
Scope 83 - INSTALLATION OF BTS (2 RBS CABINETS)& ML HOP - (4 Days) Without battery bank and SMPS
Scope 84 - INSTALLATION OF BTS (2 RBS CABINETS) – (3 Days) Without battery bank and SMPS
Scope 85 - INSTALLATION OF RBS 2111 – (1.5 Days)-Without battery bank and UPS
Scope 86 - INSTALLATION OF RBS 2111 with Mini Link – (2 Days) -Without battery bank and UPS
Scope 87 - INSTALLATION OF RBS 2111(Two cabinets) – (2 Days)Without battery bank and UPS
Scope 88 - INSTALLATION OF RBS 2* 2111 with Mini Link – (3 Days) Without battery bank and UPS
Scope 89 - INSTALLATION OF AXX 9100/9200 – (1 Day) Without battery bank and power plant
Scope 90 - INSTALLATION OF AXX 9300 – (1.5 Day) Without battery bank and SMPS
Scope 91- SWAP OUT OF MACRO BTS WITH 2308/2309 (Micro) – (1 Day) Without Battery Bank and SMPS
Scope 92 - INSTALLATION OF BTS (With Antenna Mounts) - (2 Days) Without battery bank and SMPS
Scope 93 - Implementation of Node B (Only) (WCDMA) – (2 Days) Without battery bank and SMPS
Scope 94 - Implementation of Node B with Mini Link (WCDMA) – (3 Days) Without battery bank and SMPS
Scope 95 - INSTALLATION OF OUTDOOR BTS 2954/ 2974 Enclosure(having one cabinet with maximum capacity of 4+4+4) with ML(1+0) – (2.5 Days)
Scope 96 - INSTALLATION OF OUTDOOR BTS 2954/2974 enclosure only(having single RBS cabinet with a maximum capacity of 4+4+4) – (1.5 Day)
Scope 97- INSTALLATION OF 2954/2974 Enclosure (having 2 BTS CABINETS) with ML HOP(1+0) - (4 Days)
Per Site 7140
Per Site 3740
Per Site 3740
0
Per Site 2160
Per Site 2816
Per Site 5168
Per Site 8568
Per Site 6698
Per Site 8568
0
Per Site 2112
Per Site 2816
0
Per Site 2112
Per Site 2816
Per Site 2816
Per Site 3168
0
A) I&C done by other ASP Per Site 1000
B) I&C done by self Per Site 800
0
Scope 98 - INSTALLATION OF 2954/2974 Enclosure (having 2 BTS CABINETS) only – (3 days)
Scope 99 - Swapping of Nokia/Motorola outdoor with Ericsson 2974/2954 enclosure (having one cabinet with maximum capacity of 4+4+4
Scope 100 - Expansion in 2974 BTS enclosure from one cabinet with 4,4,4 configuration to 6,6,6/8,8,8 configuration
Scope101 - Replacement of 2202 cabinet with 444 config & Expansion upto 888 with (900+1800) RBS 2206/2964-3 days
A) REPLACEMENT OF BTS 2202 WITH BTS 2206/2964 INDOOR- (1 Day)
B) 1800 SITE (CO-located WITH 900), Multi Band CELL (MBC)–(2 Days)
Scope102 - INSTALLATION OF OUTDOOR BTS 2954/2974 Enclosure(having one cabinet with maximum capacity of 4+4+4) with ML(1+1)
Scope 103 - INSTALLATION OF OUTDOOR 2954/2974 Enclosure (having 2 BTS CABINETS) with ML HOP(1+1)
Scope 104 - Implementation of BTS & ML(1+1) site (GSM/WCDMA)-3 Days
Scope 105 - INSTALLATION OF BTS (2 RBS CABINETS)& ML HOP(1+1)
Scope 106 - Swapping of Nokia BTS cabinet with 444 config & Expansion upto 666/888 with (900+1800) RBS 2206/2964-3 days
A) REPLACEMENT OF Nokia BTS with BTS 2206/2964 INDOOR- (1 Day)
B) 1800SITE(CO-located WITH 900),Multi Band CELL(MBC)– (2 Days)
Scope 107 - Swapping of Nortel/Nokia BTS cabinet with 444 config & Expansion upto 666/888 with (900) RBS 2206/2964
A) REPLACEMENT OF Nortel/Nokia BTS with BTS 2206/2964 INDOOR- (1 Day)
B) BTS Expansion (4,4,4 to 6,6,6/888) - (1.5 Days)
Scope 108 - Swapping of Nortel/Nokia BTS cabinet having config of 444 to 444 with RBS 2206/2964
Scope 109 - Swapping of Nortel/Nokia BTS (with Mini-Link De-installation cabinet having config of 444 to 444 with RBS 2206/2964
Scope 110 - Scope of work of a BTS Tester (Not to be Used)
Scope 111 - Replacement of 2202 cabinet with 444 config & Expansion upto 888 with RBS 2206/2964-(900 or 1800)
Per Site 2112
Per Site 2464
Per Hop 1200
Per Hop 1000
Per Site 4420
Per Site 2816
Per Site 3520
Per Site 3590.4
Per Site 4216
Per Site 3696
Per Site 4250
Per Site 5270
Per Site 3696
Per Site 1400
Per Hop 2464
Per Hop 2816
Per Site 1600
Per Site 1920
Per Site 1200
A) REPLACEMENT OF BTS 2202 WITH BTS 2206/2964 INDOOR- (1 Day)
B) Expansion from 444 to 666/888
Scope 112 - PDH Hop upgrade from 4*2 TO 16*2 & 1+0 to 1+1 configuration
Scope 113 - PDH TO SDH HOP UPGRADE with 1+0 configuration
Scope 114 - Swapping of Nokia/Motorola outdoor with Ericsson 2974/2954 enclosure (having two cabinets with maximum capacity of 8+8+8)
Scope 115 - Swapping of Motorola micro cabinet with 2111 BTS
Scope 116 - Swapping of Motorola micro cabinet with 2111 BTS(double cabinet )
Scope 117 - Swapping of Motorola/Nokia BTS cabinet with one/two RBS 2964 having maximum configuration of 888
Scope 118 - Swapping of Motorola BTS cabinet with RBS 2964( Three/four cabinets)
Scope 119 - Swapping of Nortel/Nokia BTS (with Mini-Link Dismantling &new Minilink hop installation cabinet having config of 444 to 444 with RBS 2206/2964
Scope 120- Nokia/Nortel swap 444 with RBS 2974 with Minilink dismanteling, Battery bank & SMPS swap and new Ericsson MW hop installation
Scope 121 - Nokia/Nortel Swap 444 to 444 with RBS 2206/2964 + expansion upto 888 in 900+1800 (MBC) config with Minilink de-installation and new Ericsson Minilink HOP Installation
Scope 126 -Implementation of BTS (GSM/WCDMA) – 2 Days-Without battery bank, SMPS & GSM Antennas installation
Scope 127 -De-installation of BTS 2111 (1 to 2) MU and RRU's without Battery, SMPS & MW – 1 Day Unit Rate 3500/- Per Site
Scope 128 -Microwave hop Installation (1.2 meter), one antenna each at both ends, 1+0 0r 1+1) on access site.
Scope 129 -Microwave hop Installation (1.8 meter), one antenna each at both ends, 1+0 0r 1+1) on access site.
Scope 134 -BTS Integration & Acceptance Testing (H/O) to Custoemr/Ericsson (Site Installed by Self)
Scope 135 -Integration & Acceptance Testing (H/O) to Custoemr/Ericsson (Site Installed by other ASP)
Scope 136 -Acceptance Testing (H/O in case of Prvate Operators) (Site Installation and Integration done by other ASP)
Per Site 1000
Scope 137 -MW Integration & Acceptance Testing (H/O) to Custoemr/Ericsson (Site Installed by Self)
Sl.No Description unit Division Item unit1 Core Equipment Installation Scenario
1.1 per Rack 3400
1.2 per Rack 3400
1.3 Cable Tray Installation at Core Room per Meter 16
1.4 DDF RACK Installation per Rack 800
1.5 ODF Rack Installation per Rack 800
2 BTS Installation Scenario 0
2.1 per Site 800
2.2 per Site Site
2.3 per Site 5600
2.4 per Site 4000
2.5 per Site 2000
2.6 per Sector 720
2.7 per Sector 360
2.8 per Site 800
2.9 per Site 800
2.10 per Site 640
2.11 Grounding Testing per Site 400
2.12 BTS Expansion per Site 2800
2.13 BTS Swapping per Site 4800
2.14 GSM Antenna change over. Per Sector 720
2.15 Realignment of Existing hop Per Sector 1120
2.16 MW ODU replacement Per Rack 600
Target price 2010
Server Rack (MSC,MGW,BSC,NGN,UMS,MSG,SS1,HLRe,OMC) Installation With cabling, Routing, Connectivity & Terminations
Switch Rack (MSC,MGW,BSC,NGN,UMS,MSG,SS1,HLRe) Installation With Cabling, Routing, Alarm Box, Connectivity & Terminations
BTS Site Survey, providing Site Survey detail report along with as built drawings / Engineering Site Survey
BTS Indoor Installation, Commissioning, Integration & ATP Sign-Off
BTS indoor Installation (only Indoor installation and Cabling work, no commissioning and no AT work)
BTS Indoor +Outdoor Installation, Commissioning, Integration & ATP Sign-Off
MBTS/BBU Site Indoor Installation and RFS/RRU Tower Top Mounted (Optical cable &Power Cable Routing, No Feeder cable)
BTS Outdoor Installation (Hoisting of 3 Antennas, Connectivity & Routing of Feeder Cables)(without cable tray)
BTS Outdoor Installation (Hoisting of 1 Omni-Antenna, Connectivity & Routing of Feeder Cables)
Installation of Antenna Pole or RRU or MW Pole
VSWR&DFT Measurement at site with data recording (provided soft copy of data) ,Testing Meter Provide by Vendor
Power Calibration Only, Power Meter Provide by Vendor
RRU to BBU Optical Cable Power loss Measurement
2.17 MW Hop up gradation from 1+0 to 1+1 Per Hop 1200
2.18 Per Meter 20
3 MW Scenario
3.1 per Hop 2800 Hop
3.2 per Hop 3600 Hop
Hop
3.3 per Hop 4800 Hop
4 Power Equipment Scenario
4.1 per Set 720
4.2 per Set 1000
4.3 per Set 720
4.4 per Set 1120
4.5 per Set 1520
4.6 per Set 1520
4.7 per Set 1920
4.8 per Set 2320
4.9 per Set 3120
4.1 per Set 1120
4.11 per Set 1520
4.12 per Set 1520
5
5.1 per Rack 1120
Replacement of Feeder cable with connectorization, weather proofing and earthing.
Microwave Installation, Commissioning, Integration &AT(Diameter<=0.6m)
Microwave Installation ( Diameter <=.6m)
Microwave Installation, Commissioning &AT(Diameter<=1.2m)
Microwave Installation ( Diameter <=1.2m)Microwave Commissioning & Integration ( Diameter <=1.2m)
Microwave Installation, Commissioning &AT(Diameter<=2.1m)
Microwave Installation ( Diameter <=2.1m)
BTS Power Plant(SMPS) Installation, Commissioning & ATP Sign-off
Core Room Power Plant(SMPS) Installation, Commissioning &ATP Sign-off(Capacity of power plant)
ZTE - Battery Bank Installation, Commissioning (240 AH) with ATP
BTS - Battery Bank Installation, Commissioning (240 ~ 500AH) With ATP
BTS - Battery Bank Installation, Commissioning (600 AH) With ATP
BTS - Battery Bank Installation, Commissioning (800 AH) With ATP
BTS - Battery Bank Installation, Commissioning (1000 AH ~ 1500AH) With ATPCore Room -Battery Bank Installation, Commissioning (1600 AH ~ 3000AH) With ATP(Core Room )Core Room -Battery Bank Installation, Commissioning (3000 AH Plus) With ATP(Core Room )
UPS and Battery(Internal) Installation& Commissioning &AT With Accessories &Terminals (Capacity <= 10KVA )
UPS and Battery(Internal) Installation& Commissioning &AT With Accessories &Terminals (Capacity <= 20KVA )
UPS and Battery(Internal) Installation& Commissioning &AT With Accessories &Terminals (Capacity <= 30KVA )
De-installation Scenario ZTE MSC /MGW/BSC/NGN/UMS/MSG/SS1/ Server Rack De-installation(All AC Server Rack) With Accessories & Terminals(With out material)
5.2 per Rack 1120
5.3 DDF RACK De-installation per Rack 360
5.4 ODF Rack De-installation per Rack 360
5.5 per Site 1120
5.6 per Site 1520
5.7 per Sector 360
5.8 per Site 1120
5.9 per Site 1520
5.10 per Site 1920
5.11 per Site 360
5.12 per Set 360
5.13 per Set 400
5.14 per Set 720
5.15 per Set 720
5.16 per Set 1320
5.17 per Set 1720
5.18 per Set 2320
5.19 per Set 2320
6
6.1 per Site 1920
6.2 per Site 720
6.3 per Site 720
6.4 per Site 1520
6.5 per KM 6
Additional
7.1 480 Sector
7.2 320 Sector
7.3 400 Each Visit
7.4 600 Site
ZTE MSC /MGW/BSC/NGN/UMS/MSG/SS1/ Switch Rack De-installation(All DC Switch Rack) With Accessories & Terminals
De-installation of BTS(Indoor only) With Accessories (Exclusive of Feeder Cable & Antenna's)De-installation of BTS(outdoor only) With Accessories ( Feeder Cable & Antenna's)De-installation of Hoisting 1 Antenna Poles Hoisting De-installation of Existing MW & other Accessories (Inclusive of Feeder Cable & Antenna) (Antenna Diameter<=0.6m)De-installation of Existing MW & other Accessories (Inclusive of Feeder Cable & Antenna) (Antenna Diameter<=1.2m)De-installation of Existing MW & other Accessories (Inclusive of Feeder Cable & Antenna) (Antenna Diameter<=2.1m)De-installation of Existing MW & other Accessories (Exclusive of Feeder Cable & Antenna) only IDU' De-installation of Existing SMPS & other Accessories Battery Bank De- Installation (240AH) with cable & AccessoriesBattery Bank De- Installation (240 ~500AH) with cable & AccessoriesBattery Bank De-Installation (600 AH Plus)with cable & AccessoriesBattery Bank De- Installation (800AH) with cable & AccessoriesBattery Bank De- Installation (1000 ~ 1500AH) with cable & Accessories
Battery Bank De-Installation (1600~ 3000AH ) with cable & Accessories
Battery Bank De-Installation (3000AH Plus)with cable & Accessories
Transportation Scenario Supply of Wooden Boxes & Packing Materials - - (BTS-12mm Plywood Box, Wrapping up with Bubble Sheet, Rapper sheet & Thermo coal Packing inside Box.)
Packing of BTS including Loading & Unloading(at Site& Warehouse)
Transportation from Site to WH up to 100Km (Based One way distance)
Transportation from Site to WH up to 200Km (Based One way distance)
Transportation from Site to WH above 200Km (Based One way distance)
Feeder Installation(RF Cable Installation, connectoriztion, weatherproofing, labelling, earthing & routing of feeder cable , Excluding Antenna)Antenna Installation(Excluding feeder)
On Site Charge(Extra No of times)
Board expansion(Card Exchange)
7.5 340 Sector
7.6 220 Sector
0 Microwave
7.7 3300 Hop
7.8 1980 Hop
7.9 1320 Hop
7.10 1120 Upgradation of IDU Hop
7.11 1300 Upgradation of ODU Hop
7.12 200 TMA De-Installation Nos.
7.13 600 Duplexer Installation Nos.
7.14 400 TMA Installation Nos.
0 Transportation
7.15 1960 Site
7.16 1400 Site
7.17 2200 Site
7.18 2320 Site
7.19 2200 Site
7.20 1400 Site
7.21 1600 Site
7.22 2400 Site
Feeder De-Installation(Deinsrtallation of RF Cable, connectors, weatherproofing, labelling, earthing, provide packing list and packaging, Excluding Antenna)Antenna De-Installation(Excluding feeder)
Microwave Installation ( Diameter >2.1m)Commissioning & Integration ( Diameter Microwave AT ( Diameter >2.1m)
Supply of Wooden Boxes & Packing Materials (BTS-12mm Plywood Box, Wrapping up with Bubble Sheet, Rapper sheet & Thermo coal Packing inside Box.)
Supply of Wooden Boxes & Packing Materials ( Accessories-12mm Plywood Box, Wrapping up with Bubble Sheet, Rapper sheet & Thermo coal Packing inside Box.)Supply of packing Material for Rack / Bay/ OLA without Cards (Wrapping with Stretch Wrapping Film 23 micron, 2 ply Corrugate sheet 140 GSM & 20 BS )Supply of packing Material for Rack / Bay/ OLA without Cards (Wooden / Ply Box- Pelletize Base 3" x 3 " wooden leg, 4" x 1" Wooden plunks for Frame, and 18 mm Ply at all 6 side. )
Supply of packing Material for Electronic Cards (Wrapping with Stretch Wrapping Film 23 micron, 2 ply Corrugate sheet 120/ 140 GSM & 17/ 20 BS, 20 / 25 mm Thermacole at all six side of Cartons & 5 Ply Cartons .
Supply of packing Material for Electronic Cards (Wooden / Ply Box- 4" x 3/4" Wooden plunks for Frame and 12mm Ply at all 6 side.)
Supply of packing Material for Electronic Cards ( 10 -12 cards are being packed in one carton box & carton box to be packed in Wooden / Ply)Supply of packing Material for Rack / Bay/ OLA with Cards (Wrapping with Stretch Wrapping Film 23 micron ( Double), 3 ply Corrugate sheet 140 GSM & 20 BS, 25 -30 mm Thermacole sheet at all six side.)
7.23 2320 Site
7.24 320 Site
7.25 200 Site
7.26 720 Site
7.27 720 Site
0 Other Items for RFI
7.28 400 Floor
7.29 960 Floor
7.30 1200 Floor
0 Special AT
7.31 1800 Site
0 BSC/MSC HI & SC
7.32 2400 PDF Installation Site
Supply of packing Material for Rack / Bay/ OLA with Cards Wooden / Ply Box- Pelletize Base 3" x 3 " wooden leg, 4" x 1" Wooden plunks for Frame, and 18 mm Ply at all 6 side.Packing of BTS/MSC /MGW/BSC/NGN/UMS/MSG/SS1/ Server Rack (at Site& Warehouse)
Packing of BTS/MSC /MGW/BSC/NGN/UMS/MSG/SS1/ Server Rack's Accessories (at Site& Warehouse)
Loading & Unloading of BTS/MSC /MGW/BSC/NGN/UMS/MSG/SS1/ Server Rack (at Site & warehouse)
Loading & Unloading of BTS/MSC /MGW/BSC/NGN/UMS/MSG/SS1/ Server Rack 's Accessories (at Site & warehouse)
Labour charges for Unloading and shifting BTS/BSC/MSC/MGW/Server Rack, RF & Antenna, SMPS, BB and other items from site to up to 3 Floor
Labour charges for Unloading and shifting BTS/BSC/MSC/MGW/Server Rack, RF & Antenna, SMPS, BB and other items from site to up to 8 FloorLabour charges for Unloading and shifting BTS/BSC/MSC/MGW/Server Rack, RF & Antenna, SMPS, BB and other items from site to above 8 FloorSystem AT for Govt. Operator
3600.0
ZTE Target Price(INR)
80
28003600
0
48000
0
0
0