覆銲簡報
-
date post
16-Jul-2015 -
Category
Documents
-
view
15 -
download
0
Transcript of 覆銲簡報
98
7
8
1
1. 2. 3. 4.
2
DMW PZR SA508 CL2 RCS SA182 GR316 RCS RPV
3
DMW safe end
4
DMW 82/182 buttering (DMW)
5
DMW
6
(DMW)
Safe End
DMW
Nozzle7
SCC IGSCC
8
PWSCC ( 326 82/182 PWSCC SCC ) ( ( ) )
9
DMW (DMW)
spray nozzle X 1 Safety nozzles X 3 Relieve nozzle X 1 Surge line nozzle X 1 / X6
RPV
10
PWSCC 1980 Palo Verde PWSCC TMI-1
11
PWSCC 1980 Palo Verde PWSCC TMI-1
12
PWSCC
2000 2003 PWSCC
82/182
13
PWSCC 2004 5 NRC Bulletin 2004-01 Alloy 82/182/600 MRP-139 /
2005
14
PWSCC 2006 10 Wolf Creek
safety/relief/surge
2007
Duane Arnold
15
PWSCC NRC nozzle configuration (LBB, leak before break)
16
PWSCC NRC PWR 2007 RCS
/
RPV
17
PWSCC PWR (MRP-139) (MRP169) alloy 600 under pwscc conditions PWSCC
18
OVL Structure Weld Overlay Full
2009-2012 17 NDT 18 19 20
2013-2020 21 22 23 24
19
WSI
IGSCC
20
21
WSI
(1109.14) (1109.10)
22
23
10CFR50 ASME B&PV CODE Section XI Division 1 IWA-1400 IWA-1400(f) possession of an arrangement with an Authorized Inspection Agency to provide inspection services;
IWA-1400(j) performance of repair /replacement activities in accordance with written programs and plans;
24
OR (Repair weld overlay, RWOL) (preemptive weld overlay, PWOL) PSI PST,
,
25
OR
IWA-4150
IWA-4110(b) IWA-4150 MRP-169
N504 Sec XI Appendix Q N638Sec XI Appendix VIII PDI
PSI PST
IWA-4530
IWA-453026
(1) ASME Sec. XI IWA-4000 Repair/Replacement Activities IWA-4110(b) SCOPE CC / /
27
Sec. XI IWA-4000 Repair / Replacement (repair) -> PWSCC (replacement) / (modification) -> (alteration)
PWSCC
28
IWA-4110 1. (discrepancies detected during inservice inspection, maintenance, or service) (regulatory requirements change) (design changes to improve equipment service) (changes to improve reliability) (personnel exposure) (economics) (end of service life) (addition of new items or systems)29
2. 3. 4. 5. 6. 7. 8.
Sec. XI IWA-4000 R/R Authorized Nuclear inservice inspector (ANII) IWA-4170 INSPECTION The services of an Authorized Inspection Agency (AIA) shall be used.
30
IWA-4142 Repair/Replacement Organizations Quality Assurance Program The organization that performs repair / replacement activities shall establish a Quality Assurance Program for control of their activities in accordance with the Repair/Replacement Program and Plans.
31
IWA-4143 Stamping (a) Application of the ASME NPT symbol is neither required nor prohibited for the fabrication of parts, appurtenances, piping subassemblies, and supports to be used by the Owner when performed at the Owners facilities by a Repair/Replacement Organization with a quality assurance program that complies with IWA-4142. These provisions may not be used to manufacture complete pumps, valves, vessels, or tanks. (b) Application of the ASME NA symbol stamp is neither required nor prohibited for installation.
32
IWA-4150
(program)
(traveller)
33
IWA-4150
code case code case
34
IWA-4220 CODE APPLICABILITY
35
Code Cases
(Case)
Guides R.G. 1.147
Nuclear Regulatory
36
(defect) 4000 PWSCC Section XI IWA-
RPV PZR PWSCC
504-3
ASME CODE CASE N-
IWX-3640
37
IWB-3640 EVALUATION PROCEDURES AND ACCEPTANCE CRITERIA FOR FLAWS IN AUSTENITIC AND FERRITIC PIPING IWB-3514.1 analytical procedures the end of the evaluation period
38
CODE CASE N-504-3 (WPS) IWA-4000 0.035%
39
CODE CASE N-504-3
PT 1/16
40
Code Case N504 (RG1.147)
NRC
ASME Code, Section XI, Division 1, Nonmandatory Appendix Q Weld overlay repair of class 1, 2, and 3 Austenitic Stainless steel piping weldments
41
MRP-169 : Technical Basis for Preemptive Weld Overlays for Alloy 82/182 Butt Welds in PWRs
42
Nine Mile Point
1981 H
43
(PD)
44
UT U.S. nuclear utilities formed the Performance Demonstration Initiative (PDI) in 1991 ASME Code, Section XI, Division 1, Appendix VIII, Performance Demonstration for Ultrasonic Examination Systems. PDI 11 (Appendix VIII-3110)
45
Performance DemonstrationASME CODE SEC XI, Division 1, Appendix VIII
46
Dissimilar Metal Welds (PDI-UT-10) Overlay (PDI-UT-11)
47
1. Oxide Floaters : ( )
48
2. Hot Solidification Cracking ( 3. Ductility Dip Cracking
)
Ductility Dip Cracking (DDC) 52MSS)
(Alloy
49
4. Lack of Interbead Bonding : ) 5. Interface Fusion t ( NDT IF t 6. Interface Porosity
t )
(
50
Code Case N-638-4CLASS 1 GTAW( ) PWHT IWA-4400
IWA-4400
PWHT 1(a) CLASS 1 GTAW( ) 1~5 IWA-400051
CODE CASE N-740PZR IWA4410 IWA-4611 ( )
52
53
IWA-4440 (Repair / Replacement Organization RO)
(IWA-2110)
54
Code Case N504 NRC (RG1.147 Conditionally Acceptable) Sec. XI NONMANDATORY APPENDIX Q 4520, IWA-4530,
IWA-4420, IWAIWA-4600
55
3. /
NIS-2
56
80 82 82 84 93
1 11
1 15
The Hartford Steam Boiler Inspection & Insurance Company HSB
7 6 23
57
ANSI/ASME QAI-1-2005 Qualifications for Authorized Inspection AUTHORIZED INSPECTION AGENCIES(AIA) ANI( ANII( ) )
58
59
IWA-21101. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. / / / PSI ISI
investigation
60
61
NDT ( NDT
)
ASME Sec. XI Code Case N416-1
PST or PSI62
/
-> ->
-> Review (witness point) (Hold Point)
63
NIS-2 IWA-6210(e)
IWA-6210
The Owner shall prepare the Owners Report for Repair / Replacement Activity, Form NIS-2, upon completion of all required activities associated with the Repair/Replacement Plan. NIS-2
IWA-6210(f) The Owner shall submit Forms NIS-1 and NIS-2 to the Inspector and obtain the required signatures. NIS-1 NIS-2
64
Sec. XI IWA-6000 IWA-6230 SUMMARY REPORT PREPARATION IWA-6230(a) IWA-6230(c) (1) (2) (3) : NIS-1 NIS-2
65
66
mockup
67
mockup182/82 safe end
68
N-740 OR N-504 ASME IGSCC 90 4 N2C-J3 6 Code Case N-504-2 N-638-1 N-638-4 N-695 N2142-2 N-740 Code Case CODE N-638 N74069
N504-1
...
N-504Case N-504 N-504-1 Aug/9/93 RG 1.147 R14 RG 1.147 R15 August 2005 October 2007 Publish date Approved Approval by Date Remark Superseded Superseded Superseded
N-504-2 Mar/12/97 N-504-3 N-504-4 Aug/4/04 Jul/10/07
70
SEC XI OR III
71
SEC XI OR III
2007
72