5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _...

10
TORONTO 5200 YONGE STREET RETAIL FOR LEASE

Transcript of 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _...

Page 1: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

TORONTO

5200 YONGESTREETRETAIL FOR LEASE

Page 2: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5
Page 3: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

Loca on: Yonge Street, just north of Empress

Size: Ground:Second:

11,000 sq.ft. (divisible)30,000 sq.ft. (divisible)

Net Rent: Ground:Second:

$65.00 per sq.ft.TBN- depending on size & location

Available: Summer 2018

» 102 commercial parking spaces available » 374 residential units above retail podium and several

thousand more existing/being developed in the immediate area

» Local area amenities include 8 million sq.ft. of offi ce space, 3 theatres, numerous restaurants and large format retailers

» Over 200 ft. of frontage onto Yonge Street » Ground and second fl oor have 22 ft. ceilings » Less than 5 minutes drive to HWY 401 » Building has underground access to the subway » Additional space available on the third fl oor if required

Loca on: Yonge Street, just north of Empres

Size: Ground:Second:

11,000 sq.ft. (divisible30,000 sq.ft. (divisible

Net Rent: Ground:Second:

$65.00 per sq.ft.TBN- depending on siz

Available: Summer 2018

» 102 commercial parking spaces available » 374 residential units above retail podium a

Property Highlights

Page 4: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

R

R

OR

R

R

R

R

R

G

G

G

G

G

G

G

G

O

O

O

O

RRRR

OO

O_ _ _ _ _

_

_

_

_

_

___

UP

UP

UP

AD

AD

ADAD

AD

AD

UP

DN

DN

UP

DN

DN

UP

UP

B

(L

T)

PART

1

1 00.52

1 82.57

6 4.78

9.06

91.55

CC

(1137)(P10,SET)2.01N

72°55'45"E

BTS

13.28

30.48

(P2,MEAS)

(P2,MEAS)

(P,SET)

P RO

PE RT Y

L INE

P RO

PE RT Y

L INE

L AN

EWA Y

YONGE STREET

PART 4, PLAN 64R-3774

P A R

PART

YONGE STREET

E-WAY

RIGHT-OF -WAY

G11 G10 G9 G8 G7 G6 G5 G4 G3G2 G1

GAGA

GBGB

GCGC

GDGD

GEGE

GFGF

GGGG

H

H

48 AT-GRADE BIKESPACES 50M SQ

ELEVATOR

ELEVATOR

STAIR C

EXIT CORRIDOR

VEST

IBUL

E

TRI-SORTERAND

COMPACTOR

VEST

IBUL

E

143 M SQ

CITYRETAIL

56 M SQ

ELEVATOR

ACCESS TO GARAGE, U/GLINK, 2ND FLOOR & 3RD

FLOOR COMMERCIAL

8 COMMERCIALVISITOR BIKES

F/A INTAKEGRATE MAXPOROSITY

20mmx20mm

F/A INTAKE,GRATE MAXPOROSITY

20mmx20mm

3200x1200FRESH AIR INTAKESHAFT C/W GRATING

SIAMESECONNECTIONS

DROP-OFF AREA.REFER TO NOTES FOR OBC

CONFORMANCE.GAS METER

EXHAUST

M.U

.A.

PIPE

ELEC

T.

FREIGHTELEVATOR

AREA:10M SQ

LOCATION OFSTEP IN GROUNDFLOOR SLAB

TYPE GLOADINGSPACE

TYPE BLOADINGSPACE

TYPE ALOADINGSPACE

GARAGEENTRY

LOADINGAREA

RES. MOVINGROOM

VEST.

MAIL ROOMW/C EXIT

CORRIDOR

UN-COMPWASTE

STORAGE

RES.GARBAGE

ROOM

COMM.GARBAGE

ROOMCOMM.

SERVICEELEV LOBBY

BICYCLEROOM

EXITCORRIDOR

FHC

SLOPE2m @ 5%

SLOPE4m @ 5%

SLOP

E3.

75m

@ 8

%

OUTLINE OFBUILDING ABOVE

175.45 FE

175.45 TOS

175.70 FE

175.70 FE

175.70 FE175.70 FE

175.45 FE

172.51 FE

175.45 FE

175.45 S

175.65 FE

175.45 FE

175.45 FE

175.35 FE

175.52 FE

175.50 FE

175.57 FE175.65 FE

SWITCHVAULT

MHMH

MH

MH

MHSTAIR E

MAIL PICK UP

STAIR A

COMMERICALENTRY

VESTIBULE

EntranceCanopy

STAIR D

FHC

PROPERTY LINE

PROP

ERTY

LIN

E

CACF TV/ TEL.ROOM

RECEPTION LOUNGEENTRY VEST.

RESIDENTIALLOBBY

NEW PRIVATEFIRE HYDRANT

FIRE

PLAC

E

MFS UNIT ACCESS

FHC

FHC

FHC

EXITCORRIDOR

GARBAGECHUTE ABOVE

FIREFIGHTERELEVATOR

SIAMESECONNECTIONS

45m TO FIRE HYDRANT

REFER TO NOTES AND DOOR SCHEDULEFOR AUTOMATIC ROLL UP DOOR

FIREFIGHTER ELEVATORTO BE PROTECTED VIA1HR ELEVATOR DOORSAND ASSOCIATEDCONTROLS

WET SPRINKLERRISER UP

WET SPRINKLERRISER BELOW

WET SPRINKLER RISERFROM BELOW

DRY SPRINKLER RISERFROM BELOW

FHC

WET SPRINKLER PIPERISER BELOW FORCOMMERCIAL SPACE

SV

SV

SV

SVSV

FSP #1

SV

FSP #2BELOW

FSP #2 UP

FSP #4 UP

FSP #3BELOW

FSP #4 BELOW

WET SPRINKLER PIPERISER FOR CITY RETAIL

FSP #1 PIPE RISERBELOW & UP

2HR. F.R.E.REFER TONOTES.

2HR F.R.E. REFER TO NOTES.

700X650 PRESS.RELIEF DUCT UPIN 2HR F.R.E.

400X350 F.A. DUCTFROM ABV & 250X250F.A. DUCT DN. C/W F/D

1000X1000 EXH.DUCT C/W/ F/D

700X650 PRESS.RELIEF DUCTIN 2-HR. F.R.E

175.60 FE

175.60 FE

178.55 FE

175.50 FE

175.45 FE

175.40 FE

175.45 FE

175.50 FE

175.50 FE175.50 FE

SLOPE2m @ 5%

175.50 FE

175.50 FE

175.45 FE

ELECTRICALROOM

175.70 FE

175.35 TOS

175.35 TOS

175.35 TOS175.55 TOS

RESIDENTIALVESTIBULE

FHC

2000 x 1000EXHAUST LOUVREIN SOFFIT

1600 x 600 EXHAUSTLOUVRE IN SOFFIT

700 x 300 EXHAUSTLOUVRE IN SOFFIT

1150 x 1150EXHAUST LOUVREIN SOFFIT

400x200 EXHAUSTLOUVRE

300x200 INTAKELOUVRE

C1

C1

C1

ISOLATED FLOOR PAD

MAIL ROOM

EXTENT OFHEATINGCABLES

PERFORATEDMETAL SOFFITFOREXHAUSTS

GRANIT WALL

RETAILAREA

5000 sq.ft.RETAILAREA

1500 sq.ft.

RETAILAREA

1500 sq.ft.

RETAILAREA

1500 sq.ft.

RETAILAREA

1700 sq.ft.

1 : 150RET

1

GROUND FLOOR retail1

YONGE STREET

12 3 4

5

Loading Bay

Commercial Garbage Room Access to Upper Floors and Parking

Freight Elevators

GROUND FLOOR | 11,200 SQ.FT.

1

1

2

2

3

3

4

4

855 sq.ft.

Page 5: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

SECOND FLOOR

YONGE STREET

UP

UPUP

UPDN

DN

DN

UP

UP

UP

UP

UP

DN UP

DN

2 HR2 HR2 HR

2 H

R2

HR

2 H

R2

HR

2 HR2 HR

2H

R2

HR

2H

R2

HR

2 HR2 HR2 HR2 HR2 HR

2H

R2

HR

2H

R

2 HR2 HR2 HR2 HR

2H

R2

HR

2H

R

2 HR2 HR

2H

R

2 HR

2H

R2

HR

2H

R

2H

R2

HR

2H

R2

HR

2 HR2 HR2 HR

2 HR2 HR2 HR2 HR2 HR2

HR

2H

R2

HR

2H

R2

HR

2H

R2

HR

2H

R

2H

R2

HR

2H

R2

HR

2H

R2

HR

2H

R2

HR

2 HR

1 HR1 HR

1 HR

1H

R1

HR

2 HR2 HR2 HR2 HR2 HR2 HR

2H

R2

HR

2H

R2

HR

2 HR2 HR2 HR2 HR2 HR

2 HR2 HR2 HR2 HR2 HR2 HR2 HR

2 HR2 HR2 HR2 HR2 HR2 HR2 HR2 HR

2 HR

2H

R

2H

R1.

5H

R

2 HR2 HR2 HR2 HR2 HR

2H

R

1 HR

1H

R1

HR

1H

R

2 HR2 HR2 HR

2H

R2

HR

2H

R

2 HR2 HR2 HR

2H

R2

HR

2H

R

2 HR2 HR

2H

R2

HR

2H

R

2H

R2

HR

2H

R2

HR

2H

R2

HR

2H

R2

HR

2H

R

2 HR2 HR2 HR2 HR2 HR2 HR2 HR2 HR

2 HR

1 HR1 HR1 HR1 HR1 HR1 HR1 HR

2 HR 2 HR

2H

R2

HR

2H

R2

HR

2H

R2

HR

2H

R2

HR

2H

R

2 HR2 HR2 HR

2 HR2 HR2 HR

G2

COMMERCIALSPACE

COMMERCIALSPACE OUTDOOR

AREA2400 sq.ft.

ELEVATORS

ELEVATORS PIPE

M.U

.A.

GARBAGECHUTE

FREIGHTELEVATOR

ELEVATOR

COMMERCIALSPACE

COMMERCIALSPACE

STAIR E

2ND FLOORCOMMERCIAL

SPACE2845m2/30,620sf

STAIR B & C

FHC

FHC

FHC ELEC

.

182.06 S

181.96 S181.96 S

182.06 S182.06 S

182.06 S

182.06 S

182.06 S

182.31 S

182.31 S

182.31 S

182.31 S

182.31 S

182.31 S

182.31 S

182.31 S

182.31 S

STAIR D

PROPERTY LINE

FIREFIGHTERELEVATOR

FHC

FIREFIGHTER ELEVATOR TOBE PROTECTED VIA 1HRELEVATOR DOORS ANDASSOCIATED CONTROLS

FIREFIGHTERELEVATOR

FSP #3 BELOW

FSP #3 UP

FSP #4 UP

WET SPRINKLERPIPE RISER UP

WET SPRINKLER PIPE RISER BELOWSV

SV

SVWET SPRINKLERPIPE RISER UP

FSP #1

FSP #2

FIREFIGHTER ELEVATOR TOBE PROTECTED VIA 1HRELEVATOR DOORS ANDASSOCIATED CONTROLS

625x400 DUCTDN C/W F/D

FREIGHTELEV.

CONTROLROOM

FHC

UNIVERSALWASHROOM

UNIVERSALWASHROOM

STAIR A

DAY CAREAREA

12000 sq.ft.

COMMONAREA

2300 sq.ft.

AREA15600 sq.ft.

Anchor 2

Anchor 1

This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”). The information set out herein, including, without limitation, any projections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verifi ed by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE. CBRE and the CBRE logo are the service marks of CBRE Limited and/or its affi liated or related companies in other countries. All other marks displayed on this document are the property of their respective owners. All Rights Reserved.

Page 6: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

9,850 SF

THIRD FLOOR

P1 LEVEL

Page 7: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

Underground Parking Entrance

Page 8: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

Subject Property Subway Sta ons

5200 YONGE STREET | AREA OVERVIEW

1

2

Condominium Developments in the Immediate Area# Development Status New

Units1 Kenneth & Holmes Pre-Construc on 29

2 Diamond Condominiums Pre-Construc on 386

3 Ellie Condos Pre-Construc on 285

4 4800 Yonge Street Pre-Construc on 536

5 Hullmark Centre Recently Complete 684

6 Emerald Park Recently Complete 450

7 55 Sheppard Ave W Pre-Construc on 152

8 88 Condos Recently Complete 371

9 Flo Condominiums Recently Complete 65

3

4 5

6 9

7 8

55

5200 YONGE STREET

• Steps from North York Centre Subway Station and walking distance to both Sheppard and Finch Stations

• 7 minute drive to HWY 401 Express

DEMOGRAPHIC SNAPSHOT 0-1 KM 0-3 KM 0-5 KM

Total Population 2015 Estimate 41,458 156,605 346,992

2020 Projected Population 43,038 167,021 368,612

Average Household Income $79,635 $96,154 $114,425

TOTAL DAYTIME POPULATION 43,999 141,691 320,663

% Pop. Change (2010-2015) 7.2% 10.1% 7.5%

% Pop. Change (2015-2018) 2.2% 3.9% 3.6%

Page 9: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

CONSTRUCTION PROGRESS PHOTOS

CONSTRUCTION HAS BROKE GROUND

Page 10: 5200 YONGE STREET - LoopNet...R R O R R R R R R G G G G G G G G O O O O R R R R O O O _ _ _ _ _ _ _ _ _ _ UP UP UP AD AD AD AD AD UP DN DN UP DN DN UP UP B (L T) P A R T 1 1 0 0. 5

Jackson Turner Sales Representa ve

416 815 [email protected]

*Sales Representa ve

Arlin Markowitz* Senior Vice President

416 815 [email protected]

Alex Edmison* Vice President416 874 7266

[email protected]

For More Informa on Please Contact:

www.sorbara.comwwwsorbara com