    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

    INP!"#I$N R!%: $n 3'16'16( the "')01 *t+ospheric "olu+n ,as

    su-.ected to a or+al eternal Visual Inspection per *PI )10 "ode

    reuire+ents #he ollo,in inor+ation details the 4ndins durin this

    Inspection

    EXTERNAL COMPONENTS:

    5!*: #he top head is ully insulated and the .ac7etin type is +astic #he

    top head has da+aed areas ,ith eposed chic7en ,ire ,hich is suscepti-le

    to +oisture inress #he -otto+ head is ully insulated and is inside the

    8essel s7irt

    5!&&: #he shell is ully insulated and is only 8isi-le throuh the %#

    inspection port holes and at the da+aed/+issin insulation areas #he shell

    8ie,ed throuh the %# port holes re8ealed +oderate to hea8y acti8e "%I

     #he accessi-le areas o the shell re8eal scalin up to 3/169 ,ith pittin up

    to 0309 3rd Plator+ ro+ top on the north side; #he insulation is o8erall in

    poor condition

  • 8/19/2019 510 External C-501 Report

    2/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

    B$$# ? B$$# 5!*: N/*

    N$@@&!: #he no>>les appear to -e in air ser8icea-le condition ,ith

    +oderate to hea8y acti8e eternal corrosion and scale -uild up e8eral

    telltale no>>les loo7 to -e 4lled ,ith de-ris ,hich is a possi-le indication o a

    past lea7 in the internal clad linin( or at the internal linin support pad seal

    ,eld

    %PP$R#: #he dec7in supports appear to -e in o8erall air condition ,ith

    liht paint ailure and liht corrosion noted #he 8essel supports appear to -e

    in air condition ,ith liht acti8e eternal corrosion noted

    *N"5$R B$: *nchor -oltin is in air condition ,ith liht to +oderate

    acti8e eternal corrosion and scale -uild'up noted

    &*!R ? P&*#A$RM: *ll ladders( dec7 railins( and plator+s appear to

    -e in o8erall air condition ,ith the eception o the top plator+ ,hich has a

    -ro7en rail on the ,est side o the plator+ Minor coatin ailure is noted

    ,ith liht eternal corrosion *ll plator+ supports and -oltin hard,are are

    coated and appear to -e in air condition

    "$*#IN/P*IN# !#!RI$R*#I$N: N/* Aully Insulated

  • 8/19/2019 510 External C-501 Report

    3/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

    A&*N!: #he Cane -oltin appears to -e in air condition ,ith liht to

    +oderate acti8e eternal corrosion &iht to +oderate corrosion and scale

    -uild'up -et,een no>>le Canes noted #he +an',ays and co8er plates

    appear to -e in air condition ,ith liht to +oderate acti8e eternal corrosion

    and hea8y eternal scale -uild'up #he +an',ay da8its appear to -e in air

    condition ,ith liht to +oderate acti8e eternal corrosion and rustin

    A$%N*#I$N: #he oundation appears to -e in air condition ,ith so+e +inor

    crac7in and -ro7en edes around the -ase noted #he 8essel s7irt appears

    to -e in air condition ,ith +oderate crac7in o the eternal 4reproo4n

    R$%N: #he roundin ca-le is attached and secure and appears to -e in

    air condition

    R!&I!A V*&V!: PV erial D 622E2'*F et Press:

  • 8/19/2019 510 External C-501 Report

    4/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

    shell areas( +an,ays( ladder and dec7in supports due to deteriorated or

    +issin caul7in and insulation

    BI$&$I"*& R$H#5: Bioloical ro,th is noted at 8arious locations

    Recommendations:

    1; Build a ull circu+erence scaold and re+o8e 100= o the

    insulation and -last to peror+ a proper "%I inspection ee note 2

    i note 1 is not possi-le;2; Re+o8e insulation at suspect areas to e8aluate the etent o "%I3; Repair( seal( or replace the insulation as needed to properly protect

    the 8essel ro+ uture "%I

  • 8/19/2019 510 External C-501 Report

    5/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

  • 8/19/2019 510 External C-501 Report

    6/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

  • 8/19/2019 510 External C-501 Report

    7/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

  • 8/19/2019 510 External C-501 Report

    8/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00

  • 8/19/2019 510 External C-501 Report

    9/9

    BUCKEYE REFINING COMPANY 

    Pressure Vessel Inspection Report

    Inspected By: Month/Year: 03/2016

    Unit Number: #5 Crude  C-501 Atmospheric Column

    API 510 Certification Number:

    Ampx-API 510-e! 00